CN101666508A - 一种热电联产机组供热和发电燃料成本的分摊计算方法 - Google Patents

一种热电联产机组供热和发电燃料成本的分摊计算方法 Download PDF

Info

Publication number
CN101666508A
CN101666508A CN200910075502A CN200910075502A CN101666508A CN 101666508 A CN101666508 A CN 101666508A CN 200910075502 A CN200910075502 A CN 200910075502A CN 200910075502 A CN200910075502 A CN 200910075502A CN 101666508 A CN101666508 A CN 101666508A
Authority
CN
China
Prior art keywords
heat supply
coal consumption
standard coal
specific entropy
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910075502A
Other languages
English (en)
Other versions
CN101666508B (zh
Inventor
李春曦
叶学民
崔馨
闫俊刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power University
Original Assignee
North China Electric Power University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Electric Power University filed Critical North China Electric Power University
Priority to CN200910075502XA priority Critical patent/CN101666508B/zh
Publication of CN101666508A publication Critical patent/CN101666508A/zh
Application granted granted Critical
Publication of CN101666508B publication Critical patent/CN101666508B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

一种热电联产机组供热和发电燃料成本的分摊计算方法,用于合理确定供热和发电两方面在燃料成本中所占比例。其技术方案是:它以供热和发电所消耗的标准煤为计算依据,所说供热标准煤耗量和发电标准煤耗量分别由下面两式确定:。本发明不仅能合理分配用于供热和发电方面的标准煤耗量,而且操作简单、易于实施,可有效用作热电联产机组供热和发电价格制定的基础。

Description

一种热电联产机组供热和发电燃料成本的分摊计算方法
技术领域
本发明涉及一种能合理分配热电联产机组供热和发电两方面所耗燃料成本的方法,属发电技术领域。
背景技术
热电联产机组具备供热和发电的双重功能,因而具有很好的产能效果。由于热电联产机组供热和发电使用同一热源,如何合理确定供热和发电两方面在燃料成本中所占的比例,始终存在争议。虽然采用何种分摊方案并不影响热电联产机组本身的燃料成本,但将直接影响到供热和发电价格的制定,关系到热电企业和热电用户双方的切身利益。
现有的热电联产机组燃料成本分摊方案主要有好处归电法、好处归热法和折中法。我国目前正在采用的热量法属于好处归电法;好处归热法包括实际焓降法、热折扣法和作功能力法;折中法主要有加权法,但权重取值缺乏理论依据。研究表明,上述方案各有优缺点,均不能全面、合理反映热电联产过程中能量的转换、利用和损耗过程。因此,设计一种新的能合理确定热电联产机组中供热和发电燃料成本的分摊方法是十分必要的。
发明内容
本发明的目的在于克服现有技术的不足、提供一种能全面、合理反映热电联产过程中能量转换、利用和损耗状态的热电联产机组供热和发电燃料成本的分摊计算方法。
本发明所述问题是以下述技术方案实现的:
一种热电联产机组供热和发电燃料成本的分摊计算方法,它以供热和发电所消耗的标准煤为计算依据,所说供热标准煤耗量和发电标准煤耗量分别由下面两式确定:
B h s = Σ D ri ( s n - s ri ) D 0 ( s n - s 0 ) B s
B e s = 1 - B h s
其中Bs、Bh s、Be s分别为全厂标准煤耗量、供热标准煤耗量、发电标准煤耗量,单位为t/h;s0、sri、sn分别为新汽比熵、第i(i=1,2,3,…)段供热抽汽比熵和排汽比熵,单位为kJ/kg·℃;D0、Dri分别为新汽量和第i段供热抽汽量,单位为t/h。
上述热电联产机组供热和发电燃料成本的分摊计算方法,它按以下步骤计算:
a、根据机组实际运行情况,确定新汽量D0和第i段供热抽汽量Dri
b、依据机组运行参数查阅“水蒸汽性质参数手册”,确定新汽比熵s0、供热抽汽比熵sri和排汽比熵sn
c、确定供热标准煤耗量Bh s和发电标准煤耗量Be s
B h s = Σ D ri ( s n - s ri ) D 0 ( s n - s 0 ) B s
B e s = 1 - B h s .
本发明以新汽和供热抽汽的熵变为依据来确定热电联产机组供热和发电两方面在燃料成本中所占的比例,正确反映了热力过程中抽汽参数的品质和抽汽位置的不可逆程度,达到合理分配用于供热和发电方面的标准煤耗量、正确确定供热和发电燃料成本的目的。本发明未作任何假设,因此不存在任何理论偏差,而且操作简单、易于实施,可以此为基础、指导热电联产机组企业供热和发电价格的制定。
附图说明
下面结合附图对本发明进一步说明。
图1是热电联产机组示意图。
图中各标号为:D0、新汽量;Dr1、第1段供热抽汽量;Dri、第i段供热抽汽量;Pe、发电量;s0、新汽比熵;sr1、第1段供热抽汽比熵;sri、第i段供热抽汽比熵;sn、排汽比熵。
文中所用符号:Bs、全厂标准煤耗量;Bh s、供热标准煤耗量;Be s、发电标准煤耗量;Qh、供热量;Pe、发电量;Cc、标准煤价格;Ah、单位供热量的燃料成本;Ae、发电每千瓦的燃料成本;αh、供热分摊比。
具体实施方式
参看图1,本发明用于热电联产机组中分摊供热和发电方面的标准煤耗量,具体步骤如下:
1、根据机组实际运行情况,确定新汽量D0、第i段供热抽汽量Dri、发电量Pe
2、依据机组运行参数查阅水蒸汽性质参数手册,确定新汽比熵s0、供热抽汽比熵sri、排汽比熵sn
3、确定供热标准煤耗量Bh s和发电标准煤耗量Be s
B h s = Σ D ri ( s n - s ri ) D 0 ( s n - s 0 ) B s - - - ( 1 )
B e s = 1 - B h s .
由此可以根据下式确定用于供热方面单位供热量的燃料成本Ah和用于发电方面每千瓦时的燃料成本Ae
A h = B h s C c Q h (元/GJ)
A e = B e s C c P e (元/kW·h)
其中,Qh为供热量(根据抽汽参数和热网回水参数确定);Cc为标准煤价格(根据热电联产企业进煤价格或当年均价确定)。
为了进一步验证本发明在技术上的合理性,由式(1)可得全厂标准煤耗量中的供热分摊比为
α h = B h s B s = Σ D ri ( s n - s ri ) D 0 ( s n - s 0 ) - - - ( 2 )
为了比较式(2)和其他分摊技术方案,表1中给出了多个不同参数和容量的热电联产机组的计算结果。已有研究表明,只有热分摊比处于热量法和实际焓降法之间,才能正确反映热电联产的实际能耗过程。表1表明,本发明所提熵变分摊技术的计算结果始终处于热量法和实际焓降法之间,而且该技术方案在理论上建立时不作任何假设,因此不存在任何理论偏差;而且,在实践上操作简单、易于实施,是一种新的用于确定热电燃料成本的分摊方法,在实践中也不容易出现争议。本发明可有效用作热电联产机组供热和发电价格制定的基础。
表1采用不同分摊方案所得热分摊比的比较
  机组型号   热量法   熵变法   加权法   作功能力法   实际焓降法   热折扣法
  C12-35/5   0.5634   0.3905   0.4465   0.2683   0.3296   0.1168
  C12-35/10   0.5535   0.4099   0.4684   0.3102   0.3832   0.1358
  C12-50/1.2   0.5473   0.3027   0.3696   0.2881   0.1964   0.0680
  C12-50/10   0.5845   0.4025   0.4850   0.3157   0.3937   0.1494
  C12-50/16   0.6085   0.4727   0.5186   0.4700   0.4388   0.1520
  C50-90/1.2   0.6191   0.4898   0.3806   0.2796   0.1421   0.0618
  C50-90/13   0.5475   0.3822   0.4398   0.3670   0.3322   0.1429
  CB10-50/10/5   0.5131   0.3840   0.4207   0.2748   0.3283   0.1147
  CB10-50/16/10   0.5863   0.4432   0.5040   0.4483   0.4216   0.1473
  CB12-35/5/1.75   0.4830   0.3242   0.3844   0.2327   0.2858   0.1013
  CB12-35/10/3   0.5948   0.4003   0.5077   0.3330   0.4206   0.1629
  CB12-50/10/5   0.3947   0.2954   0.3236   0.2114   0.2525   0.0882
  CB12-50/13/5   0.6863   0.5069   0.5905   0.5275   0.4946   0.1728
  CB12-50/16/5   0.5351   0.4045   0.4600   0.4092   0.3849   0.1344
  CB25-90/10/1.2   0.8088   0.5798   0.5805   0.3759   0.3315   0.1499
  CC50-90/10/1.2   0.7083   0.4773   0.4969   0.3969   0.3033   0.1228
  CC50-90/13/1.2   0.7736   0.5714   0.5532   0.4446   0.3329   0.1432
  CC100-90/10/1.2   0.5868   0.4856   0.4181   0.3393   0.2494   0.1073

Claims (2)

1、一种热电联产机组供热和发电燃料成本的分摊计算方法,其特征是,它以供热和发电所消耗的标准煤为计算依据,所说供热标准煤耗量和发电标准煤耗量分别由下面两式确定:
B h s = Σ D ri ( s n - s ri ) D 0 ( s n - s 0 ) B s
B e s = 1 - B h s
其中Bs、Bh s、Be s分别为全厂标准煤耗量、供热标准煤耗量、发电标准煤耗量,单位为t/h;s0、sri、sn分别为新汽比熵、第i段供热抽汽比熵和排汽比熵,单位为kJ/kg·℃;D0、Dri分别为新汽量和第i段供热抽汽量,单位为t/h。
2、根据权利要求1所述热电联产机组供热和发电燃料成本的分摊计算方法,其特征是,它按下述步骤计算:
a、根据机组实际运行情况,确定新汽量D0和第i段供热抽汽量Dri
b、依据机组运行参数查阅水蒸汽性质参数手册,确定新汽比熵s0、供热抽汽比熵sri和排汽比熵sn
c、确定供热标准煤耗量Bh s和发电标准煤耗量Be s
B h s = Σ D ri ( s n - s ri ) D 0 ( s n - s 0 ) B s
B e s = 1 - B h s .
CN200910075502XA 2009-09-24 2009-09-24 一种热电联产机组供热和发电燃料成本的分摊计算方法 Expired - Fee Related CN101666508B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910075502XA CN101666508B (zh) 2009-09-24 2009-09-24 一种热电联产机组供热和发电燃料成本的分摊计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910075502XA CN101666508B (zh) 2009-09-24 2009-09-24 一种热电联产机组供热和发电燃料成本的分摊计算方法

Publications (2)

Publication Number Publication Date
CN101666508A true CN101666508A (zh) 2010-03-10
CN101666508B CN101666508B (zh) 2012-04-25

Family

ID=41803235

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910075502XA Expired - Fee Related CN101666508B (zh) 2009-09-24 2009-09-24 一种热电联产机组供热和发电燃料成本的分摊计算方法

Country Status (1)

Country Link
CN (1) CN101666508B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103216281A (zh) * 2013-04-19 2013-07-24 国家电网公司 一种热电联产机组及其运行效率的评价方法
CN108376345A (zh) * 2018-02-22 2018-08-07 国网能源研究院有限公司 一种基于成本学习曲线的分布式天然气发电定价方法
CN108985643A (zh) * 2018-07-27 2018-12-11 浙江大学 燃气-蒸汽联合循环热电联产机组供热和发电燃料成本的分摊方法
CN111209665A (zh) * 2020-01-04 2020-05-29 西安西热节能技术有限公司 基于工况分析法的热电联产机组热量燃用成本确定方法
CN111255532A (zh) * 2020-03-10 2020-06-09 中石化节能技术服务有限公司 一种工业自备电站的优化操作控制方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3823773A1 (de) * 1988-07-14 1990-01-18 Krupp Koppers Gmbh Verfahren zur ermittlung und steuerung des brennstoff-massenstromes bei der partialoxidation (vergasung) von feinkoernigen bis staubfoermigen brennstoffen
EP1472447B2 (de) * 2002-01-25 2018-04-25 Ansaldo Energia IP UK Limited Verfahren zum betrieb einer gasturbogruppe
JP4931532B2 (ja) * 2006-09-25 2012-05-16 中国電力株式会社 構内単独運転移行時のボイラの燃料調整方法、構内単独運転移行時のボイラの燃料調整プログラム、及び構内単独運転移行時のボイラの燃料調整プログラムを記録した記録媒体

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103216281A (zh) * 2013-04-19 2013-07-24 国家电网公司 一种热电联产机组及其运行效率的评价方法
CN108376345A (zh) * 2018-02-22 2018-08-07 国网能源研究院有限公司 一种基于成本学习曲线的分布式天然气发电定价方法
CN108985643A (zh) * 2018-07-27 2018-12-11 浙江大学 燃气-蒸汽联合循环热电联产机组供热和发电燃料成本的分摊方法
CN111209665A (zh) * 2020-01-04 2020-05-29 西安西热节能技术有限公司 基于工况分析法的热电联产机组热量燃用成本确定方法
CN111209665B (zh) * 2020-01-04 2023-05-02 西安西热节能技术有限公司 基于工况分析法的热电联产机组热量燃用成本确定方法
CN111255532A (zh) * 2020-03-10 2020-06-09 中石化节能技术服务有限公司 一种工业自备电站的优化操作控制方法

Also Published As

Publication number Publication date
CN101666508B (zh) 2012-04-25

Similar Documents

Publication Publication Date Title
Niu et al. Electric power substitution for coal in China: Status quo and SWOT analysis
CN105183991B (zh) 一种区域综合能源系统的规划与设计方法
Garvey et al. On generation-integrated energy storage
CN101666508B (zh) 一种热电联产机组供热和发电燃料成本的分摊计算方法
Balamurugan et al. An optimal hybrid wind-biomass gasifier system for rural areas
CN109767080A (zh) 一种社区综合能源系统的需求侧响应评估方法
CN105354637A (zh) 一种使用弃风电加热的电采暖储热运行计划的制定方法
Zhang et al. Decision framework for feasibility analysis of introducing the steam turbine unit to recover industrial waste heat based on economic and environmental assessments
Hosseinian et al. The economic practicality of exploitation CHP (Combined Heat and Power) to scale back prices in instance home appliance manufacturing company
Jamaluddin et al. Design of Total Site-Integrated TrigenerationSystem using trigeneration cascade analysis considering transmission losses and sensitivity analysis
CN117455164A (zh) 考虑碳交易和需求响应的电热气综合能源系统的优化运行方法
Xiong et al. Case studies of demand response in multi-energy industrial parks
CN105005856A (zh) 一种大规模直流电力受入条件下的省网次日事故备用容量配置方法
CN105225070A (zh) 节能发电调度计划方法及系统
Tang et al. Integrated energy technology and service trend in China: investigation and analysis on over 1800 development zones in different regions
Sun et al. Research on Demand Side Response Strategy Considering Operation Flexibility of Thermal Storage Electric Boiler
Chakraborty et al. Multi-party energy management of microgrid with heat and electricity coupled demand response
Huang et al. Energy price sensitivity analysis of Integrated Energy System based on a parametric equation
KR20130055238A (ko) 바이오매스 열병합발전기 및 히트펌프를 이용한 요금 정산 시스템
Wen et al. Multi-time-scale scheduling strategy for regenerative electric heating system based on thermal demand response
Marks Avoiding gridlock: policy directions for Australia's electricity system
Ehnberg et al. Increased value of demand side management by reshaping the Load duration curve with wind and solar power
Zhang et al. Economic impact of the POP mode on distribution network reconstruction in the ‘coal‐to‐electricity’project of the grid company in China: a new electricity transaction mode
Acharya et al. The Opportunity of Greenhouse Gases Emission Reduction-A case study of Selected Hotel in Bhairahawa, Nepal
Chen Study on the flexible control method of thermal storage technology participating in the power grid

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120425

Termination date: 20140924

EXPY Termination of patent right or utility model