CN101254789A - Railway gale monitoring early warning system and method - Google Patents

Railway gale monitoring early warning system and method Download PDF

Info

Publication number
CN101254789A
CN101254789A CNA2008100307480A CN200810030748A CN101254789A CN 101254789 A CN101254789 A CN 101254789A CN A2008100307480 A CNA2008100307480 A CN A2008100307480A CN 200810030748 A CN200810030748 A CN 200810030748A CN 101254789 A CN101254789 A CN 101254789A
Authority
CN
China
Prior art keywords
train
strong wind
network
data center
early warning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008100307480A
Other languages
Chinese (zh)
Other versions
CN101254789B (en
Inventor
田红旗
许平
潘迪夫
高广军
鲁寨军
刘堂红
陈�峰
姚曙光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Priority to CN2008100307480A priority Critical patent/CN101254789B/en
Publication of CN101254789A publication Critical patent/CN101254789A/en
Application granted granted Critical
Publication of CN101254789B publication Critical patent/CN101254789B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention discloses an early warning system for rail strong wind monitoring, which comprises a strong wind monitoring and controlling data center, a plurality of strong wind monitoring points, a DMIS network and a TMIS network, an exchange server which connects the DMIS network and the TMIS network at same time, a train dispatching center and a monitored train, wherein the strong wind monitoring and controlling data center real-timely gets wind speed data from a plurality of strong wind monitoring points; the strong wind monitoring and controlling data center gets real-time operation information and train marshalling and type information of the monitored train from the DMIS network and the TMIS network through the exchange server; the strong wind monitoring and controlling data center sends a real-time speed limit command to the train dispatching center which transmits the real-time speed limit command to the monitored train. The invention also discloses an early warning method for the rail strong wind monitoring. The system and the method can effectively ensure the safe operation of the train in wind areas.

Description

Railway gale monitoring early warning system and method
Technical field
The invention belongs to electronic monitoring and control field, relate to a kind of railway gale monitoring early warning system and method.
Background technology
Some railway transportation developed countries such as Japan, Germany, France, the major technique that railway gale monitoring early warning and train traffic control are taked is in the individual segment that high wind is often sent out fixed point to be set, when the high wind speed of section surpasses a certain limit value, send train speed limit or the instruction of stopping transport.
Though some railway of China such as the Lan-xing Railway have tentatively been set up the gale monitoring system, but this system only can provide simple weather monitoring function, can't be implemented under the strong wind atmosphere and provide speed limit instruction or command scheduling decision-making according to circuit and current running train information for safe driving in real time, with effective guarantee train operating safety.
China is vast in territory, and geologic condition is different, often occurs strong wind weather over a long time along the railway.As China Qinghai-Tibet Platean railway, not only height above sea level, climate environment complexity, its average year strong wind number of days is more than 100 days.Normal and safe operation formation has a strong impact on high wind to train.
Therefore, the railway gale monitoring early warning system that perfect in shape and function is reliable to ensureing train operating safety, improving rail transportation efficiency and in time take the calamity emergency measure as far as possible, has very important practical sense.
Summary of the invention
Technical matters to be solved of the present invention provides a kind of railway gale monitoring early warning system and method, this system and method is used for forming train running speed restriction instruction train also timely and by the wind district according to parameters such as detected air speed data and train running informations and carries out information exchange, and commander's train safe is by the wind district.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is:
A kind of railway gale monitoring early warning system is characterized in that: comprise that strong wind monitor data center, a plurality of gale monitoring point, DMIS network are with the TMIS network, be connected swap server, Train Dispatching center and the monitored train of described DMIS network and TMIS network simultaneously; Described strong wind monitor data center obtains air speed data in real time from described a plurality of gale monitoring points; Described strong wind monitor data center obtains the real time execution information and the train marshalling list vehicle information of described monitored train from described DMIS network and TMIS network by described swap server; The described Train Dispatching of mind-set center sends real-time speed limit driving instruction in the described strong wind monitor data, and described Train Dispatching center is forwarded to described monitored train with described real-time speed limit driving instruction.The real time execution information of described monitored train comprises the train number and the location information of monitored train.
As improvement, this railway gale monitoring early warning system also comprises a plurality of strong wind data servers, described a plurality of gale monitoring point is divided into many groups and every group and by a described strong wind data server described air speed data is sent to described strong wind monitor data center, finishes the transmission of monitoring point air speed data.
The another kind of mode that gale monitoring point air speed data transmits is that described a plurality of gale monitoring points send to described strong wind monitor data center by wireless communications mode with described air speed data.Described wireless communications mode is a kind of of GSM-R, GSM, CDMA, WCDMA and CDMA2000.
As improvement, railway gale monitoring early warning system also comprises a remote monitor and control workstation that is used for emergency handling, and described remote monitor and control workstation and described strong wind monitor data center communicate to connect.Described remote monitor and control workstation is used under emergency case and emergency condition, in time transmits dependent instruction and temporary information to strong wind monitor data center, thereby under emergency case train is sent control command.
Described strong wind monitor data center is the Master Control Center of native system, be used to collect various information, comprise the real-time air speed data of monitoring point, obtain data etc. from DMIS network and TMIS network, also be used for communicating by letter, and realize other multinomial functions with Train Dispatching center etc.Described gale monitoring point is used to obtain on-the-spot real-time air speed data, and data are sent to strong wind monitor data center; Described DMIS network is the dispatch control management information system, the SPInet-IV that it is made of the Ministry of Railways, each Railway Bureau, each railroad suboffice and basic unit station, thus realization is to the concentrated supervision and the commander of china railway transportation; Described TMIS network is a TMIS, and DMIS network and TMIS network provide information such as train real time execution, vehicle; Described swap server is used for the related data of DMIS network and TMIS network is sent to strong wind monitor data center; Described Train Dispatching center connects strong wind monitor data center, and is connected with train communication, and the Train Dispatching center receives data and the instruction from strong wind monitor data center, and the instruction that will be correlated with sends to train, commands train safe by the wind district.
A kind of railway gale monitoring method for early warning is characterized in that: may further comprise the steps:
(1) line parameter circuit value is preset at strong wind monitor data center; This strong wind monitor data center obtains the real time execution information and the train marshalling list vehicle information of air speed data, monitored train during respectively by a plurality of gale monitoring points, DMIS network and TMIS network implementation;
(2) described strong wind monitor data center is sent real-time speed limit driving instruction according to the real time execution information and the train marshalling list vehicle information of the line parameter circuit value in the step (1) and the air speed data that is obtained, monitored train to the Train Dispatching center;
(3) described Train Dispatching center sends to monitored train with described real-time speed limit driving instruction.
The real time execution information of the monitored train described in the step (1) comprises the train number and the location information of monitored train; Described line parameter circuit value comprises that bridge, embankment, cutting, curve highway section and the straight line highway section equipotential on the circuit put information.
The beneficial effect that the present invention had has:
(1) provides strong wind monitoring and early warning, ensured the traffic safety of train in the wind district.The air speed data of this strong wind monitoring early-warning system real-time collecting monitoring point obtains information such as train real time execution, vehicle from DMIS network and TMIS network; Form speed limit driving instruction according to above-mentioned data and information again, commander's train safe is by the wind district.Native system can satisfy the abominable high and cold changeable climate condition in wind district, and can be implemented under the unmanned condition requirement of height reliability service, so actv. ensured train operating safety, has remarkable economic efficiency and social benefit.
(2) degree of automation height is taken into account very strong alerting ability.Total system can normally be moved when unmanned, realized the automation of entire system, and, because this system also has a remote monitor and control workstation, be used under emergency case and emergency condition, in time transmit dependent instruction and temporary information to strong wind monitor data center, emergent control command is in time sent to monitored train again in strong wind monitor data center, has demonstrated fully the alerting ability and the comformability of this monitor and early warning system.
(3) real-time height.Between the strong wind monitor data center of this system and DMIS and the TMIS network fast data channel is arranged, realize connecting in real time, the data of monitoring point also can be sent to strong wind monitor data center in real time, guaranteed the real-time update of data, obtain real-time driving instruction and this instruction is sent to train according to collected data, thereby realize commander's driving in real time.
Description of drawings
Fig. 1 is the embodiment of the invention 1 a cooresponding railway gale monitoring early warning system module map.
The specific embodiment
The invention will be further described below in conjunction with accompanying drawing.
Embodiment 1:
As shown in Figure 1, a kind of railway gale monitoring early warning system comprises that strong wind monitor data center, a plurality of gale monitoring point, DMIS network are with the TMIS network, be connected swap server, Train Dispatching center and the monitored train of described DMIS network and TMIS network simultaneously; Described strong wind monitor data center obtains air speed data in real time from described a plurality of gale monitoring points; Described strong wind monitor data center obtains the real time execution information and the train marshalling list vehicle information of described monitored train from described DMIS network and TMIS network by described swap server; The described Train Dispatching of mind-set center sends real-time speed limit driving instruction in the described strong wind monitor data, and described Train Dispatching center is forwarded to described monitored train with described real-time speed limit driving instruction.The real time execution information of described monitored train comprises the train number and the location information of monitored train.
This railway gale monitoring early warning system also comprises 2 strong wind data servers (can adopt the strong wind data server more than 2 when needing), described a plurality of gale monitoring point is divided into 2 groups and every group and by a described strong wind data server described air speed data is sent to described strong wind monitor data center, finishes the transmission of monitoring point air speed data.
Railway gale monitoring early warning system comprises that also one is used for the remote monitor and control workstation of emergency handling, and described remote monitor and control workstation and described strong wind monitor data center communicate to connect.Described remote monitor and control workstation is used under emergency case and emergency condition, in time transmits dependent instruction and temporary information to strong wind monitor data center, and emergent control command is in time sent to monitored train again in strong wind monitor data center.
Described strong wind monitor data center is the Master Control Center of native system, be used to collect various information, comprise the real-time air speed data of monitoring point, obtain data etc. from DMIS network and TMIS network, also be used for communicating by letter, and realize other multinomial functions with Train Dispatching center etc.Described gale monitoring point is used to obtain on-the-spot real-time air speed data, and data are sent to strong wind monitor data center; Described DMIS network is the dispatch control management information system, the SPInet-IV that it is made of the Ministry of Railways, each Railway Bureau, each railroad suboffice and basic unit station, thus realization is to the concentrated supervision and the commander of china railway transportation; Described TMIS network is a TMIS, and DMIS network and TMIS network provide information such as train real time execution, vehicle; Described swap server is used for the related data of DMIS network and TMIS network is sent to strong wind monitor data center; Described Train Dispatching center connects strong wind monitor data center, and is connected with train communication, and the Train Dispatching center receives data and the instruction from strong wind monitor data center, and the instruction that will be correlated with sends to train, commands train safe by the wind district.
Embodiment 2:
Unique difference of this embodiment and embodiment 1 is that air speed data that gale monitoring point obtains is sent to the load mode at strong wind monitor data center, in embodiment 2, a plurality of gale monitoring points send to described strong wind monitor data center by wireless communications mode with described air speed data.Described wireless communications mode is a kind of of GSM-R, GSM, CDMA, WCDMA and CDMA2000.
Embodiment 3:
A kind of railway gale monitoring method for early warning may further comprise the steps:
(1) line parameter circuit value is preset at strong wind monitor data center; This strong wind monitor data center obtains the real time execution information and the train marshalling list vehicle information of air speed data, monitored train during respectively by a plurality of gale monitoring points, DMIS network and TMIS network implementation;
(2) described strong wind monitor data center is sent real-time speed limit driving instruction according to the real time execution information and the train marshalling list vehicle information of the line parameter circuit value in the step (1) and the air speed data that is obtained, monitored train to the Train Dispatching center;
(3) described Train Dispatching center sends to monitored train with described real-time speed limit driving instruction.
The real time execution information of the monitored train described in the step (1) comprises the train number and the location information of monitored train; Described line parameter circuit value comprises bridge, embankment, cutting, curve highway section and the straight line path fragment position information on the circuit.

Claims (7)

1, a kind of railway gale monitoring early warning system is characterized in that: comprise that strong wind monitor data center, a plurality of gale monitoring point, DMIS network are with the TMIS network, be connected swap server, Train Dispatching center and the monitored train of described DMIS network and TMIS network simultaneously; Described strong wind monitor data center obtains air speed data in real time from described a plurality of gale monitoring points; Described strong wind monitor data center obtains the real time execution information and the train marshalling list vehicle information of described monitored train from described DMIS network and TMIS network by described swap server; The described Train Dispatching of mind-set center sends real-time speed limit driving instruction in the described strong wind monitor data, and described Train Dispatching center is forwarded to described monitored train with described real-time speed limit driving instruction.
2, a kind of railway gale monitoring early warning system as claimed in claim 1, it is characterized in that: also comprise a plurality of strong wind data servers, described a plurality of gale monitoring points are divided into many groups and every group and by a described strong wind data server described air speed data are sent to described strong wind monitor data center.
3, a kind of railway gale monitoring early warning system as claimed in claim 1 is characterized in that: described a plurality of gale monitoring points send to described strong wind monitor data center by wireless communications mode with described air speed data.
4, a kind of railway gale monitoring early warning system as claimed in claim 3 is characterized in that: described wireless communications mode is a kind of of GSM-R, GSM, CDMA, WCDMA and CDMA2000.
5, as the described a kind of railway gale monitoring early warning system of one of claim 1 to 4, it is characterized in that: comprise that also one is used for the remote monitor and control workstation of emergency handling, described remote monitor and control workstation and described strong wind monitor data center communicate to connect.
6, a kind of railway gale monitoring method for early warning is characterized in that: may further comprise the steps:
(1) line parameter circuit value is preset at strong wind monitor data center; This strong wind monitor data center obtains the real time execution information and the train marshalling list vehicle information of air speed data, monitored train during respectively by a plurality of gale monitoring points, DMIS network and TMIS network implementation;
(2) described strong wind monitor data center is sent real-time speed limit driving instruction according to the real time execution information and the train marshalling list vehicle information of the line parameter circuit value in the step (1) and the air speed data that is obtained, monitored train to the Train Dispatching center;
(3) described Train Dispatching center sends to monitored train with described real-time speed limit driving instruction.
7, railway gale monitoring method for early warning as claimed in claim 6 is characterized in that: the real time execution information of the monitored train described in the step (1) comprises the train number and the location information of monitored train; Described line parameter circuit value comprises bridge, embankment, cutting, curve highway section and the straight line path fragment position information on the circuit.
CN2008100307480A 2008-03-05 2008-03-05 Railway gale monitoring early warning system and method Active CN101254789B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100307480A CN101254789B (en) 2008-03-05 2008-03-05 Railway gale monitoring early warning system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100307480A CN101254789B (en) 2008-03-05 2008-03-05 Railway gale monitoring early warning system and method

Publications (2)

Publication Number Publication Date
CN101254789A true CN101254789A (en) 2008-09-03
CN101254789B CN101254789B (en) 2010-06-16

Family

ID=39890008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100307480A Active CN101254789B (en) 2008-03-05 2008-03-05 Railway gale monitoring early warning system and method

Country Status (1)

Country Link
CN (1) CN101254789B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101923605A (en) * 2010-08-18 2010-12-22 北京佳讯飞鸿电气股份有限公司 Wind pre-warning method for railway disaster prevention
CN102426399A (en) * 2011-09-01 2012-04-25 南京信息工程大学 Highway crosswind warning method
CN104724143A (en) * 2015-03-13 2015-06-24 南京理工大学 High speed railway crosswind information collection and early warning method and system
CN109598909A (en) * 2018-11-29 2019-04-09 中国铁路总公司 A kind of Along Railway strong wind moving monitoring system and method
CN112498419A (en) * 2020-11-25 2021-03-16 中铁第四勘察设计院集团有限公司 Encryption method, device, equipment and storage medium
CN112644449A (en) * 2019-10-11 2021-04-13 李德和 Passenger-cargo train wind pressure brake warning transmission system
CN113376710A (en) * 2021-07-08 2021-09-10 湖南中车时代通信信号有限公司 Method and system for acquiring real-time meteorological information

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101126817A (en) * 2007-09-30 2008-02-20 西南交通大学 Train windbreak safe monitoring, controlling method and its device
CN201181512Y (en) * 2008-03-05 2009-01-14 中南大学 Railway wind monitoring and early-warning system

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101923605A (en) * 2010-08-18 2010-12-22 北京佳讯飞鸿电气股份有限公司 Wind pre-warning method for railway disaster prevention
CN102426399A (en) * 2011-09-01 2012-04-25 南京信息工程大学 Highway crosswind warning method
CN102426399B (en) * 2011-09-01 2013-05-08 南京信息工程大学 Highway crosswind warning method
CN104724143A (en) * 2015-03-13 2015-06-24 南京理工大学 High speed railway crosswind information collection and early warning method and system
CN104724143B (en) * 2015-03-13 2016-09-21 南京理工大学 High-speed railway beam wind information gathering and method for early warning and system
CN109598909A (en) * 2018-11-29 2019-04-09 中国铁路总公司 A kind of Along Railway strong wind moving monitoring system and method
CN109598909B (en) * 2018-11-29 2021-10-22 中国铁路总公司 System and method for monitoring movement of strong wind along railway
CN112644449A (en) * 2019-10-11 2021-04-13 李德和 Passenger-cargo train wind pressure brake warning transmission system
CN112498419A (en) * 2020-11-25 2021-03-16 中铁第四勘察设计院集团有限公司 Encryption method, device, equipment and storage medium
CN112498419B (en) * 2020-11-25 2022-09-09 中铁第四勘察设计院集团有限公司 Encryption method, device, equipment and storage medium
CN113376710A (en) * 2021-07-08 2021-09-10 湖南中车时代通信信号有限公司 Method and system for acquiring real-time meteorological information

Also Published As

Publication number Publication date
CN101254789B (en) 2010-06-16

Similar Documents

Publication Publication Date Title
CN101254789B (en) Railway gale monitoring early warning system and method
CN110194201B (en) Train control grade conversion system and method thereof
CN102069825B (en) Method for improving safety of CTCS-3 (Chinese train control system-3) train control system
CN101537847B (en) Implementation method of train operation control system with time speed of 200 to 350 kilometers
CN105946905B (en) Virtual rail section takes detection method
CN104859683A (en) Ground equipment of high-speed railway train control system
US8565945B2 (en) Method for managing vital train movements
CN107161179A (en) Suitable for the running control system of general fast railway
CN1817709A (en) CTCS2-grade train controlling system based on wireless locomotive signal
CN108189860B (en) Driving permission control system suitable for general speed railway
CN110712667A (en) Comprehensive train control system capable of adapting to foreign requirements
US20130158742A1 (en) System and method for communicating in a transportation network
CN103237044B (en) The train automatic Pilot land mobile communication system realized based on GSM-R and method
CN201181512Y (en) Railway wind monitoring and early-warning system
CN212500426U (en) Train autonomous control system based on vehicle-to-vehicle communication
CN101786459B (en) Train temporary speed-limiting method based on self-organizing network
EP2371661A2 (en) Train information exchange
CN202413858U (en) Integrated control system of urban modern rail transit
CN1528632A (en) Wireless locomotive signal system
Dimitrova Analysis of automatic control systems for metro trains
CN102821363A (en) Urban rail-transport vehicle-ground communication method
Schutte Recent trends in automatic train controls
CN104071190A (en) Train remote supervisory system
CN1284699C (en) Automatization system for marshalling station pispatching train
Wang et al. Research on intelligent control strategy used in CTCS-3 train control system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant