CN101486633A - Formaldehyde absorbing tower - Google Patents

Formaldehyde absorbing tower Download PDF

Info

Publication number
CN101486633A
CN101486633A CNA2009100141456A CN200910014145A CN101486633A CN 101486633 A CN101486633 A CN 101486633A CN A2009100141456 A CNA2009100141456 A CN A2009100141456A CN 200910014145 A CN200910014145 A CN 200910014145A CN 101486633 A CN101486633 A CN 101486633A
Authority
CN
China
Prior art keywords
water tank
grid plate
formaldehyde
tower
lower grid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009100141456A
Other languages
Chinese (zh)
Other versions
CN101486633B (en
Inventor
王承信
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Huaxin Mass Transfer Equipment Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009100141456A priority Critical patent/CN101486633B/en
Publication of CN101486633A publication Critical patent/CN101486633A/en
Application granted granted Critical
Publication of CN101486633B publication Critical patent/CN101486633B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Gas Separation By Absorption (AREA)

Abstract

The invention relates to a formaldehyde absorption tower which simplifies the process of converting hot formaldehyde gas into formaldehyde finished products. The formaldehyde absorption tower consists of a water tank packed column, the lower part of which is provided with a hot formaldehyde gas inlet; the inside wall of the hollow cavity of the water tank packed column over the hot formaldehyde gas inlet is provided with a layer of lower grid plate and a filler is put on the lower grid plate in the hollow cavity of the water tank packed column; the filler over the lower grid plate is provided with a soft water tank; the soft water tank is positioned on the inside wall of the hollow cavity of the water tank packed column and the inside wall of the hollow cavity of the water tank packed column below the lower grid plate is provided with a cooling water tank; the inside wall of the hollow cavity of the water tank packed column over the lower grid plate is provided with a layer of upper grid plate and a filler is put on the upper grid plate in the hollow cavity of the water tank packed column; the filler on the upper grid plate is provided with a soft water tank, the soft water tank is positioned on the inside wall of the hollow cavity of the water tank packed column, the soft water tank over the upper grid plate and the soft water tank over the lower grid plate are communicated; and the cooling water tank and the soft water tanks are made of aluminum.

Description

Formaldehyde absorbing tower
Technical field
The present invention relates to formaldehyde, relate in particular to a kind of formaldehyde absorbing tower.
Background technology
Formaldehyde Production is to be raw material with methyl alcohol, evaporates gasification by methyl alcohol in vaporizer, feeds water vapour again and air becomes ternary gas, enters the formaldehyde reaction device, does under the condition of catalyzer at silver (or iron molybdenum), is oxidized to formaldehyde.The purpose that feeds water vapour is that methyl alcohol is reacted with oxygen beyond its limits of explosion, with the security that guarantees to produce.
One, the proposition of problem:
Traditional Formaldehyde Production flow process is the hot formaldehyde gas that the silver catalyst layer, behind Quench cooling and recovery part heat, also have temperature to enter in the formaldehyde absorbing tower (also have minority with vertical sieve plate column etc.) at 80-100 ℃ the hot formaldehyde gas inlet of hot formaldehyde gas from the formaldehyde absorbing tower bottom, utilize a spot of water, spray circulation downwards from the top of formaldehyde absorbing tower and be absorbed as formalin, remaining hot formaldehyde gas is that tail gas goes out tower from cat head; Heat moved outside not when formaldehyde changed formalin into by hot formaldehyde gas in formaldehyde absorbing tower.60-70 ℃ formalin is discharged in the formaldehyde absorbing tower bottom, enters the board-like formaldehyde water cooler that stainless steel is made, and water cools, formalin after the cooling, part is returned the formaldehyde absorbing tower internal recycle and is absorbed, and reaches the finished product concentration requirement, and extraction is the formaldehyde finished product.
There is following drawback in this absorption cooling process in production practice:
(1) wholely change the absorption process of formalin into by hot formaldehyde gas, promptly in formaldehyde absorbing tower from cat head to tower at the bottom of, the absorption liquid temperature raises gradually, and does not have heat to move outward.So it is not high to absorb impellent, the tail gas control that goes out tower from cat head is bad, and the residual amount of formaldehyde is exceeded standard, the one, influence environment, and the 2nd, influence benefit.
(2) formalin of discharging from formaldehyde absorbing tower bottom, heat is not recycled, but with a large amount of water quench, the load of increase water coolant water cooling tower.Particularly at summer and plate cooler during because of the recirculated water fouling, formalin cooling difficulty in the plate cooler, and the high formalin of portion temperature in the plate cooler returns the absorption of formaldehyde absorbing tower internal recycle, just more cannot say for sure to demonstrate,prove assimilation effect, causes vicious cycle.
(3) formaldehyde absorbing tower and plate cooler are all made of stainless steel, cost an arm and a leg.
(4) plate-type heat exchanger uses recirculated cooling water very easily to deposit mud, fouling etc., deals with suitable trouble, has a strong impact on normally carrying out of production, and the cleaning one by one of must stopping consumes great amount of manpower and expense.
Summary of the invention
The purpose of this invention is to provide a kind of formaldehyde absorbing tower that changes formaldehyde finished product flow process by hot formaldehyde gas into of having simplified.
To achieve these goals, the technical scheme that the present invention takes is: a kind of formaldehyde absorbing tower, comprising the water tank packing tower, water tank packing tower bottom has hot formaldehyde gas inlet, its characteristics are: on the water tank packing tower cavity inner side-wall of hot formaldehyde gas inlet top one deck lower grid plate is installed, be placed with filler on the lower grid plate in the water tank packing tower cavity, in the filler of lower grid plate top softened water tank is installed, softened water tank is installed on the water tank packing tower cavity inner side-wall, on the water tank packing tower cavity inner side-wall of lower grid plate below cooling water tank is installed.
On the water tank packing tower cavity inner side-wall of described lower grid plate top one deck top grating is installed, be placed with filler on the top grating in the water tank packing tower cavity, in the filler of top grating top softened water tank is installed, this softened water tank is installed on the water tank packing tower cavity inner side-wall, and the softened water tank of top grating top communicates with the softened water tank of described lower grid plate top.
Described cooling water tank and softened water tank material are aluminium.
Advantageous effect of the present invention is: lower grid plate, top grating among the present invention are used for carrying the top filler weight.The present invention in use, below hot formaldehyde gas inlet is at the bottom of hot formalin accumulates in tower, in hot formalin cooling water tank to be installed, and tower is equipped with liquidometer indication formalin liquid level outward, cooled formalin is discharged at the bottom of tower, enters next circulation and absorbs operation.
Go out the hot formaldehyde gas of formaldehyde reaction device, self-heating formaldehyde gas inlet enters in the present invention, rises by gas distribution, passes through packing layer and softened water tank successively, and the formaldehyde tail gas after being absorbed is discharged outside the tower after mist separates, and enters the tail gas boiler and does the fuel use.
Recovering condition according to tower temperature distribution and heat, go up most and feed cold soft water (can use refrigerated water summer) in one group of softened water tank, because temperature is low, as checking on of exhaust gas body temperature degree, again preheating soft water, this softened water tank soft water preheating of coming out enters the softened water tank of below certainly, the present invention in use, the sensible heat that absorbs heat, hot formaldehyde gas of the present invention is absorbed cooling, and soft water is heated and sends into the oiler feed of boiler as heat simultaneously, with voluminous steam, energy-saving and cost-reducing.Next group is inserted at the bottom of the tower cooling water tank in the formalin and is fed recirculated cooling water and check on as the last cooling that goes out the tower formalin, and to guarantee favorable cooling effect, recirculated cooling water goes out tower and sends into the cold water system, recycles after the cooling.
The present invention thoroughly changes the drawback of former tower, and has reclaimed heat energy, and following advantage is arranged:
(1) the present invention combines the cooling of tower and energy recovery, has reached the purpose that good cooling results, heat energy were reclaimed, reduced the cold water expense.
(2) ortho-formaldehyde absorption tower and plate cooler are united two into one, simplified flow process, reduced facility investment, use the splendid aluminum pipe of heat-transfer effect as the heat exchange material, its heat-transfer effect is tens times of steel.Water tank has occupied the volume of Stainless Steel Helices in tower, also saved the investment of expensive stainless steel filler, and having broken formaldehyde plant can only be with the convention of stainless material.
(3) thermograde rationally in the tower of the present invention, the absorption impellent is big, assimilated efficiency is high, with the distribution of differing temps with different cooling measures, at any time shift out heat with the generation that absorbs heat, having broken formaldehyde absorbing tower all is the adiabatic history that absorbs, and is the breakthrough innovation that formaldehyde absorbs theory.
(4) thoroughly solving plate cooler uses recirculated water easily to stop up, use the difficult problem of an easy fouling of water, stopped because of the long-time situation of stopping and handling of cleaning plate cooler, guaranteed the long-term operation of producing, two groups of softened water tanks feed soft water on the design does not have blocking problem, next group cooling water tank is a circulating water cooling, if there is fouling not stop at any time, can under the ordinary production situation, open the water coolant case lid, separately cleaning.Tank lid among the present invention is that flange connects, and clears up separately for each joint and designs, and is easy to maintenance.
(5) aluminum radiator long service life can be used more than 10 years, and 5-6 ten thousand yuan of the prices of a platen formula water cooler, and the aluminum radiator price has only about 20,000 yuan, and the aluminium cooling performance is than excellent many of stainless steel.The former full filling material resistance of whole tower resistance ratios is little, and turndown ratio is big, and mass transfer, heat-transfer effect are good.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Embodiment
Below in conjunction with accompanying drawing and specific embodiment the present invention is described further:
A kind of formaldehyde absorbing tower, as shown in Figure 1, comprising the water tank packing tower, water tank packing tower bottom has hot formaldehyde gas inlet, on the water tank packing tower cavity inner side-wall of hot formaldehyde gas inlet top one deck lower grid plate is installed, is placed with filler on the lower grid plate in the water tank packing tower cavity, in the filler of lower grid plate top softened water tank is installed, softened water tank is installed on the water tank packing tower cavity inner side-wall, on the water tank packing tower cavity inner side-wall of lower grid plate below cooling water tank is installed; In the present embodiment, on the water tank packing tower cavity inner side-wall of lower grid plate top one deck top grating is installed, be placed with filler on the top grating in the water tank packing tower cavity, in the filler of top grating top softened water tank is installed, this softened water tank is installed on the water tank packing tower cavity inner side-wall, and the softened water tank of top grating top communicates with the softened water tank of lower grid plate top; In the present embodiment, cooling water tank and softened water tank material are aluminium.

