CN102589497A CN2012100490092A CN201210049009A CN102589497A CN 102589497 A CN102589497 A CN 102589497A CN 2012100490092 A CN2012100490092 A CN 2012100490092A CN 201210049009 A CN201210049009 A CN 201210049009A CN 102589497 A CN102589497 A CN 102589497A
Authority
CN
China
Prior art keywords
beach
length
mine tailing
value
point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100490092A
Other languages
English (en)
Inventor
吕孝强
王德荣
于清军
赵琦
周绍青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG GOLD MINING (LINGLONG) CO Ltd
Original Assignee
SHANDONG GOLD MINING (LINGLONG) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG GOLD MINING (LINGLONG) CO Ltd filed Critical SHANDONG GOLD MINING (LINGLONG) CO Ltd
Priority to CN2012100490092A priority Critical patent/CN102589497A/zh
Publication of CN102589497A publication Critical patent/CN102589497A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Measurement Of Levels Of Liquids Or Fluent Solid Materials (AREA)

Abstract

本发明涉及一种金矿尾矿库干滩长度的实时测量计算方法,根据尾矿库滩面坡度相对固定、在线监测项目中库水位的高程已实时显示、滩顶高程定期测定而且变化周期较长的情况,依据库水位与滩顶高程的差值及坡比计算出干滩长度,进而得知尾矿库水面到达的区域。该方法能够实时确定计算出干滩长度,解决了干滩长度难于及时测量的问题。尤其是对于深夜、降雨天气等恶劣气候条件下的干滩长度测定,保障尾矿库的安全运行,起到了非常重要的作用。

Description

金矿尾矿库干滩长度的实时测量计算方法
 
技术领域
本发明涉及一种尾矿库干滩长度的实时测量计算方法。
背景技术
尾矿库干滩长度是研判尾矿库汛期能否安全度汛的重要指标,也是评价尾矿库安全性能的关键参数。在尾矿库在线监测技术实施过程中,尾矿库的干滩长度测定一直是一项棘手的难题。目前,在金矿领域,尾矿库干滩长度主要依靠人工实地测量方式,一方面无法获得干滩长度的实时数据;另一方面,人工实地测量通常存在效率低、准确度差等缺点,尤其是在深夜、降雨天气等恶劣环境和气候条件下,这种方式实现起来困难很大。
因此,依靠现有的人工实地测量方式不能满足及时获取干滩长度数据,汛期实时决策的要求,无法保障尾矿库的安全运行。
发明内容
本发明所要解决的技术问题是,提供一种金矿尾矿库干滩长度的实时测量计算方法。通过检测库水位高程、实测干滩坡比实时计算出干滩长度。
为了解决这一技术问题,本发明采用以下技术方案:
一种金矿尾矿库干滩长度的实时测量计算方法,其特征在于:将干滩的顶点T与地平面的垂直距离定义为H并作为滩顶高程,过所述顶点T且与地平面垂直的线段TO与地平面交于O点,将库水位高程定义为h2,将线段TO与水面的交点定义为N,将干滩远端距离N点最近的点定义为F点,并将线段NF的长度L作为干滩长度,将直角三角形TNF中TF与NF之间的夹角定义为α并作为干滩坡比;
在尾矿矿石粒度、矿浆浓度一定,且尾矿输送泵动力不变的情况下,经过实测得到α值;
每出一次尾矿获得一个H值;
实时测量h2,线段TN的长度h1=H- h2
以α、h1值为依据计算得到L值;
当尾矿矿石粒度、矿浆浓度之一项或者两项改变时,或者尾矿输送泵动力改变时,重新实测α值。
本发明的积极效果在于:
本发明根据尾矿库滩面坡度相对固定、在线监测项目中库水位的高程已实时显示、滩顶高程定期测定而且变化周期较长的情况,依据库水位与滩顶高程的差值及坡比计算出干滩长度,进而得知尾矿库水面到达的区域。
该方法能够实时确定计算出干滩长度,解决了干滩长度难于及时测量的问题。尤其是对于深夜、降雨天气等恶劣气候条件下的干滩长度测定,保障尾矿库的安全运行,起到了非常重要的作用。
本方法还具有测量误差小、人力成本低,操作简便易行的突出特点。
附图说明
图1为本发明的测量计算原理示意图。
具体实施方式
下面结合附图和具体实施方式对本发明做进一步的描述。
如图1所示,以地平面为基准,将干滩的顶点T与地平面的垂直距离定义为H并作为滩顶高程,过所述顶点T且与地平面垂直的线段TO与地平面交于O点。将库水位高程定义为h2,将线段TO与水面的交点定义为N,将干滩远端距离N点最近的点定义为F点,并将线段NF的长度L作为干滩长度。将直角三角形TNF中TF与NF之间的夹角定义为α并作为干滩坡比。线段TN的长度h1=H- h2
之所以将干滩远端距离N点最近的点定义为F点,是为了使直角三角形TNF所处的平面与干滩水平流动方向相平行,以确保线段NF的长度L能够准确代表干滩长度。
影响干滩坡比的因素主要是尾矿矿石粒度、矿浆浓度和尾矿输送泵动力。在特定选矿工艺条件下,尾矿矿石粒度、矿浆浓度一定,尾矿输送泵动力不变的情况下,干滩坡比稳定,经过实测得到α值。
每出一次尾矿获得一个H值,因此在计算时H值是已知的。
实时测量h2,换算得到h1的值。
以α、h1值为依据计算得到L值。
当选矿工艺改变,导致尾矿矿石粒度、矿浆浓度之一项或者两项改变时,或者尾矿输送泵动力改变时,重新实测α值。
在玲珑金矿的实践中,利用上述测量计算方法建立了蓄水区3D地形模型。由于尾矿库库区地形随着筑坝、排矿等条件,地形随时变化,所以每隔1-3个月更新一次库区地形模型:选取多个垂直于坝顶的测线,测出滩面高程,水位高程及干滩长度,建立起该测线模型;通过多个测线建立起了整个库区的三维地形模型。测线采用线性模拟或者根据排矿粒度、含水量等参数计算出沉积模拟曲线。
根据实测的库区水位数据和库区三维地形数据,成功计算出了任意点干滩长度。目前计算公式已输入软件系统,通过人工输入几个测点的滩顶高程,即能够自动形成干滩长度数据。

