CN101324416A - 钻孔桩孔底沉渣厚度测量工具及测量方法 - Google Patents

钻孔桩孔底沉渣厚度测量工具及测量方法 Download PDF

Info

Publication number
CN101324416A
CN101324416A CNA2007100751477A CN200710075147A CN101324416A CN 101324416 A CN101324416 A CN 101324416A CN A2007100751477 A CNA2007100751477 A CN A2007100751477A CN 200710075147 A CN200710075147 A CN 200710075147A CN 101324416 A CN101324416 A CN 101324416A
Authority
CN
China
Prior art keywords
plummet
thickness
lining rope
measurement
hole bottom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007100751477A
Other languages
English (en)
Inventor
黄建龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2007100751477A priority Critical patent/CN101324416A/zh
Publication of CN101324416A publication Critical patent/CN101324416A/zh
Pending legal-status Critical Current

Links

Landscapes

  • A Measuring Device Byusing Mechanical Method (AREA)

Abstract

一种钻孔桩孔底沉渣厚度测量工具,包括测绳,在测绳最底端系结有一个金属测锤,在距离测绳最底端上方1-2米处还系结有另一个金属测锤,其中测绳最底端系结的金属测锤(下测锤)重量约为1.8-2.5公斤,而在距离测绳最底端上方1-2米处的金属测锤(上测锤)的重量约为0.8-1.2公斤,两测锤的重量相差1-1.4公斤。本发明使工程师只需放下一根测绳、只放一次测绳,就可以使用轻重不同的两种测锤测量沉渣,可以避免由于测锤太重或太轻而影响工程师的对沉渣厚度的准确判断。本发明还提供一种钻孔桩孔底沉渣厚度测量方法。

Description

钻孔桩孔底沉渣厚度测量工具及测量方法
技术领域
本发明属于一种建筑施工测量设备及测量方法,具体涉及一种钻孔桩孔底沉渣厚度测量工具及测量方法。
背景技术
钻孔桩的孔底沉渣属松散结构,孔底沉渣或虚土的存在是影响钻孔桩承载力和基础一致性的一个重要因素。当孔底残留较厚沉渣时,会使桩底部刚度减小,容许承载力下降。所以,清孔质量、测量孔底沉渣厚度是钻孔桩施工中不可缺少的一环,施工规范对钻孔桩清孔后的沉渣厚度h有明确规定,即对柱桩:h<10cm,对摩擦桩:h<30em。现有测量钻孔桩孔底沉渣厚度测量工具的工具一般是采用一根50米测绳,测绳下端系结有金属测锤。金属测锤呈短条状,一般采用2-4根直径2厘米左右的短钢筋并拢并焊成一体。测量时由测量沉渣的工程师用手反复放低、抬高测绳,使金属测锤不断反复刺入然后拔出沉渣层,由此感觉沉渣层的存在,凭手感和经验判断沉渣层厚度。但由于各种地质情况下,各根桩孔底沉渣的粒径、粘性、组分千差万别,各根桩孔底沉渣对短钢筋测锤的阻力并不一样,现有钻孔桩孔底沉渣厚度测量工具,使用时会产生如下问题:其下端的测锤如果太轻,则有可能在某些桩孔中难以完全刺入沉渣层,反之,其下端的测锤如果太重,则有可能在某些桩孔中由于太容易刺入沉渣层而使测量工程师难以感到沉渣层阻力。上述两种情况均有可能影响工程师对沉渣厚度的判断。
发明内容
本发明的主要目的是针对现有技术的上述不足而提供一种钻孔桩孔底沉渣厚度测量工具和测量方法,它可以避免由于测锤太重或太轻而影响工程师的对沉渣厚度的准确判断。
为实现以上目的,本发明的钻孔桩孔底沉渣厚度测量工具包括测绳,在测绳最底端系结有一个金属测锤,其主要特点在于,在距离测绳最底端上方1-2米处还系结有另一个金属测锤,两测锤的重量相差1-1.4公斤。
较好的是,测绳最底端系结的金属测锤(下测锤)重量约为.8-2.5公斤,而在距离测绳最底端上方1-2米处的金属测锤(上测锤)的重量约为0.8-1.2公斤
本发明的钻孔桩孔底沉渣厚度测量方法,采用上述测量工具,包括以下步骤:a、放下测绳,至下测锤着地,用下测锤反复触探沉渣层,感觉沉渣层阻力和厚度;b、继续放下测绳,让测绳再下落,至上测锤着地,继续用上测锤反复触探沉渣层,感觉沉渣层阻力和厚度。
本发明具有以下优点和效果:
1、对于同一桩孔,工程师只需放下一根测绳、只放一次测绳,就可以使用轻重不同的两种测锤测量沉渣,由此避免以往测锤要么太重要么太轻的缺点,增加了判断沉渣层厚度的准确程度,解决了长期以来困扰人们的一大难题。
附图说明
图1是本发明一种具体实施例的结构示意图。
具体实施方式
实施例一
本发明的孔桩孔底沉渣厚度测量工具包括一根50米长的测绳1,在测绳最底端系结有一个1.8公斤金属测锤2(下测锤),在距离测绳最底端上方1.0米处还系结有另一个0.8公斤金属测锤3(上测锤),两测锤的重量相差1公斤。
实施例二
本发明的孔桩孔底沉渣厚度测量工具包括一根50米长的测绳,在测绳最底端系结有一个2.5公斤金属测锤,在距离测绳最底端上方2.0米处还系结有另一个1.2公斤金属测锤,两测锤的重量相差1.3公斤。
实施例三
本发明的钻孔桩孔底沉渣厚度测量方法,采用实施例一的测量工具,包括以下步骤:a、放下测绳1,至下测锤2着地,用下测锤2反复触探沉渣层,感觉沉渣层阻力和厚度;b、继续放下测绳1,让测绳1再下落,至上测锤2着地,继续用上测锤测锤反复触探沉渣层,感觉沉渣层的阻力和厚度。

