CN101407251B - 一种海洋工程模块导向定位安装方法 - Google Patents
一种海洋工程模块导向定位安装方法 Download PDFInfo
- Publication number
- CN101407251B CN101407251B CN200810228773XA CN200810228773A CN101407251B CN 101407251 B CN101407251 B CN 101407251B CN 200810228773X A CN200810228773X A CN 200810228773XA CN 200810228773 A CN200810228773 A CN 200810228773A CN 101407251 B CN101407251 B CN 101407251B
- Authority
- CN
- China
- Prior art keywords
- ways
- web
- panel
- ocean engineering
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Revetment (AREA)
Abstract
本发明公开了一种海洋工程模块导向定位安装方法,包括如下步骤:第一、制作导向构件(1)和(2);第二、将多个导向构件(1)和(2)间隔垂直安装于预装平台(6)上;第三、利用各个导向构件的面板对待合拢的海洋工程模块导向,引导海洋工程模块的撑腿定位安装,并焊接固定海洋工程模块;最后,切除多余的导向构件(1)和(2)。本发明的海洋工程模块导向定位安装方法,利用钢板切割成上部削斜的钢质构件,提前安装于大型模块安装位置,与已有结构焊接。大型模块的撑腿可以方便的插入该导向装置。由于导向构件加工简单、使用方便,可以大大提高大型模块合拢安装定位的准确性。
Description
技术领域
本发明涉及一种海洋工程模块的安装方法,更具体地说,涉及一种针对设置有支撑腿的大型模块单元实现整体合拢的方法。
背景技术
目前在海洋工程上,大多数的大型模块采用异地整体建造,然后整体吊装合拢。由于合拢要求尺寸精确,所以在合拢这些模块时,需要使用临时导向定位工装。临时导向限位工装的设计与安装决定了模块合拢精度的好坏。
此外,在海洋工程产品上大型模块上,设计有各种型式的支撑腿。这些支撑腿通常可以利用一个斜面导向安装。问题在于,在坞内或主船体漂浮状态下,这些设置支撑腿的大型海洋工程模块安装定位较为困难,精度难以保证。
发明内容
针对上述问题,本发明专为设有斜面导向支撑腿的大型海洋模块提供一种可在坞内或主船体漂浮状态下依靠平面导向定位合拢的方法。
为了解决上述问题,本发明构造了一种海洋工程模块导向定位安装方法,包括如下步骤:
第一、制作第一和第二导向构件。其中,第一导向构件由一个直角梯形腹板和与腹板成T形结构设置的面板构成;面板设置于腹板的斜边一侧。第二导向构件由第二腹板和与第二腹板成T形结构设置的面板构成;第二腹板为上部成直角梯形、下部成矩形的复合结构;面板设置于第二腹板上部斜边一侧。
第二、将多个第一和第二导向构件间隔垂直安装于预装平台的四周。其中,第一导向构件用于在预装平台的上表面内安装;第二导向构件用于在预装平台的上表面边缘处安装;安装时各个导向构件的面板等高且相互呼应。
第三、利用各个导向构件的面板对待合拢的海洋工程模块导向,引导所述海洋工程模块的撑腿定位安装,并焊接固定海洋工程模块。
最后,切除第一和第二导向构件。
此外,为了便于第二导向构件的安装固定,第二导向构件的腹板上位于面板下方开设有矩形缺口。
本发明的海洋工程模块导向定位安装方法,利用钢板切割成上部削斜的钢质构件,提前安装于大型模块安装位置,与已有结构焊接。大型模块的撑腿可以方便的插入该导向装置。由于导向构件加工简单、使用方便,可以大大提高大型模块合拢安装定位的准确性。
附图说明
图1是本发明第一导向构件的侧视结构示意图;
图2是本发明第二导向构件的侧视结构示意图;
图3是导向构件安装在预装平台上的状态结构示意图。
具体实施方式
本发明为解决大型模块单元整体合拢时准确定位的问题,提供了价格低廉、简单易行、保证大型模块准确定位于预装平台的限位导向构件。主要分为两种,如图1所示,第一种导向构件1由一个直角梯形腹板3和与腹板3成T形结构设置的面板4构成;面板4设置于腹板3斜边一侧。第二种第二导向构件2,如图2所示,由腹板5和与第二腹板5成T形结构设置的面板4构成;第二腹板5为上部成直角梯形、下部成矩形的复合结构;面板4设置于第二腹板5上部斜边一侧;优选方式下,导向构件2的腹板5上位于面板4下方开设有矩形缺口,以便第二导向构件2的安装固定。简言之,导向工件为由2块平铁焊接组成的T形结构,即由钢板提前切割成上部带有斜度的钢结构腹板,而后垂直焊接面板构成。
本发明海洋工程模块导向定位安装方法,包括如下步骤:
首先,制作上述导向构件1和2。
其次,将多个导向构件1和2间隔垂直安装于预装平台6上;其中,如图3所示,导向构件1用于在预装平台6的上表面内安装;导向构件2用于在预装平台6的上表面边缘处安装;安装时各个导向构件的面板等高且相互呼应。
再次,利用各个导向构件的面板对待合拢的海洋工程模块导向,引导海洋工程模块的撑腿定位安装,并焊接固定海洋工程模块。
最后,切除多余的导向构件1和2。
本发明海洋工程模块导向定位安装方法,主要针对底部为预装平台、上部设置有撑腿的大型海洋工程模块的定位合拢。采用若干个导向构件焊接在模块撑腿需要安装的位置。模块撑腿可以方便快捷的插入由若干限位导向构件形成的固定位置。其中,导向构件上部削斜,便于引导模块撑腿插入。T形结构具有足够的强度,保证撑腿在导入的过程中不发生变形,并因此保证了安装对位的精度。下部与已有结构焊接,在模块安装到位后,切除导向构件即完成模块合拢。
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明披露的技术范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。
Claims (2)
1.一种海洋工程模块导向定位安装方法,其特征在于,包括如下步骤:
S1.制作第一导向构件(1)和第二导向构件(2);
所述第一导向构件(1)由一个直角梯形腹板(3)和与所述腹板(3)成T形结构设置的面板(4)构成;所述面板(4)设置于所述腹板(3)斜边一侧;
所述第二导向构件(2)由第二腹板(5)和与所述第二腹板(5)成T形结构设置的面板(4)构成;所述第二腹板(5)为上部成直角梯形、下部成矩形的复合结构;所述面板(4)设置于所述第二腹板(5)上部斜边一侧;
S2.将多个所述第一导向构件(1)和第二导向构件(2)间隔垂直安装于预装平台(6)的四周;
其中,所述第一导向构件(1)用于在所述预装平台(6)的上表面内安装;所述第二导向构件(2)用于在所述预装平台(6)的上表面边缘处安装;安装时各个导向构件的面板等高且相互呼应;
S3.利用各个导向构件的面板对待合拢的海洋工程模块导向,引导所述海洋工程模块的撑腿定位安装,并焊接固定所述海洋工程模块;
S4.切除所述第一导向构件(1)和第二导向构件(2)。
2.根据权利要求1所述的海洋工程模块导向定位安装方法,其特征在于,在步骤S1中,所述第二导向构件(2)的腹板(5)上位于所述面板(4)下方开设有矩形缺口,以便用于所述第二导向构件(2)的安装固定。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810228773XA CN101407251B (zh) | 2008-11-14 | 2008-11-14 | 一种海洋工程模块导向定位安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810228773XA CN101407251B (zh) | 2008-11-14 | 2008-11-14 | 一种海洋工程模块导向定位安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101407251A CN101407251A (zh) | 2009-04-15 |
CN101407251B true CN101407251B (zh) | 2012-01-11 |
Family
ID=40570510
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200810228773XA Active CN101407251B (zh) | 2008-11-14 | 2008-11-14 | 一种海洋工程模块导向定位安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101407251B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106289193B (zh) * | 2016-08-04 | 2018-11-30 | 广州中船文冲船坞有限公司 | Fpso大面积海工模块的动态定位方法 |
CN106826176B (zh) * | 2017-03-23 | 2018-12-07 | 宝鸡石油机械有限责任公司 | 一种支持平台钻井模块导向定位安装方法 |
CN110877693B (zh) * | 2019-11-15 | 2022-04-01 | 沪东中华造船(集团)有限公司 | 一种lng船双层底分段的智能制造方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0654564A1 (fr) * | 1993-10-29 | 1995-05-24 | Etpm S.A. | Procédé pour installer le pont d'une plate-forme marine sur une structure support en mer |
CN101144270A (zh) * | 2006-09-15 | 2008-03-19 | 大连船舶重工集团有限公司 | 桩腿合拢定位结构 |
-
2008
- 2008-11-14 CN CN200810228773XA patent/CN101407251B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0654564A1 (fr) * | 1993-10-29 | 1995-05-24 | Etpm S.A. | Procédé pour installer le pont d'une plate-forme marine sur une structure support en mer |
CN101144270A (zh) * | 2006-09-15 | 2008-03-19 | 大连船舶重工集团有限公司 | 桩腿合拢定位结构 |
Also Published As
Publication number | Publication date |
---|---|
CN101407251A (zh) | 2009-04-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101407251B (zh) | 一种海洋工程模块导向定位安装方法 | |
CN102528363A (zh) | 金属薄板矩形箱结构焊接工装 | |
CN108127284A (zh) | 一种船用柴油机机架焊前装配方法 | |
CN202577305U (zh) | 钢柱定位器 | |
CN104477327A (zh) | 伸缩式侧推装置座架及其安装工艺 | |
CN204639431U (zh) | 一种激光拼焊机定位装置 | |
CN201997888U (zh) | 焊接胎具 | |
KR100644268B1 (ko) | 컨테이너선의 셀가이드 구조를 이용한 블럭 세팅 방법 | |
CN203610898U (zh) | 一种端墙总成组焊翻转工装 | |
CN203265987U (zh) | 通用发动机支架焊接定位装置 | |
CN106826004B (zh) | 齿轮齿条升降系统安装架的制作方法 | |
CN210756083U (zh) | 带调整支承的主端梁组合工装 | |
CN204679267U (zh) | 一种共轨喷油器自动高压注油机构 | |
CN104029150B (zh) | 飞行器产品后段部件开放式装配定位系统 | |
CN202152190U (zh) | 一种汽车冲压件分层货架定位总成 | |
CN203640281U (zh) | 主次楞限位卡扣 | |
CN104668871A (zh) | 转向架焊接装夹装置和装夹方法 | |
US20140352592A1 (en) | Method of transporting a hydroelectric turbine system | |
CN205629806U (zh) | 一种半挂车用机械悬挂支架定位组焊专用工装 | |
CN204785345U (zh) | 一种航显屏安装结构 | |
CN102658460B (zh) | 将支座焊接在异形板上的加工方法 | |
CN108857117B (zh) | 一种高强度发射井围栏结构件的制造方法 | |
CN212682956U (zh) | 蜘蛛式支腿焊接工装 | |
CN210967663U (zh) | 一种定位工装 | |
CN203612889U (zh) | 一体式举升机构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |