CN101691819A CN200910172315A CN200910172315A CN101691819A CN 101691819 A CN101691819 A CN 101691819A CN 200910172315 A CN200910172315 A CN 200910172315A CN 200910172315 A CN200910172315 A CN 200910172315A CN 101691819 A CN101691819 A CN 101691819A
Authority
CN
China
Prior art keywords
embedding
girder
kiln
anchor plate
pull bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910172315A
Other languages
English (en)
Other versions
CN101691819B (zh
Inventor
罗建中
曹源
童丽萍
刘瑞晓
杜健飞
曹云涛
郭强
张向东
刘奕
张勤
王先锋
朱瑞春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN PROVINCE CONSTRUCTION GROUP CO Ltd
Zhengzhou University
Original Assignee
HENAN PROVINCE CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN PROVINCE CONSTRUCTION GROUP CO Ltd filed Critical HENAN PROVINCE CONSTRUCTION GROUP CO Ltd
Priority to CN2009101723153A priority Critical patent/CN101691819B/zh
Publication of CN101691819A publication Critical patent/CN101691819A/zh
Application granted granted Critical
Publication of CN101691819B publication Critical patent/CN101691819B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Furnace Details (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本发明属于建筑加固技术领域,特别涉及一种生土窑居裂缝控制嵌梁加固系统及其施工工艺,它包括钢板、钢梁、拉杆及锚固板,钢板与钢梁固定连接后,构成嵌梁,拉杆两端设置有螺纹,嵌梁与锚固板通过拉杆连接,嵌梁左侧设置有刚性垫片,刚性垫片左侧用螺母固定,锚固板右侧设置有刚性垫片,刚性垫片右侧用螺母固定,整个嵌梁加固系统沿生土窑居的窑深方向,固定在窑顶的覆土层内,嵌梁包括钢板及钢梁,钢板与钢梁固定连接,钢梁的左侧设置有刚性垫片,刚性垫片与螺母之间设置有硬弹簧,本发明既方便实用、又具有较高耐久性和可操作性,它不但可以消除平行于窑脸的横向通缝引起的上部土体前倾倒塌危险,还可以抑制横向通缝的进一步发展。

