CN101650182B - Method for measuring cylinder in pile directly - Google Patents

Method for measuring cylinder in pile directly Download PDF

Info

Publication number
CN101650182B
CN101650182B CN 200810041578 CN200810041578A CN101650182B CN 101650182 B CN101650182 B CN 101650182B CN 200810041578 CN200810041578 CN 200810041578 CN 200810041578 A CN200810041578 A CN 200810041578A CN 101650182 B CN101650182 B CN 101650182B
Authority
CN
China
Prior art keywords
pile
rigid steel
ground
steel pile
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200810041578
Other languages
Chinese (zh)
Other versions
CN101650182A (en
Inventor
朱骏
金毅
周蓉峰
王正兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Mechanized Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Co Ltd filed Critical Shanghai Mechanized Construction Co Ltd
Priority to CN 200810041578 priority Critical patent/CN101650182B/en
Publication of CN101650182A publication Critical patent/CN101650182A/en
Application granted granted Critical
Publication of CN101650182B publication Critical patent/CN101650182B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Length Measuring Devices By Optical Means (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention relates to a method for measuring the verticality of a cylinder in a pile directly during underground engineering one-cylinder-one-pile construction, which is characterized in that a circular tube of which the bottom is sealed is arranged inside the cylinder; the inside of the center of the bottom of the circular tube is provided with a measuring reference point which is distributive light; and the distributive light is a laser beam. On the ground, a center line of the circular tube is positioned on a center line in a stiff steel cylinder, and the circular tube is relatively fixed with the stiff steel cylinder; a theoretical axis position and a reference point of a corresponding pile foundation are marked on the ground in advanced, and after the stiff steel cylinder is put in the cylinder, the top center of the stiff steel cylinder is adjusted and fixed to the theoretical axis position of the corresponding pile foundation; then a vertical collimator is used so as to enable the center of the vertical collimator to align with the reference point on a ground axis; and if a benchmark axis and the measuring reference point of the stiff steel cylinder are positioned on the same straight line, the stiff steel cylinder lies in a vertical state. The method has the advantage of having direct and quick characteristics, measures objects directly, reflects the verticality of the objects, can be used circularly and has economic and high-saving characteristics.