Claims (1)

1.一种金矿尾矿库干滩长度的实时测量计算方法,其特征在于:将干滩的顶点T与地平面的垂直距离定义为H并作为滩顶高程,过所述顶点T且与地平面垂直的线段TO与地平面交于O点,将库水位高程定义为h2,将线段TO与水面的交点定义为N,将干滩远端距离N点最近的点定义为F点,并将线段NF的长度L作为干滩长度,将直角三角形TNF中TF与NF之间的夹角定义为α并作为干滩坡比;
在尾矿矿石粒度、矿浆浓度一定,且尾矿输送泵动力不变的情况下,经过实测得到α值;每出一次尾矿获得一个H值;
实时测量h2,线段TN的长度h1=H- h2
以α、h1值为依据计算得到L值;
当尾矿矿石粒度、矿浆浓度之一项或者两项改变时,或者尾矿输送泵动力改变时,重新实测α值。
CN2012100490092A 2012-02-29 2012-02-29 金矿尾矿库干滩长度的实时测量计算方法 Pending CN102589497A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100490092A CN102589497A (zh) 2012-02-29 2012-02-29 金矿尾矿库干滩长度的实时测量计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100490092A CN102589497A (zh) 2012-02-29 2012-02-29 金矿尾矿库干滩长度的实时测量计算方法

Publications (1)

Publication Number Publication Date
CN102589497A true CN102589497A (zh) 2012-07-18

Family

ID=46478489

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100490092A Pending CN102589497A (zh) 2012-02-29 2012-02-29 金矿尾矿库干滩长度的实时测量计算方法

Country Status (1)

Country Link
CN (1) CN102589497A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103852041A (zh) * 2014-03-05 2014-06-11 北京矿冶研究总院 一种尾矿库干滩长度在线监测的方法
CN110132200A (zh) * 2019-05-07 2019-08-16 四川安信科创科技有限公司 基于北斗及视频识别的尾矿库干滩动态监测方法及系统
CN111121686A (zh) * 2019-11-11 2020-05-08 广州中海达创新科技集团有限公司 一种干滩测量系统、干滩长度的计算展示方法及存储介质
CN115984355A (zh) * 2023-03-20 2023-04-18 上海米度测控科技有限公司 一种基于深度学习计算尾矿库干滩长度的方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1559799A2 (en) * 2004-01-29 2005-08-03 Minera Michilla S.A. Procedure to leach copper concentrates, under pressure and at ambient temperature, by forming a reactive gel in a sulfate-chloride medium
CN201237502Y (zh) * 2008-06-19 2009-05-13 北京矿咨信矿业技术研究有限公司 尾矿库干滩自动化监测系统
CN101718527A (zh) * 2009-12-17 2010-06-02 丹东东方测控技术有限公司 一种基于图像识别计算尾矿库干滩长度的方法
CN101865684A (zh) * 2010-05-05 2010-10-20 西安交通大学 一种测量干滩坡度和长度的装置和方法
US20100264241A1 (en) * 2009-04-15 2010-10-21 Phoenix Environmental Reclamation Ultrasonic crushing apparatus and method
CN201993108U (zh) * 2010-12-24 2011-09-28 成都飞辉虹科技有限责任公司 尾矿库在线智能监测系统