Description

生土窑居裂缝控制嵌梁加固系统及其施工工艺
技术领域:
本发明属于建筑加固技术领域,特别涉及一种生土窑居裂缝控制嵌梁加固系统及其施工工艺。
背景技术:
生土窑居在建筑节能领域内占有重要位置。在当今全世界建筑界共同面对全球能源短缺和环境质量问题,积极寻找节能建筑形式和构造的过程中,生土窑居结构形式得到国内外众多学者和专家的青睐。生土窑居结构充分利用覆土的储热能力,白天气温较高时充分吸收热能,夜晚气温较低时再释放出来,具有天然的“冬暖夏凉”特征,是无需耗电的节能又环保的建筑结构形式。但生土窑居结构形式也具有自身结构上的一些缺点,如裂缝问题。在役窑居中往往会出现因四季交替温度应力循环而导致的平行于窑脸方向上的横向通缝。这类横向通缝通常出现于靠近窑脸1~3米的位置,很容易引起窑脸上部覆土的前倾式倒塌。在实地调研的过程中,众多居民都认为,窑洞内部一旦出现这样的横向通缝,就只好人为将其挖塌或任其倒塌,然后重新用土坯沿倒塌的面垒砌至窑顶地面。这样做不但破坏了生土窑居原有结构,也具有一定的危险性。本专利针对横向通缝进行加固处理,提出一种生土窑居的嵌梁加固系统。加固系统的研究不但能够为同类加固问题提供参考,而且对于我国传统窑居文化的保护具有重要意义。
不同于基坑支护问题中的抵抗土体的倾覆和滑移,生土窑居的加固系统只需要考虑前窑脸上部覆土的倾斜倒塌作用,因加固部位位于窑洞洞口上方,居民经常从下方经过,在进行加固设计时不但需要考虑加固系统自重,还需要着重考虑安全性问题。过于沉重的大尺寸的加固系统会严重破坏原有覆土层的承载能力,使得本已裂开的土体部分更加脆弱,加大倒塌的危险。如何设计出轻便实用,又对原状土体破坏较少的加固系统是一个难点问题。
发明内容:
综上所述,为克服现有技术的不足,本发明提供了一种生土窑居裂缝控制嵌梁加固系统及其施工工艺,它既方便实用、又具有较高耐久性和可操作性,该系统不但可以消除平行于窑脸的横向通缝引起的上部土体前倾倒塌危险,还可以抑制横向通缝的进一步发展。
为解决上述技术问题,本发明的技术方案是这样实现的:
一种生土窑居裂缝控制嵌梁加固系统,其中:它包括钢板1、钢梁2、拉杆6及锚固板8,钢板1与钢梁2固定连接后,构成嵌梁,拉杆6两端设置有螺纹,嵌梁与锚固板8通过拉杆6连接,嵌梁左侧设置有刚性垫片3,刚性垫片3左侧设置有硬弹簧5,硬弹簧5左侧用螺母4固定,锚固板8右侧设置有刚性垫片9,刚性垫片9右侧设置有硬弹簧10,硬弹簧10右侧用螺母11固定,整个嵌梁加固系统沿生土窑居的窑深方向,固定在窑顶的覆土层7内。
进一步,所述的拉杆6直径大于等于18mm。
进一步,所述的锚固板8或为钢筋混凝土板或为石板,其厚度为280~320mm。
生土窑居裂缝控制嵌梁加固系统的施工工艺,包括以及步骤:
第一步、搭设施工平台:
a、查找生土窑居中的通缝位置,判断其延伸范围,确认最易倒塌的土体范围;
b、根据判断的倒塌土体范围,选择合适的嵌梁嵌入点,并根据嵌入点搭设脚手架平台;
第二步、嵌梁加固前期施工:
a、制作嵌梁安装槽,依据嵌梁嵌入点位置和拉杆6前端至钢板1内侧的距离对覆土层进行开槽,开槽尺寸大小要能容下钢板1及钢板1左侧所有部件,并有少许余量;
b、制作拉杆孔,在选定的拉杆孔位置,由窑脸水平向内进行打孔,拉杆孔深度通常如下:
拉杆孔深度∈[1m,窑洞覆土厚度-1m]
拉杆孔的长度应不短于通缝位置向后3m左右,即:
由窑脸向内水平打孔长度≥窑脸至横向通缝的距离+3m;
c、制作拉杆槽,在形成的拉杆孔后部,沿拉杆孔延伸方向进行开槽,开槽的宽度只需使拉杆轻松穿过,开槽的深度低于拉杆的设置深度,开槽直至锚固板8预设位置;
d、制作锚固板安装槽,在锚固板8预设位置处,按照锚固板8的尺寸向下开槽,并预设手动操作空间;
第三步、嵌梁加固:
a、将钢梁2与钢板1进行焊接,形成嵌梁。在嵌梁相应位置设置小孔,以使拉杆穿过,并将嵌梁固定于嵌梁安装槽内;
