CN101261265B - Cement concrete road surface void identification and high polymer grouting rapid servicing technology - Google Patents

Cement concrete road surface void identification and high polymer grouting rapid servicing technology Download PDF

Info

Publication number
CN101261265B
CN101261265B CN2007100540457A CN200710054045A CN101261265B CN 101261265 B CN101261265 B CN 101261265B CN 2007100540457 A CN2007100540457 A CN 2007100540457A CN 200710054045 A CN200710054045 A CN 200710054045A CN 101261265 B CN101261265 B CN 101261265B
Authority
CN
China
Prior art keywords
cement concrete
road surface
detachment
high polymer
pavement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2007100540457A
Other languages
Chinese (zh)
Other versions
CN101261265A (en
Inventor
王复明
张蓓
钟燕辉
蔡迎春
石明生
李强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wang Fuming
Original Assignee
ZHENGZHOU YOUTE INFRASTRUCTURE ENGINEERING MAINTAINANCE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU YOUTE INFRASTRUCTURE ENGINEERING MAINTAINANCE Co Ltd filed Critical ZHENGZHOU YOUTE INFRASTRUCTURE ENGINEERING MAINTAINANCE Co Ltd
Priority to CN2007100540457A priority Critical patent/CN101261265B/en
Publication of CN101261265A publication Critical patent/CN101261265A/en
Application granted granted Critical
Publication of CN101261265B publication Critical patent/CN101261265B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Repair (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a cement concrete pavement detachment identification and polymer grouting fast maintenance method based on a falling weight deflectometer (FWD) and a ground penetrating radar (GPR) non-destructive test technology. The FWD and GPR are utilized to identify the detachment situation of the cement concrete pavement. Polymeric materials are injected to the pavement segment which needs detachment treatment. After the materials react, the volume quickly expands and cures, the materials fill the pavement plate bottom and base, the subbase bottom detaches, thereby reaching the purpose for fast maintenance of the cement concrete pavement detachment. The maintenance method has the advantages of speedy construction, good durability, strong pertinence and excellent waterproof performance of the injected polymeric materials, which not only saves a large amount of funds and construction periods, but also is beneficial to environmental protection and resources-saving, and provides a new advanced, efficient, economical and practical method for fast maintenance of the cement concrete pavement detachment.

Description

Cement concrete road surface void identification and high polymer grouting rapid servicing method
Technical field
The invention belongs to subgrade and pavement and detect and the maintenance technology, relate in particular to cement concrete road surface void identification and high polymer grouting rapid servicing technology.
Background technology
Since the nineties in 20th century, China's expressway construction development rapidly.Cement concrete pavement is as one of main road surface types of high-grade highway, occupies about 25% share in China.It is predicted that to the end of the year 2010, China's cement concrete pavement highway mileage will be broken through 150,000 kilometers.But it is many owing to multiple reason, many cement concrete pavements build up the needs that just can not adapt to vehicle pass-through soon, produced such as come to nothing, depression, arch upward, various breakoff phenomenons such as serious fragmentation and crack, wherein come to nothing is common and the most general disease, if untimelyly discern and punish, certainly will cause the fracture of concrete flag and the acceleration decay of road surface usability to coming to nothing.As can be seen, along with developing rapidly of cement concrete pavement, the continuous increase of mileage open to traffic detects and the maintenance management task will be heavy day by day, and is very urgent to the demand of its detection and new repairing technology.
Accurately the situation of coming to nothing is the basis of cement concrete pavement being carried out maintenance under the evaluation concrete slab.A large amount of studies show that, the situation of carrying out accurately coming to nothing under concrete slab evaluation is very difficult, and therefore the existing detection of coming to nothing needs come to nothing assessment method and theory thereof are further studied mainly based on experience and manual type.Aspect maintenance, at present, China also mainly depends on tradition decision-making mode based on experience to the maintenance of cement concrete pavement, makes maintenance be in the passive situation of " take stopgap measures " for a long time.Traditional maintenance method one is excavation type maintenance, and time-consuming, effort, cost height also are unfavorable for environmental protection; Another kind is the cement mud jacking to be carried out at the disease position handle, and this method is the main method of disease such as solve pavement depression at present, come to nothing.The ultimate principle of this method promotes for the pressure by mudjack, the material that mixes and stirs is pressed into basic unit or subbase through madjack pipe, until being penetrated into roadbed, to reach the purpose of abundant filling pore.Though it is shorter that the duration is compared in this method and the maintenance of destructive excavation type, exists the mud jacking hole bigger, road pavement has that certain infringement, mud jacking pressure are not easy to control, slurries mobile bad, deficiency such as certain curing time, the endurance quality of needs is bad.
As can be seen, existing traditional cement concrete pavement detects with the maintenance method can not satisfy busy day by day traffic needs, is badly in need of developing cement concrete road surface void identification fast and efficiently and maintenance new technology.
Along with developing rapidly of China's expressway construction, be that the Dynamic Non-Destruction Measurement of representative is subjected to increasingly extensive attention with Falling Weight Deflectometer (FWD) and ground penetrating radar (GPR).Falling Weight Deflectometer has been simulated the dynamic action of actual traffic load road pavement preferably, and it is fast to test the speed, and the precision height at home and abroad is widely used.Ground penetrating radar has obvious superiority aspect the fast detecting pavement structure layer thickness, is demonstrating wide development and application prospect aspect cement concrete road surface void identification, basic unit and roadbed defect identification, compactness and the water cut express-analysis.
Falling Weight Deflectometer utilizes hydraulic system to promote a weight, discharges the back road pavement and applies impulsive load, uses high-precision sensor and gathers road surface multiple spot flexure information, provides the foundation for further analyzing pavement structure stiffness layer and load-bearing capacity.Ground penetrating radar is by emitting antenna road pavement emission frequency electromagnetic waves, and electromagnetic wave reflects when running into the structural sheet interface, and reflected signal is by the receiving antenna collection, thereby provides the foundation for analysis road surface structare layer dielectric property and thickness, the situation of coming to nothing etc.
Research and development about high polymer grouting rapid servicing technology start to walk early to have obtained major progress the nineties, and be used widely in countries such as the U.S., Canada, Australia in the world.The subject matter that exists is that the high polymer grouting construction technology is based upon on the experiential basis always, is separated with Falling Weight Deflectometer (FWD), ground penetrating radar advanced detection techniques such as (GPR).Therefore, though the high polymer material permanance reached more than 10 years, the slip casting maintenance effect can not be guaranteed.
Above-mentioned high polymer grouting rapid servicing technology comprises superficial part injection and deep injection, and wherein the superficial part injection technique is mainly used in the come to nothing reparation and the lifting of concrete slab, and the deep injection technique is mainly used in the reinforcing of roadbed and infrastructure ground.
The high polymer grouting technology is keeped in repair sub-surface and reinforcing road bed by injection bi-component superpolymer liquid.The superpolymer liquid of injection forms solid by chemical reaction, and volume expands rapidly simultaneously, thereby fills coming to nothing in the pavement structure, and medium applies controlled pressure towards periphery.
Summary of the invention
The present invention is directed to above the deficiencies in the prior art, cement concrete road surface void identification and high polymer grouting rapid servicing technology based on Falling Weight Deflectometer (FWD), ground penetrating radar (GPR) Dynamic Non-Destruction Measurement have been proposed, set up slip casting basic parameter and Falling Weight Deflectometer and ground penetrating radar and detect correlationship between the evaluation index, for cement concrete road surface void detects and maintenance provides advanced, efficient, economic, practical a whole set of technology.
The present invention is achieved by the following technical solutions:
Cement concrete road surface void identification and high polymer grouting rapid servicing method,
(1) utilizes Falling Weight Deflectometer (FWD) and ground penetrating radar (GPR) to carry out cement concrete road surface void identification, judge the situation of coming to nothing of road deck, determine the road deck that to punish;
(2) for the concrete flag of needs punishment,, bore grouting hole with certain spacing in plate seam both sides;
(3) inject high polymer material by grouting hole down to cement concrete slab, lifting amount in road surface is controlled by control superpolymer injection rate with mudjack; After injection is finished, filling gun is withdrawn from grouting hole;
(4) punishment road surface elevation is controlled at it within 6mm error range of construction section elevation, if concrete slab length in 15m, can if length is longer, then need to monitor with laser leveler by the straight line rope control of a tension;
(5) utilize Falling Weight Deflectometer, ground penetrating radar detection technique to detect again and estimate Pavement Performance, determine slip casting effect, as meet the demands, then stop slip casting; As not meeting the demands, then need carry out after-teeming, till reaching requirement;
(6) seal up grouting hole with the thin grout of non-expansibility.
The present invention has following advantage:
1, good endurance.The high polymer material water resistance of injection is good, does not have contraction (inner volume shrank 1~3% in 10 years) substantially, and has elasticity preferably.And traditional cement mud jacking can produce drying shrinkage, and fixed back is a hard brittle material, and rupture strength is low, so permanance is relatively poor.
2, quick construction does not need health.Material is injected in back 15 minutes and is promptly formed 90% intensity, the traffic of can letting pass.
3, with strong points, controllability is good.Ravel area or weak district can be filled, be reinforced to high polymer material voluntarily in expansion process, surrounding medium pressure is depended primarily on the size of grouting amount, the control of grouting amount with adjust obviously than the control of grouting pressure with adjust more convenient.
4, the high polymer material volumetric expansion can reach 10~20 times of liquid volume, thus from heavy and light (less than consubstantiality ponding mud 10%), can as the cement mud jacking, not increase a large amount of loads to ground.
5, the high polymer grouting maintenance technique is compared with traditional method for maintaining, not only can save a large amount of funds and duration, has avoided the The Long-term Effect traffic and the bad social influence that causes, and helps protecting environment and economize on resources.
Embodiment
Embodiment: cement concrete road surface void identification of the present invention comprises following content with high polymer grouting rapid servicing technology:
The cement concrete road surface void recognition methods,
Whether have the method for coming to nothing be: measure 3 flexures under the different stage load at the same measuring point of road deck if (1) utilizing Falling Weight Deflectometer (FWD) to discern under the cement concrete slab, set up the correlationship of load and flexure, if do not come to nothing in this position, then load flexure associated straight lines process initial point or flexure y-intercept are less than 50mm, otherwise, if greater than 50mm, then can thinking, intercept comes to nothing under this point position plate;
The correlationship formula of load and flexure following (as accompanying drawing 1)
D=aP+b
Wherein: D-central authorities deflection value, mm
The P-payload values, kPa
A is a coefficient of relationship, and b is the flexure y-intercept
(2) utilize the method for ground penetrating radar (GPR) identification cement concrete road surface void to be:
A, utilize ground penetrating radar (GPR) to detect cement concrete pavement, gather the reflected signal of radar;
The shape of b, Analysis of Radar reflection wave and time delay, anti-phase if reflected signal takes place, then this position existence is come to nothing;
C, calculate the degree of depth of coming to nothing according to mistiming of anti-phase waveform in the reflection configuration, and the character of coming to nothing in the zone that obtains coming to nothing.
Why GPR can be applied in the detection of road surface, it is the dielectric property difference of road surface different structure layer at all, thereby cause that electromagnetic wave reflects when running into the interphase of different medium, the wave amplitude of reflection wave is relevant with the dielectric property of interphase upper and lower medium, its dielectric property difference is big more, and the reflection wave wave amplitude is big more.
Coming to nothing under the Cement Concrete Pavement Slab is divided into gas and fills and come to nothing and water fills and comes to nothing two kinds, and two kinds of situation general principles are identical, but corresponding reflection configuration difference, and because the air relative dielectric constant is 1, and water is 81.So the reflection wave phase of wave that both cause is opposite, and wave amplitude varies in size.
Gas fills empty reflection wave as shown in Figure 2, and the cavity has just constituted two reflecting interfaces in two surfaces up and down: concrete-air, air-basic unit.By A, B two reflection waves as can be seen because A, the reflection coefficient that B is 2 shows that one positive one is negative, therefore causes the A point reflection anti-phase.C is the stack result of A and B, and the waveform that GPR finally obtains is C.
When the cavity is a water when filling the cavity, two reflecting interfaces of formation are: concrete-water, water-basic unit.Then reflection wave also is to fill the cavity as gas, and what obtain is the Overlay of two waveforms.
The mistiming that obtains anti-phase waveform in the overlaid waveforms by accompanying drawing 2 just can calculate the degree of depth of coming to nothing, thereby the position of coming to nothing is judged, and needing to obtain the regional character of coming to nothing of coming to nothing of processing, provides foundation for formulating rational grouting program.
Cement concrete pavement high polymer grouting rapid servicing method,
(1) utilizes Falling Weight Deflectometer (FWD) and ground penetrating radar (GPR) to carry out cement concrete road surface void identification, judge the situation of coming to nothing of road deck, determine the road deck that to punish;
(2) for the concrete flag of needs punishment,, bore grouting hole with certain spacing in plate seam both sides;
(3) inject high polymer material by grouting hole down to cement concrete slab, lifting amount in road surface is controlled by control superpolymer injection rate with mudjack; After injection is finished, filling gun is withdrawn from grouting hole;
(4) punishment road surface elevation is controlled at it within 6mm error range of construction section elevation, if concrete slab length in 15m, can if length is longer, then need to monitor with laser leveler by the straight line rope control of a tension;
(5) utilize Falling Weight Deflectometer, ground penetrating radar detection technique to detect again and estimate Pavement Performance, determine slip casting effect, as meet the demands, then stop slip casting; As not meeting the demands, then need carry out after-teeming, till reaching requirement;
(6) seal up grouting hole with the thin grout of non-expansibility.

Claims (1)

1. a cement concrete road surface void is discerned and the high polymer grouting rapid servicing method, it is characterized in that:
(1) utilizes Falling Weight Deflectometer (FWD) and ground penetrating radar (GPR) to carry out cement concrete road surface void identification, judge the situation of coming to nothing of road deck, determine the road deck that to punish;
(2) for the concrete flag of needs punishment,, bore grouting hole with certain spacing in plate seam both sides;
(3) inject high polymer material by grouting hole down to cement concrete slab, lifting amount in road surface is controlled by control superpolymer injection rate with mudjack; After injection is finished, filling gun is withdrawn from grouting hole;
(4) punishment road surface elevation is controlled at it within 6mm error range of construction section elevation, if concrete slab length in 15m, is controlled by the straight line rope of a tension, if length is longer, then needs to monitor with laser leveler;
(5) utilize Falling Weight Deflectometer, ground penetrating radar detection technique to detect again and estimate Pavement Performance, determine slip casting effect, as meet the demands, then stop slip casting; As not meeting the demands, then need carry out after-teeming, till reaching requirement;
(6) seal up grouting hole with the thin grout of non-expansibility.
CN2007100540457A 2007-03-09 2007-03-09 Cement concrete road surface void identification and high polymer grouting rapid servicing technology Active CN101261265B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007100540457A CN101261265B (en) 2007-03-09 2007-03-09 Cement concrete road surface void identification and high polymer grouting rapid servicing technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007100540457A CN101261265B (en) 2007-03-09 2007-03-09 Cement concrete road surface void identification and high polymer grouting rapid servicing technology

Publications (2)

Publication Number Publication Date
CN101261265A CN101261265A (en) 2008-09-10
CN101261265B true CN101261265B (en) 2011-08-10

Family

ID=39961859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007100540457A Active CN101261265B (en) 2007-03-09 2007-03-09 Cement concrete road surface void identification and high polymer grouting rapid servicing technology

Country Status (1)

Country Link
CN (1) CN101261265B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759561A (en) * 2017-02-23 2017-05-31 中冶集团武汉勘察研究院有限公司 One kind builds/structures shallow foundation empty processing method

Families Citing this family (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101655448B (en) * 2009-09-18 2011-06-08 合肥工业大学 Instrument for detecting plate-bottom separation condition of cement concrete foundation
US9045865B2 (en) * 2013-04-19 2015-06-02 SAFEKEY Engineering Technology(Zhengzhou), Ltd. Polymer grouting method for uplifting ballastless track of high-speed rail
CN103790188B (en) * 2014-01-10 2015-11-04 天津市市政工程研究院 A kind of roadbed grouting consolidation effect evaluation method
CN104033164B (en) * 2014-05-26 2016-07-06 江苏鼎泰工程材料有限公司 Come to nothing and the harmful method repaired that seeps water to what encircle in tunnel
CN104612027B (en) * 2014-12-24 2017-06-13 江苏鼎达建筑新技术有限公司 For the geopolymer grouting process that road rehabilitation is reinforced
CN104847128B (en) * 2015-04-24 2017-03-01 深圳市苏勘岩土工程有限公司 A kind of terrace lifts leveling section material restorative procedure
CN105625154B (en) * 2015-12-18 2017-10-03 安徽优特公路养护科技有限公司 The method that high polymer carries out road rehabilitation is accurately filled at roadbase disease
CN105862534B (en) * 2016-04-20 2018-07-10 江苏鼎达建筑新技术有限公司 A kind of existing roadbed grouting consolidation effect synthetical evaluation method
CN106758718A (en) * 2016-12-16 2017-05-31 河南位登建筑工程有限公司 Maintenance of surface method
CN107366218A (en) * 2017-08-09 2017-11-21 李英章 A kind of restorative procedure for collapsing road surface
CN108254440B (en) * 2018-02-01 2020-10-30 湖南大学 Detection robot and method for detecting concrete-filled steel tube pouring quality by using same
CN108428207A (en) * 2018-03-15 2018-08-21 太原科技大学 Express way integrated dimension supports method, system, operating method and its device
CN108867281A (en) * 2018-07-23 2018-11-23 四川正达检测技术有限责任公司 A kind of cement concrete pavement cavity drop hammer deflection meter method for comprehensive detection
CN109208618B (en) * 2018-10-26 2020-08-28 大连地拓环境科技有限公司 Ecological restoration method for concrete slope
CN109490971B (en) * 2018-11-29 2020-05-05 江苏北极星交通产业集团有限公司 Detection and repair method for composite pavement void
CN110082758B (en) * 2019-05-23 2022-11-04 江苏高速公路工程养护技术有限公司 Pavement interlayer void detection and maintenance method
CN110512501B (en) * 2019-08-12 2021-02-19 武汉理工大学 Crack disease evaluation method based on ground penetrating radar and FWD combined detection
CN112030698A (en) * 2020-08-18 2020-12-04 杨永奇 Highway maintenance car based on high polymer slip casting technique
CN112663468A (en) * 2020-12-11 2021-04-16 郑州铁路职业技术学院 Non-excavation repairing method for frozen soil roadbed
CN113358857B (en) * 2021-04-30 2022-11-04 青海正旗工程检测有限公司 Penetration type foundation soil compaction degree rapid detection equipment and method
CN113529549A (en) * 2021-07-30 2021-10-22 四川公路桥梁建设集团有限公司 Bridge head pavement subsidence nondestructive quantitative detection and trenchless rapid treatment grouting construction method
CN114293450B (en) * 2021-12-30 2023-04-28 天津航大中璟科技有限公司 Void risk evaluation method for cement concrete pavement slab edge concealed grouting
CN115262314A (en) * 2022-07-22 2022-11-01 郑州大学 High polymer reinforcing and repairing method for cement road panel corner void
CN117237348B (en) * 2023-11-14 2024-02-02 贵州省公路建设养护集团有限公司 Road surface damage detection method and system for traffic department under road construction scene

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1576817A (en) * 2004-09-07 2005-02-09 长安大学 Modulus anti-inference method for rock-fill roadbed
CN1880576A (en) * 2005-06-16 2006-12-20 郑州大学 System identification technique for structural mechanics characteristic of pavement

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1576817A (en) * 2004-09-07 2005-02-09 长安大学 Modulus anti-inference method for rock-fill roadbed
CN1880576A (en) * 2005-06-16 2006-12-20 郑州大学 System identification technique for structural mechanics characteristic of pavement

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张山.地质雷达在公路基层脱空检测中的应用.《地质与勘探》.2003,第39卷85-87. *
张建华等.用FWD进行板下地基脱空状况的评定.《湖南交通科技》.2003,第29卷(第1期),113-114. *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759561A (en) * 2017-02-23 2017-05-31 中冶集团武汉勘察研究院有限公司 One kind builds/structures shallow foundation empty processing method
CN106759561B (en) * 2017-02-23 2019-03-05 中冶集团武汉勘察研究院有限公司 One kind building/structures shallow foundation empty processing method

Also Published As

Publication number Publication date
CN101261265A (en) 2008-09-10

Similar Documents

Publication Publication Date Title
CN101261265B (en) Cement concrete road surface void identification and high polymer grouting rapid servicing technology
CN101261264B (en) Semi-rigid base layer disease detection and high polymer grouting rapid servicing technology
CN101261263B (en) Roadbed defect recognition and high polymer grouting rapid reinforcement technology
Fernandes et al. Assessment of the density and moisture content of asphalt mixtures of road pavements
Saarenketo et al. Road evaluation with ground penetrating radar
CN102031747B (en) Road base reinforcing high-polymer loading and grouting method
Hall et al. Rehabilitation strategies for highway pavements
CN101684631B (en) Safety state fast non-destructive detection method of operation roadbed
CN101581701A (en) Method for detecting slip casting effect on ground surface
CN202442925U (en) Asphalt concrete test block pressure tester
Saarenketo NDT transportation
CN110453581B (en) Construction method for treating semi-rigid base asphalt pavement cracks
Chen et al. Detecting subsurface voids using ground-coupled penetrating radar
Lalagüe Use of ground penetrating radar for transportation infrastructure maintenance
CN105136907A (en) Plane testing method based grouting compactness intelligent detection system and method
CN210665566U (en) Testing device for measuring free expansion volume of high polymer
CN104834771A (en) Method for establishing strength measurement curve of concrete with high-volume mineral admixtures
CN110565493B (en) Highway subgrade disease treatment method
CN102636501B (en) Filtering method for eliminating influences of surface reinforcing steel bars to high-frequency electromagnetic waves
CN110082758B (en) Pavement interlayer void detection and maintenance method
CN206479399U (en) A kind of experimental rig for evaluating deck paving tie-layer interface characteristic
CN206020195U (en) Portable pavement structure interlayer boxshear apparatus
Zhou et al. Full-Scale Field Tests of Different Types of Piles
He et al. Case analysis of integrated maintenance technology for multi-dimensional rapid detection and trenchless reinforcement
CN107761692A (en) Based on the detection method to the groove section after continuous wall trench underground

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: ZHENGZHOU YOUTE FOUNDATION ENGINEERING MAINTENANCE CO., LTD.

Owner name: ZHENGZHOU YOUTE FOUNDATION ENGINEERING MAINTENANCE

Free format text: FORMER OWNER: ZHENGZHOU UNIVERSITY

Effective date: 20110224

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 450002 NO.97, WENHUA ROAD, ZHENGZHOU CITY, HE NAN PROVINCE TO: 450016 BUILDING A6, GELIN MOUNTAIN VILLA, NO.1369, HANGHAI EAST ROAD, ZHENGZHOU ECONOMIC AND TECHNOLOGICAL DEVELOPMENT ZONE

TA01 Transfer of patent application right

Effective date of registration: 20110224

Address after: 450016, Zhengzhou economic and Technological Development Zone, No. 1369 East Green Road, A6 Villa

Applicant after: Zhengzhou Youte Infrastructure Engineering Maintainance Co., Ltd.

Address before: 450002 No. 97, Wenhua Road, Henan, Zhengzhou

Applicant before: Zhengzhou University

Co-applicant before: Zhengzhou Youte Infrastructure Engineering Maintainance Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HENAN BOTE ENGINEERING PROTECTION CO., LTD.

Free format text: FORMER OWNER: ZHENGZHOU YOUTE FOUNDATION ENGINEERING MAINTENANCE CO., LTD.

Effective date: 20130609

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 450016 ZHENGZHOU, HENAN PROVINCE TO: 450000 ZHENGZHOU, HENAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130609

Address after: Bamboo high tech Development Zone in Henan Province, Zhengzhou City, 450000 street, No. 100 and No. 10 Liyuan Sheng Yuan Building 1 unit 8

Patentee after: Henan Bote Engineering Protection Co., Ltd.

Address before: 450016 A6 villa Green, No. 1369 East navigation road, Zhengzhou economic and Technological Development Zone, Zhengzhou, Henan

Patentee before: Zhengzhou Youte Infrastructure Engineering Maintainance Co., Ltd.

ASS Succession or assignment of patent right

Owner name: ZHENGZHOU ANYUAN ENGINEERING TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: HENAN BOTE ENGINEERING PROTECTION CO., LTD.

Effective date: 20150409

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150409

Address after: The two North Road, South eight North four Avenue West port linkage 450000 Henan province Zhengzhou City Economic and Technological Development Zone

Patentee after: Zhengzhou Anyuan Engineering Technology Co., Ltd.

Address before: Bamboo high tech Development Zone in Henan Province, Zhengzhou City, 450000 street, No. 100 and No. 10 Liyuan Sheng Yuan Building 1 unit 8

Patentee before: Henan Bote Engineering Protection Co., Ltd.

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160608

Address after: 450000 Zhengzhou province Jinshui District, Henan Cultural Road, building 48, building 39, No. 33

Patentee after: Wang Fuming

Address before: The two North Road, South eight North four Avenue West port linkage 450000 Henan province Zhengzhou City Economic and Technological Development Zone

Patentee before: Zhengzhou Anyuan Engineering Technology Co., Ltd.