CN101674975A - Floating platform for operation in regions exposed to extreme weather conditions - Google Patents
Floating platform for operation in regions exposed to extreme weather conditions Download PDFInfo
- Publication number
- CN101674975A CN101674975A CN200880014490A CN200880014490A CN101674975A CN 101674975 A CN101674975 A CN 101674975A CN 200880014490 A CN200880014490 A CN 200880014490A CN 200880014490 A CN200880014490 A CN 200880014490A CN 101674975 A CN101674975 A CN 101674975A
- Authority
- CN
- China
- Prior art keywords
- platform
- buoy
- main platform
- anchored
- floating platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B35/4413—Floating drilling platforms, e.g. carrying water-oil separating devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/50—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/50—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
- B63B21/507—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers with mooring turrets
- B63B21/508—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers with mooring turrets connected to submerged buoy
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B22/00—Buoys
- B63B22/02—Buoys specially adapted for mooring a vessel
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Earth Drilling (AREA)
- Soil Working Implements (AREA)
Abstract
A floating platform for drilling after or production of hydrocarbons comprises a semi-submersible main platform (2) carrying process and/or drilling equipment at its upper surface (7), and which is designed as a vertical, essentially flatbottomed cylinder. The main platform (2) is provided with a central vertical shaft (8) which at its lower end is adapted for reception and releasable locking of an anchoring buoy (3) carrying fastening equipment for anchoring lines (10) and for risers (14, 15) and umbilicals.
Description
Technical field
The present invention relates to a kind ofly be used for after the drilling well or the floating platform of offshore production hydro-carbon, comprise: the surface has the main platform of the semisubmersible of Fabricating machinery and/or drill outfit thereon, and the main platform design of this semisubmersible becomes vertical, basic flat bottomed cylinder.
Background technology
According to Norwegian Patent NO.319971, be known as above-mentioned design-calculated platform.Have the platform of cylinder platform body by design, pitching motion and rolling motion are significantly reduced.In addition, this platform has very big load carrying ability with respect to production or drill outfit, and has the memory capacity of very big oil, fuel etc.Platform has direction independence with respect to surrounding environment, therefore can be by means of simple fixing anchoring system anchoring.In addition, lifter can be directly connected to the receiving system on the platform, does not need rotation to move etc.
Because the operation in zone, the arctic has the threat on iceberg, this requires floating platform must have the ability to separate anchoring system and lifter.When regional operation in the appearance of extreme climate low frequency, for example suffer in the zone of hurricane, can the separating floating device be very favorable.Because this can reduce the requirement to anchoring system greatly.
To carry out shortcoming that routine separates be to lose time and interrupt transmission with producing hydro-carbon, and the anchoring rope separates separately with lifter in routine is separated.In addition, in order to take possible leakage into account and, can separated equipment to be very expensive from marine pull-up.Separate and be connected subsequently the several weeks of production that rope and/or lifter may need to end production facilities of anchoring.Connect and generally need employ storeship to be used for pull-up anchoring rope and lifter.Therefore connection work is subject to the influence of climatic conditions.
Summary of the invention
The purpose of this invention is to provide the place that a kind of platform is used in the zone that suffers extreme climate or floating ice and iceberg occur uses.
Above-mentioned purpose is achieved by the platform of the type of the introductory statement according to the present invention, it is characterized in that, main platform is provided with the vertical vertical shaft at the center, be suitable for receiving and locking releasedly anchored buoy in its lower end, this anchored buoy has the rope and be used for lifter and the securing device of umbilical cord of being used to anchor.
Description of drawings
Further specify the present invention relevant below with reference to accompanying drawing, wherein with specific embodiment
Fig. 1 illustrates main platform and the anchored buoy that links together;
Fig. 2 illustrates anchored buoy and how to rise to main platform by chain winch;
Fig. 3 illustrates first embodiment of the anchored buoy with connection flexible risers thereon;
Fig. 4 illustrates second embodiment of the anchored buoy with connection steel riser thereon;
Fig. 5 illustrates the birds-eye view that connects in the anchoring rope of anchored buoy;
Anchored buoy dropped to the free-floating position after Fig. 6 was illustrated in and disconnects connection; And
Fig. 7 illustrates from anchored buoy and stretches out and floating pick-up line on the water surface.
The specific embodiment
As depicted in figs. 1 and 2, the illustrated embodiment according to platform 1 of the present invention comprises: main platform 2 and the anchoring arrangement that comprises anchored buoy 3 under water.With as corresponding mode in the patent specification of describing introductoryly, main platform 2 is designed to vertical, basic flat bottomed cylinder.Platform may have circular or polygonal section.
Different with previously known platform, cylinder in this case is provided with the vertical vertical shaft 8 at the center, and the lower end of vertical vertical shaft 8 is suitable for receiving and locking releasedly anchored buoy 3.Platform has at the bottom of two walls being used as ballast box 4 and possible two.They are divided into the case of sufficient amount and guarantee to handle damage stability etc.Be provided with loading tank 5 in ballast box inside and be used for storage of hydrocarbons.Below the living quarters on the main deck 7 18, have engine room and different casees, the case etc. of diving.The equipment, drill outfit and the different ancillary systems that are used for oil and natural gas production are arranged on main deck as module 6.
As depicted in figs. 1 and 2, capstan winch 9 is set at the top of vertical shaft 8, is used for drawing in the connection location that anchored buoy 3 also upwards arrives vertical shaft 8 from submarine site.Anchored buoy has the part cone shape at least, is used to be received in the corresponding tapered segment of vertical shaft bottom.When buoy 3 is in the appropriate location, locked securely by the mechanical locking (not shown).Capstan winch 9 also will be used to platform connect anchoring rope (anchor chain) 10, to anchoring rope (anchor chain) 10 prestress and post-stressing.The connection house steward also has been installed on main platform, has been used to carry well stream, and be used to export oil and natural gas.Delivery hose is installed on and connects house steward and be arranged between the lifter fastener 20 on the anchored buoy.
Anchored buoy 3 is very big buoyancy containers.The unit that the buoyancy container is divided into right quantity does not cause serious consequence to guarantee to damage.The mooring pipe 12 that is used for fixing anchor chain 10 outward flange being provided with of buoy.Anchor chain 10 extends and upward to the chain lock 13 at buoy top from mooring pipe.When the buoy free-floating and when buoy is connected to main platform 2, chain lock will bear all power that come from anchor chain.Lifter and umbilical cord 14,15 are connected to buoy.If flexible risers 14 is used for normal depth of flow, will I shape or the J-shaped pipe that extend through the buoy shell from bottom to top be set.Lifter 14 is drawn in and is locked in regularly the upper limb of buoy then.To be provided with herein and be used to connection skin 20 safety valve together that is connected by delivery hose etc. etc.The rigid pipe that bellmouth or blocking device are used for fastening bending may be set bottom I shape or J-shaped pipe.If adopt steel suspension wire lifter (SCR) 15, will opening 25 (see figure 4)s be set in buoy central authorities, the deck is set in this case is used to hang lifter.Lifter hangs in the fixing flexible connecting member above deck then.Safety valve, binding flange etc. are arranged on above the deck.Use this set, steel riser will freely hang towards sea bed.Also can adopt similar suspension, be used for freely hanging flexible risers 14.Do not need flexible connecting member at the top.
When erecting stage building 1, main platform 2 and anchored buoy 3 will be connected to each other by mechanical locking.Just as on conventional equipment, drawing in/regulate anchoring rope 10 and tension rope.After drawing in anchoring rope 10, be locked by the chain lock 13 that is arranged at anchored buoy 3 tops.Behind locking anchoring rope/anchor chain 10, the length of having pulled on the chain of ship is put into the anchor chain storehouse 16 at anchored buoy top.At the end of some anchor chains pick-up line 17 has been installed.The quantity of pick-up line 17 depends on how anchoring rope 10 is set.For configuration as shown in Figure 5, adopt three pick-up line 17, i.e. every group of anchoring in the rope 10.Pick-up line 17 is set, make and it is picked up by remote-operated vehicle (ROV), the rope 17 that wherein has buoyancy elements discharges by underwater sound signal, and rope can be picked up at the water surface subsequently, perhaps has a rope 23 equipment floating elements 22 at least so that it is on the water surface and can be picked up.
Drawing in being connected also of lifter, umbilical cord etc. undertaken by connected anchored buoy 3.Behind the locking lifter 14,15, connection hose and connection cable between the pipe unit on lifter/hawser top and the main platform 2 may be set in place.After anchoring rope 10 and lifter 14,15 connections, platform 1 prior operation.
As mentioned above, the anchored buoy 3 that is in connection location is locked in main platform 2 by mechanical locking.Before can disconnecting connection, all connection hoses between main platform 2 and the anchored buoy 3 and connection cable must be open circuited.When disconnection had been performed, anchored buoy can separate by opening mechanical locking.Anchored buoy has loaded weight, so that the desired depth D place below the water surface 24 finds balance position.Anchored buoy 3 swims in the position of load that buoy wherein only is subjected to coming from the little degree of wave now.In addition, will reduce to minimum with the risk of the collision on ship and possible iceberg.
When connecting anchored buoy 3, independently or the assistance by storeship, main platform 2 will be brought to the appropriate location of buoy top.Remote-operated vehicle (ROV) is picked up and is picked up rope 17 in the vertical shaft 8 that upwards is raised on main platform 2.Pick up rope 17 and be connected to chain winch 9, chain winch 9 is used for pull-up and is arranged in the end of anchor chain 10 in anchor chain storehouse 16 at the top of anchored buoy 3, and chain is placed on the chain winch.Execution draws in, and wherein chain winch 9 usefulness whole lifters, umbilical cord, hawser of being connected in and extending downward sea bed or the like draw in anchored buoy 3.When anchored buoy 3 was in the appropriate location, it locked by mechanical locking.The connection hose, hawser etc. that come from main platform 2 are connected to anchored buoy 3 and can restart to be produced.
Selectable, to pick up rope 17 and have floating buoy 21,22, buoy 21,22 can for example be released by underwater sound signal, or is positioned over the water surface, and can pick up in the mode of routine.If adopt the device that has floating pick-up line 23, rope must be provided with and outwards arrive the side of platform 2 from vertical shaft 8.Floating then rope 23 picks up and is connected in described rope from the side of main platform 2. Buoyancy elements 21,22 is disconnected and interconnected rope falls into the sea once more.Picking up rope 17 now can be pulled up and pass vertical shaft 8 and be connected to chain winch 9.In addition just as using ROV to carry out pull-up and be connected.
When platform was provided with the equipment that is used for (after oil) drilling well after oil recovery, if this equipment will be arranged on the flat-bed deck 7, this equipment need pass main flat-bed vertical opening (month shape groove).This most suitable employing part loading tank 5 is as a month shape groove.When the moon that adopts " inside " during the shape groove, it is freezing etc. that drilling well lifter etc. prevents to suffer in unsheltered zone.Possible Oil spills also can prevent and overcomes in simple mode in moon shape groove.
Selectively, drill outfit may be arranged on (not shown) on the cantilever platform of main platform 2 sides.Under the situation of drilling operation, can regulate the anchoring rope so that when the weather load variations, keep the flat-bed appropriate location.If platform has been equipped propelling unit 11 in addition, when drilling well, propelling unit can be adopted so that keep the optimum position.
When anchored buoy 3 connects and disconnects, do not relate to drill outfit.After being in latched position, anchored buoy connects drilling well lifter etc.When disconnecting anchored buoy, the drilling well lifter with related valves etc. will disconnect from the bottom, and preferably rises before disconnection and store.
Claims (9)
1. one kind is used for after the drilling well or the floating platform of offshore production hydro-carbon, comprise: surface (7) has the main platform (2) of the semisubmersible of production facilities and/or drill outfit thereon, and the main platform (2) of semisubmersible is designed to vertical, basic flat bottomed cylinder, it is characterized in that: main platform (2) is provided with the vertical vertical shaft (8) at the center, vertical shaft (8) is suitable in its lower end receiving and locks anchored buoy (3) releasedly, and anchored buoy (3) has and is used to the securing device that anchors rope (10) and be used for lifter (14,15) and umbilical cord.
2. floating platform according to claim 1 is characterized in that, anchored buoy (3) has to the small part cone shape, is used for being received in the corresponding tapered segment of vertical shaft (8) bottom on the main platform (2).
3. according to the floating platform of claim 1 or 2, it is characterized in that the mooring pipe (12) that anchored buoy (3) is provided with cable brake (13) and is provided with along the neighboring of buoy (3).
4. according to each the described floating platform among the claim 1-3, it is characterized in that anchored buoy (3) has and is used for flexible risers (14) or steel riser (15) are fastened on device in the central opening (25) on the buoy (3).
5. according to each the described floating platform among the claim 1-4, it is characterized in that, anchored buoy (3) is divided into a plurality of ballast boxs, and each ballast box can partly fill up weight, so that make buoy (3) have proper depth (D) in water after disconnect connecting.
6. according to each the described floating platform among the claim 1-5, it is characterized in that anchored buoy (3) has been equipped Abseiling device (17), make it possible to end with anchor chain (10) and be connected in and on main platform (2), draw in capstan winch (9).
7. according to each the described floating platform among the claim 1-6, it is characterized in that, be used to draw in and strain the capstan winch (9) of anchor chain (10) by employing, anchored buoy (3) can be drawn in the vertical shaft (8) on main platform (2).
8. according to each the described floating platform among the claim 1-7, it is characterized in that main platform (2) has the vertical opening (month shape groove) that is used to carry out drilling operation or the adjusting of other oil wells on the platform shell.
9. platform according to claim 1 is characterized in that, main platform (2) has the cantilever platform that is used to support to be used to carry out the equipment that drilling operation or other oil wells regulate.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NO20071491 | 2007-03-21 | ||
NO20071491A NO20071491L (en) | 2007-03-21 | 2007-03-21 | Detachable platform for operation in exposed areas |
PCT/NO2008/000091 WO2008115068A1 (en) | 2007-03-21 | 2008-03-12 | Floating platform for operation in regions exposed to extreme weather conditions |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101674975A true CN101674975A (en) | 2010-03-17 |
Family
ID=39766102
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200880014490A Pending CN101674975A (en) | 2007-03-21 | 2008-03-12 | Floating platform for operation in regions exposed to extreme weather conditions |
Country Status (8)
Country | Link |
---|---|
US (1) | US20100143045A1 (en) |
EP (1) | EP2139754A4 (en) |
KR (1) | KR101532234B1 (en) |
CN (1) | CN101674975A (en) |
CA (1) | CA2681204C (en) |
NO (1) | NO20071491L (en) |
RU (1) | RU2009138730A (en) |
WO (1) | WO2008115068A1 (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103168137A (en) * | 2010-10-21 | 2013-06-19 | 科诺科菲利浦公司 | Ice worthy jack-up drilling unit |
CN103261018A (en) * | 2010-11-01 | 2013-08-21 | 大宇造船海洋株式会社 | Drilling ship for a polar region |
CN103282273A (en) * | 2010-11-05 | 2013-09-04 | 大宇造船海洋株式会社 | Drilling ship for polar region |
CN107640296A (en) * | 2017-09-12 | 2018-01-30 | 中国海洋石油总公司 | A kind of far-reaching extra large oil-gas field development drilling goods and materials storage transfer floating platform |
CN110035952A (en) * | 2016-09-26 | 2019-07-19 | 索拉里斯弗洛特股份有限公司 | Rotate floating platform |
CN114030562A (en) * | 2021-11-30 | 2022-02-11 | 中国船舶科学研究中心 | Large fishery platform mooring device capable of realizing floating and submerging switching and using method thereof |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2644349C (en) | 2006-03-30 | 2014-07-08 | Exxonmobil Upstream Research Company | Mobile, year-round arctic drilling system |
PL2093143T3 (en) * | 2008-02-19 | 2011-09-30 | Waertsilae Ship Design Germany Gmbh | Service vessel |
CN101612982B (en) * | 2009-08-13 | 2012-05-09 | 上海利策科技有限公司 | Circular floating ocean platform capable of releasing multi-point mooring |
US20130029546A1 (en) * | 2011-07-29 | 2013-01-31 | John James Murray | Mooring Disconnect Arrangement |
US20150101522A1 (en) * | 2013-10-15 | 2015-04-16 | Adel H. Younan | Arctic Rapid Disconnect and Reconnect Floating Driller |
GB2538275B (en) | 2015-05-13 | 2018-01-31 | Crondall Energy Consultants Ltd | Floating production unit and method of installing a floating production unit |
KR102495459B1 (en) * | 2015-12-31 | 2023-02-03 | 대우조선해양 주식회사 | Install structure of fluid transfer line and install method for spread mooring marine plant |
DE102016118079B3 (en) * | 2016-09-26 | 2017-09-28 | Aerodyn Engineering Gmbh | Mooring buoy for a floating wind turbine |
CN109455274B (en) * | 2019-01-02 | 2024-02-27 | 上海海事大学 | Water platform stabilizing device |
JP6618063B1 (en) * | 2019-03-25 | 2019-12-11 | 華南理工大学 | On-site control equipment for treating oil-polluted water areas |
Family Cites Families (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2440248A (en) * | 1944-08-19 | 1948-04-27 | Bell Telephone Labor Inc | Object locating apparatus |
GB1014879A (en) * | 1964-01-09 | 1965-12-31 | Offshore Co | Improved floating structure mooring system |
US4604961A (en) * | 1984-06-11 | 1986-08-12 | Exxon Production Research Co. | Vessel mooring system |
US4735267A (en) * | 1985-03-11 | 1988-04-05 | Shell Oil Company | Flexible production riser assembly and installation method |
NO160914C (en) * | 1986-03-24 | 1989-06-14 | Svensen Niels Alf | BUILDING LOADING SYSTEM FOR OFFSHORE PETROLEUM PRODUCTION. |
US4995762A (en) * | 1988-07-19 | 1991-02-26 | Goldman Jerome L | Semisubmersible vessel with captured constant tension buoy |
US4966495A (en) * | 1988-07-19 | 1990-10-30 | Goldman Jerome L | Semisubmersible vessel with captured constant tension buoy |
US4913591A (en) * | 1988-10-17 | 1990-04-03 | Bethlehem Steel Corporation | Mobile marine platform and method of installation |
NO176131C (en) * | 1992-05-25 | 1997-07-08 | Norske Stats Oljeselskap | System for use in offshore petroleum production |
NO176130C (en) * | 1992-05-25 | 1997-07-08 | Norske Stats Oljeselskap | System for use in offshore petroleum production |
NO923281L (en) * | 1992-08-21 | 1994-02-22 | Norske Stats Oljeselskap | Closing device for an opening in the bottom of a vessel |
NO930504D0 (en) * | 1993-02-12 | 1993-02-12 | Maritime Group As | DEVICE ON TRIAL HEADS |
NO179986C (en) * | 1994-12-08 | 1997-01-22 | Norske Stats Oljeselskap | Process and system for producing liquefied natural gas at sea |
US6113314A (en) * | 1998-09-24 | 2000-09-05 | Campbell; Steven | Disconnectable tension leg platform for offshore oil production facility |
US6712560B1 (en) * | 2000-12-07 | 2004-03-30 | Fmc Technologies, Inc. | Riser support for floating offshore structure |
NO319971B1 (en) | 2001-05-10 | 2005-10-03 | Sevan Marine As | Offshore platform for drilling for or producing hydrocarbons |
NO20024303D0 (en) * | 2002-09-09 | 2002-09-09 | Maritime Tentech As | Buoy |
ATE389580T1 (en) * | 2006-01-03 | 2008-04-15 | Bluewater Energy Services Bv | DETACHABLE SHIP ANCHORING SYSTEM |
US7958835B2 (en) * | 2007-01-01 | 2011-06-14 | Nagan Srinivasan | Offshore floating production, storage, and off-loading vessel for use in ice-covered and clear water applications |
-
2007
- 2007-03-21 NO NO20071491A patent/NO20071491L/en not_active Application Discontinuation
-
2008
- 2008-03-12 US US12/531,785 patent/US20100143045A1/en not_active Abandoned
- 2008-03-12 WO PCT/NO2008/000091 patent/WO2008115068A1/en active Application Filing
- 2008-03-12 KR KR1020097021880A patent/KR101532234B1/en active IP Right Grant
- 2008-03-12 RU RU2009138730/11A patent/RU2009138730A/en not_active Application Discontinuation
- 2008-03-12 CN CN200880014490A patent/CN101674975A/en active Pending
- 2008-03-12 CA CA2681204A patent/CA2681204C/en active Active
- 2008-03-12 EP EP08723983A patent/EP2139754A4/en not_active Withdrawn
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103168137A (en) * | 2010-10-21 | 2013-06-19 | 科诺科菲利浦公司 | Ice worthy jack-up drilling unit |
CN103168137B (en) * | 2010-10-21 | 2016-06-08 | 科诺科菲利浦公司 | Iceproof jack-up rigs unit |
CN103261018A (en) * | 2010-11-01 | 2013-08-21 | 大宇造船海洋株式会社 | Drilling ship for a polar region |
CN103261018B (en) * | 2010-11-01 | 2016-08-03 | 大宇造船海洋株式会社 | Drilling ship for region, polar region |
CN103282273A (en) * | 2010-11-05 | 2013-09-04 | 大宇造船海洋株式会社 | Drilling ship for polar region |
CN103282273B (en) * | 2010-11-05 | 2016-08-31 | 大宇造船海洋株式会社 | Drilling ship for region, polar region |
CN110035952A (en) * | 2016-09-26 | 2019-07-19 | 索拉里斯弗洛特股份有限公司 | Rotate floating platform |
CN107640296A (en) * | 2017-09-12 | 2018-01-30 | 中国海洋石油总公司 | A kind of far-reaching extra large oil-gas field development drilling goods and materials storage transfer floating platform |
CN107640296B (en) * | 2017-09-12 | 2019-11-12 | 中国海洋石油集团有限公司 | A kind of far-reaching extra large oil-gas field development drilling goods and materials storage transfer floating platform |
CN114030562A (en) * | 2021-11-30 | 2022-02-11 | 中国船舶科学研究中心 | Large fishery platform mooring device capable of realizing floating and submerging switching and using method thereof |
Also Published As
Publication number | Publication date |
---|---|
EP2139754A4 (en) | 2012-12-12 |
US20100143045A1 (en) | 2010-06-10 |
KR101532234B1 (en) | 2015-06-29 |
NO20071491L (en) | 2008-09-22 |
CA2681204A1 (en) | 2008-09-25 |
RU2009138730A (en) | 2011-04-27 |
EP2139754A1 (en) | 2010-01-06 |
CA2681204C (en) | 2014-08-05 |
WO2008115068A1 (en) | 2008-09-25 |
KR20090121403A (en) | 2009-11-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101674975A (en) | Floating platform for operation in regions exposed to extreme weather conditions | |
US7770532B2 (en) | Disconnectable riser-mooring system | |
US5044297A (en) | Disconnectable mooring system for deep water | |
EP0880450B1 (en) | System for loading ships at sea | |
CN100402371C (en) | Riser installation vessel and method of using the same | |
US6415828B1 (en) | Dual buoy single point mooring and fluid transfer system | |
CN102132001B (en) | Subsea structure installation or removal | |
US7845998B2 (en) | Spar with detachable hull structure | |
US20070163481A1 (en) | Submerged loading system | |
US6170424B1 (en) | Production/platform mooring configuration | |
US8480334B2 (en) | Hybrid riser systems and methods | |
US20120216736A1 (en) | Disconnectable mooring system and method for disconnecting or reconnecting it | |
US20060056918A1 (en) | Riser system connecting two fixed underwater installations to a floating surface unit | |
US20160101831A1 (en) | Taut Inverted Catenary Mooring System | |
RU2438913C2 (en) | Disengageable mooring system | |
US8491350B2 (en) | Floating production unit with disconnectable transfer system | |
US6893190B2 (en) | Method and structure for connecting a floating structure with rope anchor lines to the seabed | |
AU2011215983B2 (en) | Rigless intervention | |
CN114198569A (en) | Underwater connection method of dynamic flexible pipe cable and anchoring base | |
US20130203311A1 (en) | Loading hose | |
US6685519B1 (en) | System for transferring fluids and methods for installing, modifying and operating system | |
EP3204285A1 (en) | Taut inverted catenary mooring system | |
GB2467938A (en) | Deep water and ultra deep water mooring system | |
WO2018007370A1 (en) | Disconnectable bow turret | |
AU2005203655A1 (en) | System for managing offshore drilled products |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20100317 |