CN101503916A - Modularized factory building structure - Google Patents
Modularized factory building structure Download PDFInfo
- Publication number
- CN101503916A CN101503916A CNA200910094269XA CN200910094269A CN101503916A CN 101503916 A CN101503916 A CN 101503916A CN A200910094269X A CNA200910094269X A CN A200910094269XA CN 200910094269 A CN200910094269 A CN 200910094269A CN 101503916 A CN101503916 A CN 101503916A
- Authority
- CN
- China
- Prior art keywords
- production
- factory building
- modularized
- building structure
- deck
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Residential Or Office Buildings (AREA)
Abstract
The invention discloses a modularized workshop structure and relates to structural design of a multistory clean workshop of a pharmaceutical enterprise. The workshop consists of at least one two-story building; the first floor is a comprehensive region (A); the floor above the first floor is an production operating region (B) which consists of at least one modularized production region (3) and a visiting corridor (C) around the production operating region; the modularized production region (3) and the visiting corridor (C) around the production operating region are independent with each other; and the comprehensive region (A) is provided with an inlet (D), a dressing room and a shower bath of each modularized production region (3). Firstly, the modularized workshop structure is convenient for the traffic of workers, reduces the walking distance and energy consumption of an air conditioner and saves energy; and secondly, the design of a staircase and a dooryard can make the staircase meet the requirement of fire protection standard, has natural lighting through the dooryard and reduces the investment cost. The dressing room and the shower bath of the workers are arranged in the first floor and the interlayer position between stair wells so that the workers in the different production regions can enter the corresponding production region most conveniently and fully utilize the using space of the stair well. The annular visiting corridor and the production module of a plant generate no any intersection, do not need to use disposable caps and respirators and the like; therefore, the modularized workshop structure reduces the enterprise cost.
Description
Technical field
The present invention relates to the structure design of a kind of multilayer pharmaceutical enterprise clean room.
Background technology
In traditional pharmacy corporation clean room design, the staff enters Production Regional generally dual mode, and the one, entering each Production Regional again after unified the changing one's clothes near the entrance hall, factory building workshop, the 2nd, the staff directly enters the production area after each Production Regional is changed one's clothes.No matter but which kind of mode, the staff all needs to walk exterior feature or passage by special staff, if the factory building scale of construction is bigger, it is relatively just long that then personnel enter the distance of production area, just exist staff's route when entering the production area longer, thereby reduce the effective time, and the long defective that will increase corresponding air conditioning energy consumption of passage.Tradition pharmacy corporation factory building washroom is arranged near the operation room, and it is improper to be provided with as ventilation, can produce smell, might bring certain risk to quality managemant simultaneously, causes the contamination of products accident.In traditional pharmacy plant designing, the visitor generally need pass through the change one's clothes program identical with the staff, visit along staffs only then, visitor's number can cause more for a long time change one's clothes crowded, increase the use of disposable cap, mouth mask etc., add the cost of large enterprises.Visitor and staffs only are parallel, can cause certain influence to production.
The structure design of factory building of the present invention has overcome the shortcoming of above traditional pharmacy factory building, realizes that the production operation district and the personnel channel of each function is relatively independent.
Summary of the invention
The objective of the invention is to overcome the drawback of traditional pharmacy corporation plant designing, taking into full account the special requirement of pharmacy corporation, a kind of a kind of modularized factory building structure of convenient and swift, energy-conservation, health is provided for the production operation district of factory building.
A kind of modularized factory building structure of the present invention, factory building is made of floor rooms at least 2, it is characterized in that: one deck is the mixed use area, one deck is above to be the production operating space, the production operation district forms by at least one modularization Production Regional with around the visit corridor in production operation district, modularization Production Regional and separate around the visit corridor in production operation district, the mixed use area is provided with inlet, dressing room and the shower cubicle of each modularization Production Regional.
Described modularized factory building structure is provided with courtyard in each modularization Production Regional, and the inlet of each modularization Production Regional is located at one deck, and dressing room and shower cubicle are arranged in the Stall interlayer of one deck.
Described Stall interlayer is the next door of stair in each modularization Production Regional, a structure interlayer that adds between 2.8~3.3 meters eminences in distance one deck ground are pushed up extremely from level to level.
Described modularized factory building structure, described visit corridor be arranged at each floor production operation district around, visit between corridor and the production operation district direct interface channel be not set, separate.
