CN101555692A - 水上基坑降水取土施工方法 - Google Patents
水上基坑降水取土施工方法 Download PDFInfo
- Publication number
- CN101555692A CN101555692A CNA2008100357899A CN200810035789A CN101555692A CN 101555692 A CN101555692 A CN 101555692A CN A2008100357899 A CNA2008100357899 A CN A2008100357899A CN 200810035789 A CN200810035789 A CN 200810035789A CN 101555692 A CN101555692 A CN 101555692A
- Authority
- CN
- China
- Prior art keywords
- earth
- taking
- dewatering
- layer
- foundation pit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 34
- 238000010276 construction Methods 0.000 title claims abstract description 25
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 25
- 239000010959 steel Substances 0.000 claims abstract description 25
- 238000000034 method Methods 0.000 claims abstract description 14
- 238000001556 precipitation Methods 0.000 claims description 4
- 239000004568 cement Substances 0.000 claims description 3
- 238000009412 basement excavation Methods 0.000 abstract description 5
- 239000010802 sludge Substances 0.000 abstract 6
- 238000009434 installation Methods 0.000 description 6
- 238000003032 molecular docking Methods 0.000 description 4
- 239000002689 soil Substances 0.000 description 4
- 230000000994 depressogenic effect Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 239000003795 chemical substances by application Substances 0.000 description 2
- 239000004567 concrete Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000002169 extracardiac Effects 0.000 description 1
- 239000010438 granite Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Images
Landscapes
- Underground Or Underwater Handling Of Building Materials (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200810035789 CN101555692B (zh) | 2008-04-09 | 2008-04-09 | 水上基坑降水取土施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200810035789 CN101555692B (zh) | 2008-04-09 | 2008-04-09 | 水上基坑降水取土施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101555692A true CN101555692A (zh) | 2009-10-14 |
CN101555692B CN101555692B (zh) | 2011-05-25 |
Family
ID=41173954
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200810035789 Active CN101555692B (zh) | 2008-04-09 | 2008-04-09 | 水上基坑降水取土施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101555692B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102425173A (zh) * | 2011-12-07 | 2012-04-25 | 中冶天工集团有限公司 | 深基坑土方开挖方法 |
CN102605791A (zh) * | 2012-04-12 | 2012-07-25 | 中建三局第三建设工程有限责任公司 | 软土地基中土方开挖方法 |
CN107460881A (zh) * | 2016-06-02 | 2017-12-12 | 宜兴市周铁镇生力钻探机械厂 | 一种软地基水冲法土方开挖施工工艺 |
CN108330994A (zh) * | 2018-01-10 | 2018-07-27 | 中铁大桥局集团第四工程有限公司 | 一种装有快速堵漏装置的钢板桩围堰及快速堵漏方法 |
CN114045838A (zh) * | 2021-10-28 | 2022-02-15 | 浙江国进建设有限公司 | 一种基坑围护施工方法 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102787605A (zh) * | 2012-08-07 | 2012-11-21 | 天津二十冶建设有限公司 | 软土地基条形基坑支护钢板桩倾斜处理方法 |
-
2008
- 2008-04-09 CN CN 200810035789 patent/CN101555692B/zh active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102425173A (zh) * | 2011-12-07 | 2012-04-25 | 中冶天工集团有限公司 | 深基坑土方开挖方法 |
CN102425173B (zh) * | 2011-12-07 | 2013-10-16 | 中冶天工集团有限公司 | 深基坑土方开挖方法 |
CN102605791A (zh) * | 2012-04-12 | 2012-07-25 | 中建三局第三建设工程有限责任公司 | 软土地基中土方开挖方法 |
CN107460881A (zh) * | 2016-06-02 | 2017-12-12 | 宜兴市周铁镇生力钻探机械厂 | 一种软地基水冲法土方开挖施工工艺 |
CN108330994A (zh) * | 2018-01-10 | 2018-07-27 | 中铁大桥局集团第四工程有限公司 | 一种装有快速堵漏装置的钢板桩围堰及快速堵漏方法 |
CN114045838A (zh) * | 2021-10-28 | 2022-02-15 | 浙江国进建设有限公司 | 一种基坑围护施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101555692B (zh) | 2011-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105133627B (zh) | 单壁钢板桩围堰流水状态下施工工法 | |
CN106801424B (zh) | 一种围堰施工方法 | |
CN104196034A (zh) | 一种利用钢板桩作为支护围堰的基坑施工方法 | |
CN101555692B (zh) | 水上基坑降水取土施工方法 | |
CN102561371B (zh) | 岛遂结合部钢沉箱围护结构及其施工方法 | |
CN102605697A (zh) | 软土地基路堤吹填砂施工方法 | |
CN105672195A (zh) | 一种城市生态河道水下绞吸式清淤施工工法 | |
CN109371918B (zh) | 具有永临结合多功能排水箱涵的大坝结构及其施工方法 | |
CN109113086B (zh) | 一种深水基岩裸露河床区的钢混组合围堰施工方法 | |
CN1773022A (zh) | 软基快速筑堤方法与技术 | |
CN102839681A (zh) | 深水无覆盖层条件下组合钢管桩围堰及其施工方法 | |
CN109778869A (zh) | 基坑施工方法 | |
CN108505529A (zh) | 一种下承式钢箱拱桥的承台施工用钢围堰的施工方法 | |
KR101256265B1 (ko) | 임시 물막이공정이 생략된 교각의 수중설치공법. | |
CN110359476A (zh) | 一种钢板桩围堰内支撑与钻孔桩钢护筒安装用施工平台的施工方法 | |
CN109339079A (zh) | 一种紧邻河流透水地层的基坑止水系统及其施工工艺 | |
CN102561379A (zh) | 一种新型桥梁设置基础及其施工方法 | |
CN112663558B (zh) | 一种内河港池中风化岩开挖施工工艺 | |
CN111335263B (zh) | 一种建造人工岛的方法 | |
RU2374387C1 (ru) | Гидроузел на многолетнемерзлых грунтах | |
CN206220172U (zh) | 管式引水泵站 | |
Bittner et al. | Design and construction of the Sutong Bridge foundations | |
KR20140092217A (ko) | 작업선을 이용한 교각의 수중설치공법. | |
CN204435321U (zh) | 一种火力发电厂取水明渠 | |
JP3209503B2 (ja) | 取・放水装置水中構築法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20151020 Address after: 200122 No. 132 Pu circuit, Shanghai, Pudong New Area Patentee after: China Communications Third Navigational Bureau 2nd Engineering Co., Ltd Patentee after: China Construction Third Engineering Division Co., Ltd. Patentee after: CCCC Shanghai Harbour Engineering Design & Research Institute Co., Ltd. Address before: 200122 No. 132 Pu circuit, Shanghai, Pudong New Area Patentee before: China Communications Third Navigational Bureau 2nd Engineering Co., Ltd Patentee before: China Construction Third Engineering Division Co., Ltd. |