CN101469542A - 农田压桩工艺方法 - Google Patents

农田压桩工艺方法 Download PDF

Info

Publication number
CN101469542A
CN101469542A CNA2007101730800A CN200710173080A CN101469542A CN 101469542 A CN101469542 A CN 101469542A CN A2007101730800 A CNA2007101730800 A CN A2007101730800A CN 200710173080 A CN200710173080 A CN 200710173080A CN 101469542 A CN101469542 A CN 101469542A
Authority
CN
China
Prior art keywords
farmland
weight
ground
steel cylinder
technological process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2007101730800A
Other languages
English (en)
Other versions
CN101469542B (zh
Inventor
沈求良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI SOUTH POWER SUPPLY DESIGN CO Ltd
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
SHANGHAI JINXUAN CONSTRUCTION ENGINEERING Co Ltd
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI JINXUAN CONSTRUCTION ENGINEERING Co Ltd, Shanghai Municipal Electric Power Co filed Critical SHANGHAI JINXUAN CONSTRUCTION ENGINEERING Co Ltd
Priority to CN2007101730800A priority Critical patent/CN101469542B/zh
Publication of CN101469542A publication Critical patent/CN101469542A/zh
Application granted granted Critical
Publication of CN101469542B publication Critical patent/CN101469542B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明涉及电力线路架设领域,尤其涉及一种农田压桩工艺方法。该工艺方法包括安装地钻步骤:打下3组,每组3个共9支地钻,使相邻每组地钻的中心在水平面上的夹角成60度;安装钢筒步骤:在所述3组地钻所处平面的中心挖深坑,将钢筒插入,用一台卷扬机始终吊住所述钢筒顶部以保持平衡;安装增加向下压力的重物步骤:在钢筒顶部安装增加向下压力的重物;压桩步骤:通过人力向所述重物施加向下的压力,使所述钢筒压进地面中。由于采用了上述的技术解决方案,完全解决了农田压桩的问题,不需使用吊车、运输卡车、液压机等大型施工设备,显著地提高了压桩的施工效率,创造了非常好的经济效益。

Description

农田压桩工艺方法
技术领域
本发明涉及电力线路架设领域,尤其涉及一种农田压桩工艺方法。
背景技术
近年来很多地区,尤其是城市的郊区的工业区、房地产开发势头强劲,压桩钢管较传统水泥电杆可以承受相当的横向拉力而省去扳线,增加了土地的利用率,因此广受社会欢迎。电力线路架设方法也就变成了非常重要的问题。
现有的压桩方法:利用液压千斤顶提供下压力,用油泵车不断提供液压油给千斤顶,使其不断顶住压桩管向下压;同时千斤顶受到向上的反作用力(在千斤顶支架根部加上每块2吨重地水泥压块总共10~15吨,确保千斤顶能正常工作)。按照这样地压桩方法,在农田里压桩,必须要在农田内铺设钢板,让吊车、卡车等大型工器具进入现场配合施工。但是铺设钢板的进程相当缓慢,施工完成后还要拆除。损坏的大片庄稼需要赔偿,有时大型设备不可避免地会陷入泥土中,使施工非常困难。农田为机械施工设置了很大的障碍。
发明内容
本发明的目的在于解决上述在农田里压桩的施工困难,提供一种适合农田施工的压桩工艺方法,使农田的压桩简单易行,减少农田压桩带来的农田损失。
实现本发明目的技术方案是:一种农田压桩工艺方法,其特征在于,包括如下步骤:
(1)安装地钻步骤:打下3组,每组3个共9支地钻,使相邻每组地钻的中心在水平面上的夹角成60度;
(2)安装钢筒步骤:在所述3组地钻所处平面的中心挖深坑,将钢筒插入,用一台卷扬机始终吊住所述钢筒顶部以保持平衡;
(3)安装增加向下压力的重物步骤:在钢筒顶部安装增加向下压力的重物;
(4)压桩步骤:通过人力向所述重物施加向下的压力,使所述钢筒压进地面中。
优选地,所述安装增加向下压力的重物步骤包括如下步骤:
A、在所述钢筒的顶部安装用以接施工钢索和挂重物的装置;
B、挂施工钢索和重物;
优选地,所述施工钢索与地面夹角成45度的位置。
优选地,所述重物为三只五吨的手拉链条葫芦。
进一步地,为安全起见,在所述链条葫芦两侧挂双重保护绳,该保护绳挂在所述挂重物的装置上。
进一步地,为使施工钢索与地面夹角成45度的位置,在所述钢筒顶部安装接高装置,该接高装置的高度为能提供所述施工钢索与地面夹角小于45度的角度。
由于采用了上述的技术解决方案,完全解决了农田压桩的问题,不需使用吊车、运输卡车,液压机等大型施工设备,显著的提高了压桩的施工效率,创造了非常好的经济效益。
下面为本发明的有益效果的详细说明。
1、减少了大型施工工具的使用:
 
主要工具 重量比较 使用方便
现有技术方案 100吨液压机、水泥制品压块若干  水泥压块15~20吨             8吨以上吊车一辆、5吨运输卡车3辆配合施工             
本发明方案   三只5吨手拉葫芦、三角盖帽一只、接高筒一只,且可拆卸             总重285公斤左右 可以由4个人工搬运
2、提高了压桩施工效率:
活动前传统压桩工艺方法平均每天压桩1根,活动后新工艺方法平均每天压桩3~4根,提高了施工效率3~4倍。
3、取得非常好的经济效益:
(1)按每次压桩施工计算:
①平均节省施工车辆台班费2000元/次
 
工具 数量 单价费用(元/天)        合计费用
8吨吊车 1 800 800
5吨卡车 3 400 1200
合计 2000
②平均节省人工费504元/次
 
项目 人数 人工(元/天)  原来施工时间(天)   现在施工时间(天)   原来人工费用(元)   现在人工费用(元)   节约(元)
施工人员级费用     12 60 1 0.3 720 216 504
③平均节省青苗赔偿费平均2760元/次
 
项目 传统压桩 简易压桩 平均每次节省费用
农田青苗赔偿 平均损坏青苗1000平方米,按3元/平方米计算,费用为3000元         平均损坏青苗80平方米,按3元/平方米计算,费用为240元      2760元
每次施工可以节省2000+504+2760元=5264(元)
附图说明
图1为本发明农田压桩工艺方法示意图;
图2为本发明农田压桩工艺方法中地钻安装位置俯视示意图;
图3为本发明农田压桩工艺方法中地钻安装位置侧视示意图。
具体实施方式
下面结合附图和实施方式对本发明作进一步的详细说明。
参考图1,一种农田压桩工艺方法,包括如下步骤:
(1)安装地钻2步骤:打下3组,每组3个共9支地钻,使相邻每组地钻的中心在水平面上的夹角成60度;
(2)安装钢筒1步骤:在所述3组地钻所处平面的中心挖深坑,将钢筒1插入,用一台卷扬机始终吊住所述钢筒顶部以保持平衡;
(3)安装增加向下压力的重物步骤:在钢筒顶部安装增加向下压力的重物;
(4)压桩步骤:通过人力向所述重物施加向下的压力,使所述钢筒压进地面中。
上述安装增加向下压力的重物步骤包括如下步骤:
A、在所述钢筒的顶部安装用以接施工钢索4和挂重物的装置;
B、挂施工钢索和重物;
优选地,上述施工钢索与地面夹角成45度的位置。
上述重物为三只五吨的手拉链条葫芦3。
优选地,为安全起见,在所述链条葫芦两侧挂双重保护绳,该保护绳挂在所述挂重物的装置上。
为使施工钢索与地面夹角成45度左右的位置,在所述钢筒顶部安装接高装置,该接高装置的高度为能提供所述施工钢索与地面夹角小于45度的角度。
参考2、3,1为钢筒,2为地钻。在图2中地钻2与钢筒1的连线在水平面上所成的夹角为120度。各地钻中心连成的三角形为等边三角形,各地钻中心连线间的夹角为60度。
以下为实施工具的选择及选择依据。
手拉链条葫芦的选择:
1、选择三个手拉葫芦。
这样选择具有以下优点:
(1)由于三角形的稳定性,容易保持平衡;
(2)特殊场地适应性较强。
2、选择手拉葫芦的规格。
选择5吨的手拉链条葫芦。因为该规格的手拉链条葫芦为目前现有的工具,可以快速获得,而且能满足到10吨的下压力的要求。
3、研制手拉葫芦、保险绳和施工钢索的挂接件。
钢管上没有挂接葫芦的地方,因此必须要解决在钢管上提供挂接葫芦的地方。选择了用200mm槽钢自制三角形框架并在该框架上设置吊环以提供链条葫芦、保险绳和施工钢索的挂接处。上述三角形框架可以由200mm废旧槽钢焊接自制,非常经济,而且能承受6吨的拉力。
4、手拉葫芦工作角变大压力减小解决办法
参考图1所示β角,下压力随工作β角变大而逐步变小,到45度以下时,下压力将逐步下降到10吨以下。为了能提供足够的下压力而且又能利用现有的工具,节省人力,选择接高措施,缩小工作β角角度,继续提供下压力。即采用自制接高装置的方式进行下压。该接高装置的高度为能提供所述施工钢索与地面夹角小于45度的角度。
地钻的选择:
根据经验计算反作用力必须要达到45.3KN,即4.63吨才能实现压桩。由于每个地钻所能承受的上拔力为1.75吨,所以需要3个地钻:1.75吨×3=5.25吨,反作用力才能达到大于4.63吨的反作用力要求。
保险绳的选择:
6mm的钢丝绳满足葫芦本体重力。
在某黄土质地区内,10KV电压等级钢管的压桩成功率达到100%。
 
序号 施工队伍 运用简易压桩施工次数     成功次数 成功率
1 滨海工程队 12 12 100%
2 启东工程队 6 6 100%
3 人防工程队 5 5 100%
合计 23 23 100%
以上实施例仅供说明本发明之用,而非对本发明的限制,有关技术领域的技术人员,在不脱离本发明的精神和范围的情况下,还可以作出各种变换或变型,因此所有等同的技术方案也应该属于本发明的范畴,应由各权利要求所限定。

Claims (6)

1、一种农田压桩工艺方法,其特征在于,包括如下步骤:
(1)安装地钻步骤:打下3组,每组3个共9支地钻,使相邻每组地钻的中心在水平面上的夹角成60度;
(2)安装钢筒步骤:在所述3组地钻所处平面的中心挖深坑,将钢筒插入,用一台卷扬机始终吊住所述钢筒顶部以保持平衡;
(3)安装增加向下压力的重物步骤:在钢筒顶部安装增加向下压力的重物;
(4)压桩步骤:通过人力向所述重物施加向下的压力,使所述钢筒压进地面中。
2、如权利要求1所述的农田压桩工艺方法,其特征在于,所述安装增加向下压力的重物步骤包括如下步骤:
A、在所述钢筒的顶部安装用以接施工钢索和挂重物的装置;
B、挂施工钢索和重物;
3、如权利要求2所述的农田压桩工艺方法,其特征在于,所述施工钢索与地面夹角成45度的位置。
4、如权利要求3所述的农田压桩工艺方法,其特征在于,所述重物为三只五吨的手拉链条葫芦。
5、如权利要求4所述的农田压桩工艺方法,其特征在于,为安全起见,在所述链条葫芦两侧挂双重保护绳,该保护绳挂在所述挂重物的装置上。
6、如权利要求3所述的农田压桩工艺方法,其特征在于,为使施工钢索与地面夹角成45度的位置,在所述钢筒顶部安装接高装置,该接高装置的高度为能提供所述施工钢索与地面夹角小于45度的角度。
CN2007101730800A 2007-12-26 2007-12-26 农田压桩工艺方法 Active CN101469542B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007101730800A CN101469542B (zh) 2007-12-26 2007-12-26 农田压桩工艺方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007101730800A CN101469542B (zh) 2007-12-26 2007-12-26 农田压桩工艺方法

Publications (2)

Publication Number Publication Date
CN101469542A true CN101469542A (zh) 2009-07-01
CN101469542B CN101469542B (zh) 2011-11-16

Family

ID=40827325

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007101730800A Active CN101469542B (zh) 2007-12-26 2007-12-26 农田压桩工艺方法

Country Status (1)

Country Link
CN (1) CN101469542B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102505688A (zh) * 2011-09-26 2012-06-20 上海市城市建设设计研究总院 预制节段桩精确导向施工工艺
CN108179760A (zh) * 2017-12-30 2018-06-19 郑州赫恩电子信息技术有限公司 一种高效建筑施工降水装置
CN110565629A (zh) * 2019-09-17 2019-12-13 中铁隧道局集团有限公司 海上低净空拉森钢板桩安装系统及方法
CN111264242A (zh) * 2020-03-12 2020-06-12 戚建梦 一种现代农业自动化温室建设用支撑骨架高度平齐装置

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002138477A (ja) * 2000-10-30 2002-05-14 Yushima Kogyo Kk 打ち込み用アタッチメントと打ち込み装置
CN2725367Y (zh) * 2004-06-03 2005-09-14 田俊如 电力杆塔管桩基础
CN1766239A (zh) * 2004-10-28 2006-05-03 铁道第一勘察设计院 电力杆塔管型基础的设置
CN2857461Y (zh) * 2005-12-09 2007-01-17 道贵平 农田灌桩

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102505688A (zh) * 2011-09-26 2012-06-20 上海市城市建设设计研究总院 预制节段桩精确导向施工工艺
CN102505688B (zh) * 2011-09-26 2013-10-30 上海市城市建设设计研究总院 预制节段桩精确导向施工工艺
CN108179760A (zh) * 2017-12-30 2018-06-19 郑州赫恩电子信息技术有限公司 一种高效建筑施工降水装置
CN110565629A (zh) * 2019-09-17 2019-12-13 中铁隧道局集团有限公司 海上低净空拉森钢板桩安装系统及方法
CN111264242A (zh) * 2020-03-12 2020-06-12 戚建梦 一种现代农业自动化温室建设用支撑骨架高度平齐装置
CN111264242B (zh) * 2020-03-12 2022-09-13 新疆科创天达农业工程有限公司 一种现代农业自动化温室建设用支撑骨架高度平齐装置

Also Published As

Publication number Publication date
CN101469542B (zh) 2011-11-16

Similar Documents

Publication Publication Date Title
CN201857620U (zh) 一种输变电铁塔桩板基础进行竖向抗拔静载实验的装置
CN101469542B (zh) 农田压桩工艺方法
CN102505636A (zh) 一种双薄壁墩连续刚构桥0号块施工方法
CN206143757U (zh) 加长型沉管夯扩灌注桩桩管及打桩机
CN204898672U (zh) 一种废弃桩基的拔除装置
CN101586342A (zh) 沉箱采用千斤顶水平移动车顶升工艺
CN103510517A (zh) 大吨位锚杆静压桩简易压桩架
CN201826262U (zh) 一种预应力张拉台车
CN203461720U (zh) 简易悬臂吊装机械
CN203581022U (zh) Gis设备运输装置
CN206336964U (zh) 一种支顶式管道吊装装置及系统
CN102094543A (zh) 气动升降通讯塔
CN101936011B (zh) 钢套箱分块卡口捆绑式连接方法及利用其的施工方法
CN104045014A (zh) 一种用于电杆焊接的排杆架
CN204281116U (zh) 风力发电塔跨越自爬式平移吊机
CN209585099U (zh) 一种采用法兰连接的变电站构支架装配式桩基础
CN207277864U (zh) 一种用于大型钢结构拼装的混凝土临时支撑胎架
CN202245789U (zh) 一种门式起重机防台风的专用装置
CN202379616U (zh) 移动式简易起吊装置
CN111056460A (zh) 一种装配式塔吊检修平台及安装方法
CN201137319Y (zh) 三角盖帽
CN214497512U (zh) 一种静压桩机用提升牵引塔架
CN205839756U (zh) 一种可拆卸式锚杆静压桩桩架结构
CN202039267U (zh) 荷载辅助承载装置
CN213679457U (zh) 一种用于大吨位预制管桩的安装平台

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI SOUTH POWER SUPPLY DESIGN CO., LTD.

Free format text: FORMER OWNER: SHANGHAI JINXUAN CONSTRUCTION ENGINEERING CO., LTD.

Effective date: 20120321

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 200540 JINSHAN, SHANGHAI TO: 200233 XUHUI, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20120321

Address after: 200233 No. 222, Qin Jiang Road, Shanghai, Xuhui District

Co-patentee after: Shanghai Electric Power Corporation

Patentee after: Shanghai South Power Supply Design Co., Ltd.

Address before: 200540 room 3, building 1621, 136 Jinshan Road, Shanghai, Jinshan District

Co-patentee before: Shanghai Electric Power Corporation

Patentee before: Shanghai Jinxuan Construction Engineering Co., Ltd.

ASS Succession or assignment of patent right

Owner name: SHANGHAI MUNICIPAL ELECTRIC POWER COMPANY STATE EL

Free format text: FORMER OWNER: SHANGHAI MUNICIPAL ELECTRIC POWER COMPANY

Effective date: 20121030

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121030

Address after: 200233 No. 222, Qin Jiang Road, Shanghai, Xuhui District

Patentee after: Shanghai South Power Supply Design Co., Ltd.

Patentee after: Shanghai Electric Power Corporation

Patentee after: State Grid Corporation of China

Address before: 200233 No. 222, Qin Jiang Road, Shanghai, Xuhui District

Patentee before: Shanghai South Power Supply Design Co., Ltd.

Patentee before: Shanghai Electric Power Corporation