CN102587423A CN2012100535337A CN201210053533A CN102587423A CN 102587423 A CN102587423 A CN 102587423A CN 2012100535337 A CN2012100535337 A CN 2012100535337A CN 201210053533 A CN201210053533 A CN 201210053533A CN 102587423 A CN102587423 A CN 102587423A
Authority
CN
China
Prior art keywords
ball
steel pipe
absolute altitude
light ball
piling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100535337A
Other languages
English (en)
Other versions
CN102587423B (zh
Inventor
王腾
管志川
张玉哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum East China
Original Assignee
China University of Petroleum East China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum East China filed Critical China University of Petroleum East China
Priority to CN201210053533.7A priority Critical patent/CN102587423B/zh
Publication of CN102587423A publication Critical patent/CN102587423A/zh
Application granted granted Critical
Publication of CN102587423B publication Critical patent/CN102587423B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种海洋平台打入式钢管桩土塞深度测试装置以及利用该装置测试土塞高度的方法,它是在开口钢管桩的管体内外分别置有两个重量不同的球,管体内为重球,管体外为轻球,两个球通过一根绕过管体顶部的柔性钢丝绳相连,管体外壁上设有高度标注;重球、轻球和钢丝绳的重量应保证柔性钢丝绳始终处于拉紧状态。本发明可以应用于现场,进行实时测试打桩过程及打桩结束后海洋平台钢管桩内土塞高度,为打入式钢管桩内土塞的高度检测提供了一种精确的测试装置,为设计者对打入式桩基的土塞状态做出准确判断提供了依据。

Description

海洋平台打入式钢管桩土塞深度测试装置及其测试方法
技术领域
本发明涉及海洋平台设计、施工技术,尤其是海洋平台钢管桩设计、施工技术。
背景技术
随着我国海洋石油工业的迅速发展,对海洋平台的桩基础提出了更高的要求,目前海洋平台的钢管桩基础越来越多地采用了超大直径(2m左右)超长(100m左右)桩,钢管桩分为开口钢管桩和闭口钢管桩,开口钢管桩较闭口桩更易打入到设计深度,而且沉桩后由于土塞的作用,开口桩在静荷载作用下表现同闭口桩类似,可以满足承载力要求,所以在海洋钻井平台中应用较广。与本发明有关的是开口钢管桩。
开口钢管桩在被打入土层的过程中,大量的土体涌入管内,形成土塞。土塞效应对于海上大直径超长桩的打入性及打桩完成后土塞对桩基承载力都有显著的影响。
在海上打桩过程中,根据土塞是否与桩内壁发生相对运动,将土塞分成闭塞、不闭塞和部分土塞三种状态。在闭塞状态,土塞所起到的作用完全同闭口桩那样,桩端土体不能继续涌入管内。要选择适合的打桩设备及锤型,以便将桩顺利地贯入到设计深度,并满足承载力的要求,必须预先进行动力沉桩的可打入性分析。这就要判断土塞在打桩过程中的状态及其对桩的可打入性分析的影响,所以土塞效应的正确判断直接影响到桩的可打入性分析正确与否。
另外,土塞效应对桩端土体极限承载力的计算是非常关键的。API 2006规范中的桩基承载力公式也考虑了土塞对桩端承载力的影响。如果不能反映真实的土塞效应,就会误导设计者对土塞是否处于闭塞状态做出错误判断,影响桩基承载力的设计。
因此,要准确进行打桩分析,准确计算桩端极限承载力,就要合理确定土塞效应判断方法,影响土塞效应的关键因素是打桩结束后海洋平台钢管桩内土塞相对于海底泥面线的高度,由于目前海洋平台的钢管桩基础越来越多地采用了超大直径超长桩,所以在打桩过程中,无法准确确定土塞高度,只能通过经验估计管体内土塞的高度,这样就不能真实反映土塞效应,从而影响桩基承载力的设计,因此,怎么准确确定打入式钢管桩内土塞高度一直是本领域急需解决的技术问题。
发明内容
为了准确分析土塞效应对桩基承载力及桩的可打性的影响,本发明提供一种海洋平台打入式钢管桩土塞深度测试装置,这种装置可以应用于现场,进行实时测试打桩过程及打桩结束后海洋平台钢管桩内土塞相对钢管外泥线的高度。
为达到上述目的,本发明测试装置的结构是:它是在开口钢管桩的管体内外分别置有两个重量不同的球,管体内为重球,管体外为轻球,两个球通过一根绕过管体顶部的柔性钢丝绳相连,管体外壁上设有高度标注;重球、轻球和钢丝绳的重量应保证柔性钢丝绳始终处于拉紧状态。
优选要求:轻球的重量至少等于钢丝绳的重量,保证轻球能拉紧柔性钢丝绳;重球重量在减去海水浮力后仍大于轻球的重量,保证重球始终沉在管体内的海底泥面上并能拉紧柔性钢丝绳;钢丝绳的长度应保证打桩前和结束后轻球始终处于海水面以上。
利用上述装置测试钢管桩中土塞高度的方法如下:
第一步:在打桩开始前,将重球置于管体内,轻球置于管体外,重球靠自身重力下落到海底泥面上,此时记录管体外轻球的初始标高,用b表示;
第二步:打桩开始,开口钢管桩在被打入土层的过程中,管内形成土塞,其泥面标高会发生变化,重球的标高随之变化,轻球标高也发生变化,在管体外壁的高度标注上显示出即时标高,打桩完成记录最终标高,用c表示;
第三步:通过打桩前后管外轻球的两次标高,计算出管体内土塞相对于管外泥面线的高度,计算公式如下:a=b-c-d其中:
a表示管内土塞相对管外泥线的高度,负值表示低于管外泥面线,正值表示高于管外泥面线;
d表示钢管桩的贯入深度;可通过水面线处打桩前后的标高获得。
下面根据本发明的工作机理说明本发明的优点:在打桩过程中,管内重球在重力作用下随土塞移动,从而拖动管外轻球上下移动,记录轻球前后标高,即可计算出管内土塞相对管外泥面线的高度,反映出打桩过程的土塞效应。总之,本发明为打入式钢管桩内土塞的高度检测提供了一种精确的测试装置,为设计者对打入式桩基的土塞状态做出准确判断提供了依据,解决了长期以来人们一直渴望解决但始终未能解决的技术难题,其积极效果远远超过了现有技术,具有突出的实质性特点和显著的进步。
附图说明
图1是本发明的结构及打桩前的示意图;
图2是本发明打桩后的示意图,图中以土塞低于海底泥面线为例。
图中:1-管体,2-重球,3-轻球,4-钢丝绳,5-高度标注,6-土塞。
具体实施方式
如图1所示,本发明测试装置的结构是:它是在开口钢管桩的管体1内外分别置有两个重量不同的球,管体内为重球2,管体外为轻球3,两个球通过一根绕过管体顶部的柔性钢丝绳4相连,管体1外壁上设有高度标注5,要求轻球3的重量至少等于钢丝绳4的重量,保证轻球3能拉紧柔性钢丝绳4;要求重球2的重量在减去海水浮力后仍大于轻球3的重量,保证重球2始终沉在管体内的海底泥面上并能拉紧柔性钢丝绳4;柔性钢丝绳4的长度应保证打桩前和结束后轻球3始终处于海水面以上。
利用上述装置测试钢管桩中土塞高度的方法如下:
第一步:在打桩开始前,将重球2置于管体1内,轻球3置于管体1外,重球2靠自身重力下落到海底泥面上,此时记录管体外轻球的初始标高,用b表示,如图1所示的b;
第二步:打桩开始,开口钢管桩在被打入土层的过程中,管内形成土塞6,其泥面标高会发生变化,重球2的标高随之变化,轻球3随着管体1下移和重球2变化而变化,在管体外壁的高度标注5上显示出即时标高,打桩完成记录最终标高,用c表示,如图2所示的c;
第三步:通过打桩前后管外轻球3的两次标高,计算出管体内土塞6相对于管外泥面线的高度,计算公式如下:a=b-c-d其中:
a表示管内土塞6相对管外泥线的高度,负值表示低于管外泥面线,正值表示高于管外泥面线;
d表示钢管桩的贯入深度,如图2所示的d,可通过水面线处打桩前后的标高获得。

Claims (3)

1.一种海洋平台打入式钢管桩土塞深度测试装置,其特征在于,它是在开口钢管桩的管体内外分别置有两个重量不同的球,管体内为重球,管体外为轻球,两个球通过一根绕过管体顶部的柔性钢丝绳相连,管体外壁上设有高度标注;重球、轻球和钢丝绳的重量应保证柔性钢丝绳始终处于拉紧状态。
2.如权利要求1所述的测试装置,其特征在于,要求轻球的重量至少等于钢丝绳的重量,保证轻球能拉紧柔性钢丝绳;要求重球重量在减去海水浮力后仍大于轻球的重量,保证重球始终沉在管体内的海底泥面上并能拉紧柔性钢丝绳;钢丝绳的长度应保证打桩前和结束后轻球始终处于海水面以上。
3.一种利用权利要求1或2所述的装置测试钢管桩中土塞深度的方法,其特征在于,步骤如下:
第一步:在打桩开始前,将重球置于管体内,轻球置于管体外,重球靠自身重力下落到海底泥面上,此时记录管体外轻球的初始标高,用b表示;
第二步:打桩开始,开口钢管桩在被打入土层的过程中,管内形成土塞,其泥面标高会发生变化,重球的标高随之变化,轻球标高也发生变化,在管体外壁的高度标注上显示出即时标高,打桩完成记录最终标高,用c表示;
第三步:通过打桩前后管外轻球的两次标高,计算出管体内土塞相对于管外泥面线的高度,计算公式如下:a=b-c-d,其中:
a表示管内土塞相对管外泥线的高度,负值表示低于管外泥面线,正值表示高于管外泥面线;
d表示钢管桩的贯入深度;可通过水面线处打桩前后的标高获得。
CN201210053533.7A 2012-03-02 2012-03-02 利用海洋平台打入式钢管桩土塞深度测试装置测试土塞深度的方法 Expired - Fee Related CN102587423B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210053533.7A CN102587423B (zh) 2012-03-02 2012-03-02 利用海洋平台打入式钢管桩土塞深度测试装置测试土塞深度的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210053533.7A CN102587423B (zh) 2012-03-02 2012-03-02 利用海洋平台打入式钢管桩土塞深度测试装置测试土塞深度的方法

Publications (2)

Publication Number Publication Date
CN102587423A true CN102587423A (zh) 2012-07-18
CN102587423B CN102587423B (zh) 2014-04-16

Family

ID=46476614

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210053533.7A Expired - Fee Related CN102587423B (zh) 2012-03-02 2012-03-02 利用海洋平台打入式钢管桩土塞深度测试装置测试土塞深度的方法

Country Status (1)

Country Link
CN (1) CN102587423B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400857A (zh) * 2016-12-15 2017-02-15 武汉科技大学 用于现场测量开口桩内土塞闭塞程度的模型装置及方法
CN106836317A (zh) * 2017-02-24 2017-06-13 同济大学 一种考虑土塞效应的沉桩模型试验装置及其应用
CN107794956A (zh) * 2017-10-31 2018-03-13 中国地质大学(武汉) 一种可拆卸的现场土塞高度动态测量装置及方法
CN108396769A (zh) * 2018-05-18 2018-08-14 阳光学院 一种管桩
CN108487333A (zh) * 2018-01-25 2018-09-04 中国地质大学(武汉) 一种管桩与土塞接触面循环剪切试验装置及方法
CN110106924A (zh) * 2019-04-16 2019-08-09 中交四航工程研究院有限公司 沉桩过程管桩土塞高度监测装置及监测方法
CN110243272A (zh) * 2019-07-12 2019-09-17 福州大学 测量吸力基础沉贯土塞和水塞高度的试验装置及测量方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2591097Y (zh) * 2000-05-10 2003-12-10 付怀清 一种基础工程用的排水板桩
KR20060112798A (ko) * 2005-04-28 2006-11-02 장성두 지반삽입체 및 이를 이용한 지반삽입체의 심도검사방법
CN101324416A (zh) * 2007-06-15 2008-12-17 黄建龙 钻孔桩孔底沉渣厚度测量工具及测量方法
KR101015878B1 (ko) * 2007-04-10 2011-02-23 주식회사 선택코리아 보강용 파일의 심도측정장치
CN201943095U (zh) * 2010-11-22 2011-08-24 中国十七冶集团有限公司 钻孔灌注桩沉淀物厚度的测量筒
CN202519712U (zh) * 2012-03-02 2012-11-07 中国石油大学(华东) 海洋平台打入式钢管桩土塞深度测试装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2591097Y (zh) * 2000-05-10 2003-12-10 付怀清 一种基础工程用的排水板桩
KR20060112798A (ko) * 2005-04-28 2006-11-02 장성두 지반삽입체 및 이를 이용한 지반삽입체의 심도검사방법
KR101015878B1 (ko) * 2007-04-10 2011-02-23 주식회사 선택코리아 보강용 파일의 심도측정장치
CN101324416A (zh) * 2007-06-15 2008-12-17 黄建龙 钻孔桩孔底沉渣厚度测量工具及测量方法
CN201943095U (zh) * 2010-11-22 2011-08-24 中国十七冶集团有限公司 钻孔灌注桩沉淀物厚度的测量筒
CN202519712U (zh) * 2012-03-02 2012-11-07 中国石油大学(华东) 海洋平台打入式钢管桩土塞深度测试装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
徐向阳等: "大直径钢管桩土体闭塞效应分析", 《中国水运(下半月)》 *
雷国辉等: "粉细砂中敞口PHC管桩群桩锤击施工效应", 《岩土工程学报》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400857A (zh) * 2016-12-15 2017-02-15 武汉科技大学 用于现场测量开口桩内土塞闭塞程度的模型装置及方法
CN106836317A (zh) * 2017-02-24 2017-06-13 同济大学 一种考虑土塞效应的沉桩模型试验装置及其应用
CN106836317B (zh) * 2017-02-24 2018-07-03 同济大学 一种考虑土塞效应的沉桩模型试验装置及其应用
CN107794956A (zh) * 2017-10-31 2018-03-13 中国地质大学(武汉) 一种可拆卸的现场土塞高度动态测量装置及方法
CN107794956B (zh) * 2017-10-31 2023-02-28 中国地质大学(武汉) 一种可拆卸的现场土塞高度动态测量装置及方法
CN108487333A (zh) * 2018-01-25 2018-09-04 中国地质大学(武汉) 一种管桩与土塞接触面循环剪切试验装置及方法
CN108487333B (zh) * 2018-01-25 2019-08-30 中国地质大学(武汉) 一种管桩与土塞接触面循环剪切试验装置及方法
CN108396769A (zh) * 2018-05-18 2018-08-14 阳光学院 一种管桩
CN110106924A (zh) * 2019-04-16 2019-08-09 中交四航工程研究院有限公司 沉桩过程管桩土塞高度监测装置及监测方法
CN110106924B (zh) * 2019-04-16 2024-04-02 中交四航工程研究院有限公司 沉桩过程管桩土塞高度监测装置及监测方法
CN110243272A (zh) * 2019-07-12 2019-09-17 福州大学 测量吸力基础沉贯土塞和水塞高度的试验装置及测量方法

Also Published As

Publication number Publication date
CN102587423B (zh) 2014-04-16

Similar Documents

Publication Publication Date Title
CN102587423B (zh) 利用海洋平台打入式钢管桩土塞深度测试装置测试土塞深度的方法
Randolph et al. Recent advances in offshore geotechnics for deep water oil and gas developments
CN105044306B (zh) 一种桩承式路堤透明土模型试验装置和方法
CN109281341B (zh) 一种多功能孔内检测反馈系统
CN105019485B (zh) 一种基坑开挖桩基静载试验检测方法
CN104406568A (zh) 深水区地表沉降监测装置及方法
CN204590104U (zh) 一种模拟自平衡测桩法的模型实验装置
CN206428688U (zh) 一种静力触探探头
CN106394810A (zh) 一种基于动力贯入锚板及其最终嵌入深度确定装置
CN109556653A (zh) 一种带有液压吸力筒基础的原位管土作用测试系统及其测试方法
CN107700458A (zh) 用于海洋超软土原位测试的梨形扩底全流触探探头
CN107525727A (zh) 一种吸力式桶形基础循环往复作用加载试验装置及方法
CN202519712U (zh) 海洋平台打入式钢管桩土塞深度测试装置
CN107587531A (zh) 一种循环荷载作用下嵌岩钢管桩加载试验装置及测试方法
CN107747306A (zh) 一种用于海洋超软土原位测试的十字形全流触探探头
CN103469778A (zh) 一种划分岩石风化程度的标准贯入试验方法
Gaudin et al. New frontiers for centrifuge modelling in offshore geotechnics
CN203256733U (zh) 灌注桩桩顶混凝土标高检测装置
CN207472306U (zh) 一种带有液压吸力筒基础的原位管土作用测试系统
CN204214437U (zh) 深水区地表沉降监测装置
CN206591549U (zh) 一种模拟波浪荷载的钢管桩水平循环实验装置
CN207295797U (zh) 打入式钢管桩土塞深度测量装置
CN105951895B (zh) 钢管斜桩自平衡法载荷箱测试结构及测试方法
CN107489174B (zh) 一种单个桶形基础竖向抗拔承载力的计算方法
CN207144019U (zh) 一种循环荷载作用下嵌岩钢管桩加载试验装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140416

Termination date: 20180302

CF01 Termination of patent right due to non-payment of annual fee