CN101619972A - 一种水库蓄水量的测算方法 - Google Patents

一种水库蓄水量的测算方法 Download PDF

Info

Publication number
CN101619972A
CN101619972A CN200910181895A CN200910181895A CN101619972A CN 101619972 A CN101619972 A CN 101619972A CN 200910181895 A CN200910181895 A CN 200910181895A CN 200910181895 A CN200910181895 A CN 200910181895A CN 101619972 A CN101619972 A CN 101619972A
Authority
CN
China
Prior art keywords
reservoir
water level
pondage
segmentation
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910181895A
Other languages
English (en)
Inventor
唐海华
丁杰
黄春雷
赵宇
王建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing NARI Group Corp
State Grid Electric Power Research Institute
Original Assignee
Nanjing NARI Group Corp
State Grid Electric Power Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing NARI Group Corp, State Grid Electric Power Research Institute filed Critical Nanjing NARI Group Corp
Priority to CN200910181895A priority Critical patent/CN101619972A/zh
Publication of CN101619972A publication Critical patent/CN101619972A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A90/00Technologies having an indirect contribution to adaptation to climate change
    • Y02A90/30Assessment of water resources

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

本发明公开了一种水库蓄水量的测算方法,属于水库调度领域。传统的水库蓄水量以坝前水位作为水库代表水位,通过水位库容曲线插值获得。该方法认为水库水面是以坝前水位为基准点的水平面,忽略了库区上游末端的壅水现象和水库上下游沿程的附加比降影响。对于狭长河道型水库而言,水库长宽比非常大,库区上下游附加比降也较大,上游末端壅水明显,按传统方法插值所得水库蓄水量误差较大,严重影响了水库调度计算精度。本发明采用动态水面线方法,基于库区采集的实测动态水面线资料进行积分计算,包括单元划分测算、遥测水位采集和分段叠加计算三个环节,其中单元划分测算为核心处理环节,遥测水位采集为数据整备环节,单元叠加为结果计算环节。

Description

一种水库蓄水量的测算方法
技术领域
本发明属于水库调度领域,特别涉及基于实测动态水面线的水库蓄水量测算方法。
背景技术
在水库调度领域中,水库蓄水量是所有调度计算的基础,目前国内外主要根据坝前水位作为水库代表水位,在水位静库容曲线上插值获得。
水位静库容曲线插值主要基于两个假定:一是认为水库水面是以坝前水位为基准点的水平面;二是认为水库的总蓄水量仅与水库坝前水位有关,呈单值函数关系,即水位静库容曲线。对于一般的湖泊型水库而言,该方法基本可满足精度要求,但对于狭长的河道型水库而言,则偏差较大,经常导致不合理现象,如在短时段内库蓄水量剧烈变化、水量平衡计算所得入库流量呈锯齿波动、入库流量或出库流量为负值等。
究其原因:对于狭长河道型水库而言,水库末端存在不同程度的壅水现象,与此同时,由于长宽比较大,在河道流速影响下,库区上下游存在一定的附加比降,这与前述的水库水平面假设相矛盾。因此,有必要充分应用现代科技手段,对传统的水库蓄水量计算方法进行改进。
发明内容
本发明的目的在于提供一种更为准确的水库蓄水量测算方法,以提高水库蓄水量的计算精度。本发明提供了一种基于动态水面线的水库蓄水量测算方法,其特征在于,包括以下步骤:
1)水库库区根据地形情况进行沿程单元划分、水位遥测站点布设和大断面地形资料测量;
2)各单元根据大断面地形资料,依次沿水平方向和高程方向积分得单元水位蓄水量曲线:
W ( z ) = ∫ 0 dL ∫ l ( y ) r ( y ) [ z up ( x , y , z ) - z down ( x , y , z ) ] dxdy
其中,(x,y)表示单元蓄水区的任一平面点,x表示横断面方向,y表示沿流速的纵断面方向;zup(x,y,z)、zdown(x,y,z)分别表示单元水面高程为z时,(x,y)处的水面高程与河底高程(m);dL表示单元水库长度(m);l(y)、r(y)分别表示方程 z up ( x , y , z ) = z down ( x , y , z ) | ∀ y , z 的两个解[且设l(y)<r(y)],即任一断面(y)处左、右岸水边的x值;
3)根据水库的水位库容曲线对各单元水位蓄水量曲线进行校正,以保证总水量平衡;
4)针对某时刻,采集库区沿程各水位遥测站点的水位观测值,点绘得库区实测动态水面线;
5)根据实测动态水面线确定水库上游末端回水点和单元叠加方式:
Figure G2009101818952D00023
回水点以上应视为正常的河道槽蓄量,不计入水库总蓄水量;
Figure G2009101818952D00024
对于受异常波动干扰或采集失败引起的异常水位点,应叠加相邻单元以屏蔽异常水位;
6)根据单元叠加方式确定库区分段方案,合并各分段内所有单元水位蓄水量曲线得各分段水位蓄水量曲线:
V ( z ) = Σ i = 1 m ∫ 0 d L i ∫ l i ( y ) r i ( y ) [ z up ( x , y , z ) - z down ( x , y , z ) ] dxdy = Σ i = 1 m W i ( z )
式中,m表示某分段内的单元数,Wi(z)为i单元的水位蓄水量曲线;
7)以各分段上下游断面水位均值作为各分段代表水位,查对应分段水位蓄水量曲线得分段蓄水量,累加各分段蓄水量得水库总蓄水量。
本发明提供的基于动态水面线的水库蓄水量测算方法,立足于水库蓄水量随沿程水面线动态变化这一实际情况,通过实时采集库区沿程的遥测水位获得库区实测水面线,并根据单元水体积分原理,充分考虑了库区末端顶托壅水和沿程附加比降对水库蓄水量的影响,有效提高了水库蓄水量计算精度。
附图说明
图1是测量计算逻辑流程图。
图2是单元划分及遥测站点布设示意图。
图3是大断面地形资料示意图。
图4是分段叠加示意图。
具体实施方式
本发明基于动态水面线的水库蓄水量测算方法主要在于提高水库蓄水量的计算精度,主要由三个环节构成:单元划分测算、遥测水位采集和分段叠加计算。逻辑流程如图1所示。单元划分测算首先根据库区地形情况进行遥测站点布设及单元划分(如图2所示),然后通过各单元内大断面地形资料(如图3所示)积分获得各单元水位蓄水量曲线,并以总库容曲线为标准对各单元水位蓄水量曲线进行校正;遥测水位采集则实时采集库区各遥测站点水位值,按沿程方向点绘得库区实测动态水面过程线;分段叠加计算首先根据动态水面线资料确定分段单元叠加方式及分段水位蓄水量曲线,然后按各分段代表水位查算对应分段蓄水量,最后累加得水库总蓄水量。
1.单元划分测算
Step1:根据库区地形情况,在水流方向的主要地形变化转折点处布置遥测水位站点,如图2的A、B、C、D、E、F、G点;
Step2:以各遥测站点所在横断面对库区进行单元划分,如图2所示的AA′、BB′、CC′、DD′、EE′、FF′、GG′等断面;
Step3:测量库区大断面地形和断面间距资料,如图3所示;
Step4:假定各大断面之间的水体为柱体,应用积分原理计算依次各单元水位蓄水量曲线;
Step5:累加各单元水位蓄水量曲线后与原水位库容曲线对比,可得各单元水位蓄水量曲线修正系数,以此对各单元水位蓄水量曲线进行校正,以确保各单元水位蓄水量曲线累加后与原水位库容曲线保持平衡。
2.遥测水位采集
Step1:采集库区各水位遥测站点的实测水位;
Step2:沿库区流量方向依次点绘各遥测站点的实测水位,形成库区的实测动态水面线,如图4的G-F-E-D-C-B-A过程线;
Step3:根据库区末端的回水点位置,确定水库上游槽蓄水量部分,如图4的GG′断面以上部分;
Step4:通过库区沿程水面线,检查是否存在水位站点采集异常或其他扰动情况,若存在,则可通过叠加相邻单元的方式,消除该站点的异常水位影响,如图4的DD′断面水位异常,应合并上下游两相邻单元。
3.分段叠加计算
Step1:根据库区单元叠加方式确定库区的分段组合,依次叠加各分段对应单元水位蓄水量曲线,得各分段水位蓄水量曲线,若某分段内仅有一个单元,则该分段的水位蓄水量曲线即为对应单元的水位蓄水量曲线;
Step2:以库区各分段上下游断面的实测水位平均值作为各分段代表水位;
Step3:根据各分段代表水位查分段水位蓄水量曲线得各分段蓄水量;
Step4:累加库区各分段蓄水量得水库总蓄水量。

Claims (6)

1.一种水库蓄水量的测算方法,其特征在于,包括以下步骤:
1)水库库区根据地形情况进行沿程单元划分、水位遥测站点布设和大断面地形资料测量;
2)各单元根据大断面地形资料,依次沿水平方向和高程方向积分得单元水位蓄水量曲线:
W ( z ) = ∫ 0 dL ∫ l ( y ) r ( y ) [ z up ( x , y , z ) - z down ( x , y , z ) ] dxdy
其中,(x,y)表示单元蓄水区的任一平面点,x表示横断面方向,y表示沿流速的纵断面方向;zup(x,y,z)、zdown(x,y,z)分别表示单元水面高程为z时,(x,y)处的水面高程与河底高程(m);dL表示单元水库长度(m);l(y)、r(y)分别表示方程 z up ( x , y , z ) = z down ( x , y , z ) | ∀ y , z 的两个解[且设l(y)<r(y)],即任一断面(y)处左、右岸水边的x值;
3)根据水库的水位库容曲线对各单元水位蓄水量曲线进行校正,以保证总水量平衡;
4)针对某时刻,采集库区沿程各水位遥测站点的水位观测值,点绘得库区实测动态水面线;
5)根据实测动态水面线确定水库上游末端回水点和单元叠加方式:
Figure A2009101818950002C3
回水点以上应视为正常的河道槽蓄量,不计入水库总蓄水量;
Figure A2009101818950002C4
对于受异常波动干扰或采集失败引起的异常水位点,应叠加相邻单元以屏蔽异常水位;
6)根据单元叠加方式确定库区分段方案,合并各分段内所有单元水位蓄水量曲线得各分段水位蓄水量曲线:
V ( z ) = Σ i = 1 m ∫ 0 dL i ∫ l i ( y ) r i ( y ) [ z up ( x , y , z ) - z down ( x , y , z ) dxdy = Σ i = 1 m W i ( z )
式中,m表示某分段内的单元数,Wi(z)为i单元的水位蓄水量曲线;
7)以各分段上下游断面水位均值作为各分段代表水位,查对应分段水位蓄水量曲线得分段蓄水量,累加各分段蓄水量得水库总蓄水量。
2.根据权利要求1所述水库蓄水量的测算方法,其特征在于,水库应根据地形情况进行库区单元划分、水位遥测站点布设及大断面地形资料测量。
3.根据权利要求1所述水库蓄水量的测算方法,其特征在于,水库各单元可通过大断面地形资料积分获得对应单元的水位蓄水量关系曲线,并根据水库水位库容曲线对各单元进行修正。
4.根据权利要求1所述水库蓄水量的测算方法,其特征在于,水库需采集库区沿程各水位遥测站点水位,并点绘成库区实测动态水面线。
5.根据权利要求1所述水库蓄水量的测算方法,其特征在于,水库根据库区实测动态水面线确定回水点和单元叠加方式,以此对库区进行分段,并叠加各分段内单元水位蓄水量曲线得各分段水位蓄水量曲线。
6.根据权利要求1所述水库蓄水量的测算方法,其特征在于,某时刻水库总蓄水量应根据库区实测动态水面线确定各分段代表水位,并在各分段水位蓄水量曲线上插值获得各分段蓄水量后累加得到。
CN200910181895A 2009-08-12 2009-08-12 一种水库蓄水量的测算方法 Pending CN101619972A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910181895A CN101619972A (zh) 2009-08-12 2009-08-12 一种水库蓄水量的测算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910181895A CN101619972A (zh) 2009-08-12 2009-08-12 一种水库蓄水量的测算方法

Publications (1)

Publication Number Publication Date
CN101619972A true CN101619972A (zh) 2010-01-06

Family

ID=41513324

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910181895A Pending CN101619972A (zh) 2009-08-12 2009-08-12 一种水库蓄水量的测算方法

Country Status (1)

Country Link
CN (1) CN101619972A (zh)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831887A (zh) * 2010-03-18 2010-09-15 北京师范大学 一种兼顾人类和生态需求的水库兴利库容确定方法
CN102419196A (zh) * 2011-09-02 2012-04-18 广西远长公路桥梁工程有限公司 利用多个水位遥控检测装置自动绘制河流水面线的方法
CN102778215A (zh) * 2012-07-23 2012-11-14 中国神华能源股份有限公司 一种矿井地下水库的库容确定方法
CN105823526A (zh) * 2016-06-16 2016-08-03 唐山现代工控技术有限公司 一种淤积及水位监测仪及其应用方法
CN106415421A (zh) * 2014-08-20 2017-02-15 三菱电机株式会社 工厂系统信息制作装置
CN106802172A (zh) * 2017-01-19 2017-06-06 河南省水利勘测有限公司 一种水库库容精确监测及分析的方法
CN107194615A (zh) * 2017-06-28 2017-09-22 中国神华能源股份有限公司 煤矿地下水库建设适用性的评价方法
CN109858666A (zh) * 2018-12-12 2019-06-07 中国水利水电科学研究院 一种湖泊水资源量评估与预测方法
CN110909490A (zh) * 2019-12-10 2020-03-24 黄河勘测规划设计研究院有限公司 基于简化圣维南方程组的库区冰坝壅水模拟方法
CN111121909A (zh) * 2019-12-31 2020-05-08 长江工程监理咨询有限公司(湖北) 一种确定断面水位的方法、装置、系统及一种电子设备
CN112287528A (zh) * 2020-10-16 2021-01-29 黄河勘测规划设计研究院有限公司 一种基于高滩高槽的多沙河流水库防洪高水位确定方法
CN113268881A (zh) * 2021-05-31 2021-08-17 四川华能康定水电有限责任公司 基于插值计算的水库入库流量测算方法
CN113447096A (zh) * 2020-03-25 2021-09-28 金乡县海阔天空智能科技有限公司 一种冷库冷却水点检测装置
CN114459571A (zh) * 2022-04-12 2022-05-10 中国水利水电科学研究院 一种基于初态水位曲线簇河道初始水位确定方法
CN114817861A (zh) * 2022-05-25 2022-07-29 中国长江三峡集团有限公司 一种考虑回水影响的河道型水库蓄能量测算方法
CN114994702A (zh) * 2022-06-15 2022-09-02 江苏省水利科学研究院 一种基于机载激光雷达的水库库容测算方法
CN117150974A (zh) * 2023-10-31 2023-12-01 长江三峡集团实业发展(北京)有限公司 基于大流量的库区水面线预测方法、装置、设备及介质

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831887A (zh) * 2010-03-18 2010-09-15 北京师范大学 一种兼顾人类和生态需求的水库兴利库容确定方法
CN102419196A (zh) * 2011-09-02 2012-04-18 广西远长公路桥梁工程有限公司 利用多个水位遥控检测装置自动绘制河流水面线的方法
CN102778215A (zh) * 2012-07-23 2012-11-14 中国神华能源股份有限公司 一种矿井地下水库的库容确定方法
CN102778215B (zh) * 2012-07-23 2013-08-21 中国神华能源股份有限公司 一种矿井地下水库的库容确定方法
CN106415421B (zh) * 2014-08-20 2019-01-08 三菱电机株式会社 工厂系统信息制作装置
CN106415421A (zh) * 2014-08-20 2017-02-15 三菱电机株式会社 工厂系统信息制作装置
CN105823526A (zh) * 2016-06-16 2016-08-03 唐山现代工控技术有限公司 一种淤积及水位监测仪及其应用方法
CN106802172A (zh) * 2017-01-19 2017-06-06 河南省水利勘测有限公司 一种水库库容精确监测及分析的方法
CN107194615A (zh) * 2017-06-28 2017-09-22 中国神华能源股份有限公司 煤矿地下水库建设适用性的评价方法
CN109858666A (zh) * 2018-12-12 2019-06-07 中国水利水电科学研究院 一种湖泊水资源量评估与预测方法
CN110909490A (zh) * 2019-12-10 2020-03-24 黄河勘测规划设计研究院有限公司 基于简化圣维南方程组的库区冰坝壅水模拟方法
CN110909490B (zh) * 2019-12-10 2023-03-24 黄河勘测规划设计研究院有限公司 基于简化圣维南方程组的库区冰坝壅水模拟方法
CN111121909A (zh) * 2019-12-31 2020-05-08 长江工程监理咨询有限公司(湖北) 一种确定断面水位的方法、装置、系统及一种电子设备
CN113447096A (zh) * 2020-03-25 2021-09-28 金乡县海阔天空智能科技有限公司 一种冷库冷却水点检测装置
CN113447096B (zh) * 2020-03-25 2022-05-27 金乡县海阔天空智能科技有限公司 一种冷库冷却水点检测装置
CN112287528A (zh) * 2020-10-16 2021-01-29 黄河勘测规划设计研究院有限公司 一种基于高滩高槽的多沙河流水库防洪高水位确定方法
CN112287528B (zh) * 2020-10-16 2021-07-20 黄河勘测规划设计研究院有限公司 一种基于高滩高槽的多沙河流水库防洪高水位确定方法
CN113268881A (zh) * 2021-05-31 2021-08-17 四川华能康定水电有限责任公司 基于插值计算的水库入库流量测算方法
CN114459571A (zh) * 2022-04-12 2022-05-10 中国水利水电科学研究院 一种基于初态水位曲线簇河道初始水位确定方法
CN114459571B (zh) * 2022-04-12 2022-06-07 中国水利水电科学研究院 一种基于初态水位曲线簇河道初始水位确定方法
CN114817861A (zh) * 2022-05-25 2022-07-29 中国长江三峡集团有限公司 一种考虑回水影响的河道型水库蓄能量测算方法
CN114817861B (zh) * 2022-05-25 2024-05-24 中国长江三峡集团有限公司 一种考虑回水影响的河道型水库蓄能量测算方法
CN114994702A (zh) * 2022-06-15 2022-09-02 江苏省水利科学研究院 一种基于机载激光雷达的水库库容测算方法
CN117150974A (zh) * 2023-10-31 2023-12-01 长江三峡集团实业发展(北京)有限公司 基于大流量的库区水面线预测方法、装置、设备及介质
CN117150974B (zh) * 2023-10-31 2024-01-26 长江三峡集团实业发展(北京)有限公司 基于大流量的库区水面线预测方法、装置、设备及介质

Similar Documents

Publication Publication Date Title
CN101619972A (zh) 一种水库蓄水量的测算方法
CN104631392B (zh) 一种基于河相关系的航道整治设计方法
CN114817861B (zh) 一种考虑回水影响的河道型水库蓄能量测算方法
CN109060056A (zh) 一种非接触式雷达测流的河道断面流量计算方法
CN107609300B (zh) 一种既有铁路平面线位整体重构设计方法
CN114580793B (zh) 基于多源互补以及局部调控的水环境优化方法及系统
CN105823526A (zh) 一种淤积及水位监测仪及其应用方法
CN101865683A (zh) 基于应变计的梁式桥位移动态测量系统及测量方法
CN103093088A (zh) 陡坡和弯曲道路的安全评估方法
JP5593459B1 (ja) 山地河川流域の流量推定用回帰関数の演算方法、同関数の選定方法、および山地河川流域の年平均流量推定方法
CN112287436B (zh) 一种多沙河流水库淤积断面和有效库容设计方法及系统
CN102901537A (zh) 一种闸门测流方法及装置
CN110726445A (zh) 一种感潮河段污染物通量在线监测系统及方法
CN103632537B (zh) 一种基于浮动车的城市道路aadt估计方法
CN102565303B (zh) 一种冲沟沟头溯源侵蚀速率的快速监测方法
CN103823936B (zh) 一种确定等流时线的方法
CN103590363A (zh) 下切性河段水位降幅的控制节点定位防护方法
CN104714001B (zh) 一种土壤侵蚀调查单元空间布局的方法
CN106320257A (zh) 基于水文观测的湖库槽蓄曲线确定方法
CN202885872U (zh) 一种闸门测流装置
CN103983323B (zh) 水电站水位测量方法和水电站水位监测系统
CN102589497A (zh) 金矿尾矿库干滩长度的实时测量计算方法
CN103852113A (zh) 一种适用于u形渠道的量水槽及其计量方法
CN109282737A (zh) 一种防波堤抛石挤淤效果测定方法
CN108197426A (zh) 规划排污口任意多点概化下降解系数不确定的小型河道纳污能力估算方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100106