b、将锚固板8安装于锚固板安装槽内;
c、在拉杆6的一端依次安装刚性垫片3、硬弹簧5和螺母4,抬起拉杆6的另一端,使其依次穿过嵌梁预设的小孔、覆土层前部的拉杆孔、覆土层后部设置的拉杆槽以及锚固板8;
d、在锚固板8右侧设置刚性垫片3,在刚性垫片3右侧安装硬弹簧5和螺母4,并拧紧;
第四步、嵌梁加固后期处理:
a、在覆土层后部的拉杆槽部分用土回填平整并夯实;
b、在窑脸上部嵌梁安装槽处采用草泥灰回填抹面,使表面平整。
本发明的有益效果为:
(1)解决了生土窑居前端上部土体的倾斜倒塌问题:窑居居民不必再采用任其倒塌然后修补的被动方法。
(2)加固系统嵌入部分轻便,对原状土的扰动较小,施工安全性较高。
(3)锚固两端采用硬弹簧施加预应力,使得整个系统适应于温度应力的循环变化,耐久性较高。
(4)整个系统水平方正,便于施工,同时也减少了对窑洞顶部覆土层的扰动。
(5)加固系统取材简单方便,充分利用前端嵌梁的作用力,增加钢板扩大作用面积,不但分散了作用于原状土的应力,而且更加有效地阻止了土体的前倾式坍塌。
附图说明:
图1为本发明的结构示意图;
图2为本发明图1的A-A剖视图;
图3为本发明图1中B的局部放大图;
图4为本发明图1中C的局部放大图。
具体实施方式:
下面结合附图对本发明作进一步的详细说明。
如图1、图2、图3、图4所示,嵌梁加固系统沿生土窑居的窑深方向,固定在窑顶的覆土层7内,嵌梁加固系统包括钢板1、钢梁2、拉杆6及锚固板8,钢板1与钢梁2固定连接后,构成嵌梁,拉杆6两端设置有螺纹,嵌梁与锚固板8通过拉杆6连接,嵌梁左侧设置有刚性垫片3,刚性垫片3左侧设置有硬弹簧5,硬弹簧5左侧用螺母4固定,锚固板8右侧设置有刚性垫片9,刚性垫片9右侧设置有硬弹簧10,硬弹簧10右侧用螺母11固定,拉杆采用直径为24mm的钢筋,拉杆6两端设置有螺纹,锚固板8采用钢筋混凝土板,其厚度为300mm,具体施工步骤为:
第一步、搭设施工平台:
a、查找生土窑居中的通缝位置,判断其延伸范围,确认最易倒塌的土体范围;
b、根据判断的倒塌土体范围,选择合适的嵌梁嵌入点,并根据嵌入点搭设脚手架平台,嵌入点的深度系指窑顶覆土层地面向下至嵌入点的距离,即以窑顶覆土层地表面为水平零点;
第二步、嵌梁加固前期施工:
a、制作嵌梁安装槽,依据嵌梁嵌入点位置和拉杆6前端至钢板1内侧的距离对覆土层进行开槽,开槽尺寸大小要能容下钢板1及钢板1左侧所有部件,并有少许余量;
b、制作拉杆孔,在选定的拉杆孔位置,由窑脸水平向内进行打孔,拉杆孔深度通常如下:
拉杆孔深度∈[1m,窑洞覆土厚度-1m]
拉杆孔的长度应不短于通缝位置向后3m左右,即:
由窑脸向内水平打孔长度≥窑脸至横向通缝的距离+3m;
c、制作拉杆槽,在形成的拉杆孔后部,沿拉杆孔延伸方向进行开槽,开槽的宽度只需使拉杆轻松穿过,开槽的深度低于拉杆的设置深度,开槽直至锚固板8预设位置,通常情况下,尺寸设置应符合以下表达式:
拉杆孔长度+拉杆槽长度≥拉杆长度>窑洞深度
拉杆槽深度≥拉杆孔深度≥拉杆设置深度
锚固板直径或宽度≥拉杆槽宽度≥拉杆孔直径
d、制作锚固板安装槽,在锚固板8预设位置处,按照锚固板8的尺寸向下开槽,并预设手动操作空间;
第三步、嵌梁加固:
a、将钢梁2与钢板1进行焊接,构成嵌梁。在嵌梁相应位置设置小孔,以使拉杆6穿过,并将嵌梁固定于嵌梁安装槽内;
b、将锚固板8安装于锚固板安装槽内;
c、在拉杆的一端依次安装刚性垫片3、硬弹簧5和螺母4,抬起拉杆6的另一端,使其依次穿过嵌梁预设的小孔、覆土层前部的拉杆孔、覆土层7后部设置的拉杆槽以及锚固板8;
d、在锚固板8右侧设置刚性垫片3,在刚性垫片3右侧安装硬弹簧5和螺母4,并拧紧;
第四步、嵌梁加固后期处理:
a、在覆土层后部的拉杆槽部分用土回填平整并夯实;
b、在窑脸上部嵌梁安装槽处采用草泥灰回填抹面,使表面平整。