Modularized factory building structure of the present invention, the centre in each floor production operation district is provided with courtyard, and the modularization Production Regional is separated in the both sides of courtyard, and the centre of courtyard is provided with interface channel, the two ends of courtyard are respectively arranged with stair, and each modularization Production Regional interconnects by passage.
A side of courtyard is provided with stair as staff only in the modularized factory building structure of the present invention, each modularization Production Regional, and each layer staircase interlayer is provided with dressing room or shower cubicle or washroom.
Modularized factory building structure of the present invention, the ground of visiting the corridor are higher than 0.4~0.6 meter on the ground in production operation district.
Modularized factory building structure of the present invention, every layer floor height is between 5~7 meters.
Modularized factory building structure of the present invention, factory building one deck mixed use area is provided with warehouse district, power station, switchgear house.
Modularized factory building structure of the present invention, utilize the interlayer position of the staircase between each floor of multilayer pharmaceutical factory building that the washroom is set, staircase interlayer between each floor promptly is meant the corner of stair between each layer, can make full use of the space of pharmacy factory building floor height, the interlayer different with the floor height of modularization Production Regional is set.Described modularized factory building structure is independently visited between corridor and the production operation district around the production operation district of factory building direct interface channel is not set, and is separate; Visit ground, corridor and be higher than 0.4~0.6 meter on ground, production operation district, be convenient to visit to Production Regional, modularized factory building structure of the present invention, the staff only needs the modularization Production Regional that can enter corresponding production operation district by the other independent personnel's stair of courtyard, traffic is the most easily, significantly reduce personnel's travel distance, avoided the problem of the long air conditioning energy consumption that brings apart from the corridor simultaneously, embodied energy-conservation characteristics.Secondly, stair add the design of courtyard, can avoid sealing the equipment that stair need equipment cup and forced fume exhaust, can make the staircase natural ventilation again, the comfortableness that the increase personnel pass through makes stair can pass through the courtyard natural lighting again even stair satisfy the requirement of fire protection rule, reduces cost of investment.Staff's dressing room, shower cubicle are arranged at one deck, convenient management, and the Stall interlayer of one deck is as personnel's dressing room and shower cubicle, the space of the one deck that can make full use of, the problem that the solution personnel change one's clothes does not influence the use of one deck again, reaches the purpose of saving building costs.To change one's clothes, the clean system of people such as shower is arranged at each layer staircase interlayer position, the Production Regional that makes the personnel of variant Production Regional can enter appropriate level has the most easily made full use of the usage space of floor gap again.Utilize the position of each floor gap staircase interlayer that the washroom is set, can satisfy employee's needs, can avoid health to produce influence again, also can directly ventilate simultaneously, avoid the generation of peculiar smell and the health influence of Production Regional to courtyard to Production Regional.Special-purpose annular is set among the present invention visits the corridor, visit the corridor simultaneously and do not produce any intersection with the Workshop Production module, the visitor is to need not to use disposable cap, mouth mask etc. visiting Production Regional, reduce the cost of enterprise, simultaneously visitor's number can or not cause more for a long time yet change one's clothes crowded, visit the corridor and compare 0.4~0.6 meter of lifting with the plant operations face, make the visitor recognize the production procedure of modern pharmaceutical enterprise, the production operation of enterprise is not had any impact simultaneously in a more favourable mode.
Description of drawings
Fig. 1 is one deck of the present invention mixed use area plane structure schematic diagram.
Fig. 2 is a production operation of the present invention district plane structure schematic diagram.
Fig. 3 is a production operation of the present invention district plane structure schematic diagram.
Fig. 4 is staircase interlayer of the present invention and stair counter structure schematic diagram.
Among the figure, 1-staircase interlayer; Courtyard in the 2-modularization Production Regional; 3-modularization Production Regional; The 4-passage; The A-mixed use area; B-production operation district; C-visits the corridor; The inlet of D-modularization Production Regional; Courtyard in the middle of the E-production operation district; F-Stall interlayer.
The specific embodiment
Below in conjunction with accompanying drawing the invention will be further described content of the present invention, but patent of the present invention is not limited to this.
