CN105625154B - The method that high polymer carries out road rehabilitation is accurately filled at roadbase disease - Google Patents

The method that high polymer carries out road rehabilitation is accurately filled at roadbase disease Download PDF

Info

Publication number
CN105625154B
CN105625154B CN201510970572.7A CN201510970572A CN105625154B CN 105625154 B CN105625154 B CN 105625154B CN 201510970572 A CN201510970572 A CN 201510970572A CN 105625154 B CN105625154 B CN 105625154B
Authority
CN
China
Prior art keywords
barrier film
high polymer
mentioned cavity
repair apparatus
cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510970572.7A
Other languages
Chinese (zh)
Other versions
CN105625154A (en
Inventor
王辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Youte Highway Maintenance Technology Co Ltd
Original Assignee
Anhui Youte Highway Maintenance Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Youte Highway Maintenance Technology Co Ltd filed Critical Anhui Youte Highway Maintenance Technology Co Ltd
Priority to CN201510970572.7A priority Critical patent/CN105625154B/en
Publication of CN105625154A publication Critical patent/CN105625154A/en
Application granted granted Critical
Publication of CN105625154B publication Critical patent/CN105625154B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/10Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for raising or levelling sunken paving; for filling voids under paving; for introducing material into substructure

Abstract

The present invention proposes and the method that high polymer carries out road rehabilitation is accurately filled at roadbase disease, comprises the following steps:S1, pass through ultrasound examination dead circuit lower cavity position, shape and volume;S2, drilled by repair apparatus according to above-mentioned empty cavity position;S3, repair apparatus are preset with pressure values, and barrier film is imported into above-mentioned cavity by repair apparatus, and repair apparatus gas injection into barrier film makes to reach preset pressure value in barrier film;It S4, will take out, then be sent into by Space adjustment equipment in above-mentioned cavity after gas discharge in barrier film;The gas flowmeter that S5, basis are poured in barrier film calculates above-mentioned cavity volume, the slip casting into barrier film according to above-mentioned cavity volume;S6, Space adjustment equipment adjust its volume taken up space in above-mentioned cavity according to suffered pressure.The present invention can be filled with simple and effective to cavity under road with proper amount of high polymer.

Description

The method that high polymer carries out road rehabilitation is accurately filled at roadbase disease
Technical field
Invention is related to road rehabilitation field, and in particular to high polymer progress road is accurately filled at roadbase disease and is repaiied Multiple method.
Background technology
Traffic with the development people of science and technology also increasingly facilitates, but road foundation may produce cavity due to disease, It is that people leave serious potential safety hazard if cavity handles be likely to result in road collapsion not in time, can be by excavating filling Mode solves this problem, but excavating filling wastes time and energy, and time-consuming, and also to plant filling mode be to use high polymer material Rapid spatial expansion is filled to cavity after material chemically reacts, but ground end cavity size is difficult accurately to calculate Come, make the amount that high polymer is filled be difficult to determine, have impact on this solution and use.
The content of the invention
The technical problem existed based on background technology, the present invention is proposed accurately fills high polymer at roadbase disease The method for carrying out road rehabilitation.
It is proposed by the present invention that the method that high polymer carries out road rehabilitation is accurately filled at roadbase disease including following Step:
S1, pass through ultrasound examination dead circuit lower cavity position, shape and volume;
S2, drilled by repair apparatus according to above-mentioned empty cavity position;
S3, repair apparatus are preset with pressure values, and barrier film is imported into above-mentioned cavity by repair apparatus, repair apparatus to Gas injection in barrier film, makes to reach preset pressure value in barrier film;
It S4, will take out, then be sent into by Space adjustment equipment in above-mentioned cavity after gas discharge in barrier film;
S5, above-mentioned cavity volume calculated according to the gas flowmeter that pours in barrier film, according to above-mentioned cavity volume to isolation Slip casting in film;
S6, Space adjustment equipment adjust its volume taken up space in above-mentioned cavity according to suffered pressure.
Preferably, repair apparatus is proposed in step S2 and S3, the repair apparatus includes frame, rotating shaft, borehole drill construction And inflation mechanism;
Rotating shaft may be rotatably mounted in frame;
Borehole drill construction includes drilling part and first driving means, and first driving means movement is arranged in rotating shaft, and first drives Dynamic device driving drilling part is rotated;
Inflation mechanism includes aerating device and barrier film fixing device, and aerating device is movably mounted in rotating shaft, isolates Film fixing device is arranged on aerating device, and aerating device pipeline connection barrier film fixing device.
Preferably, drilling part is screw rod.
Preferably, barrier film fixing device includes gas cylinder, film side fixation briquetting and baroceptor, and briquetting is fixed on film side By being removably mounted at gas cylinder lower end, gas cylinder upper end pipeline connection aerating device, baroceptor is arranged on gas cylinder It is interior.
Preferably, Space adjustment equipment is proposed in step S4 and S6, the Space adjustment equipment includes fixed mount, driving Mechanism and Space adjustment mechanism;
Space adjustment mechanism includes regulation bucket, compact heap and passage;Bucket opening upwards are adjusted, drive mechanism is arranged on solid Determine on frame, drive mechanism drive connection regulation bucket, drive mechanism driving regulation bucket is moved up and down, and passage passes vertically through regulation Bucket, compact heap is removably mounted at regulation bucket lower end and positioned at passage periphery, and regulation bucket lower end is provided with pressure sensor.
Preferably, regulation bucket correspondence compact heap installation site installs elasticity layer.
Preferably, step S3 specifically includes following steps:
S31, repair apparatus are preset with pressure values, and the shape and body of barrier film are selected according to above-mentioned cavity shape and volume Product, when the barrier film is reached preset pressure value in above-mentioned cavity, barrier film is attached on above-mentioned cavity inner wall;
S32, by ventilation make barrier film enter above-mentioned cavity in, and until barrier film in gas pressure intensity be preset pressure value When stop inflation.
Then barrier film is passed into above-mentioned cavity and pours it is determined that drilled behind the position of underground cavity pocket by the present invention Gas, makes gas in barrier film reach default pressure, is combined and can calculated according to the condition such as pressure and amount and the temperature of inflation Go out the volume of cavity, the gas in barrier film is reclaimed, is easy to use next time, then send into barrier film by Space adjustment equipment Into above-mentioned cavity, high polymer is then passed through into barrier film, error is there may be because the volume of above-mentioned cavity is calculated, in sky Between adjustment equipment when bearing the pressure of high polymer and being more than the power that high polymer applies under most suitable density to Space adjustment equipment, Space adjustment equipment retracts and provides suitable space for high polymer, be advantageously implemented above-mentioned cavity be filled it is rear enough firm, The present invention simply and easily determines filling high polymer in above-mentioned cavity and suitably measured, and if occurring in high polymer filling process Above-mentioned cavity is connected with areola around it, and also high polymer filling will not be affected greatly.
Brief description of the drawings
Fig. 1 accurately fills the method flow that high polymer carries out road rehabilitation to be proposed by the present invention at roadbase disease Schematic diagram;
Fig. 2 is repair apparatus structural representation;
Fig. 3 is Space adjustment device structure schematic diagram;
Fig. 4 is from gas injection schematic flow sheet in film.
Embodiment
It is proposed by the present invention to accurately fill high polymer at roadbase disease and enter shown in reference picture 1, Fig. 2, Fig. 3 and Fig. 4 The method of row road rehabilitation, comprises the following steps:
S1, pass through ultrasound examination dead circuit lower cavity position, shape and volume.
S2, drilled by repair apparatus according to above-mentioned empty cavity position.
Repair apparatus includes frame 1, rotating shaft 2, borehole drill construction 3 and inflation mechanism 4;
Rotating shaft 2 may be rotatably mounted in frame 1.
Borehole drill construction 3 includes drilling part 31 and first driving means 32, and drilling part 31 can select screw rod, and screw rod exists Soil is facilitated to discharge while effectively drilling, the movement of first driving means 32 is arranged in rotating shaft 2, and first driving means 32 drive Screw rod is rotated;First driving means 32 are being turned to suitable position by borehole drill construction 3 by rotating shaft 2, then pass through driving Device 32 drives screw rod to rotate and drilling can be achieved to the position movement of above-mentioned cavity.
Inflation mechanism 4 includes aerating device 41 and barrier film fixing device 42, and aerating device 41 is movably mounted to rotating shaft 2 On, barrier film fixing device 42 is arranged on aerating device 41, and the pipeline connection barrier film fixing device 42 of aerating device 41, every Include gas cylinder 421, film side from film fixing device 42 and fix briquetting 422 and baroceptor 423, film side is fixed briquetting 422 and led to Cross and be removably mounted at the lower end of gas cylinder 421, the upper end pipeline connection aerating device 41 of gas cylinder 421, baroceptor 423 is installed In gas cylinder 421, aerating device 41 is moved to behind suitable position by inflation mechanism 4 by rotating shaft 2, is fixed and pressed by film side Block 422 fixes barrier film, is moved after fixing by aerating device 41 barrier film sending into above-mentioned cavity, be then inflated, Record aeration quantity and pressure internal in barrier film gas replenishment process is obtained by baroceptor 423.
S3, repair apparatus are preset with pressure values, and barrier film is imported into above-mentioned cavity by repair apparatus, repair apparatus to Gas injection in barrier film, makes to reach preset pressure value in barrier film;
Step S3 specifically includes following steps:
S31, repair apparatus are preset with pressure values, and the shape and body of barrier film are selected according to above-mentioned cavity shape and volume Product, when the barrier film is reached preset pressure value in above-mentioned cavity, barrier film is attached on above-mentioned cavity inner wall;Ultrasound examination Rear cavity volume and shape are simultaneously inaccurate, it is not possible to for calculating the amount of addition high polymer, but can be for being selected in suitable shape Shape and the barrier film of volume are used.
S32, by ventilation make barrier film enter above-mentioned cavity in, and until barrier film in gas pressure intensity be preset pressure value When stop inflation.
It S4, will take out, then be sent into by Space adjustment equipment in above-mentioned cavity after gas discharge in barrier film;
Space adjustment equipment includes fixed mount 5, drive mechanism 6 and Space adjustment mechanism 7.
Space adjustment mechanism 7 includes regulation bucket 71, compact heap 72 and passage 73;Adjust the opening upwards of bucket 71, driving machine Structure 6 is arranged on fixed mount 5, the drive connection of drive mechanism 6 regulation bucket 71, and the driving regulation bucket 71 of drive mechanism 6 is moved up and down, and is led Expects pipe 73 passes vertically through regulation bucket 71, and compact heap 72 is removably mounted at the regulation lower end of bucket 71 and positioned at the periphery of passage 73, adjusted Section bucket 71 lower end is provided with pressure sensor.
S5, above-mentioned cavity volume calculated according to the gas flowmeter that pours in barrier film, according to above-mentioned cavity volume to isolation Slip casting in film.
S6, Space adjustment equipment adjust its volume taken up space in above-mentioned cavity according to suffered pressure.
Then the present invention passes through the general of inflation mechanism 4 it is determined that drilled behind the position of underground cavity pocket by borehole drill construction 3 Barrier film is passed into above-mentioned cavity and gas injection, is combined and can calculated according to conditions such as pressure and the amount inflated and temperature The volume of cavity, the gas in barrier film is reclaimed, is easy to use next time, barrier film is fixed on into adjustment barrel by compact heap 72 After upper, error is there may be because the volume of above-mentioned cavity is calculated, barrier film is sent to by above-mentioned sky by Space adjustment equipment In chamber, high polymer is then passed through into barrier film by passage 73, the pressure for bearing high polymer in Space adjustment equipment is more than During the power that high polymer applies under most suitable density to Space adjustment equipment, the driving regulation bucket 71 of drive mechanism 6 retracts as height Polymers provides suitable space, is advantageously implemented above-mentioned cavity and is filled rear enough firm, regulation bucket 71 has barrel-like structure Demand when regulation bucket 71 is moved to power can also be saved by not only contributing to saving cost of manufacture.
In order to reduce in the possibility that high polymer overflows out of barrier film, present embodiment, the regulation correspondence compact heap 72 of bucket 71 Installation site installs elasticity layer.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.

Claims (7)

1. the method that high polymer carries out road rehabilitation is accurately filled at roadbase disease, it is characterised in that including following step Suddenly:
S1, pass through ultrasound examination dead circuit lower cavity position, shape and volume;
S2, drilled by repair apparatus according to above-mentioned empty cavity position;
S3, repair apparatus are preset with pressure values, and barrier film is imported into above-mentioned cavity by repair apparatus, and repair apparatus is to isolation Insufflation gas in film, make to reach preset pressure value in barrier film;
It S4, will take out, then be sent into by Space adjustment equipment in above-mentioned cavity after gas discharge in barrier film;
The gas flowmeter that S5, basis are filled with barrier film calculates above-mentioned cavity volume, according to above-mentioned cavity volume into barrier film Slip casting;
S6, Space adjustment equipment adjust its volume taken up space in above-mentioned cavity according to suffered pressure.
2. according to claim 1 accurately fill the method that high polymer carries out road rehabilitation at roadbase disease, its It is characterised by:Repair apparatus is proposed in step S2 and S3, the repair apparatus includes frame (1), rotating shaft (2), borehole drill construction And inflation mechanism (4) (3);
Rotating shaft (2) may be rotatably mounted in frame (1);
Borehole drill construction (3) includes drilling part (31) and first driving means (32), and mobile be arranged on of first driving means (32) turns On axle (2), first driving means (32) driving drilling part (31) is rotated;
Inflation mechanism (4) includes aerating device (41) and barrier film fixing device (42), and aerating device (41) is movably mounted to In rotating shaft (2), barrier film fixing device (42) is arranged on aerating device (41), and aerating device (41) pipeline connection barrier film Fixing device (42).
3. according to claim 2 accurately fill the method that high polymer carries out road rehabilitation at roadbase disease, its It is characterised by:Drilling part (31) is screw rod.
4. according to claim 2 accurately fill the method that high polymer carries out road rehabilitation at roadbase disease, its It is characterised by:Barrier film fixing device (42) includes gas cylinder (421), film side and fixes briquetting (422) and baroceptor (423), film side is fixed briquetting (422) and connected by being removably mounted at gas cylinder (421) lower end, gas cylinder (421) upper end pipeline Logical aerating device (41), baroceptor (423) is arranged in gas cylinder (421).
5. according to claim 1 accurately fill the method that high polymer carries out road rehabilitation at roadbase disease, its It is characterised by:Space adjustment equipment is proposed in step S4 and S6, the Space adjustment equipment includes fixed mount (5), driving machine Structure (6) and Space adjustment mechanism (7);
Space adjustment mechanism (7) includes regulation bucket (71), compact heap (72) and passage (73);Bucket (71) opening upwards are adjusted, Drive mechanism (6) is arranged on fixed mount (5), drive mechanism (6) drive connection regulation bucket (71), and drive mechanism (6) driving is adjusted Section bucket (71) is moved up and down, and passage (73) passes vertically through regulation bucket (71), and compact heap (72) is removably mounted at regulation bucket (71) lower end and positioned at passage (73) periphery, regulation bucket (71) lower end pressure sensor is installed.
6. according to claim 5 accurately fill the method that high polymer carries out road rehabilitation at roadbase disease, its It is characterised by:Adjust bucket (71) correspondence compact heap (72) installation site and elasticity layer is installed.
7. the high polymer that accurately filled at roadbase disease according to claim 1-6 any one carries out road rehabilitation Method, it is characterised in that step S3 specifically includes following steps:
S31, repair apparatus are preset with pressure values, and the shape and volume of barrier film are selected according to above-mentioned cavity shape and volume, is made When barrier film reaches preset pressure value in above-mentioned cavity, barrier film is attached on above-mentioned cavity inner wall;
S32, by ventilation make barrier film enter above-mentioned cavity in, and until barrier film in gas pressure intensity be preset pressure value when stop Only inflate.
CN201510970572.7A 2015-12-18 2015-12-18 The method that high polymer carries out road rehabilitation is accurately filled at roadbase disease Active CN105625154B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510970572.7A CN105625154B (en) 2015-12-18 2015-12-18 The method that high polymer carries out road rehabilitation is accurately filled at roadbase disease

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510970572.7A CN105625154B (en) 2015-12-18 2015-12-18 The method that high polymer carries out road rehabilitation is accurately filled at roadbase disease

Publications (2)

Publication Number Publication Date
CN105625154A CN105625154A (en) 2016-06-01
CN105625154B true CN105625154B (en) 2017-10-03

Family

ID=56040465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510970572.7A Active CN105625154B (en) 2015-12-18 2015-12-18 The method that high polymer carries out road rehabilitation is accurately filled at roadbase disease

Country Status (1)

Country Link
CN (1) CN105625154B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115491944A (en) * 2022-09-23 2022-12-20 郑州安源工程技术有限公司 Method for repairing road hidden trouble diseases

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3936040A1 (en) * 1989-09-07 1991-05-29 Fischer Artur Werke Gmbh INJECTION PACKER FOR INJECTING RESIN IN CONCRETE Cracks
US6309493B1 (en) * 1999-02-11 2001-10-30 Flexible Products Company Method for filling cracks in a concrete structure with foamable polyurethane prepolymer
CN101261263B (en) * 2007-03-09 2011-07-20 郑州优特基础工程维修有限公司 Roadbed defect recognition and high polymer grouting rapid reinforcement technology
CN101261264B (en) * 2007-03-09 2011-07-20 郑州优特基础工程维修有限公司 Semi-rigid base layer disease detection and high polymer grouting rapid servicing technology
CN101261265B (en) * 2007-03-09 2011-08-10 郑州优特基础工程维修有限公司 Cement concrete road surface void identification and high polymer grouting rapid servicing technology
CN102031747B (en) * 2009-09-28 2012-06-06 郑州优特基础工程维修有限公司 Road base reinforcing high-polymer loading and grouting method
CN104612027B (en) * 2014-12-24 2017-06-13 江苏鼎达建筑新技术有限公司 For the geopolymer grouting process that road rehabilitation is reinforced

Also Published As

Publication number Publication date
CN105625154A (en) 2016-06-01

Similar Documents

Publication Publication Date Title
TWI410552B (en) Method and arrangement for improving soil and/or for lifting structures
CN102182468B (en) Method and device for solidifying water-filling cracking surrounding rocks of tunnel by adopting high-pressure air water-dispelling grouting
CN108037267A (en) A kind of pipe leakage water eroding and flooding of simulating induces the experimental rig that road caves in
CN105926686A (en) Centrifugal model testing system and method studying common character of composite foundation and support structure
CN104458535A (en) Soil body permeability characteristic testing device for centrifugal model test
CN108152118A (en) A kind of pile formula subgrade seepage flow erosion test device of adjustable head
CN105625154B (en) The method that high polymer carries out road rehabilitation is accurately filled at roadbase disease
CN207211122U (en) A kind of construction land used face press
CN105625153B (en) A kind of high polymer method for repairing and mending of roadbase disease
CN104947648A (en) Deep replacement dynamic compaction gravel pile foundation reinforcement method
CN108205057B (en) Simulation test device for urban stratum collapse caused by water cut-off circulation path of underground engineering
CN104790376A (en) Soft foundation modified rapid separation and tamping method
CN112161908A (en) Triaxial apparatus continuous seepage test device and use method thereof
CN207248699U (en) Double plunger water filling infiltration testing apparatus in a kind of hole
CN108627424A (en) Portable prefabricated wall connection chamber Grouted density monitoring and compensation device and method
CN107964991B (en) Building forced landing deviation correcting equipment and method using equipment
CN110794118A (en) Soil erosion and water loss simulation device
CN109469117A (en) A kind of foundation pit supporting system model test apparatus and method
CN108756837A (en) A kind of water injection well transfer drive method
CN114518441A (en) Two-dimensional test model and method for simulating tunnel excavation stratum loss
CN208672391U (en) The carbon ramming mass multilayer sampling device of hydraulic-driven
CN207452870U (en) Sand replacement method density test equipment and its storage sand device
CN206556962U (en) A kind of preparation of soil sample device
CN206696016U (en) The fast corning machine of cooling rate
CN112414750A (en) Soil sampling and detecting equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant