CN101566277B - Gas dispenser and gas station composed of the same - Google Patents

Gas dispenser and gas station composed of the same Download PDF

Info

Publication number
CN101566277B
CN101566277B CN 200910141153 CN200910141153A CN101566277B CN 101566277 B CN101566277 B CN 101566277B CN 200910141153 CN200910141153 CN 200910141153 CN 200910141153 A CN200910141153 A CN 200910141153A CN 101566277 B CN101566277 B CN 101566277B
Authority
CN
China
Prior art keywords
gas
gas cylinder
pressure
high pressure
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 200910141153
Other languages
Chinese (zh)
Other versions
CN101566277A (en
Inventor
沈军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200910141153 priority Critical patent/CN101566277B/en
Publication of CN101566277A publication Critical patent/CN101566277A/en
Application granted granted Critical
Publication of CN101566277B publication Critical patent/CN101566277B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C5/00Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures
    • F17C5/002Automated filling apparatus
    • F17C5/005Automated filling apparatus for gas bottles, such as on a continuous belt or on a merry-go-round
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2205/00Vessel construction, in particular mounting arrangements, attachments or identifications means
    • F17C2205/03Fluid connections, filters, valves, closure means or other attachments
    • F17C2205/0302Fittings, valves, filters, or components in connection with the gas storage device
    • F17C2205/0323Valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/03Mixtures
    • F17C2221/032Hydrocarbons
    • F17C2221/033Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/01Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
    • F17C2223/0107Single phase
    • F17C2223/0123Single phase gaseous, e.g. CNG, GNC
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/01Propulsion of the fluid
    • F17C2227/0128Propulsion of the fluid with pumps or compressors
    • F17C2227/0135Pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/01Propulsion of the fluid
    • F17C2227/0128Propulsion of the fluid with pumps or compressors
    • F17C2227/0157Compressors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2250/00Accessories; Control means; Indicating, measuring or monitoring of parameters
    • F17C2250/03Control means
    • F17C2250/032Control means using computers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2250/00Accessories; Control means; Indicating, measuring or monitoring of parameters
    • F17C2250/06Controlling or regulating of parameters as output values
    • F17C2250/0605Parameters
    • F17C2250/0636Flow or movement of content

Abstract

A gas dispenser is technically characterized in that a PLC firstly collects the pressure value of a pressure sensor in a gas dispersion gun, namely the pressure value in a vehicular gas cylinder. Thenthe pressure value is added with a preset value, wherein 0<the preset value <20. The summation is compared with the pressure value of each pressure sensor under a plurality of gas cylinder openings. The valve corresponding with the pressure value which is most approximative to and larger than the summation is opened for dispensing the gas through pressure difference. The steps are adopted again before balancing or after balancing. The steps are repeated until the value of the pressure sensor in the gas dispersion gun is the rated pressure value of the vehicular gas cylinder, wherein the ratedpressure value is smaller than or equal to 20MPa. Then the valve is closed and the gas dispensation is finished. The gas station of the invention is composed of a plurality of gas cylinders and gas d ispensers. The gas station is technically characterized in that the plurality of gas cylinders are used circularly for providing the high-pressure gas for satisfying the using amount of continuous gasdispensation of a single gun or a plurality of guns to the vehicular gas cylinder. The invention changes the technical route of prior gas substation. The matching of large-scale power devices of comp ressor and hydraulic pump is not required. The gas dispenser has no mechanical wear and extraordinarily low current consumption. The gas dispenser of the invention is the developing direction of the future.

Description

A kind of filling machine and by its gas station that constitutes
Technical field
A kind of filling machine of the present invention and by its gas station that constitutes, changed the technology path of existing secondary gas filling station, utilize many gas cylinders alternate cycles to provide high pressure air independently to finish to the aerating of automobile gas cylinder, the working mechanism that has broken away from compressor and oil hydraulic pump belongs to gas aerating equipment and automation control area.
Background technique
The present invention is applicable to all gases, and this case is that example is illustrated with the rock gas.
At present, compressor formula or oil hydraulic pump formula gas station, its filling machine all is to take from rock gas in three gas holder of basic, normal, high pressure in gas station place to additional gas, when the underpressure in the gas holder, get gas in gas station compressor sledge body or the gas cylinder of oil hydraulic pump sledge body from the fortune car and in basic, normal, high pressure gas holder, replenish pressurization, the sequence of positions of three gas holder of basic, normal, high pressure also is changeless, and reaching the gas order of getting that certain pressure satisfies filling machine can be to additional gas.
Compressor formula or oil hydraulic pump formula gas station, its filling machine must promptly pressurize to air cylinder by compressor or oil hydraulic pump under the cooperation of compressor or oil hydraulic pump, just can finish the aerating of automobile gas cylinder.Compressor or oil hydraulic pump mechanical wear, consuming electric power are huge, invest also huge, so any improvement of existing filling machine all is for the number of starts of saving compressor or oil hydraulic pump, operating time and the change of carrying out.Any innovation of just existing filling machine, its invention effect all are could realize under the cooperation of compressor or oil hydraulic pump or the effect by compressor or oil hydraulic pump could embody.
Filling machine of the present invention no longer needs compressor, oil hydraulic pump to cooperate, and it doesn't matter for the effect of generation and compressor, oil hydraulic pump.This is the maximum characteristics that are different from existing filling machine.
Along with the maturation of LNG liquified natural gas means of transportation in China and the foundation and the popularization of large quantities of vaporizing stations, pressure in the vaporizer reaches 35 to 40MPa, can directly be added in the air cylinder of accumulating gas bottle truck, and pressure reaches 30MPa, for secondary gas filling station provides high-pressure natural gas, its economic benefit the best.It is supporting that this just needs new filling machine.
Summary of the invention
The object of the invention breaks away from the working mechanism of compressor, oil hydraulic pump, invents a kind of filling machine, and this filling machine comprises single rifle or multiple gun filling machine, and utilization " many gas cylinders alternate cycles provides the high pressure air technology " realizes list or many gas circuits and list or adds the air gun working method; It is many gas cylinders alternate cycles, the gas cylinder of front needs the gas cylinder of back to provide high pressure air to be used, after the gas cylinder of front uses up, unloading down gas cylinder that primary gas filling station is filled it up with after the high pressure air or another fills high pressure air inserts, for the gas cylinder of last round of back provides high pressure air, so circulation has the gas cylinder of the high pressure air filled to participate in circulation all the time, satisfies the single air filling gun of single gas circuit and the automobile gas cylinder is added rock gas or many gas circuits adds air gun many automobile gas cylinders are added rock gas simultaneously.
The notion of this case high-pressure natural gas or abbreviation high pressure air: because the automobile gas cylinder limits pressure is 20MPa, the gas cylinder mesohigh gas pressure of being mentioned among the present invention should be greater than 20MPa, just can finish the inflation of automobile gas cylinder, high-pressure natural gas or abbreviation high pressure air are meant that gas pressure is more than 20MPa.High pressure air generally selects 25MPa or 30MPa to be advisable, the 30MPa optimum.
The present invention is that example is illustrated with compressed natural gas CNG, is equally applicable to other gas, and other gas aerating adopts the method to be considered as technical equivalents.
The described valve of this case comprises the existing all kinds of valves in market, for example pneumatic valve, pneumatic actuator, solenoid valve, electro hydraulic valve, hydrovalve, mixing valve, one-way valve, explosion-proof valve, stop valve etc.
The described sensor of this case comprises the existing various kinds of sensors in market, specific being meant comprises all kinds of different equipment that can send numeral, analog information, for example, the pressure information of the output of pressure transmitter, just be considered as the pressure information from pressure transducer, its pressure transmitter is considered as pressure transducer; Sensor also comprises the equipment that can send numeral, analog information on the measuring apparatus.
The PLC programmable controller is selected in this case for use, and modern PLC is the combination of computer technology, control technique, mechanics of communication, network technique.Overall structure is arranged, modular construction is also arranged, extended function is arranged, the PLC function is maked rapid progress and is developed, and we will give full play to its technology potential, realize various controls and information exchange purpose on our the gas aerating equipment.Employing PLC technology, simple for structure clear, control easily, programming is simple, and reliable performance shortens the R﹠D cycle, is easy to maintenance and program updates and upgrades.
Those adopt separately computer technologies is that miniature cpu chip, control circuit, mechanics of communication, network technique combination are pieced together; substitute the PLC function and constitute this case filling machine or gas station; realization is to the alternate cycles control of the valve under many gas cylinders mouth; the technology of being considered as becomes bad use, falls into this case rights protection scope equally.
How the many gas cylinders of this case realize alternate cycles, need the filling machine of this case to realize.The filling machine of this case just produces for many gas cylinders alternate cycles.Be essentially different with existing filling machine.
This case has two patent applications under an inventive concept, i.e. filling machine and by its gas station that constitutes.
Technological scheme 1:
Gas circuit under many gas cylinders mouth is the single channel pipeline, and sensor, valve are installed on the single channel pipeline, and it is connected with measuring apparatus, air filling gun after corresponding sensor, the valve parallel connection separately again;
Perhaps,
Gas circuit under many gas cylinders mouth is the demultiplexing outlet pipe in parallel, sensor, valve are installed on the corresponding multiple-way duct, on the multiple-way duct separately corresponding sensor, valve between them once more after the parallel connection respectively with multiple metering device, air filling gun in a road connect;
Be connected with PLC and under its control, constitute single rifle or multiple gun filling machine,
Its technical characteristics is: PLC gathers the force value of pressure transducer in the air filling gun earlier, it is the force value in the automobile gas cylinder, add a setting value, 0<setting value<20, its sum goes to compare with the force value of each pressure transducer under many gas cylinders mouth, open the most approaching greater than itself and corresponding valve, use the pressure reduction aerating, before the balance or after the balance, take above-mentioned steps once more, so repeat, when the value of pressure transducer is automobile gas cylinder rated pressure value in air filling gun, rated pressure value≤20MPa, cut-off valve, aerating finishes.
Illustrate:
Many gas cylinders are meant a plurality of air cylinders of gas station, can be full of the gas cylinder of high pressure air; The automobile gas cylinder is meant gas station to need the gas cylinder of aerating, for example, taxi gas cylinder, bus gas cylinder etc., at present, the automobile gas cylinder rated pressure of national regulation is 20MPa, promptly filling machine to automobile gas cylinder inflation pressure maximum till the 20MPa.
Many gas cylinders are connected by rapid pipe joint with many gas cylinders of this case filling machine mouth, and are very convenient, omit among the figure and do not draw, and make every effort to the drawing cleaning.Explanation is not no longer one by one drawn in the same omission of other figure rapid pipe joint.
Because the automobile gas cylinder initial pressure value of the aerating of standing is inequality, the setting value value varies in size, and filling machine is got gas in many gas cylinders be not in proper order, is to get gas from low to high at interval.
In Fig. 1,
Gas circuit under many gas cylinders mouth is the single channel pipeline, and sensor, valve are installed on the single channel pipeline, and it is connected with measuring apparatus, air filling gun after corresponding sensor, the valve parallel connection separately again;
Pressure transducer 10 under 1 to the 8 gas cylinder mouth, valve 11 after the parallel connection, are connected with the pressure transducer 12 in one-way valve 14, measuring apparatus 13, air filling gun 15, the air filling gun 15 between them again.
They constitute single rifle filling machine under the control of PLC 9.
In Fig. 1, measuring apparatus comprises mass flowmenter, volume measurement meter etc., its measurement sensory information is input to the input end among the PLC, information on the IC-card card reader 16 of PLC reception driver inflation, finish data processing such as calculating correction values, payment, storage, accumulative total by the microcomputer among the PLC, and on the filling machine display screen, show, and these data are carried out exchanges data by communication module among the PLC and external device, finish the function that filling machine itself should have.These all are the prior aries in the filling machine, are non-essential features, and this paper needn't be described in detail at this.
Fig. 2 is that a plurality of of parallel connection of Fig. 1 duplicate, outlet pipe and be unified into a plurality of outlet pipes under many gas cylinders mouth among Fig. 2 just, and be unified into several outlet pipes and just duplicate the filling machine of several Fig. 1 between 17 and 18 the dotted line place in Fig. 2.
" many " in the multiple gun filling machine equal the gas circuit concrete number of demultiplexing outlet pipe in parallel under many gas cylinders mouth.Gas circuit under many gas cylinders mouth is the demultiplexing outlet pipe in parallel, sensor, valve are connected on respectively on the corresponding multiple-way duct, two outlet pipes in parallel, it is exactly the rush-harvesting and rush-planting filling machine, eight outlet pipes in parallel, be exactly eight rifle filling machines, what outlet pipes in parallel are exactly what are the filling machine of air filling gun.
Pressure transducer, valve on the road pipeline that the multiple-way duct of parallel connection is wherein corresponding under many gas cylinders air outlet, be connected on the filling machine that PLC control forms one road air filling gun down with measuring apparatus, air filling gun again after the parallel connection between them, among Fig. 2, wherein road pressure transducer 10, valve 11 on the multiple-way duct in parallel separately under 1 to 8 gas cylinder, between them after the parallel connection, connect with measuring apparatus 13, air filling gun 12 again, under the control of PLC 9, form road control in the multiple gun filling machine, promptly control under 1 to 8 gas cylinder Push And Release of 8 valves in parallel with gas cylinder 1 valve 11.
In Fig. 3, outlet pipe under 1 to 12 mouthful of the gas cylinder has been in parallel the two-way outlet pipe, filling machine just is the rush-harvesting and rush-planting filling machine, wherein No. one pressure transducer 14, valve 16 under 1 to 12 gas cylinder, in parallel between them, connect with pressure transducer 21 in measuring apparatus 20, the air filling gun 22 again, under the control of PLC 13, form a road in the rush-harvesting and rush-planting filling machine, promptly control the Push And Release of 12 valves in parallel under 1 to 12 mouthful of the gas cylinder with gas cylinder 1 valve 16.Equally, wherein another road pressure transducer 14, valve 15 under 1 to 12 gas cylinder, in parallel between them, connect with pressure transducer 18 in measuring apparatus 17, the air filling gun 18 again, under the control of PLC 13, form another road in the rush-harvesting and rush-planting filling machine, promptly control the Push And Release of 12 valves in parallel under 1 to 12 mouthful of the gas cylinder with gas cylinder 1 valve 15.
PLC in the multiple gun filling machine has two kinds of different connections, and respectively as Fig. 2 and Fig. 3, difference is that a plurality of PLC control the valve of multichannel and the valve of a PLC control multichannel respectively.
In Fig. 2, between 17 and 18 under the gas cylinder 1, dotted line is represented can be at this multiple-way duct that inserts in parallel, and other gas cylinder also is same situation 2 to 8 times, omits and does not draw; A complete single rifle filling machine on the current picture of 18 expressions, 17 is the same with 18, also is a complete single rifle filling machine, omits and do not draw.To keep the drawing cleaning.In fact.Fig. 2 is the copy pattern arranged side by side of the single rifle filling machine among Fig. 1.Want in parallel a plurality of, single rifle filling machine structure of just duplicating a plurality of Fig. 1 is in Fig. 2, and access point in parallel is between 17 to 18.
In Fig. 3, the air outlet parallel connection under gas cylinder 1 is divided into the two-way outlet pipe, and valve 15,16 is installed in respectively on the different pipelines, and other gas cylinder also is same situation 2 to 12 times.Here parallel connection is divided into two-way for example, illustrates at this and can parallel connection go out a lot of roads outlet pipe.
Working procedure:
In Fig. 1
Working procedure: for example, coming the storage pressure in the taxi of gas station is 2MPa, PLC9 gathers the force value on the sensor 12 in the air filling gun 15, add a setting value 5, this setting value is the value that we are scheduled to, can be 2,3,4,5, any numerical value among the 6-18, purpose is to increase pressure reduction, 0<setting value<20, and PLC goes to seek that pressure (for example has 7MPa with an immediate gas cylinder more than the 7MPa in many gas cylinders, 8PMa, 9MPa, 10MPa), open and (open the gas cylinder of 8MPa, rather than open valve on the gas cylinder of 9MPa, the most approaching is exactly this meaning) valve on this gas cylinder, air filling gun begins the aerating of taxi gas cylinder, after utilizing pressure balance, next remove to seek the above immediate gas cylinder of 12MPa, middle hop is crossed 9MPa, 10MPa, 11MPa, the valve of 12MPa is opened this valve, inflation once more, successively from low pressure to the high pressure, get gas at interval, when the value of pressure transducer 12 is rated pressure 20MPa in air filling gun 15 till, cut-off valve, aerating finishes.The Automobile air bottle pressure that rated pressure is less than or equal to the formulation of present country is 20MPa.
In order to improve aerating speed, before inflation reaches balance, when pressure differs 1MPa, speed is slow, and PLC gathers the information of pressure transducer in the air filling gun and opening the pressure information that adds the pressure transducer in the gas bottle and compares, when pressure differs 1MPa, close this valve in advance, add a setting value, its sum goes to compare with the force value of each pressure transducer under many gas cylinders mouth, opens the most approaching greater than itself and corresponding valve once more.So repeat.When the information of pressure transducer is 20MPa in PLC collection air filling gun, finish this taxi aerating task.Can accelerate aerating speed like this.
Specify:
The present invention is made of the sensor on the gas path pipe that is installed under many gas cylinders mouth, valve, measuring apparatus, air filling gun and PLC, and the installation form between them is according to the design of Fig. 1, Fig. 2, Fig. 3, can also various variation, for example: Fig. 4; As long as its effect reaches: the technical characteristics of this case all is considered as falling into protection scope of the present invention.
In Fig. 4, by the gas path pipe under many gas cylinders mouth, sensor, valve, measuring apparatus, air filling gun and PLC totally six elements constitute, many gas cylinders among Fig. 1 are made a control unit, and several such control units parallel connections and measuring apparatus, air filling gun series connection constitute a filling machine.Wherein the information of the pressure transducer 12 in the air filling gun 15 is compared with the pressure transducer under many gas cylinders mouth by the signaling line or the wireless communication module of the PORT COM between the PLC9, and the PLC of unit controls the Push And Release of the valve of the correspondence under many gas cylinders mouth of unit separately separately.Several such unit provide high pressure air as the same many gas cylinders alternate cycles that realizes of the many groups of many gas cylinders, satisfy the technical characteristics of this case filling machine equally.
So: by the gas path pipe under many gas cylinders mouth, sensor, valve, measuring apparatus, air filling gun and PLC totally six various connection diagrams that element constitutes; as long as its effect conforms to the technical characteristics of this case or be close, all be considered as the protection domain that technical equivalents falls into this case.
Many gas cylinders begin circulation time, pressure in the gas cylinder all is preferably 30MPa of 25MPa, and along with the aerating consumption, each storage pressure is all reducing gradually, the storage pressure of elder generation's usefulness reduces earlier, as low pressure, after the gas cylinder used as middle and high pressure, for the gas cylinder of first usefulness supporting, pressure in the gas cylinder of elder generation's usefulness is earlier less than our predefined value (the setting value span is between 0 to 10MPa), just unload this gas cylinder, change the gas cylinder that is full of high pressure air, participate in new one and take turns circulation.The branch that does not have fixing basic, normal, high pressure air cylinder, the purpose that this filling machine that also is we invent will reach.
Technological scheme 2:
Gas station is made up of many gas cylinders and filling machine, and its technical characteristics is: many gas cylinders alternate cycles provides high pressure air, satisfies single rifle of filling machine or multiple gun to the continuous aerating consumption of automobile gas cylinder.
Illustrate:
Many gas cylinders alternate cycles provides the high pressure air technical characteristics:
In many gas cylinders one or one group of gas cylinder need a plurality of of its back or, organize gas cylinder more provides high pressure air to be used, when its pressure less than the needs of our regulation when unloading the setting value of gas cylinder, 0<setting value<12MPa, unload down that primary gas filling station fills it up with that high pressure air inserts once more or directly insert or the one group of gas cylinder that is full of high pressure air in addition, for first or first group of gas cylinder of last round of back provides high pressure air;
First of last round of back or first group of gas cylinder repeat above-mentioned steps;
So repeat, have the gas cylinder of the high pressure air filled to insert the participation circulation all the time;
Realize that many gas cylinders alternate cycles provides high pressure air for the filling machine that adopts many gas cylinders circulating system, filling machine impel many gas cylinders can alternate cycles again to additional gas continuously.
This case filling machine goal of the invention will realize that exactly many gas cylinders alternate cycles gets rock gas, is finished the aerating of automobile gas cylinder by single rifle or multiple gun that many gas cylinders alternate cycles provides high pressure air to satisfy filling machine by its gas station that constitutes.Be completely free of the working method that compressor, oil hydraulic pump and basic, normal, high air cylinder combine.
Understand the notion of one or one group gas cylinder in many gas cylinders:
A gas cylinder notion:
A gas cylinder alternate cycles in many gas cylinders, that is: the rock gas residual air (the overbottom pressure gas that pressure reduces gradually) in gas cylinder needs the high pressure in a plurality of gas cylinders in back, in calm the anger and cooperate that just to use up (be not that any gas does not have, here refer to that pressure is less than the value of setting in the gas cylinder, as 2,3,4,5,6, a numerical value among the 7-12, unload this gas cylinder), after using up, unloading this gas cylinder goes to female station to fill it up with after the high pressure air or another is full of the gas cylinder of high pressure air, insert once more, for first gas cylinder in a plurality of gas cylinders in last round of back uses up gas, high pressure air is provided, after first gas cylinder in a plurality of gas cylinders in last round of back uses up gas, unloading this gas cylinder goes to female station to fill it up with after the high pressure air or another is full of the gas cylinder of high pressure air, also insert once more, for second gas cylinder in a plurality of gas cylinders in last last round of back (first in a plurality of gas cylinders in last round of back) uses up gas, high pressure air is provided, so so continuous circulation, constantly there is the gas cylinder that is full of high pressure air to participate in circulation, make full use of pressure reduction in the air cylinder to the aerating of automobile gas cylinder, reach the saving compressor, the function of oil hydraulic pump pressurized feed.Just a gas station just finishes automobile gas cylinder aerating task by many gas cylinders alternate cycles.No longer needing compressor, oil hydraulic pump that gas cylinder is pressurizeed finishes the aerating of automobile gas cylinder.
Illustrate: in Fig. 1, filling machine is got the rock gas in the 1st gas cylinder, pressure is more and more low, can only satisfy the more and more low low inflation requirement of automobile gas cylinder, need the middle and high cooperation in the 2nd to 8 gas cylinder, when the 1st gas cylinder to during the force value that unloads of our regulation, unload down primary gas filling station and fill it up with high pressure air and insert or directly change another bottle high pressure air again, provide high pressure air for the 2nd bottle; The 2nd gas cylinder repeats the step of the 1st gas cylinder again, for the 3rd gas cylinder provides high pressure air; Repetitive cycling circulates each time so like this, all has high pressure air to insert and participates in circulation, satisfies the aerating consumption of filling machine.
One group of gas cylinder notion:
In the practical application, many gas cylinders are divided into many groups:
One conception of species is: in Fig. 1, a plurality of air cylinders are treated as one group, serial or parallel connection becomes a big gas cylinder, be linked into by rapid pipe joint on the position of gas cylinder 1 among Fig. 1, or as gas cylinder 1, front at sensor 10 connects by rapid pipe joint, rapid pipe joint is omitted and is not drawn, in like manner, every group of a plurality of air cylinders in the gas cylinder 2 to 8 also are that serial or parallel connection becomes a gas cylinder respectively, just 1 among Fig. 1 is to 8 gas cylinders, wherein each gas cylinder all is to form one group by a plurality of air cylinder serial or parallel connections to constitute a big gas cylinder, such benefit is to strengthen the gas storage capacity of 1 to 8 gas cylinder, for example: 8 existing how long pipes (are had 6 pipes, 8 pipes, 11 pipes etc.) (vehicle-mounted total capacity is 18 cubes of water capacities to trailer, the maximum capacity of highway transport on the national regulation) a plurality of long tube gas storage steel cylinders of each in are in parallel or be connected into an air cylinder, are connected on 1 to 8 gas cylinder position in the middle of Fig. 1 by rapid pipe joint respectively.Be characterized in: take 8 trailers, still, and 88 gas cylinders that trailer constitutes, the Capacity Ratio of each gas cylinder is bigger, can arrive 18 cubes of water capacities, and the total gas storage water capacity of gas station is: 18 * 8=124 cube of water capacity.
Another kind of notion is: the air cylinder under the gas cylinder mouth more than 12 among Fig. 3 is divided into two groups, and promptly every group of 6 air cylinders are respectively: 1 to 6,7 to 12; Or being divided into three groups, i.e. every group of 4 air cylinders are respectively: 1 to 4,5 to 8,9 to 12.12 gas cylinders among Fig. 3 are not to limit number, the number for example in this case in the many gas cylinders of representative, and it also is fixed arbitrarily being divided into how many groups; For example can also be that 18 gas cylinders are divided into two groups, i.e. every group of 9 gas cylinders; Or be divided into three groups, i.e. every group of 6 gas cylinders or the like.A plurality of gas cylinders are divided into many groups, if every group of air cylinder, the grouping that is equal to nothing, every group of air cylinder should be more than two.
Many gas cylinders are meant two more than the gas cylinder, without compressor, oil hydraulic pump pressurization, finish the aerating of automobile gas cylinder by many gas cylinders alternate cycles.
The concrete number of many gas cylinders is by the capacity of gas cylinder and utilization efficiency decision, for example, pressure is at 5MPa in first gas cylinder, the 6th storage pressure is at 20MPa, at this moment, gas in these six gas cylinders have no idea the automobile gas cylinder the is filled it up with gas of 20MPa, at this moment need first gas cylinder is unloaded, unloading this gas cylinder goes to female station to fill it up with after the high pressure air or another gas cylinder that is full of high pressure air connects, could continue the aerating of automobile gas cylinder, in unloading the process of this gas cylinder, can not interrupt aerating work, need the 7th, eight gas cylinders that are full of high pressure air participate in circulation, race against time for first gas cylinder unloads with access, the 7th, the such gas cylinder of eight gas cylinders is many more, and just to unload and insert the time of striving for just many more for first gas cylinder.The concrete number of many gas cylinders generally is can circulate to add that in addition several is to unload and insert the gas cylinder that gas cylinder is raced against time.
Many gas cylinders are divided into many groups, make things convenient for the automobile transportation.
Many groups are meant two groups, more than three groups or four groups, the gas cylinder number in every group is more than two many many gas cylinders of group notions that Here it is; , it is optimum scheme that many gas cylinders are divided into the many gas cylinders of many groups, the just automobile transportation of every prescription.For example: in Fig. 3,12 gas cylinders are divided into two groups, 6 every group, promptly 1 to 6,7 to 12,6 gas cylinders are one group and are installed in and can transport 18 cubes of water capacity pressurized gass on the automobile, convenient transportation, be characterized in: take 2 trailers, each gas cylinder capacity is 3 cubes of water capacities.The total gas storage water capacity of gas station is: 18 * 2=36 cube of water capacity.Overbottom pressure gas in 1 to 6 gas cylinder needs 7 to 12 mesohigh gas supports just can use up, after overbottom pressure in 1 to 6 gas cylinder is run out of air, unload together, another is full of, and 6 gas cylinders insert 1 to 6 gas cylinder position respectively in the gas bottle truck of high-pressure natural gas, beginning is that 7 to 12 gas cylinders use up gas, and high pressure air is provided.Equally, after 7 to 12 gas cylinders used up gas, other 6 gas cylinders that are full of in the high-pressure natural gas gas bottle truck inserted 7 to 12 gas cylinder positions respectively, repetitive cycling again,
The circulation of many gas cylinders is no matter be by a gas cylinder or by one group of gas cylinder circulation, and all falling into many gas cylinders alternate cycles provides high pressure air to finish protection domain to refueling.
This case alternate cycles has three layers of implication:
The one: the pressures cycle of the rock gas in the gas cylinder, be inflated to high pressure by removing primary gas filling station, from high pressure to the low pressure alternate cycles;
The 2nd: gas cylinder is inflated to high pressure by removing primary gas filling station, and alternate cycles in many gas cylinders is for many gas cylinders whole system that circulates provides high pressure.Make and do not re-use the gas station that adopts the whole system of many gas cylinders alternate cycles compressor, oil hydraulic pump and just can finish automobile gas cylinder aerating task.
The 3rd: PLC gathers cell pressure value in the air filling gun, add a setting value, adopt sum go with many gas cylinders in pressure transducer pressure information relatively, open valve near its sum, its process is that circulation is looked for, circulated and open valve, the centre has at interval, when PLC gathers that the cell pressure value is 20MPa in the air filling gun till.
Specify:
Gas station is made up of many gas cylinders and filling machine, no matter its many gas cylinders and filling machine make up in which way, for example: Fig. 5, frame of broken lines represents that the gas cylinder group is installed on the automobile, can wholely move, link to each other with filling machine by rapid pipe joint, as long as its effect is: many gas cylinders alternate cycles provides high pressure air, satisfies single rifle of filling machine or multiple gun to the continuous aerating consumption of automobile gas cylinder.Just fall into the protection domain of this case.
Beneficial effect
1, filling machine of the present invention is simple in structure, and is multiple functional; Get gas with the order of existing filling machine essential distinction is arranged.
2, filling machine comprises the multiple gun filling machine, aerating efficient height;
3, single, the multiple gun gas station of many gas cylinders and filling machine composition, equipment is simple, and operation is considerably less, the Utilization ratio height, electrical source of power does not need transformer, saves manpower and power consumption expense, does not have mechanical wear, builds a station easily;
4, floor space is little, and the direct floor space of equipment is less than 40 square metres, and without any building, rate of expansion is fast;
5, saved the main equipment investment, as sledge gas compressor, sledge body fluid press pump, long-tube trailer etc.;
6, zero disposal of pollutants is without any noise;
Description of drawings
Among Fig. 1:
1, which gas cylinder 2,3,4,5,6,7,8 represent respectively; 9 expression PLC; Pressure transducer under the 1st gas cylinder of 10 expressions; Valve under the 1st gas cylinder of 11 expressions; Pressure transducer under the same reason, the 2nd to the 8th gas cylinder and valve are as 10,11, and mark omits, and keep the drawing cleaning; Pressure transducer in the 12 expression air filling guns; 13 expression measuring apparatuss; 14 expression one-way valves; 15 expression air filling guns; Gas sensing member or IC card reader in the 16 expression work condition environments.
Among Fig. 2:
1, which gas cylinder 2,3,4,5,6,7,8 represent respectively; 9 expression PLC; Pressure transducer under the 1st gas cylinder of 10 expressions; Valve under the 1st gas cylinder of 11 expressions; Pressure transducer under the same reason, the 2nd to the 8th gas cylinder and valve are as 10,11, and mark omits, and keep the drawing cleaning; Pressure transducer in 12 air filling guns; 13 expression measuring apparatuss; 14 expression one-way valves; 15 expression air filling guns; Gas sensing member or IC card reader in the 16 expression work condition environments; Dotted line represents that the gas cylinder mouth can the parallel multiplex outlet pipe at this between 17 to 18, one tunnel control in the complete multichannel sequence controller of the current picture of 18 expressions; 17 roughly the same 18, do not draw, keep the picture cleaning.
Among Fig. 3:
1, which gas cylinder 2,3,4,5,6,7,8,9,10,11,12 represent respectively; 13 expression PLC; Pressure transducer under the 1st gas cylinder of 14 expressions; Valve under the 1st gas cylinder mouth of 15 expressions on one road outlet pipe of parallel connection; Valve under the 1st gas cylinder mouth of 16 expressions on another road outlet pipe of parallel connection; Pressure transducer under the same reason, the 2nd to the 12nd gas cylinder and valve are as 14,15,16, and mark omits, and keep the drawing cleaning; 17 expression measuring apparatuss; Pressure transducer in the 18 expression air filling guns; 19 expression air filling guns; 20 expression measuring apparatuss; Pressure transducer in the 21 expression air filling guns; 22 expression air filling guns; 23 dotted lines represent the 4th to 10 as the 1st, 2,3,11,12 accesses, omit here.
Among Fig. 4:
1, which gas cylinder 6,7,8 represent respectively; 9 expression PLC; Pressure transducer under the 8th gas cylinder of 10 expressions; Valve under the 8th gas cylinder of 11 expressions; Pressure transducer under the same reason, the 1st to the 7th gas cylinder and valve are as 10,11, and mark omits, and keep the drawing cleaning; Pressure transducer in the 12 expression air filling guns; 13 expression measuring apparatuss; 14 expression one-way valves; 15 expression air filling guns; Gas sensing member in the 16 expression work condition environments; 17 expression fast connecting joints; 18 expression IC card reader.
Among Fig. 5:
1, which gas cylinder 6,7,8 represent respectively; 9 expression PLC; Pressure transducer under the 8th gas cylinder of 10 expressions; Valve under the 8th gas cylinder of 11 expressions; Pressure transducer under the same reason, the 1st to the 7th gas cylinder and valve are as 10,11, and mark omits, and keep the drawing cleaning; Pressure transducer in the 12 expression air filling guns; 13 expression measuring apparatuss; 14 expression one-way valves; 15 expression air filling guns; Gas sensing member in the 16 expression work condition environments; 17 expression fast connecting joints; 18 expression IC card reader; Two frame of broken lines represent that this group gas cylinder is installed on the automobile, can wholely moves among the figure.
Embodiment
Embodiment 1
Technological scheme 1:
Gas circuit under many gas cylinders mouth is the single channel pipeline, and sensor, valve are installed on the single channel pipeline, and it is connected with measuring apparatus, air filling gun after corresponding sensor, the valve parallel connection separately again;
Perhaps,
Gas circuit under many gas cylinders mouth is the demultiplexing outlet pipe in parallel, sensor, valve are installed on the corresponding multiple-way duct, on the multiple-way duct separately corresponding sensor, valve between them once more after the parallel connection respectively with multiple metering device, air filling gun in a road connect;
Be connected with PLC and under its control, constitute single rifle or multiple gun filling machine;
Its technical characteristics is: PLC gathers the force value of pressure transducer in the air filling gun earlier, it is the force value in the automobile gas cylinder, add a setting value, 0<setting value<20, its sum goes to compare with the force value of each pressure transducer under many gas cylinders mouth, open the most approaching greater than itself and corresponding valve, use the pressure reduction aerating, before the balance or after the balance, take above-mentioned steps once more, so repeat, when the value of pressure transducer is automobile gas cylinder rated pressure value in air filling gun, rated pressure value≤20MPa, cut-off valve, aerating finishes.
In Fig. 1, describe in detail:
Gas pipeline, PLC, valve, sensor, measuring apparatus, air filling gun under many gas cylinders mouth.These six essential elementss have constituted filling machine.
1, which gas cylinder 2,3,4,5,6,7,8 represent respectively; 9 expression PLC; Pressure transducer under the 1st gas cylinder of 10 expressions; Valve under the 1st gas cylinder of 11 expressions; Pressure transducer under the same reason, the 2nd to the 8th gas cylinder and valve are as 10,11, and mark omits, and keep the drawing cleaning; Pressure transducer in the 12 expression air filling guns; 13 expression measuring apparatuss; 14 expression one-way valves; 15 expression air filling guns; 16 expression IC card reader.
1st, the capacity of 2,3,4,5,6,7,8 gas cylinders can amplify, and promptly becomes a lot of gas cylinder serial or parallel connections a big gas cylinder as one in them.1 to 8 gas cylinder in Fig. 1 be by rapid pipe joint insert respectively 1 to 8 locational.Rapid pipe joint is omitted and is not drawn.
1 to 8 gas cylinder is represented many gas cylinders, and many gas cylinders are not defined as 8 in practice, and this case illustrates the process of the alternate cycles of many gas cylinders for 8 gas cylinder examples.Many gas cylinders are exactly by many gas cylinders self alternate cycles, and promptly the overbottom pressure gas in the gas cylinder of front needs the high pressure air of the gas cylinder of back to cooperate support to use up, after using up, gas cylinder unloads, there is the gas cylinder that is full of high pressure air to insert again, begins new one again and take turns alternate cycles, have high pressure air to participate in circulation all the time.
Many gas cylinders technical characteristics is exactly: constantly have low pressure gas cylinder to unload in many gas cylinders, constantly have the gas cylinder of the high pressure air of carrying in time to insert, can realize alternate cycles.
How to realize, need this case filling machine, the job step of filling machine:
In Fig. 1
Working procedure: for example, coming the storage pressure in the taxi of gas station is 2MPa, pressure information value in the PLC9 collection air filling gun 15 on the sensor 12 is 2MPa, add a setting value 5, this setting value is our fixed in advance value, can be 1,2,3,4,5, any numerical value among the 6-19, purpose is to increase pressure reduction, 0<setting value<20, PLC goes to seek that the above immediate gas cylinder of pressure and 7MPa (for example has 7MPa in many gas cylinders, 8PMa, 9MPa, gas cylinders such as 10MPa), open and (open the gas cylinder of 8MPa, rather than open valve on the gas cylinder of 9MPa, 8 and 7 is the most approaching, rather than 9, if do not have 8, just select 9, rather than select 10, the most approaching is exactly this meaning,) valve on this gas cylinder, air filling gun begins the aerating of taxi gas cylinder, utilize pressure reduction to reach balance after, next remove to seek the above immediate gas cylinder of 12MPa, middle hop is crossed 9MPa, 10MPa, 11MPa, the valve of 12MPa, open this valve, inflation once more is successively from low pressure to the high pressure, get gas at interval, till when the value of pressure transducer 12 is rated pressure 20MPa in air filling gun 15, cut-off valve, aerating finishes.The Automobile air bottle pressure that rated pressure is less than or equal to the formulation of present country is 20MPa.
In order to improve aerating speed, before inflation reaches balance, when for example pressure differs 1MPa, speed is slow, and PLC gathers the information of pressure transducer in the air filling gun and opening the pressure information that adds the pressure transducer in the gas bottle and compares, when pressure differs 1MPa, close this valve in advance, add a setting value, its sum goes to compare with the force value of each pressure transducer under many gas cylinders mouth, opens the most approaching greater than itself and corresponding valve once more.So repeat.When the information of pressure transducer is 20MPa in PLC collection air filling gun, finish this taxi aerating task.Improved aerating speed like this.
At Fig. 2, the aerating principle of filling machine is the same among Fig. 3.Select Fig. 3 to illustrate the rush-harvesting and rush-planting working procedure:
In Fig. 3, outlet pipe under 1 to 12 mouthful of the gas cylinder has been in parallel the two-way outlet pipe, filling machine just is the rush-harvesting and rush-planting filling machine, wherein No. one pressure transducer 14, valve 16 under 1 to 12 gas cylinder, in parallel between them, connect with pressure transducer 21 in measuring apparatus 20, the air filling gun 22 again, under the control of PLC 13, form a road in the rush-harvesting and rush-planting filling machine, promptly control the Push And Release of 12 valves in parallel under 1 to 12 mouthful of the gas cylinder with gas cylinder 1 valve 16.
Equally, wherein another road pressure transducer 14, valve 15 under 1 to 12 gas cylinder, in parallel between them, connect with pressure transducer 18 in measuring apparatus 17, the air filling gun 18 again, under the control of PLC 13, form another road in the rush-harvesting and rush-planting filling machine, promptly control the Push And Release of 12 valves in parallel under 1 to 12 mouthful of the gas cylinder with gas cylinder 1 valve 15.
The pipeline of above-mentioned two air filling guns by separately controlled by a road in the valve of the parallel connection under many gas cylinders mouth respectively, and both do not disturb mutually, respectively add the gas of each, and the concrete aerating flow process of single air filling gun 22,18 sees the narration of air filling gun 15 among Fig. 1 for details.
Specify:
By the gas path pipe under many gas cylinders mouth, sensor, valve, measuring apparatus, air filling gun and PLC totally six various connection diagrams that element constitutes, just, the installation form of six essential elementss of this case between them can be various variation, anyone has seen this case connection diagram, can also association go out other connection diagram, for example: the connecting means of Fig. 4.
In Fig. 4, by the gas path pipe under many gas cylinders mouth, sensor, valve, measuring apparatus, air filling gun and PLC totally six elements constitute, many gas cylinders among Fig. 1 are made a control unit, and several such control units parallel connections and measuring apparatus, air filling gun series connection constitute a filling machine.Wherein the information of the pressure transducer 12 in the air filling gun 15 is compared with the pressure transducer under many gas cylinders mouth by the signaling line or the wireless communication module of the PORT COM between the PLC9, and the PLC of unit controls the Push And Release of the valve of the correspondence under many gas cylinders mouth of unit separately separately.Several such unit provide high pressure air as the same many gas cylinders alternate cycles that realizes of the many groups of many gas cylinders,
Fig. 4 equally also can realize the function of the filling machine of this case.
We have no idea to list one by one all connection diagrams and are protected; the present invention is made of the gas path pipe upper sensor, valve, measuring apparatus, air filling gun and the PLC that are installed under many gas cylinders mouth; as long as its effect reaches: the technical characteristics of this case all is considered as falling into the protection domain of this case filling machine.
Embodiment 2
Technological scheme 2:
Gas station is made up of many gas cylinders and filling machine, and its technical characteristics is: many gas cylinders alternate cycles provides high pressure air, satisfies single rifle of filling machine or multiple gun to the continuous aerating consumption of automobile gas cylinder.
Many gas cylinders alternate cycles provides the high pressure air technical characteristics:
