CN101205765B - 老结构地下墙开门洞施工方法 - Google Patents

老结构地下墙开门洞施工方法 Download PDF

Info

Publication number
CN101205765B
CN101205765B CN2006101476186A CN200610147618A CN101205765B CN 101205765 B CN101205765 B CN 101205765B CN 2006101476186 A CN2006101476186 A CN 2006101476186A CN 200610147618 A CN200610147618 A CN 200610147618A CN 101205765 B CN101205765 B CN 101205765B
Authority
CN
China
Prior art keywords
underground wall
door opening
steel
construction
old
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2006101476186A
Other languages
English (en)
Other versions
CN101205765A (zh
Inventor
姜向红
龚振斌
周慕忠
乔恒昌
李筠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 1 Group Co Ltd
Original Assignee
Shanghai First Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai First Construction Co Ltd filed Critical Shanghai First Construction Co Ltd
Priority to CN2006101476186A priority Critical patent/CN101205765B/zh
Publication of CN101205765A publication Critical patent/CN101205765A/zh
Application granted granted Critical
Publication of CN101205765B publication Critical patent/CN101205765B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0274Temporary shoring of wall opening

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

本发明公开了一种老结构地下墙开门洞施工方法。本发明的方法包括如下步骤:(a)先在老结构地下墙门洞范围内的混凝土上,凿出垂直的凹槽;(b)然后在凹槽内安装钢顶撑;(c)然后绑扎,安装门框柱、过梁模板,施工养护,拆除门框柱、梁模板及钢顶撑,门框防水施工,再凿除老结构地下墙门洞范围内其余的混凝土。通过上述施工技术,很好的解决了地下墙大面积凿除过程中地下墙的安全和稳定,确保结构变形得到有效控制,同时也很好的解决了新老结构防水问题。

Description

老结构地下墙开门洞施工方法
技术领域
本发明涉及一种在地下墙开门洞施工方法。
背景技术
目前,随着城市建设的迅猛发展,经常需要在老结构的基础上,建筑新的的结构,接通时往往需要在老结构地下墙上开凿门洞。如何确保老结构的安全,同时使新结构能够方便的施工,目前没有前该方面没有十分可靠、相对成熟的施工技术。施工中常常困难重重。
发明内容
本发明需要解决的技术问题是公开一种老结构地下墙开门洞施工方法,以满足建筑领域的需要。
本发明的方法包括如下步骤:
(a)先在老结构地下墙门洞范围内的混凝土上,凿出垂直的凹槽;
(b)然后在凹槽内安装钢顶撑;
(c)然后绑扎,安装门框柱、过梁模板,施工养护,拆除门框柱、过梁模板及钢顶撑,门框防水施工,再凿除老结构地下墙门洞范围内其余的混凝土。
通过上述施工技术,很好的解决了地下墙大面积凿除过程中地下墙的安全和稳定,确保结构变形得到有效控制,同时也很好的解决了新老结构防水问题。本方法经过多场合测试,施工技术已经得到验证,趋向成熟。
附图说明
图1为地下墙凿除与顶撑施工方案。
图2为图1的剖视图。
具体实施方式
参见图1和图2,本发明的方法包括如下步骤:
(a)先在老结构地下墙门洞范围内的混凝土1上,凿出垂直的上凹槽2;
(b)然后在凹槽2内安装钢顶撑3,钢顶撑3与地下墙上下顶足;
(c)然后绑扎,安装门框柱、过梁模板,施工养护,拆除门框柱、过梁模板及钢顶撑,门框防水施工,再凿除老结构地下墙门洞范围内其余的混凝土。
当然步骤(c)也可以是:凿除老结构地下墙门洞范围内其余的混凝土,然后绑扎,安装门框柱、过梁模板,施工养护,拆除门框柱、过梁模板及钢顶撑,门框防水施工;
所说的凹槽2的宽度为0.8~1.3米,优选1米;
所说的钢顶撑3的尺寸为200×300的工字钢或槽钢;
凹槽2的间距为0.8~1.5m。
钢顶撑3最好与地下墙内钢筋焊接固定。
施工时应当注意,老结构地下墙内钢筋不能割断。

Claims (7)