Claims (4)

1.一种生土窑居裂缝控制嵌梁加固系统,其特征在于:它包括钢板(1)、钢梁(2)、拉杆(6)及锚固板(8),钢板(1)与钢梁(2)固定连接后,构成嵌梁,拉杆(6)两端设置有螺纹,嵌梁与锚固板(8)通过拉杆(6)连接,嵌梁左侧设置有刚性垫片(3),刚性垫片(3)左侧设置有硬弹簧(5),硬弹簧(5)左侧用螺母(4)固定,锚固板(8)右侧设置有刚性垫片(9),刚性垫片(9)右侧设置有硬弹簧(10),硬弹簧(10)右侧用螺母(11)固定,整个嵌梁加固系统沿生土窑居的窑深方向,固定在窑顶的覆土层(7)内。
2.根据权利要求1所述的生土窑居裂缝控制嵌梁加固系统,其特征在于:所述的拉杆(6)直径大于等于18mm。
3.根据权利要求1所述的生土窑居裂缝控制嵌梁加固系统,其特征在于:所述的锚固板(8)或为钢筋混凝土板或为石板,其厚度为280~320mm。
4.根据权利要求1所述的生土窑居裂缝控制嵌梁加固系统的施工工艺,其特征在于:它包括以下步骤:
第一步,搭设施工平台:
a、查找生土窑居中的通缝位置,判断其延伸范围,确认最易倒塌的土体范围
b、根据判断的倒塌土体范围,选择合适的嵌梁嵌入点,并根据嵌入点搭设脚手架平台;
第二步,嵌梁加固前期施工:
a、制作嵌梁安装槽,依据嵌梁嵌入点位置和拉杆(6)前端至钢板(1)内侧的距离对覆土层进行开槽,开槽尺寸大小要能容下钢板(1)及钢板(1)左侧所有部件,并有少许余量;
b、制作拉杆孔,在选定的拉杆孔位置,由窑脸水平向内进行打孔,拉杆孔深度通常如下:
拉杆孔深度∈[1m,窑洞覆土厚度-1m]
拉杆孔的长度应不短于通缝位置向后3m左右,即:
由窑脸向内水平打孔长度≥窑脸至横向通缝的距离+3m;
c、制作拉杆槽,在形成的拉杆孔后部,沿拉杆孔延伸方向进行开槽,开槽的宽度只需使拉杆轻松穿过,开槽的深度低于拉杆的设置深度,开槽直至锚固板(8)预设位置;
d、制作锚固板安装槽,在锚固板(8)预设位置处,按照锚固板(8)的尺寸向下开槽,并预设手动操作空间;
第三步,嵌梁加固:
a、将钢梁(2)与钢板(1)进行固定,形成嵌梁。在嵌梁相应位置设置小孔,以使拉杆穿过,并将嵌梁固定于嵌梁安装槽内;
b、将锚固板(8)安装于锚固板安装槽内;
c、在拉杆(6)的一端依次安装刚性垫片(3)、硬弹簧(5)和螺母(4),抬起拉杆(6)的另一端,使其依次穿过嵌梁预设的小孔、覆土层前部的拉杆孔、覆土层后部设置的拉杆槽以及锚固板(8);
d、在锚固板(8)右侧设置刚性垫片(3),在刚性垫片(3)右侧安装硬弹簧(5)和螺母(4),并拧紧;
第四步,嵌梁加固后期处理:
a、在覆土层后部的拉杆槽部分用土回填平整并夯实;
b、在窑脸上部嵌梁安装槽处采用草泥灰回填抹面,使表面平整。
CN2009101723153A 2009-09-28 2009-09-28 生土窑居裂缝控制嵌梁加固系统及其施工工艺 Expired - Fee Related CN101691819B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101723153A CN101691819B (zh) 2009-09-28 2009-09-28 生土窑居裂缝控制嵌梁加固系统及其施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101723153A CN101691819B (zh) 2009-09-28 2009-09-28 生土窑居裂缝控制嵌梁加固系统及其施工工艺

