CN101377672A - Power plant environment pollution harnessing remote diagnostic control system - Google Patents

Power plant environment pollution harnessing remote diagnostic control system Download PDF

Info

Publication number
CN101377672A
CN101377672A CNA2007100453410A CN200710045341A CN101377672A CN 101377672 A CN101377672 A CN 101377672A CN A2007100453410 A CNA2007100453410 A CN A2007100453410A CN 200710045341 A CN200710045341 A CN 200710045341A CN 101377672 A CN101377672 A CN 101377672A
Authority
CN
China
Prior art keywords
factory
control system
dog
remote
monitoring center
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007100453410A
Other languages
Chinese (zh)
Inventor
徐建刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ORIENTAL ENVIRO-INDUSTRY Co Ltd
Original Assignee
SHANGHAI ORIENTAL ENVIRO-INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ORIENTAL ENVIRO-INDUSTRY Co Ltd filed Critical SHANGHAI ORIENTAL ENVIRO-INDUSTRY Co Ltd
Priority to CNA2007100453410A priority Critical patent/CN101377672A/en
Publication of CN101377672A publication Critical patent/CN101377672A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Testing And Monitoring For Control Systems (AREA)

Abstract

The present invention provides a remote diagnosis and control system for environmental pollution treatment of a power plant. The system comprises a plurality of plant end monitoring devices and a remote monitoring center which is used for monitoring and managing the work of each plant end monitoring device; each plant end monitoring device comprises an information reading and storage device which is connected with an plant end internal network, and is connected with the remote monitoring center for communication through a public wired or wireless communication network. The present invention facilitates the monitoring of the running state of the desulphurization system and the denitration system, can promoptly discover the abnormal condition, greatly saves the investment in the labor resources of the professional personnel and the experts, can prevent the situation that the desulphurization device and the denitration device do not work, and is conducive to the supervision of the environmental protection department.

Description

Power plant environment pollution harnessing remote diagnostic control system
Technical field
The present invention relates to the tele-control system in the industrial control field, relate in particular to a kind of power plant environment pollution harnessing remote diagnostic control system.
Background technology
Along with fast development of national economy, no matter being industrial enterprise or resident living grows to even greater heights to the demand of electric power, and electric power facility is constantly built, and wherein the fuel-burning power plant still occupies main flow.And the fuel-burning power plant defective of self especially, that is exactly a large amount of flue dust and a harmful gas of discharging.In the face of the current environment that goes from bad to worse, country makes a decision and administers or close down the enterprise of high pollution, wherein explicitly calls for the fuel-burning power plant must possess desulfuring and denitrifying apparatus and just can generate electricity by way of merging two or more grid systems.
The pollutant that thermal power plant is eliminated in institute's discharging waste gas mainly uses desulfuring and denitrifying apparatus, the DCS control system of existing desulfuring and denitrifying apparatus is mainly monitored our factory desulphurization denitration engineering process system, finish analog quantity control (MCS), sequential control (SCS), data acquisition (DAS) and the accident sequence system (SOE) of regulation, to satisfy the requirement of various operating conditions, guarantee safety, efficient operation.And the data of desulphurization denitration engineering DCS are delivered to the existing plant level supervisory information system of power plant (SIS) by redundant interface.
Yet, in order to guarantee the profit of generating plant, some generating plant take to start desulfuring and denitrifying apparatus and not the means of actual motion escape environmental administration supervision, discharge a large amount of harmful gases and flue dust privately, the idle fragile now environment of fund waste order too that causes of the environmental protection equipment that the appearance of this phenomenon had both made country's cost substantial contribution start makes the matter worse.
Summary of the invention
Purpose of the present invention just is by the DCS data of each power plant desulfurization denitrification apparatus are sent to a remote centralized control system, monitor and diagnose the operation conditions of desulfuring and denitrifying apparatus by long-range expert's Centralized Monitoring mode, can either sufficiently and reasonably use Expert Resources like this, in time each power plant's operation data is analyzed, is diagnosed and provide the method scheme that solves abnormal conditions, can save power plant's environment protection treating facility again and run the input of on-the-spot professional, expert's number, also help the operation that environmental administration supervises the desulphurization denitration environmental protection equipment more easily.
To achieve these goals, the invention provides a kind of power plant environment pollution harnessing remote diagnostic control system, this system comprises some factories end watch-dog and is used for the remote monitoring center of each described factory end watch-dog work of monitoring management, described each factory's end watch-dog comprises that the information that connects factory's end internal network reads storage facilities, and described each factory's end watch-dog establishes a communications link by public wired or wireless communication network and described remote monitoring center.
Wherein, described factory end watch-dog also comprises fire wall, and its information of being arranged at reads between storage facilities and the described public wired or wireless communication network, is subjected to the invasion of external network in order to prevent factory's end internal network.
Wherein, described public cable network comprises that public network ADSL inserts, and stable data transmits in order to satisfy more, also can use DDN private line access described factory end watch-dog and remote monitoring center.
Wherein, described public wireless communication network comprises that GPRS inserts, promptly load the device that the GPRS modulator-demodular unit sends and receives as data respectively at described factory end watch-dog and described remote monitoring center, data transmit in order to satisfy faster, also can use the CDMA1X technology as data transfer means.
Wherein, to read storage facilities be to utilize general-purpose interface to connect the multi-purpose computer of factory's end internal network to described information.
Wherein, described general-purpose interface is an Ethernet interface, and described information reads storage facilities can insert factory's end internal network and plant level supervisory information system (SIS) communication by netting twine and switch.
Wherein, described remote monitoring center is reliable high-performance computer, and is provided with some giant-screens, and the corresponding factory of each giant-screen end watch-dog is for the directly perceived real-time information that each factory's end watch-dog transmits of checking.
The invention provides a kind of power plant environment pollution harnessing remote diagnostic control system, it mainly utilizes the watch-dog that quarters at each factory's end to read the DCS data of power plant desulfurization denitrating system, and send to long-range Surveillance center by public wired or wireless network, the data of coming for the unified analysis of the expert of Surveillance center transmits, this diagnostic control system helps the supervisory control system running state, unusual circumstance in time, and saved the professional greatly, expert's human input, also can avoid desulphurization denitration equipment that the generation of the circumstances that construction do not move is arranged, be beneficial to the supervision of environmental administration.
Description of drawings
Fig. 1 is the structural representation of one embodiment of the invention
Embodiment
Now according to accompanying drawing, the present invention will be further described.
Embodiment 1
Please refer to shown in Figure 1, power plant environment pollution harnessing remote diagnostic control system comprises remote monitoring center 10, fire wall 30, interface computer 40 and the public internet 20 that connects remote computer and fire wall, fire wall 30 is by network connection interface computing machine 40, and interface computer 40 is by network insertion power plant internal network 50.
Wherein remote control room 60 is the machine rooms away from power plant and built-in remote monitoring center 10.Pulpit 70, electric room 80, on-the-spot 90 all are positioned at power plant inside.Wherein 70 inside, pulpit have power plant's internal network 50, and are connected SIS system, operator station 100, interface computer 40, fire wall 30, engineer station, long-range FGD-DCS active station on power plant's internal network.Electric room 80 built-in DCS racks 110, DCS rack 110 stands 100 and the engineer station by network attended operation person.On-the-spot 90 comprise remote cabinet 120, and remote cabinet 120 connects unit 110 by network.
Be to utilize the SIS interface be positioned at desulfurization island inside to read information in the prior art, guarantee the normal operation of system for desulfuration and denitration from remote cabinet 120, DCS rack 110, long-range FGD-DCS active station, engineer station, operator station 100.
In the present invention, interface computer 40 disposes with power plant desulfurization Control Software that denitration device uses thinks supporting data collection program, the collection that can concentrate and storage are from the DCS data of desulphurization denitration equipment, and with data to remote monitoring center 10, before interface computer 40 inserts public internet 20, must insert fire wall 30 earlier, the purpose that adds fire wall 30 is in order to guarantee that power plant's internal network 50 avoids the invasion from the various harmful informations on the public internet 20, to guarantee the normal operation of the stable and desulphurization denitration equipment of power plant's internal network 50.Remote monitoring center 10 and interface computer 40 are respectively arranged with the data read and the data of working in coordination and transmit software, the data that the fetch interface computing machine that assurance remote monitoring center 10 can be safe, accurate, real-time is collected.After remote monitoring center 10 received needed data, then the expert can arrive the situation of desulphurization denitration equipment operation according to the inner giant-screen Real Time Observation that is provided with of remote monitoring center, and the problem that is occurred is in time solved and notice power plant aspect.Especially, native system is fit to monitor simultaneously the ruuning situation of a plurality of power plant, has so both reduced the cost of power plant aspect, also makes the advantage of the concentrated remote monitoring of native system be brought into play.

Claims (7)

1, power plant environment pollution harnessing remote diagnostic control system, it is characterized in that, this system comprises some factories end watch-dog and is used for the remote monitoring center of each described factory end watch-dog work of monitoring management, described each factory's end watch-dog comprises that the information that connects factory's end internal network reads storage facilities, and described each factory's end watch-dog establishes a communications link by public wired or wireless communication network and described remote monitoring center.
2, remote diagnosis control system as claimed in claim 1 is characterized in that, described factory end watch-dog also comprises fire wall, and its information of being arranged at reads between storage facilities and the described public wired or wireless communication network.
3, remote diagnosis control system as claimed in claim 1 or 2 is characterized in that, described public cable network comprises that public network ADSL inserts, or uses DDN private line access described factory end watch-dog and remote monitoring center.
4, remote diagnosis control system as claimed in claim 1 or 2, it is characterized in that, described public wireless communication network comprises that GPRS inserts, promptly load the device that the GPRS modulator-demodular unit sends and receives as data respectively, or use the CDMA1X technology as data transfer means at described factory end watch-dog and described remote monitoring center.
5, remote diagnosis control system as claimed in claim 1 or 2 is characterized in that, it is to utilize general-purpose interface to connect the multi-purpose computer of factory's end internal network that described information reads storage facilities.
6, remote diagnosis control system as claimed in claim 5 is characterized in that, described general-purpose interface is an Ethernet interface, and described information reads storage facilities can insert factory's end internal network and plant level supervisory information system communication by netting twine and switch.
7, remote diagnosis control system as claimed in claim 1 or 2 is characterized in that, described remote monitoring center is reliable high-performance computer, and is provided with some giant-screens, the corresponding factory of each giant-screen end watch-dog.
CNA2007100453410A 2007-08-28 2007-08-28 Power plant environment pollution harnessing remote diagnostic control system Pending CN101377672A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007100453410A CN101377672A (en) 2007-08-28 2007-08-28 Power plant environment pollution harnessing remote diagnostic control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007100453410A CN101377672A (en) 2007-08-28 2007-08-28 Power plant environment pollution harnessing remote diagnostic control system

Publications (1)

Publication Number Publication Date
CN101377672A true CN101377672A (en) 2009-03-04

Family

ID=40421246

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007100453410A Pending CN101377672A (en) 2007-08-28 2007-08-28 Power plant environment pollution harnessing remote diagnostic control system

Country Status (1)

Country Link
CN (1) CN101377672A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102541021A (en) * 2012-01-18 2012-07-04 娄卡奔新能源科技发展(上海)有限公司 Environment monitoring management central system of cement industry
CN101817352B (en) * 2009-09-23 2013-01-02 兰州理工大学 Intelligent wheel stopper system based on wireless communication
CN103048962A (en) * 2012-12-10 2013-04-17 广州市怡文环境科技股份有限公司 Component-based cross-platform environment monitoring system
CN103795594A (en) * 2013-07-08 2014-05-14 韶关学院 Industrial monitoring system based on network terminal
CN106647259A (en) * 2016-10-28 2017-05-10 中国科学院自动化研究所 Coking gas desulfurization and denitrification integrated equipment centralized management and control system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101817352B (en) * 2009-09-23 2013-01-02 兰州理工大学 Intelligent wheel stopper system based on wireless communication
CN102541021A (en) * 2012-01-18 2012-07-04 娄卡奔新能源科技发展(上海)有限公司 Environment monitoring management central system of cement industry
CN103048962A (en) * 2012-12-10 2013-04-17 广州市怡文环境科技股份有限公司 Component-based cross-platform environment monitoring system
CN103048962B (en) * 2012-12-10 2015-05-27 广州市怡文环境科技股份有限公司 Component-based cross-platform environment monitoring system
CN103795594A (en) * 2013-07-08 2014-05-14 韶关学院 Industrial monitoring system based on network terminal
CN106647259A (en) * 2016-10-28 2017-05-10 中国科学院自动化研究所 Coking gas desulfurization and denitrification integrated equipment centralized management and control system
CN106647259B (en) * 2016-10-28 2019-08-23 中国科学院自动化研究所 Coking flue gas desulfurization and denitrification integration apparatus centralized management system

Similar Documents

Publication Publication Date Title
CN206472103U (en) A kind of photovoltaic plant intelligent management system
CN113644745A (en) Energy storage power station intelligence operation and maintenance analytic system based on cloud pipe limit end
CN102545387B (en) Integrated information platform of intelligent substation
CN107395117A (en) Distributed solar energy electricity generation system monitors and remote diagnosis SaaS platforms
CN202837985U (en) GPRS-communication based remote online monitoring system for sewage treatment equipment
CN102830673A (en) GPRS (General Packet Radio Service) communication-based remote online monitoring system and method for sewage treatment equipment
CN110033186A (en) A kind of huge hydroelectric power plant's intelligence prison disc system
CN100382515C (en) Power and environment concentrated monitoring management system
CN102263436B (en) On-line monitoring system for energy-saving scheduling and real-time coal consumption of power grid
CN101377672A (en) Power plant environment pollution harnessing remote diagnostic control system
CN103701212A (en) Method and system for monitoring and analyzing power grid safety and stability control device
CN108173261B (en) New energy grid-connected active high-reliability automatic control system
CN103970098A (en) Intelligent substation auxiliary system integrated monitoring platform
CN108173517A (en) A kind of photovoltaic generation monitoring management system
CN201680503U (en) Centralized heating remote control monitoring device and system
CN206775517U (en) A kind of garbage compression station redundant configuration system based on Cloud Server
CN111478434A (en) Power dispatching remote maintenance system
CN201657028U (en) Large scale wind power generation monitoring system
CN201258824Y (en) Remote monitoring system of wind generating set
CN113654587A (en) Wind-powered electricity generation field environmental data monitoring devices
CN201955662U (en) Operation optimization management control system for thermal generator set
CN104617668A (en) System and method for remotely monitoring transformer substation storage battery
CN105240210A (en) Wind generation set condition monitoring system based on voice recognition
CN110632426A (en) Modular combined type electric power detection device
CN206115258U (en) Coal -fired power plant equipment on -line manages diagnostic system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090304