In many gas cylinders one or one group of gas cylinder need a plurality of of its back or, organize gas cylinder more provides high pressure air to be used, when its pressure less than the needs of our regulation when unloading the setting value of gas cylinder, 0<setting value<12MPa, unload down that primary gas filling station fills it up with that high pressure air inserts once more or directly insert or the one group of gas cylinder that is full of high pressure air in addition, for first or first group of gas cylinder of last round of back provides high pressure air;
First of last round of back or first group of gas cylinder repeat above-mentioned steps;
So repeat, have the gas cylinder of the high pressure air filled to insert the participation circulation all the time;
Realize that many gas cylinders alternate cycles provides high pressure air for the filling machine that adopts many gas cylinders circulating system, filling machine impel many gas cylinders can alternate cycles again to additional gas continuously.
In Fig. 1:
We suppose 1 to 8 gas cylinder, and the water capacity of each bottle is 3 cubes, and the rock gas that is full of 25MPa reaches 1200 cubes, and the taxi gas cylinder is 15L, and the gas cylinder rated working pressure is limited in the 20MPa.
Qualitative analysis, simulation develops, and many gas cylinders alternate cycles process is described.
When taxi comes gas station when inflation, the PLC9 in the filling machine information in the pressure transducer 12 in the air filling gun 15 of gathering generally is that pressure in the pressure transducer 12 in the air filling gun 15 adds that a setting value removes to seek minimum again, successively from low pressure to the high pressure.For example: the taxi storage pressure of pressure transducer detection arrival gas station is 3MPa in the air filling gun, adds that a setting value 3 equals 6, goes for greater than the most close gas cylinder of 6MPa pressure and opens its valve, the beginning aerating.Setting value is littler, and aerating speed is slower, and the number of times of opening valve the more.Certainly, in order to improve aerating speed, before their balances, when air pressure differed 1MPa, cut-off valve repeated above-mentioned steps in advance, improves aerating speed.
The 1st to the 20th aerating:
The 25MPa pressure of the 1st gas cylinder begins to drop to 23MPa;
The 21st to the 40th aerating:
The 23MPa pressure of the 1st gas cylinder begins to drop to 18MPa; The pressure 25MPa pressure of the 2nd gas cylinder begins to descend;
The 41st to the 60th aerating:
The 18MPa pressure of the 1st gas cylinder begins to drop to 10MPa; The pressure of the 2nd gas cylinder drops to 18MPa pressure; The pressure 25MPa pressure of the 3rd gas cylinder begins to descend;
The 61st to the 80th aerating:
The 10MPa pressure of the 1st gas cylinder begins to drop to 8MPa; The pressure of the 2nd gas cylinder drops to 15MPa pressure; The pressure of the 3rd gas cylinder is reduced to 20MPa pressure and is begun to descend; The pressure 25MPa pressure of the 4th gas cylinder begins to descend;
The 81st to the 100th aerating:
The 8MPa pressure of the 1st gas cylinder begins to drop to 3MPa; The pressure of the 2nd gas cylinder drops to 10MPa pressure; The pressure of the 3rd gas cylinder drops to 15MPa; The pressure 18MPa pressure of the 4th gas cylinder begins to descend; The pressure of the 5th gas cylinder drops to 22MPa; The pressure 25MPa pressure of the 6th gas cylinder begins to descend;
At this moment we unload the 1st gas cylinder, connect a gas cylinder that is full of high pressure air and insert as the 8th gas cylinder, and the 2nd to 8 gas cylinder originally is the 1st to 7 gas cylinder, are again that 1 to 8 gas cylinder is in circulation again now.
Said process is got gas by filling machine and is realized that working procedure is as follows from low pressure to the high-tension cell:
The information that PLC 9 collects the pressure transducer 12 in the air filling gun 15, compare with the pressure transducer 10 under 1 to 8 gas cylinder, in the time of relatively, adding a setting value 3, also can be data such as 4,5,6, increase pressure reduction, open valve under 1 to 8 gas cylinder at interval according to force value from low pressure to the high pressure, 8 valves under 1 to 8 gas cylinder are in parallel, once can only have one to open valve, connect with measuring apparatus, air filling gun, all rock gases all pass through measuring apparatus, air filling gun is finished the aerating of automobile gas cylinder.
We find out that the outlet pipe under 1 to 8 gas cylinder is the single channel pipeline, can only connect a measuring apparatus, an air filling gun is worked.
In Fig. 3:
Outlet pipe under many gas cylinders mouth also is unified into two outlet pipes, and this example is the rush-harvesting and rush-planting gas station that rush-harvesting and rush-planting filling machine and many gas cylinders constitute, and can connect two measuring apparatuss, two air filling guns.
1, which gas cylinder 2,3,4,5,6,7,8,9,10,11,12 represent respectively; 13 expression PLC; Pressure transducer under the 1st gas cylinder of 14 expressions; Valve under the 1st gas cylinder mouth of 15 expressions on one road outlet pipe of parallel connection; Valve under the 1st gas cylinder mouth of 16 expressions on another road outlet pipe of parallel connection; Pressure transducer under the same reason, the 2nd to the 12nd gas cylinder and valve are as 14,15,16, and mark omits, and keep the drawing cleaning; 17 expression measuring apparatuss; Pressure transducer in the 18 expression air filling guns; 19 expression air filling guns; 20 expression measuring apparatuss; Pressure transducer in the 21 expression air filling guns; 22 expression air filling guns.
We are divided into two groups to 1 to 12 gas cylinder, all are to be connected with the position of 1 to 12 gas cylinder among Fig. 3 by rapid pipe joint.Promptly 1 to 6 one group, 7 to 12 1 groups, purpose is to allow these two groups of alternate cycles, in the protection domain of many gas cylinders alternate cycles.Unloading next gas cylinder for unloading next group gas cylinder, this group gas cylinder is contained on the automobile, convenient transportation.
We see the working procedure of two air filling guns earlier:
PLC 13 collects the Push And Release that pressure transducer 18 and pressure transducer 14 under 1 to 12 gas cylinder in the air filling guns 19 removes to control the valve 15 with under the gas cylinder 1 under 1 to the 12 gas cylinder mouth 12 valves in parallel, opening of arbitrary valve in them, other valve, all must close, once only allow opening of a valve, 1 to 12 gas cylinder is opened from low pressure to the high pressure successively, and rock gas all passes through measuring apparatus 17, air filling gun 19.
PLC 13 collects the Push And Release that pressure transducer 21 and pressure transducer 14 under 1 to 12 gas cylinder in the air filling guns 22 removes to control the valve 16 with under the gas cylinder 1 under 1 to the 12 gas cylinder mouth 12 valves in parallel, opening of arbitrary valve in them, other valve, all must close, once only allow opening of a valve, 1 to 12 gas cylinder is opened from low pressure to the high pressure successively, and rock gas all passes through measuring apparatus 20, air filling gun 22.
Two air filling guns can be worked simultaneously, and aerating efficient improves, and we see how alternate cycles of many gas cylinders again.
1 to 12 gas cylinder, the water capacity of each bottle is 3 cubes, is full of the rock gas of 25MPa, and the taxi gas cylinder is 15L, and working pressure is limited in the 20MPa.
When taxi comes the gas station inflation, use 19 air filling guns, PLC13 in the filling machine gathers information in the pressure transducer 18 in the air filling gun 19, generally be in the pressure transducer 18 in the air filling gun 19 pressure add a setting value go again to seek near itself and value, successively from low pressure to the high pressure.For example: the taxi storage pressure of pressure transducer detection arrival gas station is 3MPa in the air filling gun, adds that a setting value 3 equals 6, goes for the close gas cylinder of 6MPa pressure and opens its valve, the beginning aerating.After utilizing pressure reduction to reach balance, repeat above-mentioned steps, go to repeat to seek to high pressure from low pressure at interval, till the force value of the pressure transducer in air filling gun is 20MPa, cut-off valve, aerating finishes.
Data are simulation, and qualitative analysis illustrates that many gas cylinders organize the alternate cycles process more.
The 1st to the 20th aerating:
The 25MPa pressure of the 1st air cylinder begins to drop to 23MPa;
The 21st to the 40th aerating:
The 23MPa pressure of the 1st air cylinder begins to drop to 18MPa; The pressure 25MPa pressure of the 2nd air cylinder begins to descend;
The 41st to the 60th aerating:
The 18MPa pressure of the 1st air cylinder begins to drop to 10MPa; The pressure of the 2nd air cylinder drops to 18MPa pressure; The pressure 25MPa pressure of the 3rd air cylinder begins to descend;
The 61st to the 80th aerating:
The 10MPa pressure of the 1st air cylinder begins to drop to 3MPa; The pressure of the 2nd air cylinder drops to 10MPa pressure; The pressure of the 3rd air cylinder drops to 18MPa; The pressure 25MPa pressure of the 4th air cylinder begins to descend;
The 81st to the 100th aerating:
The pressure of the 2nd air cylinder drops to 3MPa pressure; The pressure of the 3rd air cylinder drops to 10MPa; The pressure 18MPa of the 4th air cylinder; The pressure 25MPa pressure of the 5th air cylinder begins to descend;
The 101st to the 120th aerating:
The pressure of the 3rd air cylinder drops to 3MPa; The pressure 10MPa of the 4th air cylinder; The pressure decline 18MPa of the 5th air cylinder;
The pressure 25MPa pressure of the 6th air cylinder begins to descend;
Slightly
The 230th to the 250th aerating:
Pressure is 20MPa in the 8th air cylinder; Pressure is about 16MPa in the 7th air cylinder; Pressure is about 10MPa in the 6th air cylinder; Pressure is about 6MPa in the 5th air cylinder; Other the 1st pressure to the 4th air cylinder is less than 3MPa.
The 251st to the 270th aerating:
Pressure is 20MPa in the 9th air cylinder; Pressure is about 16MPa in the 8th air cylinder; Pressure is about 10MPa in the 7th air cylinder; Pressure is about 3MPa in the 6th air cylinder; Other the 1st pressure to the 5th air cylinder is less than 3MPa.
At this moment we all unload 1 to 6 gas cylinder, changes 6 bottles and be full of high pressure air, and as the 7th to 12 gas cylinder, the 7th to 12 gas cylinder originally is the 1st to 6 gas cylinder, begins new one so again and take turns circulation.Its order always gas cylinder of back provides high-pressure natural gas for the gas cylinder of front.
Specify:
Gas station is made up of many gas cylinders and filling machine, no matter its many gas cylinders and filling machine make up in which way, for example: Fig. 5, frame of broken lines represents that the gas cylinder group is installed on the automobile, can wholely move, link to each other with filling machine by rapid pipe joint, as long as its effect is: many gas cylinders alternate cycles provides high pressure air, satisfies single rifle of filling machine or multiple gun to the continuous aerating consumption of automobile gas cylinder.Just fall into the protection domain of this case.

Claims (2)

1. a gas station is made up of many gas cylinders and filling machine, and its technical characteristics is: many gas cylinders alternate cycles provides the high pressure air that is equal to or greater than 25MPa, satisfies single rifle of filling machine or multiple gun to the continuous aerating of automobile gas cylinder;
In many gas cylinders one or one group of gas cylinder need a plurality of of its back or, organize gas cylinder more provides high pressure air to be used; When its pressure less than the needs of our regulation when unloading the setting value of gas cylinder, 0<setting value<12MPa is unloaded down primary gas filling station and is filled it up with that high pressure air inserts once more or directly insert or the one group of gas cylinder that is full of high pressure air in addition; For first or first group of gas cylinder of last round of back provides high pressure air, or provide high pressure air for first or first group of gas cylinder thereafter of last round of back;
First of last round of back or first group of gas cylinder repeat above-mentioned steps;
So repeat, have the gas cylinder of the high pressure air filled to insert the participation circulation all the time.
2. set up a kind of method of gas station, be made up of many gas cylinders and filling machine, its technical characteristics is: many gas cylinders alternate cycles provides the high pressure air that is equal to or greater than 25MPa, satisfies single rifle of filling machine or multiple gun to the continuous aerating of automobile gas cylinder;
In many gas cylinders one or one group of gas cylinder need a plurality of of its back or, organize gas cylinder more provides high pressure air to be used, when its pressure less than the needs of our regulation when unloading the setting value of gas cylinder, 0<setting value<12MPa is unloaded down primary gas filling station and is filled it up with or one group of gas cylinder that high pressure air inserts once more or directly access is full of high pressure air in addition; For first or first group of gas cylinder of last round of back provides high pressure air, or provide high pressure air for first or first group of gas cylinder thereafter of last round of back;
First of last round of back or first group of gas cylinder repeat above-mentioned steps;
So repeat, have the gas cylinder of the high pressure air filled to insert the participation circulation all the time.
CN 200910141153 2009-03-31 2009-05-19 Gas dispenser and gas station composed of the same Active CN101566277B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910141153 CN101566277B (en) 2009-03-31 2009-05-19 Gas dispenser and gas station composed of the same

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN 200910029998 CN101509599A (en) 2009-03-31 2009-03-31 Secondary gas filling station
CN200910029998.7 2009-03-31
CN 200910141153 CN101566277B (en) 2009-03-31 2009-05-19 Gas dispenser and gas station composed of the same

Publications (2)

Publication Number Publication Date
CN101566277A CN101566277A (en) 2009-10-28
CN101566277B true CN101566277B (en) 2011-05-04

Family

ID=41002088

Family Applications (2)

Application Number Title Priority Date Filing Date
CN 200910029998 Pending CN101509599A (en) 2009-03-31 2009-03-31 Secondary gas filling station
CN 200910141153 Active CN101566277B (en) 2009-03-31 2009-05-19 Gas dispenser and gas station composed of the same

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN 200910029998 Pending CN101509599A (en) 2009-03-31 2009-03-31 Secondary gas filling station

Country Status (2)

Country Link
CN (2) CN101509599A (en)
WO (1) WO2010111888A1 (en)

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101509599A (en) * 2009-03-31 2009-08-19 沈军 Secondary gas filling station
CN101780940A (en) * 2010-03-25 2010-07-21 沈军 Son-mother gas filling station
CN101793347A (en) * 2010-04-13 2010-08-04 沈军 Gas filling station
CN101886737B (en) * 2010-06-24 2012-07-04 上海穗杉实业有限公司 Integrated fluid filling control method and device
CN102174988B (en) * 2011-03-09 2013-04-24 刘圣华 Moving integrated CNG (compressed natural gas) storage and transportation gas supplying device and control method
CN102564500B (en) * 2011-11-09 2013-11-13 北京爱社时代科技发展有限公司 Method for estimating air consumption of compressed air system
CN102506301A (en) * 2011-11-10 2012-06-20 四川金科环保科技有限公司 Compressed natural gas (CNG) secondary fueling station
CN102563348A (en) * 2011-12-23 2012-07-11 江西稀有稀土金属钨业集团有限公司 Device and method for increasing utilization rate of argon gas
CN102635781B (en) * 2012-04-03 2014-03-19 新兴能源装备股份有限公司 High-pressure gas containerized tube bundle
US9863581B2 (en) 2012-08-24 2018-01-09 Nearshore Natural Gas, Llc Virtual gaseous fuel pipeline
CN103148348B (en) * 2013-03-22 2015-04-29 北京伯肯新能源设备有限公司 Electronic type CNG (Compressed Natural Gas) gas charging station sequence control panel
CN104595706A (en) * 2015-02-03 2015-05-06 中冶华天南京工程技术有限公司 Natural gas filling system
CN104845693A (en) * 2015-05-05 2015-08-19 马鞍山市宝天重工机械有限公司 Efficient and energy-saving natural gas production technology
CN108105587A (en) * 2017-12-28 2018-06-01 天津良华新能源科技有限公司 A kind of hydraulic type CNG air entraining substation control system and control method
CN108662430A (en) * 2018-07-18 2018-10-16 广州宽度信息技术有限公司 A kind of chain charging device of bottled gas and its application method
CN110542014B (en) * 2019-08-19 2021-09-21 沈军 Hydrogenation station corresponding to hydrogen storage cylinder group trailer
CN110553142B (en) * 2019-08-19 2021-07-02 沈军 Hydrogenation station
CN112539337B (en) * 2019-09-20 2022-08-05 中国石油化工股份有限公司 Model selection method for high-pressure tube bundle vehicle hydrogen supply station equipment
CN111256030A (en) * 2020-03-16 2020-06-09 厚普智慧物联科技有限公司 Communication device between gas dispenser and high-pressure gas storage device and gas filling method
CN113531381B (en) * 2020-04-09 2023-09-15 国家能源投资集团有限责任公司 Hydrogenation system and hydrogenation method
CN114909604A (en) * 2021-02-08 2022-08-16 国家能源投资集团有限责任公司 Hydrogenation control method and device for hydrogenation station and hydrogenation station
CN113446513B (en) * 2021-06-30 2022-06-14 成都渝能能源设备有限公司 LNG (liquefied Natural gas) dispenser adopting single return gas metering and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2890579Y (en) * 2006-02-10 2007-04-18 马磊 Gas filling machine capable of automatically sequencing to supply gas
CN100346103C (en) * 2005-09-06 2007-10-31 马磊 Quickly assembled secondary gas refueling station without compressor
CN101082389A (en) * 2006-05-29 2007-12-05 新疆新捷燃气有限责任公司 CNG directly inflating process and CNG substation
CN200999957Y (en) * 2006-10-24 2008-01-02 成都华气厚普机电科技有限责任公司 Single or double gun CNG intelligent air entraining machine
CN201007425Y (en) * 2006-12-30 2008-01-16 郑州科林石油设备有限公司 Air supply pressure self-recognizing compressed natural filling machine

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5549142A (en) * 1994-05-27 1996-08-27 Jeffrey P. Beale Dispensing system for refueling transport containers with cryogenic liquids
CN2677729Y (en) * 2004-02-09 2005-02-09 北京长空机械有限责任公司 Machine for filling liquified natural gas
CN2861701Y (en) * 2005-09-29 2007-01-24 上海自动化仪表股份有限公司 Industrial site bus based natural gas filling machine
CN101058400B (en) * 2006-04-21 2011-11-23 中国国际海运集装箱(集团)股份有限公司 Liquefied natural gas aerating machine and aerating method
CN2905757Y (en) * 2006-04-21 2007-05-30 中国国际海运集装箱(集团)股份有限公司 Liquefied petroleum gas supplying device
CN2915831Y (en) * 2006-06-20 2007-06-27 濮阳市合众石油科技开发有限公司 High middle and low pressure switching device adopting pneumatic valve of compressed natural gas charging machine
JP2007192410A (en) * 2007-02-14 2007-08-02 Tatsuno Corp Gas filling system
CN101059203A (en) * 2007-05-30 2007-10-24 李富国 Gas-supply method of CNG gas-charging station for automobile
CN201162936Y (en) * 2008-01-04 2008-12-10 刘亚东 Liquefied natural gas feeder
CN101509599A (en) * 2009-03-31 2009-08-19 沈军 Secondary gas filling station

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100346103C (en) * 2005-09-06 2007-10-31 马磊 Quickly assembled secondary gas refueling station without compressor
CN2890579Y (en) * 2006-02-10 2007-04-18 马磊 Gas filling machine capable of automatically sequencing to supply gas
CN101082389A (en) * 2006-05-29 2007-12-05 新疆新捷燃气有限责任公司 CNG directly inflating process and CNG substation
CN200999957Y (en) * 2006-10-24 2008-01-02 成都华气厚普机电科技有限责任公司 Single or double gun CNG intelligent air entraining machine
CN201007425Y (en) * 2006-12-30 2008-01-16 郑州科林石油设备有限公司 Air supply pressure self-recognizing compressed natural filling machine

Also Published As

Publication number Publication date
CN101566277A (en) 2009-10-28
CN101509599A (en) 2009-08-19
WO2010111888A1 (en) 2010-10-07

Similar Documents

Publication Publication Date Title
CN101566277B (en) Gas dispenser and gas station composed of the same
CN101418907B (en) High-pressure hydrogen supply system for exterior hydrogen feeding hydrogenation stations
CN109185698B (en) Efficient hydrogenation method and system
WO2022135110A1 (en) Mixed pressurization multistage filling hydrogenation device
CN110553142B (en) Hydrogenation station
KR101560083B1 (en) Method for dispensing compressed gases
CN103836331B (en) The vehicle-mounted gas bomb group trailer-type of one gas station
CN112483886A (en) Liquid hydrogen storage type hydrogenation device adopting liquid hydrogen pre-cooling
CN101813237B (en) Hydraulic CNG (Compressed Natural Gas) gas filling substation and pipeline system, control system and control method thereof
CN110542014B (en) Hydrogenation station corresponding to hydrogen storage cylinder group trailer
CN101793347A (en) Gas filling station
CN101463943B (en) Energy-saving natural gas supply sub-station system
CN115388324A (en) Gas-liquid hydrogen combined supply hydrogenation station
CN214249134U (en) Mixed supercharging multistage filling hydrogenation device
CN104864269A (en) Selection method of CNG general station devices
CN102174988A (en) Moving integrated CNG (compressed natural gas) storage and transportation gas supplying device and control method
US10018303B1 (en) Method and system for transfer of natural gas
KR20210126509A (en) Device for filling pressurized gas tanks
CN1304010A (en) Peak-regulating and gas-storing method for natural gas pipe network
CN219013995U (en) Cold energy recovery type liquid hydrogen hydrogenation station filling system
CN100509501C (en) Non-power natural gas supplying system and method thereof
CN102149958A (en) Gas-filling system having a residual-gas recovery device, and residual-gas recovery method
CN204534110U (en) Hydraulic type air entraining substation
CN201330929Y (en) Compressed natural gas optimizing substation system
CN202056511U (en) Movable integrated CNG storage and transportation gas supply device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 225001, No. 9, grand road, Sheyang Town, Baoying County, Yangzhou, Jiangsu

Patentee after: Shen Jun

Address before: Yangzhou City, Jiangsu province 225001 Yanfu Road No. 6 Building 28 Room 601 office dormitory

Patentee before: Shen Jun

CP02 Change in the address of a patent holder

Address after: 225105 8 Sha Sha Road, Sha tou Town, Guangling District, Yangzhou, Jiangsu

Patentee after: Shen Jun

Address before: 225001 Dashelu No. 9, Sheyang Lake Town, Baoying County, Yangzhou City, Jiangsu Province

Patentee before: Shen Jun

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 225324 North of Kechuang Pioneering Avenue, Gaogang District, Taizhou City, Jiangsu Province

Patentee after: Shen Jun

Address before: 225105 8 Sha Sha Road, Sha tou Town, Guangling District, Yangzhou, Jiangsu

Patentee before: Shen Jun

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: No.112-5, building 13, Tongyun Trade City, Guangling District, Yangzhou City, Jiangsu Province

Patentee after: Shen Jun

Address before: 225324 North of Kechuang Pioneering Avenue, Gaogang District, Taizhou City, Jiangsu Province

Patentee before: Shen Jun

CP02 Change in the address of a patent holder