Claims (3)

1.一种钻孔桩孔底沉渣厚度测量工具,包括测绳,在测绳最底端系结有一个金属测锤,其特征在于:在距离测绳最底端上方1-2米处还系结有另一个金属测锤,两测锤的重量相差1-1.4公斤。
2.根据权利要求1所述的钻孔桩孔底沉渣厚度测量工具,其特征在于:测绳最底端系结的金属测锤重量约为1.8-2.5公斤,而在距离测绳最底端上方1-2米处的金属测锤的重量约为0.8-1.2公斤。
3.一种钻孔桩孔底沉渣厚度测量方法,其特征在于采用权利要求2所述的测量工具,包括以下步骤:a、放下测绳,至下测锤着地,用下测锤反复触探沉渣层,感觉沉渣层的阻力和厚度;b、继续放下测绳,让测绳再下落,至上测锤着地,继续用上测锤反复触探沉渣层,感觉沉渣层阻力和厚度。
CNA2007100751477A 2007-06-15 2007-06-15 钻孔桩孔底沉渣厚度测量工具及测量方法 Pending CN101324416A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007100751477A CN101324416A (zh) 2007-06-15 2007-06-15 钻孔桩孔底沉渣厚度测量工具及测量方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007100751477A CN101324416A (zh) 2007-06-15 2007-06-15 钻孔桩孔底沉渣厚度测量工具及测量方法

Publications (1)

Publication Number Publication Date
CN101324416A true CN101324416A (zh) 2008-12-17

Family

ID=40188049

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007100751477A Pending CN101324416A (zh) 2007-06-15 2007-06-15 钻孔桩孔底沉渣厚度测量工具及测量方法

Country Status (1)

Country Link
CN (1) CN101324416A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587423A (zh) * 2012-03-02 2012-07-18 中国石油大学(华东) 海洋平台打入式钢管桩土塞深度测试装置及其测试方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587423A (zh) * 2012-03-02 2012-07-18 中国石油大学(华东) 海洋平台打入式钢管桩土塞深度测试装置及其测试方法
CN102587423B (zh) * 2012-03-02 2014-04-16 中国石油大学(华东) 利用海洋平台打入式钢管桩土塞深度测试装置测试土塞深度的方法

Similar Documents

Publication Publication Date Title
CN101324415A (zh) 钻孔桩孔底沉渣厚度测量工具和测量方法
Perko Helical piles: a practical guide to design and installation
CN206752536U (zh) 一种钻孔灌注桩孔底沉渣测量装置
CN105019485B (zh) 一种基坑开挖桩基静载试验检测方法
Samtani et al. Soils and foundations reference manual–Volume II
CN103422495A (zh) 一种空心钻孔灌注桩及其施工方法
CN106401557B (zh) 一种联合测试煤层瓦斯含量和瓦斯压力确定钻孔有效抽采半径的方法
CN105862703B (zh) 一种岩溶地区路基承载能力的原位测试方法及测试装置
CN203256733U (zh) 灌注桩桩顶混凝土标高检测装置
CN201053859Y (zh) 钻孔桩孔底沉渣厚度测量工具
CN101324416A (zh) 钻孔桩孔底沉渣厚度测量工具及测量方法
CN105780829B (zh) 钻孔灌注桩沉渣厚度快速准确检测装置
CN107941137A (zh) 任意倾角钻孔变形量测方法
CN208568471U (zh) 静止侧向土压力系数k0原位测试装置
CN204238266U (zh) 用于检测桩孔沉渣厚度的组合测锤
CN201508179U (zh) 逐桩测量放样打点器
CN105484300A (zh) 一种大孔径钻孔护壁加固泥浆临界比重的测定方法
CN205530399U (zh) 一种灌注桩沉渣厚度测定装置
Sumanth et al. Significance of Energy Transfer Ratio in Standard Penetration Test and Its Influence on Foundation Design
El-Sherbiny et al. Evaluation of SPT energy for Donut and Safety hammers using CPT measurements in Egypt
CN108489814A (zh) 静止侧向土压力系数k0原位测试装置及测试方法
CN101324417A (zh) 钻孔桩孔底沉渣厚度测量工具
Manceau et al. The Field Behaviour of Drilled and grouted piles in rock
CN203547720U (zh) 钻孔灌注桩钻孔检测装置
Fellenius et al. Testing and design of a piled foundation project. A case history

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20081217