CN101936011B - 钢套箱分块卡口捆绑式连接方法及利用其的施工方法 - Google Patents
钢套箱分块卡口捆绑式连接方法及利用其的施工方法 Download PDFInfo
- Publication number
- CN101936011B CN101936011B CN2010102864560A CN201010286456A CN101936011B CN 101936011 B CN101936011 B CN 101936011B CN 2010102864560 A CN2010102864560 A CN 2010102864560A CN 201010286456 A CN201010286456 A CN 201010286456A CN 101936011 B CN101936011 B CN 101936011B
- Authority
- CN
- China
- Prior art keywords
- steel bushing
- rope
- bayonet socket
- bushing case
- binding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 103
- 239000010959 steel Substances 0.000 title claims abstract description 103
- 238000000034 method Methods 0.000 title claims abstract description 31
- 238000010276 construction Methods 0.000 title claims abstract description 28
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 50
- 238000003466 welding Methods 0.000 claims description 6
- 239000000284 extract Substances 0.000 claims description 4
- 238000007789 sealing Methods 0.000 claims description 4
- 238000005553 drilling Methods 0.000 claims description 3
- 238000003754 machining Methods 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 3
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 239000002689 soil Substances 0.000 abstract description 12
- 238000009412 basement excavation Methods 0.000 abstract description 5
- 238000005096 rolling process Methods 0.000 abstract description 3
- 238000004804 winding Methods 0.000 abstract description 2
- 244000303847 Lagenaria vulgaris Species 0.000 abstract 3
- 235000009797 Lagenaria vulgaris Nutrition 0.000 abstract 3
- 230000007306 turnover Effects 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 3
- 238000010008 shearing Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Earth Drilling (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102864560A CN101936011B (zh) | 2010-09-19 | 2010-09-19 | 钢套箱分块卡口捆绑式连接方法及利用其的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102864560A CN101936011B (zh) | 2010-09-19 | 2010-09-19 | 钢套箱分块卡口捆绑式连接方法及利用其的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101936011A CN101936011A (zh) | 2011-01-05 |
CN101936011B true CN101936011B (zh) | 2012-08-29 |
Family
ID=43389563
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010102864560A Active CN101936011B (zh) | 2010-09-19 | 2010-09-19 | 钢套箱分块卡口捆绑式连接方法及利用其的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101936011B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102433888B (zh) * | 2011-08-25 | 2013-10-23 | 中交二航局第三工程有限公司 | 装配式钢套箱 |
CN108342993B (zh) * | 2018-02-26 | 2020-04-03 | 利越集团有限公司 | 一种水中承台悬吊支撑平台及其施工工法 |
CN113833001A (zh) * | 2021-09-22 | 2021-12-24 | 济南市市政工程设计研究院(集团)有限责任公司 | 一种可拆卸滚动下沉式沉井结构及施工工艺 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2538839Y (zh) * | 2002-03-22 | 2003-03-05 | 熊建辉 | 水中墩基础施工用锁扣式钢围堰 |
JP2005226326A (ja) * | 2004-02-13 | 2005-08-25 | Ohbayashi Corp | 既設橋脚基礎の補強構造および既設橋脚基礎の補強方法 |
CN101581099A (zh) * | 2009-06-16 | 2009-11-18 | 中铁九局集团有限公司 | 单壁钢吊箱围堰 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8066449B2 (en) * | 2002-07-18 | 2011-11-29 | Aubian Engineering, Inc. | Method for dry isolation of a water passage of a dam |
-
2010
- 2010-09-19 CN CN2010102864560A patent/CN101936011B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2538839Y (zh) * | 2002-03-22 | 2003-03-05 | 熊建辉 | 水中墩基础施工用锁扣式钢围堰 |
JP2005226326A (ja) * | 2004-02-13 | 2005-08-25 | Ohbayashi Corp | 既設橋脚基礎の補強構造および既設橋脚基礎の補強方法 |
CN101581099A (zh) * | 2009-06-16 | 2009-11-18 | 中铁九局集团有限公司 | 单壁钢吊箱围堰 |
Also Published As
Publication number | Publication date |
---|---|
CN101936011A (zh) | 2011-01-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203271243U (zh) | 火力发电厂烟囱钛板钢内筒倒装施工装置 | |
CN103556649B (zh) | 海上风力发电机组的导管架调平机构 | |
CN105040715B (zh) | 使用钢板桩做桥梁施工围堰方法 | |
CN102134860A (zh) | 工程桩承载力自身反力平衡加载测试方法 | |
CN101936011B (zh) | 钢套箱分块卡口捆绑式连接方法及利用其的施工方法 | |
CN101792015B (zh) | 一种多功能的拼装式水上移动设备 | |
CN201428139Y (zh) | 钢格构架式塔式起重机基础结构 | |
CN214883827U (zh) | 一种施工升降机悬挑基础支撑体系装置 | |
CN209854759U (zh) | 一种中空夹层钢管混凝土结构杆塔与基础的单边螺栓连接构造 | |
CN102587377B (zh) | 吊锤沉桩装置及沉桩方法 | |
CN204510221U (zh) | 旋转式水上打桩导架 | |
CN208379601U (zh) | 一种可回收式基坑支护桩及拆装装置 | |
CN101469542B (zh) | 农田压桩工艺方法 | |
CN110593298A (zh) | 一种利用辅助桩改进筒型基础承载性能的复合基础及其施工方法 | |
CN207228148U (zh) | 一种单管塔预制拼装式基础 | |
CN203007965U (zh) | 用于水下高桩承台施工的钢吊箱系统 | |
CN206034929U (zh) | 混凝土方柱柱顶后装的提升架 | |
CN108756202A (zh) | 一种可循环利用的建筑悬挑脚手架固定装置和使用方法 | |
CN201850549U (zh) | 海洋平台阶梯型抗沉降桩腿 | |
CN213062058U (zh) | 一种用于海域承台的可拆卸底板钢吊箱围堰 | |
CN210827544U (zh) | 一种利用辅助桩改进筒型基础承载性能的复合基础 | |
CN113897945A (zh) | 一种地连墙组合式连接结构及施工方法 | |
CN112813969A (zh) | 一种钢管桩桩基及其施工方法 | |
CN112112180A (zh) | 一种装配式组合桥墩与承台的连接系统及其施工方法 | |
CN206800379U (zh) | 后注浆预应力空心方桩 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Xian Zheng Hong Inventor after: Su Xueping Inventor after: Li Deqin Inventor after: Tang Shilian Inventor before: Li Deqin Inventor before: Tang Shilian Inventor before: Xian Zheng Hong Inventor before: Su Xueping |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: LI DEQIN TANG SHILIAN XIAN ZHENGHONG SU XUEPING TO: XIAN ZHENGHONG SU XUEPING LI DEQIN TANG SHILIAN |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: ROAD + BRIDGE SOUTH CHINA ENGINEERING CO., LTD. Free format text: FORMER NAME: ROAD AND BRIDGE SOUTH CHINA ENGINEERING CO., LTD. |
|
CP01 | Change in the name or title of a patent holder |
Address after: 528400 Guangdong city of Zhongshan Province East Xing Zheng Road No. 1 Central Plaza 3 floor 19 Patentee after: ROAD & BRIDGE SOUTH CHINA ENGINEERING Co.,Ltd. Address before: 528400 Guangdong city of Zhongshan Province East Xing Zheng Road No. 1 Central Plaza 3 floor 19 Patentee before: ROAD AND BRIDGE SOUTHERN ENGINEERING Co.,Ltd. |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: The method and construction method of using the steel sleeve box with segmented bayonet binding connection and its utilization Effective date of registration: 20231214 Granted publication date: 20120829 Pledgee: Zhongshan Branch of Bank of Communications Co.,Ltd. Pledgor: ROAD & BRIDGE SOUTH CHINA ENGINEERING Co.,Ltd. Registration number: Y2023980071581 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |