CN110359476A - 一种钢板桩围堰内支撑与钻孔桩钢护筒安装用施工平台的施工方法 - Google Patents
一种钢板桩围堰内支撑与钻孔桩钢护筒安装用施工平台的施工方法 Download PDFInfo
- Publication number
- CN110359476A CN110359476A CN201910597170.5A CN201910597170A CN110359476A CN 110359476 A CN110359476 A CN 110359476A CN 201910597170 A CN201910597170 A CN 201910597170A CN 110359476 A CN110359476 A CN 110359476A
- Authority
- CN
- China
- Prior art keywords
- pile
- steel
- steel sheet
- otic placode
- pile casting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/04—Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/02—Restraining of open water
- E02D19/04—Restraining of open water by coffer-dams, e.g. made of sheet piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Revetment (AREA)
- Earth Drilling (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910597170.5A CN110359476B (zh) | 2019-07-04 | 2019-07-04 | 一种钢板桩围堰内支撑与钻孔桩钢护筒安装用施工平台的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910597170.5A CN110359476B (zh) | 2019-07-04 | 2019-07-04 | 一种钢板桩围堰内支撑与钻孔桩钢护筒安装用施工平台的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110359476A true CN110359476A (zh) | 2019-10-22 |
CN110359476B CN110359476B (zh) | 2020-10-30 |
Family
ID=68218117
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910597170.5A Active CN110359476B (zh) | 2019-07-04 | 2019-07-04 | 一种钢板桩围堰内支撑与钻孔桩钢护筒安装用施工平台的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110359476B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112031017A (zh) * | 2020-09-11 | 2020-12-04 | 中铁十一局集团第一工程有限公司 | 一种适用于裸岩地质条件下深水桩基钢护筒施工方法 |
CN113818460A (zh) * | 2021-10-09 | 2021-12-21 | 中铁大桥局第七工程有限公司 | 一种基于高标准环保要求的围堰施工方法 |
CN114541442A (zh) * | 2022-04-01 | 2022-05-27 | 中铁大桥局集团第五工程有限公司 | 一种锁扣钢管或钢板桩围堰内支撑的安装方法 |
CN114753357A (zh) * | 2022-04-08 | 2022-07-15 | 中铁七局集团有限公司 | 水中钻孔桩的施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3605414A (en) * | 1968-11-27 | 1971-09-20 | Joseph W Westmoreland Jr | Submerged well head platform |
JP2001348888A (ja) * | 2000-06-06 | 2001-12-21 | Ohbayashi Corp | 水中基礎構造物の構築工法および装置 |
JP2003206539A (ja) * | 2002-01-11 | 2003-07-25 | Hirose & Co Ltd | 仮締切り工法 |
CN204644882U (zh) * | 2015-05-07 | 2015-09-16 | 中交第二公路工程局有限公司 | 一种水中桥梁承台预制有底钢吊箱围堰固定装置 |
CN109736440A (zh) * | 2019-02-28 | 2019-05-10 | 北京市第三建筑工程有限公司 | 一种大跨度钢结构错层合拢安装方法 |
-
2019
- 2019-07-04 CN CN201910597170.5A patent/CN110359476B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3605414A (en) * | 1968-11-27 | 1971-09-20 | Joseph W Westmoreland Jr | Submerged well head platform |
JP2001348888A (ja) * | 2000-06-06 | 2001-12-21 | Ohbayashi Corp | 水中基礎構造物の構築工法および装置 |
JP2003206539A (ja) * | 2002-01-11 | 2003-07-25 | Hirose & Co Ltd | 仮締切り工法 |
CN204644882U (zh) * | 2015-05-07 | 2015-09-16 | 中交第二公路工程局有限公司 | 一种水中桥梁承台预制有底钢吊箱围堰固定装置 |
CN109736440A (zh) * | 2019-02-28 | 2019-05-10 | 北京市第三建筑工程有限公司 | 一种大跨度钢结构错层合拢安装方法 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112031017A (zh) * | 2020-09-11 | 2020-12-04 | 中铁十一局集团第一工程有限公司 | 一种适用于裸岩地质条件下深水桩基钢护筒施工方法 |
CN113818460A (zh) * | 2021-10-09 | 2021-12-21 | 中铁大桥局第七工程有限公司 | 一种基于高标准环保要求的围堰施工方法 |
CN113818460B (zh) * | 2021-10-09 | 2023-02-28 | 中铁大桥局第七工程有限公司 | 一种基于高标准环保要求的围堰施工方法 |
CN114541442A (zh) * | 2022-04-01 | 2022-05-27 | 中铁大桥局集团第五工程有限公司 | 一种锁扣钢管或钢板桩围堰内支撑的安装方法 |
CN114541442B (zh) * | 2022-04-01 | 2023-12-22 | 中铁大桥局集团第五工程有限公司 | 一种锁扣钢管或钢板桩围堰内支撑的安装方法 |
CN114753357A (zh) * | 2022-04-08 | 2022-07-15 | 中铁七局集团有限公司 | 水中钻孔桩的施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN110359476B (zh) | 2020-10-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106013052B (zh) | 钢板桩与沉井组合式地下停车库的施工方法 | |
CN110359476A (zh) | 一种钢板桩围堰内支撑与钻孔桩钢护筒安装用施工平台的施工方法 | |
CN105133627B (zh) | 单壁钢板桩围堰流水状态下施工工法 | |
CN101962956B (zh) | 一种桥梁预制基础及其埋床法 | |
CN110093928A (zh) | 一种基坑支护结构及土方开挖施工方法 | |
US20150071711A1 (en) | Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method | |
US6139225A (en) | Method for building an underground continuous wall | |
CN209741877U (zh) | 一种钢板桩根部增设砼圈梁止水的围堰结构 | |
CN102363961A (zh) | 一种入土深度小的深水单壁钢板桩围堰结构及其施工方法 | |
CN109630127A (zh) | 一种富水软弱地层超深盾构竖井的施工方法 | |
CN102134853A (zh) | Ct式锁口钢管桩基坑止水支护装置及工法 | |
CN109339065A (zh) | 一种深水裸露基岩密排桩支护施工承台的方法 | |
CN112695803B (zh) | 一种海滩上的顶管工作井和管沟的支护、止水施工方法 | |
CN109797749A (zh) | 一种水下基坑施工装置及施工方法 | |
CN113235601A (zh) | 湿陷性黄土临近建筑物的深基坑施工风险控制结构及工法 | |
JP7352048B1 (ja) | 大スパン駅の両翼開放型半トップダウン掘削・半逆打ちによる建造方法 | |
CN202401462U (zh) | 一种入土深度小的深水单壁钢板桩围堰结构 | |
CN104164881A (zh) | 一种桩墙叠合悬臂基坑支护施工方法及结构 | |
CN210315632U (zh) | 一种深厚覆盖层地区大跨拱桥环形地下连续墙基础 | |
CN108589543B (zh) | 适于岩层地质的筑岛钢板桩围堰式钻孔桩平台的施工方法 | |
JP4206165B2 (ja) | 構築物の仮締切工法 | |
JP2002146811A (ja) | 水中構造物基礎の施工法 | |
CN112523236A (zh) | 一种组合围堰结构及其施工方法 | |
CN108179759A (zh) | 导向井水下钻芯掏槽无封底方法 | |
CN109989346B (zh) | 桥梁大直径预制混凝土管柱基础及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhao Shaoqiang Inventor after: Zhu Weiwei Inventor after: Lv Jianyuan Inventor after: Li Erwei Inventor after: Liu Jianwei Inventor after: Wang Ying Inventor after: Feng Dan Inventor after: Xing Chuangfeng Inventor after: Hao Yunchao Inventor after: Gui Wencai Inventor after: Xu Xusheng Inventor before: Li Erwei Inventor before: Zhu Weiwei Inventor before: Lv Jianyuan Inventor before: Wang Ying Inventor before: Zhao Shaoqiang Inventor before: Liu Jianwei Inventor before: Feng Dan Inventor before: Xing Chuangfeng Inventor before: Hao Yunchao Inventor before: Gui Wencai Inventor before: Xu Xusheng |
|
GR01 | Patent grant | ||
GR01 | Patent grant |