Publications (2)

Publication Number Publication Date
CN101691819A true CN101691819A (zh) 2010-04-07
CN101691819B CN101691819B (zh) 2011-01-19

Family

ID=42080528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101723153A Expired - Fee Related CN101691819B (zh) 2009-09-28 2009-09-28 生土窑居裂缝控制嵌梁加固系统及其施工工艺

Country Status (1)

Country Link
CN (1) CN101691819B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104763440A (zh) * 2015-04-16 2015-07-08 郑州大学 生土窑居窑拱裂缝工字撑局部加固方法
CN104895346A (zh) * 2015-06-30 2015-09-09 郑州大学 生土窑居拱顶防局部土体坍塌的加固系统及其施工工艺
CN105133850A (zh) * 2015-08-01 2015-12-09 陕西省建筑科学研究院 一种既有黄土窑洞的加固方法
CN109403651A (zh) * 2018-10-23 2019-03-01 陕西省建筑科学研究院有限公司 采用钢拉索改善窑洞整体稳定性的砖石箍窑加固方法
CN110685454A (zh) * 2019-10-22 2020-01-14 陕西省建筑科学研究院有限公司 采用置换拱顶受剪区域覆土的黄土窑洞抗震加固方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8514122D0 (en) * 1985-06-05 1985-07-10 Ilukkumbure P W Jack bolt
CN2480472Y (zh) * 2001-04-16 2002-03-06 吴志峰 金属盖板型墙面变形装置
CN201169771Y (zh) * 2008-03-18 2008-12-24 启东建筑集团有限公司 深基坑支护用土层锚杆
CN201209251Y (zh) * 2008-06-02 2009-03-18 巨力索具股份有限公司 高强度光圆锚杆

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104763440A (zh) * 2015-04-16 2015-07-08 郑州大学 生土窑居窑拱裂缝工字撑局部加固方法
CN104895346A (zh) * 2015-06-30 2015-09-09 郑州大学 生土窑居拱顶防局部土体坍塌的加固系统及其施工工艺
CN105133850A (zh) * 2015-08-01 2015-12-09 陕西省建筑科学研究院 一种既有黄土窑洞的加固方法
CN105133850B (zh) * 2015-08-01 2017-07-04 陕西省建筑科学研究院 一种既有黄土窑洞的加固方法
CN109403651A (zh) * 2018-10-23 2019-03-01 陕西省建筑科学研究院有限公司 采用钢拉索改善窑洞整体稳定性的砖石箍窑加固方法
CN109403651B (zh) * 2018-10-23 2021-03-16 陕西省建筑科学研究院有限公司 采用钢拉索改善窑洞整体稳定性的砖石箍窑加固方法
CN110685454A (zh) * 2019-10-22 2020-01-14 陕西省建筑科学研究院有限公司 采用置换拱顶受剪区域覆土的黄土窑洞抗震加固方法
CN110685454B (zh) * 2019-10-22 2021-10-01 陕西省建筑科学研究院有限公司 采用置换拱顶受剪区域覆土的黄土窑洞抗震加固方法

Also Published As

Publication number Publication date
CN101691819B (zh) 2011-01-19

Similar Documents

Publication Publication Date Title
CN101691819B (zh) 生土窑居裂缝控制嵌梁加固系统及其施工工艺
CN205134353U (zh) 一种防冻拔和融沉的装配型通风桩基础结构
CN2916024Y (zh) 塌陷区抗变形高压电线塔
CN104895089A (zh) 地下室楼板与支护桩共同工作的永久支护体系的施工方法
CN111101731B (zh) 一种古建筑木结构整体同步提升方法
CN104818728A (zh) 一种地下室楼板与支护桩共同工作的永久支护体系
CN202117068U (zh) 微型桩板式复合基础
CN101691760B (zh) 一种锚杆联合掏挖复合基础及其施工方法
CN110439353A (zh) 一种水泥电线杆防倾倒的架设施工方法
CN103741708B (zh) 预制式砼杆套筒基础
CN201133089Y (zh) 屋面梁改为楼面梁的荷载转移装置
CN204001705U (zh) 基于地锚桁架的地下室外墙单面支模施工结构
CN106088762B (zh) 一种插槽式外包钢板预制装配式圆形地下粮仓
CN213625735U (zh) 一种地下室排水防浮结构
CN203684258U (zh) 预制式砼杆套筒基础
CN211006701U (zh) 桩墙合一的基坑支护结构
CN209523207U (zh) 一种土木工程用基坑防崩塌支架
CN221461897U (zh) 一种黄土窑洞裂缝控制预应力加固结构
CN106193744B (zh) 一种内外均包钢板圆形预制装配式地下粮仓
CN201495554U (zh) 一种锚杆联合掏挖复合基础
CN204491660U (zh) 双面对加预应力结构可调式地下管廊
CN214116605U (zh) 承压型囊式扩体抗浮锚杆
CN204491658U (zh) 单面对加预应力结构功能式地下管廊
CN206189414U (zh) 一种插槽式外包钢板预制仓壁圆形地下粮仓
CN205387721U (zh) 一种公路挡土墙加固结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: HENAN PROVINCE CONSTRUCTION CORPORATION

Owner name: ZHENGZHOU UNIVERSITY

Free format text: FORMER OWNER: HENAN PROVINCE CONSTRUCTION CORPORATION

Effective date: 20100906

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Tong Liping

Inventor after: Zhang Qin

Inventor after: Wang Xianfeng

Inventor after: Zhu Ruichun

Inventor after: Luo Jianzhong

Inventor after: Cao Yuan

Inventor after: Du Jianfei

Inventor after: Liu Ruixiao

Inventor after: Cao Yuntao

Inventor after: Guo Qiang

Inventor after: Zhang Xiangdong

Inventor after: Liu Yi

Inventor before: Luo Jianzhong

Inventor before: Zhang Qin

Inventor before: Wang Xianfeng

Inventor before: Zhu Ruichun

Inventor before: Cao Yuan

Inventor before: Tong Liping

Inventor before: Liu Ruixiao

Inventor before: Du Jianfei

Inventor before: Cao Yuntao

Inventor before: Guo Qiang

Inventor before: Zhang Xiangdong

Inventor before: Liu Yi

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LUO JIANZHONG CAO YUAN TONG LIPING LIU RUIXIAO DU JIANFEI CAO YUNTAO GUO QIANG ZHANG XIANGDONG LIU YI ZHANG QIN WANG XIANFENG ZHU RUICHUN TO: TONG LIPING LUO JIANZHONG CAO YUAN DU JIANFEI LIU RUIXIAO CAO YUNTAO GUO QIANG ZHANG XIANGDONG LIU YI ZHANG QIN WANG XIANFENG ZHU RUICHUN

Free format text: CORRECT: ADDRESS; FROM: 450002 NO.81, WENHUA ROAD, ZHENGZHOU CITY, HE'NAN PROVINCE TO: 450001 NO.100, KEXUE AVENUE, ZHENGZHOU HIGH-TECH DEVELOPMENT AREA, HE'NAN PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20100906

Address after: 450001 Zhengzhou science and Technology Development Zone, Henan, No. 100 science Avenue

Applicant after: Zhengzhou University

Co-applicant after: Henan Province Construction Group Co., Ltd.

Address before: 450002 No. 81, Wenhua Road, Henan, Zhengzhou

Applicant before: Henan Province Construction Group Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110119

Termination date: 20160928