CN101614133B - High pressure jet drilling and slotting integration pressure-release anti-burst method - Google Patents

High pressure jet drilling and slotting integration pressure-release anti-burst method Download PDF

Info

Publication number
CN101614133B
CN101614133B CN2009101821194A CN200910182119A CN101614133B CN 101614133 B CN101614133 B CN 101614133B CN 2009101821194 A CN2009101821194 A CN 2009101821194A CN 200910182119 A CN200910182119 A CN 200910182119A CN 101614133 B CN101614133 B CN 101614133B
Authority
CN
China
Prior art keywords
coal
drilling
high pressure
pressure
slotting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009101821194A
Other languages
Chinese (zh)
Other versions
CN101614133A (en
Inventor
林柏泉
翟成
吴海进
张连军
杨威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN2009101821194A priority Critical patent/CN101614133B/en
Publication of CN101614133A publication Critical patent/CN101614133A/en
Application granted granted Critical
Publication of CN101614133B publication Critical patent/CN101614133B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention relates to a high pressure jet drilling and slotting integration pressure-release anti-burst method, which combines a high pressure jet method and a drilling construction method to realize the integration of drilling and slotting. When a press control drill scalpel drilling bit drills to a preset position of a coal seam, applies high pressure jet with the pressure between 25 and 35MPa and the flow rate between 40 and 80L/min in a bore hole to cut the coal body on two sides of the bore hole; in the slotting process, the coal flow rate is between 4 and 8kg/min, and a flat slot with the radius between 400 and 700mm and the seam width of 25mm is formed on the two sides of the bore hole; and the high pressure jet carries the cut coal body out of the bore hole. By the method, the coal body exposure area is increased, the flat slot is equivalent to a thin protective layer exploited in a local range, the coal body near the bore hole achieves pressure release, and the air permeability of the coal body is improved by 200 to 300 times so as to create good conditions for pressure release and gas release and flow inside the coal seam. The method has the advantages of having wide pressure release range and fully integral pressure release of the coal seam, improving the capacity of coal seam gas drainage, and having effective anti-burst function and comprehensive practicability.

Description

High pressure jet drilling and slotting integration pressure-release anti-burst method
Technical field
The present invention relates to high pressure jet drilling and slotting integration pressure-release anti-burst method, be particularly useful for the projecting coal bed regional pressure-relief outburst-prevention of the high gas low-permeable in colliery.
Background technology
Coal and gas are outstanding to be serious natural calamity one in the process of coal mining, and along with the increase of mining depth, coal-bed gas pressure and content increase, ature of coal is soft, and gas permeability of coal seam is low, and gas outburst risk further strengthens, outstanding number of times day by day increases, and the disaster that causes is also serious day by day.In order to eliminate the projecting coal bed outburst hazard of high gas low-permeable, China has carried out the investigative test research of multiple anti-burst method to high gas low-permeable outburst danger coal seam since the seventies in 20th century.
The projecting coal bed work plane extinction of present high gas low-permeable method and measure mainly contains: exploitation topping, regional gas are taken out in advance, advance borehole, longhole infusion, hydraulic flushing in hole, deep hole loosening blasting and Deep-hole Controlled Blasting etc.Certain effect has more or less all been played in various measures in the part, it is abundant inadequately that these anti-burst method ubiquities whole release, and occurring implementation method aftereffect inspection index easily transfinites problems such as working procedure complexity.
Summary of the invention
Technical problem: it is simple to the purpose of this invention is to provide a kind of method, time saving and energy saving, the effective high pressure jet drilling and slotting integration pressure-release anti-burst method of release.
Technical scheme: high pressure jet drilling and slotting integration pressure-release anti-burst method of the present invention:
(1) the through hole drilling rod that will have a high pressure sealing with rig to the coal seam along layer or layer-through drilling to desired location;
(2) start rig and move back the brill operation, start the high pressure pumping plant simultaneously, by the high pressure sealing through hole drilling rod in holing the high-pressure spray of certain pressure and flow is carried out the limit to the coal body of boring both sides and move back and bore the limit cutting, make the boring both sides form the flat slot of certain width and height;
(3) the coal seam section is carried out slot; Under the layer-through drilling situation, coal seam section total length is carried out slot; The coal seam along layer boring, is stopped the slot operation at distance drilling orifice 5~10m place, directly withdraw from drilling rod;
(4) continue the creeping into of next boring, slot operation.
Described certain pressure is 25~30MPa, and flow is 40~80L/min; The described flat slot radius that forms in the boring both sides is the wide 25mm of being of 400~700mm, seam.
Beneficial effect: the present invention combines high-pressure spray with drilling construction, and realization is crept into slot integrated, can solve the gas outstanding problem in the projecting coal bed recovery process of high gas low-permeable safely and effectively.Rig is after carrying out the hydraulic slotted liner technique measure, at first increased the coal body exposed area, be equivalent to exploit in the subrange one deck topping as thin as a wafer, reach a layer interior self-emancipation, give the inner release in coal seam, gas release and flow and created good condition, consequently cause the slot fully release of the certain limit of coal body up and down, increased the permeability in coal seam; Secondly, slot that slot forms in coal body or space make slot coal body on every side move to the slot space, thereby have more enlarged slot release, gas-removing scope under the effect of geostatic stress.Because cutting, the percussion of hydraulic slotted liner technique, a part of coal body is shot down by water under high pressure and washes away around the boring, form flat slot space, this slot can make on every side that coal body is subjected to displacement and exapnsion, has increased the crack in the coal body, has improved the Gas Flow state in the coal seam greatly, the virgin stress and the crack situation of coal body have been changed, stress tense situation in coal body and the country rock is to a certain degree relaxed, and reaches a large amount of releases of outstanding potential, makes the coal petrography hardening.Like this, both weakened or eliminated outstanding power, and changed projecting coal bed physical and mechanical properties again greatly, so high pressure jet drilling and slotting integration pressure-release anti-burst method can play and prevents the useful effect given prominence to.By the projecting coal bed boring of high gas low-permeable, the disposable of slot are finished, improved the gas permeability in coal seam, give the inner release in coal seam, gas release and flow and created good condition.This method has increased the coal body exposed area; and flat slot has been equivalent to exploit in the subrange one deck topping as thin as a wafer; coal body has obtained release near the boring; the coal body gas permeability has improved 200~300 times; give the inner release in coal seam, gas release and flow and created good condition; big, the whole release of this method coal seam release scope is abundant; improve the ability of extraction coal-bed gas; play and prevent the useful effect given prominence to; this method is easy to operate, operation is simple; save the working time greatly, alleviated workman's workload, had practicality widely.
The specific embodiment
High pressure jet drilling and slotting integration pressure-release anti-burst method of the present invention: adopt high-pressure spray to combine with drilling construction, realization is crept into slot integrated, and the gas that solves in the projecting coal bed recovery process of high gas low-permeable is outstanding.At first use rig to suitable layer in coal seam or layer-through drilling to the coal seam in the projecting coal bed zone of high gas low-permeable, low-pressure water, drilling construction and common drilling construction basically identical are adopted in boring.Low-pressure water is delivered to the positive nozzle ejaculation that voltage-controlled brill cuts the drill bit position through rig, drilling rod, finish jointly with rig and to creep into operation, after creeping into end, rig stops operating, only move back the brill operation, after high service system hydraulic pressure reaches scheduled pressure value 25~35MPa, as required, water under high pressure can be mixed mutually with the abrasive particle that the abrasive material loading system produces, form liquid-solid two-phase fluid.The drilling rod of boring is the special through hole drilling rod with high pressure sealing, and this drilling rod can bear the high-pressure spray of 20~30MPa and not reveal, and is drilled into desired location, and desired location is determined the degree of depth, inclination angle, the elevation angle of boring according to geologic parameter.When voltage-controlled brill cuts after bit drills enters the coal seam desired location, stop to creep into, control voltage-controlled brill and cut the switching of the low-pressure water of drill bit to water under high pressure this moment, start rig then and move back the brill operation, start the high pressure pumping plant simultaneously, utilization pressure is that 25~35MPa, flow are that the high-pressure spray of 40~80L/min cuts the coal body of the both sides of holing in boring, coal flow in the slot process is at 4~8kg/min, form the flat slot of radius a 400~700mm, the wide 25mm of seam in the boring both sides, in moving back the process of brill, implement to finish the operation of high-pressure spray slot.Under the layer-through drilling situation, coal seam section total length is carried out slot.At holing of high gas low air permeability coal seam along layer, in order to guarantee job safety and to help the aperture is sealed extraction, need leave certain leading distance, can stop the slot operation at 5~10m place, distance aperture as required, directly withdraw from drilling rod.Repeat said process, continue the creeping into of next boring, slot operation.

Claims (3)

1. high pressure jet drilling and slotting integration pressure-release anti-burst method is characterized in that:
(1) the through hole drilling rod that will have a high pressure sealing with rig to the coal seam along layer or layer-through drilling to desired location;
(2) start rig and move back the brill operation, start the high pressure pumping plant simultaneously, by the high pressure sealing through hole drilling rod in holing the high-pressure spray of certain pressure and flow is carried out the limit to the coal body of boring both sides and move back and bore the limit cutting, make the boring both sides form the flat slot of certain width and height;
(3) the coal seam section is carried out slot; Under the layer-through drilling situation, coal seam section total length is carried out slot; The coal seam along layer boring, is stopped the slot operation at distance drilling orifice 5~10m place, directly withdraw from drilling rod;
(4) continue the creeping into of next boring, slot operation.
2. high pressure jet drilling and slotting integration pressure-release anti-burst method according to claim 1 is characterized in that: described certain pressure is 25~30MPa, and flow is 40~80L/min.
3. high pressure jet drilling and slotting integration pressure-release anti-burst method according to claim 1 is characterized in that: the described flat slot radius that forms in the boring both sides is the wide 25mm of being of 400~700mm, seam.
CN2009101821194A 2009-07-14 2009-07-14 High pressure jet drilling and slotting integration pressure-release anti-burst method Expired - Fee Related CN101614133B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101821194A CN101614133B (en) 2009-07-14 2009-07-14 High pressure jet drilling and slotting integration pressure-release anti-burst method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101821194A CN101614133B (en) 2009-07-14 2009-07-14 High pressure jet drilling and slotting integration pressure-release anti-burst method

Publications (2)

Publication Number Publication Date
CN101614133A CN101614133A (en) 2009-12-30
CN101614133B true CN101614133B (en) 2011-07-06

Family

ID=41494000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101821194A Expired - Fee Related CN101614133B (en) 2009-07-14 2009-07-14 High pressure jet drilling and slotting integration pressure-release anti-burst method

Country Status (1)

Country Link
CN (1) CN101614133B (en)