A kind of modularized factory building structure, factory building is made of floor rooms 2, every layer floor height is at 5 meters, one deck is mixed use area A, be production operating space B more than two layers, production operation district B forms by a modularization Production Regional 3 with around the visit corridor C around the production operation district B, and direct interface channel is not set between modularization Production Regional 3 and the visit corridor C around the production operation district, separate, the ground of visiting corridor C is higher than 0.4 meter on the ground in production operation district.Courtyard 2 is set in the modularization Production Regional 3, the inlet D of modularization Production Regional 3 is located at one deck mixed use area A, dressing room and shower cubicle are arranged in the Stall interlayer F of one deck, interlayer F is the next door of stair in modularization Production Regional 3, a structure interlayer that adds between the 2.8 meters eminences in distance one deck ground are pushed up extremely from level to level.A side of courtyard 2 is provided with stair as staff only in modularization Production Regional 3, and each layer staircase interlayer 1 all is provided with dressing room, shower cubicle and washroom.Factory building one deck mixed use area A is provided with warehouse district, power station, switchgear house.
A kind of modularized factory building structure, factory building is made of floor rooms 3, every layer floor height is at 6 meters, one deck is mixed use area A, two, three layers are production operating space B, production operation district B forms by 3 modularization Production Regional 3 with around the visit corridor C around the production operation district B, between modularization Production Regional 3 and the visit corridor C direct interface channel is not set around the production operation district, separate, the ground of visiting corridor C is higher than 0.5 meter on the ground in production operation district, Stall interlayer F is located at a structure interlayer that extremely adds between the top from level to level apart from the 3 meters eminences in one deck ground, and all the other are with embodiment 1.
Embodiment 3
Modularized factory building structure of the present invention, factory building is made of floor rooms 10, and every layer floor height is at 7 meters, the centre of each floor production operation district B is provided with courtyard E, modularization Production Regional 3 is separated in the both sides of courtyard E, and the centre of courtyard E is provided with interface channel 4, and the two ends of courtyard are respectively arranged with stair.All the other are with embodiment 2.
Embodiment 4
By one deck mixed use area A, above each floor production operation district B of one deck and form around the visit corridor C in production operation district.Production operation district B is divided into 4 independently modularization production areas 3, its inlet D is located at one deck, in each modularization Production Regional courtyard 2 is set, staff's dressing room, shower cubicle are arranged on the Stall interlayer F of one deck, Stall interlayer F is the next door of stair in each modularization Production Regional, a structure interlayer that adds between the 3.3 meters eminences in distance one deck ground are pushed up extremely from level to level; Visit corridor C be arranged at above each the floor production operation district of one deck around, visit between corridor C and the production operation district direct interface channel be not set, separate, visit ground, corridor is higher than 0.6 meter on ground, production operation district, all the other are with embodiment 2.
Embodiment 5
Described modularized factory building structure, factory building is made of floor rooms 5, and every layer floor height is at 5.5 meters, and modularization production area 3 is 8, and all the other are with embodiment 3.
Claims (8)
1, a kind of modularized factory building structure, factory building is made of floor rooms at least 2, it is characterized in that: one deck is mixed use area (A), one deck is above to be production operating space (B), production operation district (B) forms by at least one modularization Production Regional (3) with around the visit corridor (C) in production operation district, modularization Production Regional (3) and separate around the visit corridor (C) in production operation district, mixed use area (A) is provided with inlet (D), dressing room and the shower cubicle of each modularization Production Regional (3).
2, modularized factory building structure according to claim 1, it is characterized in that, in each modularization Production Regional (3) courtyard (2) is set, the inlet (D) of each modularization Production Regional (3) is located at one deck, and dressing room and shower cubicle are arranged in the Stall interlayer (F) of one deck.
3, modularized factory building structure according to claim 2 is characterized in that, described Stall interlayer (F) is the next door of stair in each modularization Production Regional, a structure interlayer that adds between 2.8~3.3 meters eminences in distance one deck ground are pushed up extremely from level to level.
4, modularized factory building structure according to claim 1, it is characterized in that, the centre in each floor production operation district (B) is provided with courtyard (E), with the both sides of modularization Production Regional (3) separation at courtyard (E), the centre of courtyard (E) is provided with interface channel (4), the two ends of courtyard (E) are respectively arranged with stair, and each modularization Production Regional (3) interconnects by passage (4).
5, modularized factory building structure according to claim 1, it is characterized in that, modularized factory building structure of the present invention, a side of each interior courtyard of modularization Production Regional (3) (2) is provided with stair, and each layer staircase interlayer (1) is provided with dressing room or shower cubicle or washroom.
6, modularized factory building structure according to claim 1 is characterized in that, modularized factory building structure of the present invention, and the ground of visiting corridor (C) is higher than 0.4~0.6 meter on the ground in production operation district.
7, modularized factory building structure according to claim 1 is characterized in that, every layer floor height is between 5~7 meters.
8, modularized factory building structure according to claim 1 is characterized in that, modularized factory building structure of the present invention, and factory building one deck mixed use area (A) is provided with warehouse district, power station, switchgear house.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910094269XA CN101503916B (en) | 2009-03-30 | 2009-03-30 | Modularized factory building structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910094269XA CN101503916B (en) | 2009-03-30 | 2009-03-30 | Modularized factory building structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101503916A true CN101503916A (en) | 2009-08-12 |
CN101503916B CN101503916B (en) | 2011-03-23 |
Family
ID=40976280
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910094269XA Active CN101503916B (en) | 2009-03-30 | 2009-03-30 | Modularized factory building structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101503916B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103362314A (en) * | 2013-08-05 | 2013-10-23 | 徐州中煤百甲重钢科技有限公司 | Washing selecting coal plant modularization building method |
CN106401224A (en) * | 2016-11-24 | 2017-02-15 | 中国电子工程设计院 | Clean room factory structure |
WO2021027528A1 (en) * | 2019-08-09 | 2021-02-18 | 世源科技工程有限公司 | Clean room capable of inhibiting gaseous molecular pollutant from diffusing |
CN113027184A (en) * | 2021-03-03 | 2021-06-25 | 机械工业第九设计研究院有限公司 | Container car vanning workshop system |
CN113282979A (en) * | 2021-03-11 | 2021-08-20 | 机械工业第九设计研究院有限公司 | Design method of powder metallurgy enterprise visiting channel layout system |
-
2009
- 2009-03-30 CN CN200910094269XA patent/CN101503916B/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103362314A (en) * | 2013-08-05 | 2013-10-23 | 徐州中煤百甲重钢科技有限公司 | Washing selecting coal plant modularization building method |
CN103362314B (en) * | 2013-08-05 | 2015-12-09 | 徐州中煤百甲重钢科技有限公司 | Washing coal works modular construction method |
CN106401224A (en) * | 2016-11-24 | 2017-02-15 | 中国电子工程设计院 | Clean room factory structure |
WO2021027528A1 (en) * | 2019-08-09 | 2021-02-18 | 世源科技工程有限公司 | Clean room capable of inhibiting gaseous molecular pollutant from diffusing |
CN113027184A (en) * | 2021-03-03 | 2021-06-25 | 机械工业第九设计研究院有限公司 | Container car vanning workshop system |
CN113282979A (en) * | 2021-03-11 | 2021-08-20 | 机械工业第九设计研究院有限公司 | Design method of powder metallurgy enterprise visiting channel layout system |
Also Published As
Publication number | Publication date |
---|---|
CN101503916B (en) | 2011-03-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101503916B (en) | Modularized factory building structure | |
CN204402090U (en) | Avoid the biological medicine mill construction of the stream of people, logistics intersection | |
CN211173275U (en) | Plane arrangement structure of line side-down type small and medium high-speed rail station house | |
CN201526176U (en) | Modularized workshop structure | |
CN110469162A (en) | Clean room overall structure and workshop operation method for medicine production | |
CN204590232U (en) | A kind of core tube of high-rise building | |
CN210858148U (en) | Novel enclose box-like commercial building | |
CN213705414U (en) | Urban underground rail transit transfer station | |
CN202578033U (en) | Corridor connecting separated independent common elevator for multiple residences and families | |
CN205688578U (en) | Separate type steelframe glass architecture | |
CN207063624U (en) | A kind of self-propelled parking building that saves land | |
Mui | From intelligent building to smart city-A case study | |
CN104234449A (en) | Practical building structure | |
CN103790392A (en) | Barrier-free communication structure for adding elevator to multi-storey residential building | |
CN212317573U (en) | Residential traffic core and building with same | |
CN203867218U (en) | Building structure high in usable rate | |
CN204369367U (en) | A kind of three-dimensional column elevator structure | |
CN201635425U (en) | Single-storey house type structure with swimming pool | |
Hamed | Sustainable Energy Production Solutions in Railway Stations | |
CN203583917U (en) | Gear-type residential building | |
CN207420139U (en) | A kind of line side formula railway station building arrangement | |
CN201420406Y (en) | Tower-type high-rise residential building for solving ventilation problem of middle households | |
Wang et al. | The comparison of hospital certification between G-SEED and foreign certification criteria | |
CN203129629U (en) | Energy-saving, safe and efficient-operation traffic junction for high-rise residential buildings | |
Wang | Thinking about the Design of Commercial Industry Space Facilities under the Background of Epidemic Situation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |