CN101407294B - Control apparatus for elevator and installation construction method for elevator - Google Patents

Control apparatus for elevator and installation construction method for elevator Download PDF

Info

Publication number
CN101407294B
CN101407294B CN200710180754XA CN200710180754A CN101407294B CN 101407294 B CN101407294 B CN 101407294B CN 200710180754X A CN200710180754X A CN 200710180754XA CN 200710180754 A CN200710180754 A CN 200710180754A CN 101407294 B CN101407294 B CN 101407294B
Authority
CN
China
Prior art keywords
elevator
lift car
construction
control panel
operation control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200710180754XA
Other languages
Chinese (zh)
Other versions
CN101407294A (en
Inventor
迫田友治
岸川孝生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to CN200710180754XA priority Critical patent/CN101407294B/en
Publication of CN101407294A publication Critical patent/CN101407294A/en
Application granted granted Critical
Publication of CN101407294B publication Critical patent/CN101407294B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Elevator Control (AREA)

Abstract

The invention provides an elevator control gear, which can realize lift car running used for elevator construction by using partial functions of a formal running control board even before the detail specifications of the lift car are defined. The elevator control gear comprises: an incoming panel which obtains the electricity needed by the running of the elevator exteriorly; a formal running control board used for controlling the driving mechanism of the lift car according to the operations on the call button of the elevator lobby, the destination call button in the lift car and the like to lead the lift car to go up and down, and opening and closing the lift door when arriving the designed floor of the passenger; and a main circuit disc used for supplying the electricity from the incoming panel to the driving mechanism of the lift car and the lift car according to the instruction from the formal running control board, wherein, a running control board used for construction is further arranged, which is provided with an operation switch-box used for construction and replaces the formal running control board to be connected with the incoming panel, the main circuit disc and the lift car.

Description

Elevator control gear and installation construction method for elevator
Technical field
The present invention relates to a kind of elevator control gear and installation construction method for elevator, especially relate to the control device for running the engine that uses when a kind of elevator is constructed.
Background technology
The elevator cage operation device that uses when constructing as elevator, for example open and disclose the elevator cage operation device that uses when a kind of elevator is constructed in the flat 8-259121 communique the patent of invention spy of Japan, its special-purpose operation of construction control panel that will be used to replace the commencement of commercial operation control panel is arranged in the Machine Room, the attended operation switch-board on the special-purpose operation of this construction control panel by cable and connecting box, and on lift car, operate this operating switch case by operating personal, make elevator cage operation with this.
Patent documentation 1: the patent of invention spy of Japan open flat 8-259121 communique (the 3rd~4 page, Fig. 1~Fig. 3)
In the elevator cage operation device that when the elevator construction of patent documentation 1, uses, owing to the special-purpose operation of construction control panel, cable, joint box and operating switch case can be handled as separate member, so it is these various members are easy to connect, lighter to the transport operation of Machine Room and installation exercise afterwards.
, if as patent documentation 1, all the elevator operation functions during with construction all collect in the special-purpose operation control panel of constructing, and then the special-purpose operation of this construction control panel also must possess the function that is subjected to the electric work energy and powers to winch of alternating current.Under situations such as the lifting travel of elevator is long, owing to increase to the delivery of winch, thereby can cause constructing special-purpose operation control panel profile and weight increase, and bring difficulty for carrying work.
In addition, if be subjected to the restriction of construction period, and when causing formal operation control panel and construction special-purpose operation control panel to overlap the period that is provided with in the Machine Room, the problem that the space is set at the original special-purpose operation control panel of guaranteeing in regard to very narrow Machine Room to construct then can appear being difficult to.
If in order to address this problem, do not use the special-purpose operation of construction control panel and adopt, when after formal operation control panel sets, beginning to carry out the method for elevator construction, because specification at elevator, especially before the detail specifications of lift car is determined, the manufacturing of formal operation control panel can't be carried out, thus can cause the construction of elevator to lag behind significantly period, thus become the bottleneck problem that influences the integral construction progress.
Summary of the invention
The object of the present invention is to provide a kind of elevator control gear and installation construction method for elevator, even this elevator control gear had before the detail specifications of lift car is determined, also can utilize the part of functions of formal operation control panel, realize the device of elevator construction with cage operation.
In order to address the above problem, the present invention proposes a kind of elevator control gear, it has: the incoming panel that obtains elevator operation required electric power from the outside; According to the operation of the call button of elevator lobby or the bed of interest call button in the lift car, the driver train of control lift car makes the lift car lifting, opens and closes the formal operation control panel of elevator door behind the floor that arrives passenger's appointment; And according to instruction from described formal operation control panel, to give the power circuit dish of described lift car driver train and lift car from the electric power supply of described incoming panel, wherein, further be provided with construction with moving control panel, it has working operating switch case, replaces described formal operation control panel to be connected with described power circuit dish and described lift car with described incoming panel when construction.
In addition, the invention allows for a kind of construction method of installation with elevator of elevator control gear, wherein this elevator control gear has: obtain the incoming panel of elevator operation required electric power from the outside, according to the operation of the bed of interest call button in elevator lobby call button or the lift car, the driver train of control lift car, make the lift car lifting, behind the floor that arrives passenger's appointment, open and close the formal operation control panel of elevator door; And according to instruction from described formal operation control panel, to give the power circuit dish of described lift car driver train and lift car from the electric power supply of described incoming panel, the construction method of installation of this elevator comprises: described incoming panel and described power circuit dish are set at least, replace the construction of described formal operation control panel and described incoming panel and described power circuit dish and described lift car bonded assembly with moving control panel when being arranged on construction, operation is constructed with operation control panel bonded assembly with described construction and is used the operating switch case, make described lift car lifting to construct, finish the back in construction and remove described construction, described formal operation control panel is connected with described power circuit dish and described lift car with described incoming panel with the operation control panel.
The invention effect
In the present invention, elevator control gear is divided into incoming panel function block, power circuit dish function block and operation control panel function block to be considered, when constructing, elevator also can utilize formal incoming panel and formal power circuit dish, in construction, replacing formal operation control panel and formal incoming panel with construction with the operation control panel is connected with formal power circuit dish, use as power supply for construction ladder control setup, so do not need incoming panel function block and power circuit dish function block secondary are moved into the Machine Room, it is not enough to worry that also the space is set, and can reduce carrying weight.
And,,, can successfully carry out the construction that is provided with of elevator so can not bring adverse influence to the manufacturing schedule of formal operation control panel because use is only to have and the construction of the content function associated of constructing operation control panel.
Description of drawings
Fig. 1 is the block diagram of the system architecture of expression elevator control gear one embodiment involved in the present invention;
Fig. 2 is illustrated in construction in the elevator installation of embodiment of Fig. 1 with the block diagram of the coupled condition of operation control panel 60.
Nomenclature
The 10-incoming panel
The operation control panel that 20-is formal
30-power circuit dish
The driver train of 40-lift car
The 50-lift car
The 60-construction is with moving control panel
10A, 10B-incoming panel adaptor union
20A, 20C, the operation control panel adaptor union that 20D-is formal
30B, 30D-power circuit dish adaptor union
60A, 60C, the 60D-construction is with moving the control panel adaptor union
The specific embodiment
When elevator control gear is considered as the complex of function block, elevator control gear can be divided into incoming panel function block, power circuit dish function block and operation control panel function block.
Wherein, relevant power circuit dish, as long as knowing the stop number of floor levels of elevator is the basic specification such as form, maximum rated seating capacity and maximum load quality and command speed etc. that length, passenger's usefulness/dwelling house usefulness/bed of hoist trunk such as uses at lift car, just can determine the specification of power consumption and circuit component, and these specifications can change hardly.In addition, after the specification of power circuit dish is determined, just can calculate the required power of elevator operation, therefore determine the electrical specification of incoming panel, and these specifications can change hardly.
In contrast to this, the operation control panel must could be made after the specification of lift car and each layer elevator lobby is determined.In lift car and elevator lobby, have various options aspect the configuration design of elevator door and interior decoration.
In lift car and elevator lobby, have aspect the circuit of direct relation in specification, also have various options aspect control operation when the control operation when the control operation when the content of the quantity of the kind of the quantity of vertical main controlling board, (wheelchair with) lateral operation dish and position, elevator door sensor and quantity and position, dialogue machine and position, broadcasting, energy-saving run, earthquake, fire, fault and anti-theft image pick-up are first-class with the operation control panel.
The client decision during specification through expensive time of regular meeting and also can constantly claim halfway, carry out the change of specification.Therefore, the more operation control panel of specification change might not always can be provided with incoming panel and the power circuit dish that specification can be changed hardly simultaneously.
For this reason, in the present invention, the specification aspect being had incoming panel and the power circuit dish that progress and the specification of manufacturing schedule of the operation control panel of numerous uncertain factors can change hardly independently separates, incoming panel and the power circuit dish that earlier specification can be changed hardly are arranged on the formal position, on these incoming panels and power circuit dish, be connected then usefulness instead have construction with the construction of operating switch case with the operation control panel, and it is used as power supply for construction ladder control setup.
After construction finishes, remove construction with being connected between operation control panel and incoming panel and the power circuit dish, be arranged on this time point then and made the formal operation control panel that finishes, and be connected with the power circuit dish with the incoming panel that has set, and it is used as formal elevator control gear.
The embodiment that below sees figures.1.and.2 to elevator control gear involved in the present invention describes.
Fig. 1 is the block diagram of the system architecture of expression elevator control gear one embodiment involved in the present invention.
The elevator control gear of present embodiment is made of incoming panel 10 and formal operation control panel 20 and power circuit dish 30 under the formal state that is provided with.Incoming panel 10 is by adaptor union 10A, and 10B is connected with power circuit dish 30 with formal operation control panel 20.Formal operation control panel 20 is by adaptor union 20A, 20D, 20C is connected with power circuit dish 30 and lift car 50 with incoming panel 10, and be connected at the call button of this not shown elevator lobby and display panel etc.Power circuit dish 30 is by adaptor union 30B, and 30D and incoming panel 10 are connected with formal operation control panel 20, and are connected with lift car 50 with the driver train 40 of lift car.
Incoming panel 10 obtains the required electric power of elevator operation from the outside.Power circuit dish 30 will be given the driver train 40 of lift car from the electric power supply of incoming panel 10 according to the instruction of formal operation control panel 20.Formal operation control panel 20 is according to the operation of the bed of interest call button in elevator lobby call button or the lift car 50 etc., the driver train 40 of control lift car, make lift car 50 liftings, behind the floor that arrives passenger's appointment, open and close elevator door, allow passenger's elevator up and down.
In the present embodiment, when construction, set up by adaptor union 60A, 60D, 60C and incoming panel 10 and power circuit dish 30 and the construction of lift car 50 bonded assemblys are with moving control panel 60 to replace formal operation control panel 20.Construction is connected with construction operating switch case with operation control panel 60 by wired or wireless circuit.
Fig. 2 is illustrated in construction in the elevator installation of embodiment of Fig. 1 with the block diagram of the coupled condition of operation control panel 60.
Fig. 2 represents to be provided with the state of formal operation control panel 20., the adaptor union 20A of the operation control panel 20 that this is formal, 20D, 20C is not connected with other adaptor union, so formal operation control panel 20 is not worked.
The construction of using as substituting of formal operation control panel 20 is passed through adaptor union 60A with operation control panel 60,60D, 60C is connected with power circuit dish 30 and lift car 50 with incoming panel 10, and by construction is operated with the operating switch case, the construction that can carry out lift car 50 is with moving.
So, even formal operation control panel 20 is not worked after being provided with yet, and in construction, there is not to plan to allow the workmen use setting type main controlling board in the lift car 50 and lateral operation dish etc. yet, so the construction stage even without formal operation control panel 20, can not go wrong, therefore yet, whether the setting of formal operation control panel 20, can not become the bottleneck problem of elevator installation.
Under formal operation control panel 20 and incoming panel 10 and power circuit dish 30 and lift car 50 open circuited states, after construction connects with operation control panel 60, not by operation control panel 20, but control with the incoming panel 10 of 60 pairs of elevators of operation control panel and the operation of power circuit dish 30 and lift car 50 by construction, so before formal operation control panel 20 installs, also can carry out the operation in the hoist trunk.
After construction finishes, remove the adaptor union 60A of construction with operation control panel 60,60D, 60C, and with the adaptor union 20A of formal operation control panel 20,20D, 20C are connected with the other side's adaptor union respectively, finish formal elevator control gear with this.
Therefore, according to present embodiment, with incoming panel and power circuit dish and construction are set in the Machine Room are formed the special-purpose situation of moving control panel of incorporate traditional construction with the operation control panel and compare, do not need incoming panel function block and power circuit dish function block secondary are moved into the Machine Room, it is not enough to worry that also the space is set, and can reduce carrying weight.
In addition, because use is only to have and the construction of the content function associated of constructing operation control panel,, can successfully carry out the construction that is provided with of elevator so can not bring adverse influence to the manufacturing schedule of formal operation control panel.

Claims (2)

1. an elevator control gear has: the incoming panel that obtains elevator operation required electric power from the outside; According to the operation of the bed of interest call button in elevator lobby call button or the lift car, control lift car driver train makes the lift car lifting, opens and closes the formal operation control panel of elevator door behind the floor that arrives passenger's appointment; And, will give the power circuit dish of described lift car driver train and lift car from the electric power supply of described incoming panel according to instruction from described formal operation control panel, it is characterized in that,
Further being provided with construction with the operation control panel, it has working operating switch case, the time replaces described formal operation control panel and is connected with described power circuit dish and described lift car with described incoming panel in construction.
2. construction method of installation with elevator of elevator control gear, wherein this elevator control gear has: obtain the incoming panel of elevator operation required electric power from the outside, according to the operation of the bed of interest call button in elevator lobby call button or the lift car, control lift car driver train, make the lift car lifting, behind the floor that arrives passenger's appointment, open and close the formal operation control panel of elevator door; And, will give the power circuit dish of described lift car driver train and lift car from the electric power supply of described incoming panel according to instruction from described formal operation control panel, the construction method of installation of this elevator is characterised in that,
Described incoming panel and described power circuit dish are set at least,
Be arranged on that construction the time replaces described formal operation control panel and with described incoming panel and described power circuit dish and the construction of described lift car bonded assembly with the operation control panel,
Operation is used the operating switch case with described construction with the construction of operation control panel bonded assembly, makes described lift car lifting constructing,
Finish the back in construction and remove described construction operation control panel,
Described formal operation control panel is connected with described power circuit dish and described lift car with described incoming panel.
CN200710180754XA 2007-10-11 2007-10-11 Control apparatus for elevator and installation construction method for elevator Expired - Fee Related CN101407294B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200710180754XA CN101407294B (en) 2007-10-11 2007-10-11 Control apparatus for elevator and installation construction method for elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200710180754XA CN101407294B (en) 2007-10-11 2007-10-11 Control apparatus for elevator and installation construction method for elevator

Publications (2)

Publication Number Publication Date
CN101407294A CN101407294A (en) 2009-04-15
CN101407294B true CN101407294B (en) 2010-09-29

Family

ID=40570542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200710180754XA Expired - Fee Related CN101407294B (en) 2007-10-11 2007-10-11 Control apparatus for elevator and installation construction method for elevator

Country Status (1)

Country Link
CN (1) CN101407294B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104340813B (en) * 2014-10-30 2016-09-14 中国建筑股份有限公司 A kind of installation construction method for elevator
CN112469656B (en) * 2018-08-01 2022-05-10 三菱电机株式会社 Elevator device

Also Published As

Publication number Publication date
CN101407294A (en) 2009-04-15

Similar Documents

Publication Publication Date Title
AU2018203401B2 (en) Method and Apparatus for Modernizing an Elevator Installation
JP5576016B2 (en) Elevator equipment modernization method and system
CN101746649B (en) Elevator device
CN107777492A (en) The control system and method for elevator are taken by robot
US20140251935A1 (en) Method and control assembly for operating at least two lifting devices, in particular cranes, in parallel
JP2010023959A (en) Moving system for autonomous traveling vehicle by elevator
KR102305486B1 (en) Elevator renewal method and elevator control panel
CN103863903A (en) Elevator
CN107298351A (en) Method, program and mobile device for controlling elevator device
CN105600632A (en) System and method for automatically entering and exiting elevator
CN101407294B (en) Control apparatus for elevator and installation construction method for elevator
CN103508275A (en) Elevator control apparatus
EP1935824B1 (en) Method and system for modernising a lift system
TWI383945B (en) Method of modernising a lift installation
CN102190217A (en) Elevator
JP2015044668A (en) Elevator group management control system
JP6538114B2 (en) Method of diagnostic operation of elevator, elevator control apparatus and diagnostic operation program of elevator
JP2012180160A (en) Group management elevator
JPWO2019035214A1 (en) Elevator renewal method and elevator accessory panel
CA2601839A1 (en) Freight elevator door control utilizing serial communication
CN102080250B (en) Automatic lifting structure of plating/phosphating line
JP4810362B2 (en) Elevator control device and elevator installation work method
TW201943634A (en) Cooperative operation system for elevator and self-supporting vehicle
CN204280928U (en) Control housing assisted by Machineroom-less elevator system and elevator
CN103922201B (en) Elevator control gear

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100929

Termination date: 20171011