Families Citing this family (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102010005353B4 (en) * 2010-01-21 2015-12-31 Thyssenkrupp Industrial Solutions Ag Process for the preparation of individual compartments suitable for coke oven by non-mechanical dividing of a carbon press cake
CN101824982A (en) * 2010-04-19 2010-09-08 中国矿业大学 Coal bed gas drainage effective radius measuring method
CN101915098A (en) * 2010-07-14 2010-12-15 中国矿业大学 Method for preventing and controlling rock burst through hydraulic cutting
CN101936160B (en) * 2010-08-11 2012-06-27 郑州煤炭工业(集团)有限责任公司 Three-soft coal bed rotary-cut drilling elimination outburst method and rotary-cut drilling device
CN102071955B (en) * 2010-11-03 2013-01-23 河南理工大学 Soft outburst coal seam tunneling reserved coal body reinforcement and outburst-proof method
CN102465712B (en) * 2010-11-15 2015-01-28 湖南汉寿中煤科技有限公司 Drilling-cutting-linked coal layer gas drainage and outburst prevention system and method based on ultra-long drilling and high-pressure water jetting
WO2012065295A1 (en) * 2010-11-15 2012-05-24 湖南汉寿中煤科技有限公司 System and method for gas drainage and outburst prevention in coal seam by drill-cut linkage of long drilling hole and high pressure water jet
CN102022133B (en) * 2010-11-16 2012-07-25 郑州大学 Regional gas underground high-pressure jet hole digging, pressure relief and outburst prevention method
CN102041966A (en) * 2010-12-03 2011-05-04 中国矿业大学 In-seam or across-seam double-power quick drilling and chambering integrated device and method
CN102168560A (en) * 2011-03-10 2011-08-31 贵州铸安矿山科技股份有限公司 Displacement crosscut coal uncovering method
CN102230363B (en) * 2011-06-10 2013-03-27 河南理工大学 Device and method for drilling and forming hole in coal rock in structural belt
CN102493833A (en) * 2011-11-25 2012-06-13 重庆市能源投资集团科技有限责任公司 Depressurized extraction method for cutting through roof or floor of coal seam by abrasive water jet
CN102852506B (en) * 2012-10-17 2014-05-14 中国矿业大学 High-pressure pneumatic blasting pressure relieving and transmission increasing method
CN103016044B (en) * 2012-11-27 2014-12-10 河南理工大学 Comprehensive method of drilling, permeability increasing, repairing and gas-driven displacing of drill hole underground coal mine
CN103939129B (en) * 2014-04-10 2016-03-16 河南理工大学 Integrated apparatus taken out by brill
CN104389559B (en) * 2014-09-30 2017-04-26 河南理工大学 Method and device for preventing and controlling gas transfinite in thick-coal-seam mining process
CN104612746B (en) * 2015-01-12 2016-08-24 中国矿业大学 -quick-fried manifold type coal body anti-reflection method is cut in a kind of boring
CN106468176B (en) * 2015-08-16 2018-11-13 郑州大学 A kind of coal mine release outburst elimination method of the micro- Protective Coal Seam of wire cutting
CN106640180B (en) * 2015-08-16 2018-11-13 郑州大学 A kind of coal mine release extinction of the micro- Protective Coal Seam of circulating wire cutting and coal-bed gas exploitation system and method
CN106640181B (en) * 2015-08-16 2018-11-13 郑州大学 A kind of coal mine release extinction of the micro- Protective Coal Seam of reciprocating wire cutting and coal-bed gas exploitation system and method
CN108871411A (en) * 2018-06-27 2018-11-23 中煤科工集团重庆研究院有限公司 Hydraulic seam-cutting pressure relief evaluation method for cross-layer drilling
CN110259378B (en) * 2019-07-03 2020-07-28 中煤科工集团重庆研究院有限公司 Drilling hole design method for eliminating blank zone of pre-pumping coal seam of bottom pumping roadway cross-layer drilling hole
CN112593999B (en) * 2020-12-24 2023-04-25 山西晋煤集团技术研究院有限责任公司 Directional long-drilling hydraulic permeability-increasing method for soft coal seam and/or soft and hard composite coal seam
CN114810197B (en) * 2022-05-19 2022-10-25 贵州一和科技有限公司 Gas permeability increasing method for coal roadway driving face dynamic and static combined action
CN115614006B (en) * 2022-10-27 2023-08-18 重庆大学 Coal gas exploitation method combining layered pressure relief and multi-layer combined mining

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1097807A1 (en) * 1982-01-20 1984-06-15 Донецкий Ордена Трудового Красного Знамени Политехнический Институт Method of coal stratum degassing
RU2307244C1 (en) * 2006-02-20 2007-09-27 Институт угля и углехимии СО РАН (ИУУ СО РАН) Method for underground coal seam series gasification
CN101082283A (en) * 2007-06-29 2007-12-05 淮南矿业(集团)有限责任公司 Gob-side entry retaining Y-shaped ventilation goaf roof pressure relief gas extraction method
CN101117894A (en) * 2007-08-24 2008-02-06 阳泉煤业(集团)有限责任公司 Fully mechanized coal face high suction tunnel lower-returning drilling primary mining gas drainage method
CN101251028A (en) * 2008-04-03 2008-08-27 淮南矿业(集团)有限责任公司 Method for taking out and picking high gassy seam group dislodging gob-side entry retaining Y type ventilated decompression firedamp

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1097807A1 (en) * 1982-01-20 1984-06-15 Донецкий Ордена Трудового Красного Знамени Политехнический Институт Method of coal stratum degassing
RU2307244C1 (en) * 2006-02-20 2007-09-27 Институт угля и углехимии СО РАН (ИУУ СО РАН) Method for underground coal seam series gasification
CN101082283A (en) * 2007-06-29 2007-12-05 淮南矿业(集团)有限责任公司 Gob-side entry retaining Y-shaped ventilation goaf roof pressure relief gas extraction method
CN101117894A (en) * 2007-08-24 2008-02-06 阳泉煤业(集团)有限责任公司 Fully mechanized coal face high suction tunnel lower-returning drilling primary mining gas drainage method
CN101251028A (en) * 2008-04-03 2008-08-27 淮南矿业(集团)有限责任公司 Method for taking out and picking high gassy seam group dislodging gob-side entry retaining Y type ventilated decompression firedamp

Also Published As

Publication number Publication date
CN101614133A (en) 2009-12-30

Similar Documents

Publication Publication Date Title
CN101614133B (en) High pressure jet drilling and slotting integration pressure-release anti-burst method
CN102383828B (en) Refection reducing and outburst eliminating method for deep-hole hydraulic fracture driving gas shallow hole extraction
CN102619552B (en) Directional hydraulic pressing penetration, permeability increase and outburst elimination method of guide groove
CN103362538B (en) Coal seam cutting, fracturing, pressure pumping and alternating gas extraction method
WO2017092207A1 (en) Method of performing combined drilling, flushing, and cutting operations on coal seam having high gas content and prone to bursts to relieve pressure and increase permeability
CN110195580B (en) Gas-liquid two-phase combined coal bed permeability increasing method
CN201090139Y (en) Press control drill scalpel integration drilling bit
CN101666241B (en) Integrated drilling-blasting-pressurizing-drawing protrusion preventing method for regional gas control
CN101644166A (en) Method for extracting gas from high gas low permeability coal seam by punching, slotting, pressure releasing, and permeability increasing
CN106988680A (en) Ice pellets abradant jet Aided Machine drills and coal seam cutting method
CN105370256A (en) Method for increasing wetting radius of high-pressure water injection of low-air-permeability coal seams through sectioned pre-splitting
CN107023295B (en) Hard coal erosion-prevention pressure-relief drilling construction method and equipment
CN105804786B (en) A kind of weak seam bottom plate layer-through drilling pressure rushes anti-reflection method
CN203499569U (en) Water-pressure-controlled drilling and blanking integrated efficient drill bit
CN101538987B (en) Anchoring drilling machine based on working mode of double-pump complementation automatic merging
CN102966372A (en) Slotting induced-flow pressure-relief anti-reflection method for complicated seam
CN105909225A (en) Fully mechanized caving face inter-frame oriented hydraulic fracturing top-coal weakening method
CN105041218B (en) A kind of anti-collapse two-way rib winged injection grouting drill bit and its application method
CN102748065A (en) Method for extracting gas of blank zone of working face with large mining length
CN108868874A (en) Hydraulic slotting process method for downward bedding drilling
CN102678166A (en) Method for increasing gas extraction rate by permeability increasing of single thick coal seam
CN102268966B (en) Hard rock crushing drill bit and method for crushing hard rock
CN102926797B (en) Drilling, dust discharging and permeability-increasing integrated device for high gas pressure, high geostress and high crushing (three-high) area of coal mine
CN101975023B (en) Method and device for drilling deep and long gas drainage hole in soft coal seam along layers
CN204266925U (en) A kind of coal mine roadway rock-reinforcing anti-collapse hole drill head

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110706

Termination date: 20160714