Description

Method for measuring cylinder in pile directly
Technical field
The present invention relates to an a kind of method of directly measuring stake inner cylinder verticality during for underground works one post one pile driving construction.
Background technology
Reverse construction is earlier along building basement axis or construct on every side diaphram wall or other supporting construction, simultaneously the relevant position construction supporting pile of interior of building and with this as construction period or as permanent structure) support of bearing superstructure deadweight and construction loads.The beam slab floor structure of construction ground one deck is as the very big support of diaphram wall rigidity after it is finished, and earth excavation and build each layer underground structure downwards successively subsequently is until the base plate back cover.Because the floor structure of ground one deck has been constructed and finished, and successively carries out the construction of superstructure so can make progress simultaneously, ground is upper and lower constructs simultaneously thereby form, and finishes until engineering.Construction at reverse construction center pillar (rigid steel pile) and supporting pile (cast-in-situ bored pile) is a part and parcel, it is to hole in place after smooth, put down steel reinforcement cage (becoming stake behind the placing concrete) then in the bottom in hole, subsequently the top of steel reinforcement cage interpolation shaped steel (becoming post behind the placing concrete), carry out the perfusion of monolithic concrete behind the location to be measured, stake be whole buildings the basis, be arranged in the soil layer under the whole buildings.Post is the support frame of building, and its is exposed by the excavation back after deposit concrete forms intensity, therefore for the having relatively high expectations of the verticality of post, generally need reach 1/300 to 1/500.And be rigid steel pile top adjunction pile cover again on pile body for the measuring method of interpolation shaped steel before building concrete of post in common underground works one post one pile driving construction at present, thereby make rigid steel pile prolong (exceeding ground), utilize similar triangle theory then, verticality by control ground above pile cover is to reach the verticality of control below ground rigid steel pile, and its reference point of measuring control is the top that is positioned at rigid steel pile end face and the adjunction pile cover on ground.Because the pile cover length that lengthens is significantly less than the length that is embedded in rigid steel pile in the soil, this kind method is the indirect measurement on the long limit of minor face control, and measuring accuracy is lower, generally only has about 1/100, can't reach the job design requirement of present high level and high-rise building.
Summary of the invention
The objective of the invention is to solve the problem that its verticality can't accurately be measured in the major gene insertion boring in the reverse construction of the prior art, a kind of method for measuring cylinder in pile directly is provided.The present invention designs method for measuring cylinder in pile directly, it is characterized in that: the pipe of putting a base seal in column body, in the built-in datum mark of the bottom centre of pipe, on ground the center line of pipe occupy in the rigid steel pile on the center line, and with the rigid steel pile relative fixed, mark theoretical axis position and the reference point of corresponding pile foundation in advance on ground, rigid steel pile is put into behind the pile body its top center adjusted on the theoretical axis position of corresponding pile foundation and fixing.Use plumb aligner then, the reference point with on the centrally aligned ground axis of plumb aligner forms datum axis thus.After this observe the datum mark that is positioned at pipe bottom centre in the rigid steel pile, if the datum mark of datum axis and rigid steel pile is located along the same line, then represent the rigid steel pile plumbness, otherwise, then should adjust rigid steel pile bottom and position, make the datum axis of datum mark and plumb aligner be in coincidence status, and be fixed.The built-in datum mark of the bottom centre of pipe is a concentrated light upwards.Concentrated light is laser beam.Advantage of the present invention be have directly, characteristics fast.It directly measures object itself, the verticality of reflection object.Need not to obtain corresponding data by conversion or other round-about ways.Use this method, the pipe in the built-in rigid steel pile is recyclable to be recycled again, saves cost, and other ancillary method also can be recycled, and has economic high characteristics of saving.
Description of drawings
Accompanying drawing is structural representation of the present invention,
Below in conjunction with example the present invention is elaborated.
Embodiment
At first in cylinder 3, deploy the pipe 1 of a base seal, in the built-in datum mark of the bottom centre of pipe 1, can select laser pen 2 for use, laser pen 2 is upwards placed, laser beam is penetrated along the center line of pipe 1, on ground the center line of pipe 1 is occupy in the rigid steel pile 3 on the center line, and with rigid steel pile 3 usefulness fixed supports 6 relative fixed, so that construction can be extracted after finishing, treat down that the correction of root post is used.Fixed mount 4 is set on ground in advance, and mark the theoretical axis position of corresponding pile foundation and the reference point of appearing the theoretical axis position of pile foundation at fixed mount 4 subscripts, rigid steel pile 3 put into behind the pile body 5 its top center adjusted on the theoretical axis position of corresponding pile foundation and fixing, use plumb aligner, reference point with on the centrally aligned ground axis (on the fixed mount 4) of plumb aligner forms datum axis thus.After this observe the laser beam of the datum mark ejaculation that is positioned at pipe 1 bottom centre in the rigid steel pile, if datum mark and the laser beam of datum axis and rigid steel pile 3 are located along the same line, represent that then rigid steel pile 3 is in plumbness.Otherwise, then should adjust the position of rigid steel pile 3 bottoms, make the laser beam that penetrates on the datum mark and the datum axis of plumb aligner be in coincidence status, be about to post and adjust to vertical position and be fixed, extract the pipe 1 of relative fixed rigid steel pile 3 in then and treat that the root post is proofreaied and correct use down.Can carry out concrete pouring subsequently.

Claims (2)

1. method for measuring cylinder in pile directly, it is characterized in that: the pipe of putting a base seal in column body, in the built-in datum mark of the bottom centre of pipe, the built-in datum mark of the bottom centre of pipe is a concentrated light upwards, on ground the center line of pipe occupy in the rigid steel pile on the center line, and with the rigid steel pile relative fixed, mark theoretical axis position and the reference point of corresponding pile foundation in advance on ground, rigid steel pile put into behind the pile body its top center adjusted on the theoretical axis position of corresponding pile foundation and fixing, use plumb aligner, with the reference point on the centrally aligned ground axis of plumb aligner, form datum axis thus, after this observe the datum mark that is positioned at pipe bottom centre in the rigid steel pile, if the datum mark of datum axis and rigid steel pile is located along the same line, then represent the rigid steel pile plumbness, otherwise, then should adjust rigid steel pile bottom and position, make the datum axis of datum mark and plumb aligner be in coincidence status, and be fixed.
2. by the described method for measuring cylinder in pile directly of claim 1, it is characterized in that: concentrated light is laser beam.
CN 200810041578 2008-08-11 2008-08-11 Method for measuring cylinder in pile directly Expired - Fee Related CN101650182B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200810041578 CN101650182B (en) 2008-08-11 2008-08-11 Method for measuring cylinder in pile directly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200810041578 CN101650182B (en) 2008-08-11 2008-08-11 Method for measuring cylinder in pile directly

Publications (2)

Publication Number Publication Date
CN101650182A CN101650182A (en) 2010-02-17
CN101650182B true CN101650182B (en) 2013-08-07

Family

ID=41672468

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200810041578 Expired - Fee Related CN101650182B (en) 2008-08-11 2008-08-11 Method for measuring cylinder in pile directly

Country Status (1)

Country Link
CN (1) CN101650182B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108895967B (en) * 2018-05-14 2022-06-28 桂林电子科技大学 Position detection method and detection device for karst cave pile foundation casing
CN108798042B (en) * 2018-07-10 2020-09-01 中铁一局集团第二工程有限公司 Steel pipe column integrated construction verticality adjusting method
CN109868851B (en) * 2019-03-15 2020-10-13 中交第三航务工程局有限公司 Measuring method for controlling verticality of wind power foundation steel pipe pile
CN110424951A (en) * 2019-07-04 2019-11-08 中国建筑第八工程局有限公司 The measuring tool and its application method of pile foundation hole perpendicularity

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1345007A1 (en) * 2002-03-12 2003-09-17 Jean-Edouard Gissinger Surveying marker

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1345007A1 (en) * 2002-03-12 2003-09-17 Jean-Edouard Gissinger Surveying marker

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP特开平6-94457A 1994.04.05
仲葆文,等.《灌注桩钢立柱垂直度控制系统的设计和研制》.《华东理工大学学报》.2004,第30卷(第3期),第306-310页. *

Also Published As

Publication number Publication date
CN101650182A (en) 2010-02-17

Similar Documents

Publication Publication Date Title
JP5486863B2 (en) Vertical accuracy control method for structural pillars
CN113605390B (en) Accurate positioning structure for pile connection and construction method
CN104328799A (en) Accurate positioning method for steel pipe column in cover and cut top-down subway station
CN101650182B (en) Method for measuring cylinder in pile directly
CN112900450A (en) Rotary drilling and full-rotation combined back-inserting method positioning method for steel pipe structure pile by reverse construction method
US7530176B2 (en) Method and apparatus for monitoring element alignment
CN109443327A (en) A kind of distribution method of SURVEYING CONTROL NETWORK
CN104372798A (en) Construction method of all-casing all-direction drilling rig
CN113338356A (en) Anti-floating anchor rod construction structure and construction method thereof
CN102966254B (en) Arrangement method for measuring tower used for construction of stub matching method
CN208650087U (en) Steel pipe column fast-positioning device for contrary sequence method
CN214459689U (en) Cast-in-place box girder support of weak soil foundation
CN106087991A (en) The high dug pile construction method at natural below ground of stake top mark
CN103061454A (en) Locating method of installing concrete filled steel tubular column in underground deep hole
CN202266034U (en) Fixing device for anchor bolts of embedded type diamond combined steel and concrete column feet
CN104088292A (en) Axis single-pile multi-tripod foundation and construction method thereof
JPH08120673A (en) Accurate erection method and equipment for steel frame column under ground surface of reverse construction method
CN106403996A (en) Production method of forced centering observation mark stake for precision engineering measurement
CN213572037U (en) High prefabricated stand based on ecological barricade of grid
CN203310412U (en) GNSS (global navigation satellite system) observation pillar for reducing multipath effect
CN214116620U (en) Adjustable support for accurate positioning of permanent double-steel-pipe column
CN112095658A (en) High-prefabricated stand column based on grid ecological retaining wall and construction method for accurate installation of high-prefabricated stand column
CN212175798U (en) Whole strutting arrangement of deep basal pit
CN209308031U (en) A kind of hydraulic modulation platform
CN109235453B (en) Deep foundation pit PRC pipe pile assembled supporting method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI MECHANIZED CONSTRUCTION CO., LTD.

Free format text: FORMER NAME: SHANGHAI CITY MACHINERY CONSTRUCTION CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 201802 Shanghai City, Jiading District Nanxiang Town, Shanghai Yi Road No. 1255

Patentee after: SHANGHAI MECHANIZED CONSTRUCTION GROUP Co.,Ltd.

Address before: 201802 Shanghai City, Jiading District Nanxiang Town, Shanghai Yi Road No. 1255

Patentee before: SHANGHAI MECHANIZED CONSTRUCTION Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130807

Termination date: 20210811