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1559799A2 (en) * 2004-01-29 2005-08-03 Minera Michilla S.A. Procedure to leach copper concentrates, under pressure and at ambient temperature, by forming a reactive gel in a sulfate-chloride medium
CN201237502Y (zh) * 2008-06-19 2009-05-13 北京矿咨信矿业技术研究有限公司 尾矿库干滩自动化监测系统
US20100264241A1 (en) * 2009-04-15 2010-10-21 Phoenix Environmental Reclamation Ultrasonic crushing apparatus and method
CN101718527A (zh) * 2009-12-17 2010-06-02 丹东东方测控技术有限公司 一种基于图像识别计算尾矿库干滩长度的方法
CN101865684A (zh) * 2010-05-05 2010-10-20 西安交通大学 一种测量干滩坡度和长度的装置和方法
CN201993108U (zh) * 2010-12-24 2011-09-28 成都飞辉虹科技有限责任公司 尾矿库在线智能监测系统

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103852041A (zh) * 2014-03-05 2014-06-11 北京矿冶研究总院 一种尾矿库干滩长度在线监测的方法
CN103852041B (zh) * 2014-03-05 2017-01-04 北京矿冶研究总院 一种尾矿库干滩长度在线监测的方法
CN110132200A (zh) * 2019-05-07 2019-08-16 四川安信科创科技有限公司 基于北斗及视频识别的尾矿库干滩动态监测方法及系统
CN111121686A (zh) * 2019-11-11 2020-05-08 广州中海达创新科技集团有限公司 一种干滩测量系统、干滩长度的计算展示方法及存储介质
CN115984355A (zh) * 2023-03-20 2023-04-18 上海米度测控科技有限公司 一种基于深度学习计算尾矿库干滩长度的方法

Similar Documents

Publication Publication Date Title
CN109060056B (zh) 一种非接触式雷达测流的河道断面流量计算方法
CN109345777B (zh) 基于陡坡汇流和断面流量计算的山洪泥石流预警方法和系统
CN106446411A (zh) 粘性泥石流内部流速、冲击力空间分布测量方法
Ou et al. Advancements and challenges in rill formation, morphology, measurement and modeling
Bossi et al. Multi-temporal LiDAR-DTMs as a tool for modelling a complex landslide: A case study in the Rotolon catchment (eastern Italian Alps)
CN103235883A (zh) 一种基于非接触式河流表面测速的瞬时流量回归计算方法
CN104631392B (zh) 一种基于河相关系的航道整治设计方法
CN201177529Y (zh) 水位远程测报系统
CN104652347A (zh) 山区非静态水体水位与淹没影响人口关系评价方法
Sun et al. Tailings dam flood overtopping failure evolution pattern
CN106157544A (zh) 沟谷型泥石流的监测预警方法和装置
CN102589497A (zh) 金矿尾矿库干滩长度的实时测量计算方法
CN103837196A (zh) 一种尾矿库干滩参数监测系统及方法
CN105136072B (zh) 一种隧道衬砌裂缝深度测量方法及测量装置
CN106680454A (zh) 一种具拦沙坝已治理崩岗土壤侵蚀模数测算方法
CN104091040A (zh) 一种土壤入渗性能计算方法
CN103823936B (zh) 一种确定等流时线的方法
CN103422463B (zh) 梯级通航枢纽物理模型数学模型一体化试验方法
CN202885872U (zh) 一种闸门测流装置
CN108411844A (zh) 一种天然沟道不规则断面的泥石流流速场的分析及装置
CN106192865B (zh) 一种泥石流弯道超高计算方法及其应用
CN103808487A (zh) 一种测量并计算风蚀模型的方法
CN106777734A (zh) 一种山地滑坡预测方法
CN111859257A (zh) 一种水位非匀速涨落过程山区岸滩浸润线位置确定方法
CN105133549A (zh) 三角形量水堰

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120718