Claims (3)

1, a kind of formaldehyde absorbing tower, comprising water tank packing tower (1), water tank packing tower (1) bottom has hot formaldehyde gas inlet (5), it is characterized in that: on water tank packing tower (1) the cavity inner side-wall of hot formaldehyde gas inlet (5) top one deck lower grid plate (4) is installed, be placed with filler on the lower grid plate (4) in water tank packing tower (1) cavity, in the filler of lower grid plate (4) top softened water tank (2) is installed, softened water tank (2) is installed on water tank packing tower (1) the cavity inner side-wall, on water tank packing tower (1) the cavity inner side-wall of lower grid plate (4) below cooling water tank (6) is installed.
2, formaldehyde absorbing tower according to claim 1, it is characterized in that: on water tank packing tower (1) the cavity inner side-wall of described lower grid plate (4) top one deck top grating (3) is installed, be placed with filler on the top grating (3) in water tank packing tower (1) cavity, in the filler of top grating (3) top softened water tank (2) is installed, this softened water tank (2) is installed on water tank packing tower (1) the cavity inner side-wall, and the softened water tank (2) of top grating (3) top communicates with the softened water tank (2) of described lower grid plate (4) top.
3, formaldehyde absorbing tower according to claim 2 is characterized in that: described cooling water tank (6) is an aluminium with softened water tank (2) material.
CN2009100141456A 2009-02-11 2009-02-11 Formaldehyde absorbing tower Expired - Fee Related CN101486633B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100141456A CN101486633B (en) 2009-02-11 2009-02-11 Formaldehyde absorbing tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100141456A CN101486633B (en) 2009-02-11 2009-02-11 Formaldehyde absorbing tower

Publications (2)

Publication Number Publication Date
CN101486633A true CN101486633A (en) 2009-07-22
CN101486633B CN101486633B (en) 2012-04-18

Family

ID=40889718

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100141456A Expired - Fee Related CN101486633B (en) 2009-02-11 2009-02-11 Formaldehyde absorbing tower

Country Status (1)

Country Link
CN (1) CN101486633B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108421367A (en) * 2018-03-23 2018-08-21 深圳市贝优通新能源技术开发有限公司 A kind of intelligent formaldehyde collection processing equipment based on Internet of Things

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2116523U (en) * 1992-02-24 1992-09-23 华南理工大学 Absorption condensation tower for manufacturing formaldehyde
CN1137074C (en) * 2001-07-11 2004-02-04 马辰生 Producing equipment for formaldehyde and its completed production process
CN101024603B (en) * 2007-03-29 2011-05-18 永港伟方(北京)科技股份有限公司 Methanol absorbing system
CN201033767Y (en) * 2007-03-29 2008-03-12 永港伟方(北京)科技有限公司 Formaldehyde absorption auxiliary tower
CN100569725C (en) * 2007-03-29 2009-12-16 永港伟方(北京)科技股份有限公司 Formaldehyde absorbing method and system
CN201062240Y (en) * 2007-03-29 2008-05-21 永港伟方(北京)科技有限公司 Formaldehyde absorption main tower
CN201351146Y (en) * 2009-02-11 2009-11-25 王承信 Absorption tower for formaldehyde

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108421367A (en) * 2018-03-23 2018-08-21 深圳市贝优通新能源技术开发有限公司 A kind of intelligent formaldehyde collection processing equipment based on Internet of Things

Also Published As

Publication number Publication date
CN101486633B (en) 2012-04-18

Similar Documents

Publication Publication Date Title
CN101143729A (en) Multi-bed layer shaft radial synthesizing tower
CN201351146Y (en) Absorption tower for formaldehyde
CN101486633B (en) Formaldehyde absorbing tower
CN113091338B (en) Reaction heat recycling system in formaldehyde production
CN100400430C (en) Energy saving, purifying and recovering process for urea process condensate
CN108413783B (en) A kind of and tower function heat exchanger
CN203256303U (en) Heat pipe heat-exchange equipment for cooling quenching oil and recycling residual heat of quenching oil
CN104829438A (en) Formaldehyde production method and apparatus thereof
CN103243207B (en) Heat pipe heat-exchange equipment for cooling quenching oil and recovering waste heat of quenching oil
CN202993142U (en) Carbon plant waste heat power generation and heating system based on calcining furnace calcined coke waste heat recovery
CN203187610U (en) Methenamine production device
CN216538373U (en) Final stage water transfer heat bed layer ammonia synthesis reactor
CN202688235U (en) Device for producing formaldehyde by methanol
CN102050447A (en) System for purifying carbon dioxide from combustion tail gas
CN201873530U (en) Device for purifying carbon dioxide (CO2) in tail gas after burning
CN101143807A (en) Method for producing dimethyl ether by separating heat tube type reactor
CN103331076A (en) A mass and heat transfer device combining an absorbing tower and a heat exchanger and a preparation method of the mass and heat transfer device
CN201207411Y (en) Portable micro hydrogen source device for fuel cell
CN2280087Y (en) Reactor for conversion sulfur oxides by use of heat pipe heat-exchange
CN102952562B (en) Petronaphthalene rectification reflux temperature control device and control method thereof
CN101560412B (en) Conversion section front gas, heat, oil water separator
CN203030165U (en) Absorption tower and heat exchanger combined mass and heat transfer device
CN108320822A (en) A kind of modular small presurized water reactor that steam generator is integrated
CN201186210Y (en) Vertical type water-cooling tube box type reactor
CN202993141U (en) Distributed waste heat boiler based on carbon plant calcining furnace calcined coke attached heat pipe heat exchange

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NANTONG HUAXIN MASS TRANSFER EQUIPMENT TECHNOLOGY

Free format text: FORMER OWNER: WANG CHENGXIN

Effective date: 20141020

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 277100 ZAOZHUANG, SHANDONG PROVINCE TO: 226300 NANTONG, JIANGSU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20141020

Address after: 226300 lion bridge village, Jinsha Town, Nantong, Tongzhou District, Jiangsu

Patentee after: Nantong Huaxin Mass Transfer Equipment Technology Co.,Ltd.

Address before: 277100 Puli Chemical Co., Ltd., 18 Qingquan Road, Shizhong District, Shandong, Zaozhuang

Patentee before: Wang Chengxin

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120418

Termination date: 20180211

CF01 Termination of patent right due to non-payment of annual fee