1.老结构地下墙开门洞施工方法,其特征在于,包括如下步骤:
(a)先在老结构地下墙门洞范围内的混凝土(1)上,凿出垂直的上凹槽(2);
(b)然后在上凹槽(2)内安装钢顶撑(3),钢顶撑(3)与地下墙上下顶足;
(c)然后绑扎,安装门框柱、过梁模板,施工养护,拆除门框柱、过梁模板及钢顶撑,门框防水施工,再凿除老结构地下墙门洞范围内其余的混凝土。
2.老结构地下墙开门洞施工方法,其特征在于,包括如下步骤:
(a)先在老结构地下墙门洞范围内的混凝土(1)上,凿出垂直的上凹槽(2);
(b)然后在上凹槽(2)内安装钢顶撑(3),钢顶撑(3)与地下墙上下顶足;
(c)凿除老结构地下墙门洞范围内其余的混凝土,然后绑扎,安装门框柱、过梁模板,施工养护,拆除门框柱、过梁模板及钢顶撑,门框防水施工。
3.根据权利要求1或2所述的方法,其特在于,所说的凹槽(2)的宽度为0.8~1.3米。
4.根据权利要求1或2所述的方法,其特在于,所说的凹槽(2)的宽度为1米。
5.根据权利要求1或2所述的方法,其特在于,所说的钢顶撑(3)的尺寸为200×300的工字钢或槽钢。
6.根据权利要求1或2所述的方法,其特在于,所说的凹槽(2)的间距为0.8~1.5m。
7.根据权利要求1或2所述的方法,其特在于,钢顶撑(3)与地下墙内钢筋焊接固定。
CN2006101476186A 2006-12-20 2006-12-20 老结构地下墙开门洞施工方法 Active CN101205765B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2006101476186A CN101205765B (zh) 2006-12-20 2006-12-20 老结构地下墙开门洞施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2006101476186A CN101205765B (zh) 2006-12-20 2006-12-20 老结构地下墙开门洞施工方法

Publications (2)

Publication Number Publication Date
CN101205765A CN101205765A (zh) 2008-06-25
CN101205765B true CN101205765B (zh) 2010-12-08

Family

ID=39566224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2006101476186A Active CN101205765B (zh) 2006-12-20 2006-12-20 老结构地下墙开门洞施工方法

Country Status (1)

Country Link
CN (1) CN101205765B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831969B (zh) * 2010-05-07 2011-07-13 华太建设集团有限公司 自平衡式支撑承重墙体开设洞口的方法
CN108412522A (zh) * 2018-04-09 2018-08-17 长江勘测规划设计研究有限责任公司 地下工程墙体洞门加固结构及其施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2131076A (en) * 1982-12-02 1984-06-13 Denis George Mcmahon Making an opening in a wall
CN1290798A (zh) * 2000-11-17 2001-04-11 胡伟 一种无粘结预应力混凝土楼盖开洞技术
CN1308172A (zh) * 2001-02-20 2001-08-15 周瑞峰 建筑物墙上洞口加大方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2131076A (en) * 1982-12-02 1984-06-13 Denis George Mcmahon Making an opening in a wall
CN1290798A (zh) * 2000-11-17 2001-04-11 胡伟 一种无粘结预应力混凝土楼盖开洞技术
CN1308172A (zh) * 2001-02-20 2001-08-15 周瑞峰 建筑物墙上洞口加大方法

Also Published As

Publication number Publication date
CN101205765A (zh) 2008-06-25

Similar Documents

Publication Publication Date Title
KR100957599B1 (ko) 가설흙막이 구조물을 이용한 지하구조물 시공방법
CN106088148B (zh) 综合管廊模板及其应用
CN103590404B (zh) 一种紧邻已建地下结构的基坑支撑方法
CN103132537A (zh) 钢格构柱回字型混凝土承台组合式塔吊基础结构及施工方法
CN106120807A (zh) 永久性基坑围护水泥土刚性墙及其施工方法
CN103485537A (zh) 超高层水平二次结构预埋钢筋施工方法及其结构
CN109667587A (zh) 采用预制装配仰拱的钻爆法隧道结构
CN101205765B (zh) 老结构地下墙开门洞施工方法
CN204282399U (zh) 一种地铁围护结构
CN101725147B (zh) 低净空间下先插后喷型钢旋喷桩围护结构施工工艺
CN203034476U (zh) 钢格构柱回字型混凝土承台组合式塔吊基础结构
KR101708218B1 (ko) 하이브리드 지하 피트 구조물 및 그의 시공방법
CN208815540U (zh) 深基坑支撑结构
CN207143746U (zh) 混凝土支撑栈桥板下支撑梁模板系统
CN203429798U (zh) 超高层水平二次结构预埋钢筋结构
CN207878472U (zh) 密排阶梯型旋挖桩支护体系
CN106284372A (zh) 一种电力沟整体浇注过程中顶板模板的支撑方法
CN108104112A (zh) 一种基于原土原位制浆的地下墙体施工方法
CN107304566B (zh) 一种可拆卸土钉墙面板结构
CN206503160U (zh) 一种带抗浮措施的地下连续墙结构
CN104131816A (zh) 一种运营中地铁隧道地下墙开门洞的施工方法
CN1127602C (zh) 建筑物墙上洞口加大方法
CN219315694U (zh) 地下连续墙
KR101524302B1 (ko) 무가시설의 지중 구조물 시공방법
KR100515789B1 (ko) 조립식 건축물의 콘크리트 기초 슬래브 일체형 흙막이 구조

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 200120 25-27 Floor, 33 Fushan Road, China (Shanghai) Free Trade Pilot Area, Pudong New Area, Shanghai

Patentee after: Shanghai Construction No.1 (Group) Co., Ltd.

Address before: 200120 Fushan Road 33, Shanghai

Patentee before: Shanghai First Construction Co., Ltd.

CP03 Change of name, title or address