CN101177223A - Elevator equipment - Google Patents

Elevator equipment Download PDF

Info

Publication number
CN101177223A
CN101177223A CNA2007101371371A CN200710137137A CN101177223A CN 101177223 A CN101177223 A CN 101177223A CN A2007101371371 A CNA2007101371371 A CN A2007101371371A CN 200710137137 A CN200710137137 A CN 200710137137A CN 101177223 A CN101177223 A CN 101177223A
Authority
CN
China
Prior art keywords
deflection sheave
sheave
winch
deflection
hoist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101371371A
Other languages
Chinese (zh)
Inventor
富田正道
萩谷知文
藤野笃哉
荒堀昇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Publication of CN101177223A publication Critical patent/CN101177223A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to an elevator device which is characterized in that an elevator cage and a counterweight arranged inside a lifting channel and suspension-lifted by a lifting cable are driven by a windlass; the windlass is arranged below the lifting channel; a second steering pulley and a first steering pulley are respectively arranged leftwards and rightwards below the windlass; the left end of the first steering pulley is positioned at the left side of the right end of the cable pulley; the right end of the second steering pulley is positioned at the right side of the left end of the cable pulley; and the lifting cable extending downwards from the right side of the cable pulley is steered to extend upwards after reaching at the left side of the first steering pulley and then reaches the elevator cage after passing through a third steering pulley and finally reaches the counterweight after passing through a fourth steering pulley. Therefore, the mounting operation and maintenance of the devices such as windlass can be achieved conveniently by standing on the elevator floor in the lifting channel.

Description

Lift facility
Technical field
The present invention relates to a kind of lift facility, wherein, have winch in hoist trunk, its lift car and counterbalanced weight move along the guide rail in the hoist trunk.
Background technology
As prior art, a kind of elevator that has winch in hoist trunk has been proposed, it is provided with deflection sheave near winch.
For example in patent documentation 1 disclosed lift facility, two deflection sheavies are arranged the below that is arranged on winch, after the hoist cable that extends towards the below from the both sides of the driving rope sheave of winch is wound on described two deflection sheavies respectively, be wound on the deflection sheave on top separately.
In addition, in patent documentation 2 disclosed lift facilities, two deflection sheavies are arranged the top that is arranged on winch, the hoist cable that extends towards the top from the both sides of the driving rope sheave of winch is wound on described two deflection sheavies respectively, and it regulates the winding angle of hoist cable on the driving rope sheave by changing these deflection sheavies with the diameter Relationship and the distance that drive between the rope sheave.
Patent documentation 1: the spy opens (Fig. 1, Fig. 2 and Fig. 4 etc.) 2004-26424 number
Patent documentation 2: No. 2004/050528 communique of international publication (Fig. 4 and Fig. 5 etc.)
, in above-mentioned patent documentation 1 and patent documentation 2 disclosed lift facilities, because winch and be positioned at the top that near it deflection sheave all is arranged on hoist trunk, so very inconvenient when installation exercise that carries out winch etc. and maintenance operation.
Summary of the invention
In view of the above problems, the object of the present invention is to provide a kind of lift facility of machine House-less, in this lift facility, may stand in installation exercise and the maintenance operation of carrying out winch etc. on the floor, elevator hole of hoist trunk easily.
To achieve these goals, lift facility of the present invention is constituted as, lift car that is suspended in midair by hoist cable in hoist trunk and counterbalanced weight are driven by the rope sheave of winch, wherein, below the middle body of described hoist trunk, winch is set, first deflection sheave and second deflection sheave are set below this winch, the axle of described first deflection sheave is positioned on the roughly the same position of the height on right side with respect to the axle of described second deflection sheave, the left end of described first deflection sheave is positioned at right-hand member than described rope sheave and keeps left on the position of side, and the right-hand member of described second deflection sheave is positioned on the left end position on the right side than described rope sheave, the described hoist cable that just extends down from the right side part of described rope sheave after extending the left part that arrives described first deflection sheave, turn to towards above extend, through arriving described lift car behind the 3rd deflection sheave on hoist trunk top, the described hoist cable that extends from the left part of described rope sheave towards the below after extending the right side part that arrives described second deflection sheave, turn to towards above extend, through arriving described counterbalanced weight behind the 4th deflection sheave on hoist trunk top.
(invention effect)
According to the present invention, a kind of lift facility of machine House-less can be provided, in this lift facility, may stand in installation exercise and the maintenance operation of carrying out winch etc. on the floor, elevator hole of hoist trunk easily.
Description of drawings
Fig. 1 is the schematic side view of hoist cable method for winding of the lift facility of expression the present invention first form of implementation.
Fig. 2 is the top plan view of hoist trunk of the lift facility of expression the present invention first form of implementation.
Fig. 3 is the schematic side view of hoist cable method for winding of the lift facility of expression the present invention second form of implementation.
Fig. 4 is the driver train schematic top plan view partly of the lift facility of expression the present invention second form of implementation.
Fig. 5 is the top plan view of hoist trunk of the elevator of expression the present invention second form of implementation.
Among the figure: the 1-lift car; The 2-counterbalanced weight; The 3-winch; The 4-rope sheave; 5,5a, 5b, 5c-hoist cable; The 6-hoist trunk; 7-first deflection sheave; 8-second deflection sheave; 9-the 3rd deflection sheave; 10-the 4th deflection sheave; 11-hoist trunk wall; 12,13-hoist cable fixed part; 14-underslung type pulley; 15-counterbalanced weight hoist cable pulley; 16a, 16b-lift car guide rail; 17a, 17b-counterbalanced weight guide rail; The 18-pedestal; 19-bottom deflection sheave; The 20-bolt; Floor, 21-elevator hole; 22-lift car deflection sheave; 23-counterbalanced weight deflection sheave.
The specific embodiment
Following with reference to description of drawings form of implementation of the present invention.
Fig. 1 is the partial schematic diagram of hoist cable 5 method for winding of the lift facility of expression the present invention first form of implementation.Fig. 2 is the top plan view of hoist trunk 6 of the elevator of this form of implementation.The lift facility of this form of implementation is constituted as, and lift car 1 is along lift car guide rail 16a, 16b lifting, and counterbalanced weight 2 is along counterbalanced weight guide rail 17a, 17b lifting.And lift car 1 and counterbalanced weight 2 are suspended in midair by three one group hoist cable 5, and are driven by the rope sheave 4 that is arranged on the winch 3 in the hoist trunk.
Be arranged in the moving area and the space between the hoist trunk wall 11 of lift car 1 on the position in the close elevator hole of winch 3 below hoist trunk 6 middle bodies.First deflection sheave 7 and second deflection sheave 8 are arranged on the below of this winch 3, the axle of first deflection sheave 7 is positioned on the roughly the same position of the height on right side with respect to the axle of the axle 8 of second deflection sheave, the left end of first deflection sheave 7 is positioned at right-hand member than rope sheave 4 and keeps left on the position of side, and the right-hand member of second deflection sheave 8 is positioned on the left end position on the right side than rope sheave 4.
At this, " right side " or " left side " among the present invention be meant respectively, from right side or the left side of winch 3 when the position observation winch 3 that axially (any one side at the front or the back side) separates.That is to say that the method for arranging of the machinery and equipment of the elevator in the hoist trunk of the present invention 6 also comprises the symmetrical method for arranging of layout with Fig. 1 etc. certainly.Therefore, in Fig. 1, comprise that the driver train of winch 3 and first deflection sheave 7 and second deflection sheave 8 also can be arranged near any wall in two the parallel walls among the figure.And, in this form of implementation, shown in the top plan view of Fig. 2, be that example describes near the situation of the wall setting of Fig. 1 top with driver train.
The method for winding of the hoist cable 5 in this form of implementation as shown in Figure 1.At first, side from the hoist cable 5 that rope sheave 4 extends towards the below obliquely in the mode of being partial to it, extend from turning to towards the top after the right side part of rope sheave 4 extends to the left part that reaches first deflection sheave 7, behind two the 3rd deflection sheavies 9 that are arranged on hoist trunk 6 tops, and arrive the hoist cable fixed part 12 on hoist trunks 6 tops via two the underslung type pulleys 14 that are arranged on lift car 1 bottom.And, the opposing party in the above-mentioned hoist cable 5 extends from the left part of rope sheave 4 to turn to towards the top after the right side part that arrives second deflection sheave 8 and extends, behind two the 4th deflection sheavies 10 that are arranged on hoist trunk 6 tops, and via the hoist cable fixed part 13 of the counterbalanced weight suspention that is arranged on counterbalanced weight 2 tops with arrival hoist trunk 6 tops, pulley 15 back.In addition, as shown in Figure 2, the vertical projection of the 3rd deflection sheave 9 is configured to the vertical projection approximate vertical with the vertical projection and the rope sheave 4 of the 4th deflection sheave 10.
In addition, first deflection sheave 7 and second deflection sheave 8 are arranged side by side on one-piece type pedestal 18, and the height of the axle of two pulleys is basic identical.At this, first deflection sheave 7 and second deflection sheave 8 are configured to and can regulate the position of these two pulleys by on the fixed part of the bearing of two pulleys a plurality of not shown bolts hole being set along the vertical direction.
And the winch 3 in this form of implementation is slim winch.At this, slim winch is meant that the radial dimension of winch framework profile is greater than the winch of axial width size.
According to this form of implementation, because first deflection sheave 7 and the 8 adjacent settings of second deflection sheave, so can be at the size b that on the direction of hoist trunk wall 11, dwindles the driver train single-piece horizontal direction that constitutes by winch 3 and first deflection sheave 7 and second deflection sheave 8.And, the winding angle of hoist cable 5 on rope sheave 4 can be set for greater than 180 °, because the raising of the friction force between rope sheave 4 and the hoist cable 5, so can improve driving efficiency.In addition, because in this form of implementation, the deadweight of hoist cable 5 acts on the rope sheave 4, thus with first deflection sheave 7 be not set below winch 3 compare with the structure of second deflection sheave 8, it is big to have the friction force that acts on the rope sheave 4, the advantage that driving efficiency is high.
And, in this form of implementation,, first deflection sheave 7 and second deflection sheave 8 be arranged on the highly essentially identical position because arranging, so can dwindle driver train single-piece size h up and down, that can reduce winch 3 cheats 21 height of starting at from elevator.In addition, owing to can on identical height and position, carry out the maintenance operation of winch 3 and first deflection sheave 7 and second deflection sheave 8, so also have the effect that can shorten working hours.
In addition, because driver train is arranged on the position in close elevator hole of hoist trunk 6 belows, so the pedestal 18 that can adopt bolt 20 that support driving mechanism is used is fixed on the floor 21 that elevator cheats, so can simplify the mounting structure of driver train.And, owing to carry out the installation exercise and the maintenance operation of driver train on the floor 21 in lift stand hole, so, even in the elevator that the Machine Room is not set, also can carry out the installation exercise and the maintenance operation of driver train easily.
As mentioned above, owing to can dwindle the lateral dimension b of driver train and size h up and down simultaneously, so help realizing the miniaturization of whole hoist trunk.And according to present embodiment, the occasion that is arranged on hoist trunk 6 tops with winch 3 is identical, because downward load acts on the rope sheave 4 from hoist cable 5, so, if according to design, when the top of hoist trunk 6 has been provided with winch 3, then can directly use this winch 3.And, owing to be arranged on the moving area of lift car 1 and the described winch 3 in the space between the hoist trunk wall 11 is slim winchs, so as shown in Figure 2, can design the wall of the elevator lobby opposition side of hoist trunk 6 and the interval between the lift car 1 narrower, therefore from the result, can further realize the miniaturization of hoist trunk 6.And, also can constitute driver train by being arranged in the moving area and the space between the hoist trunk wall 11 of lift car 1 on the position that the non-slim close elevator of winch 3 below the hoist trunk middle body cheated.
Followingly second form of implementation of the present invention is described with reference to Fig. 3 and Fig. 4 and Fig. 5.The integral structure of lift facility and first form of implementation are basic identical.Be that with the difference of first form of implementation as Fig. 3 and shown in Figure 5, with the below of the rope sheave 4 that is arranged on winch 3, a bottom deflection sheave 19 under being actually has replaced first deflection sheave 7 and second deflection sheave 8.In addition, same hoist cable (for example hoist cable 5a) be at the lower portion coiling secondary of bottom deflection sheave 19, so, as shown in Figure 4,, on bottom deflection sheave 19, be adjacent to be provided with two grooves with respect to a hoist cable.Owing to be that three hoist cables (5a, 5b and 5c) are provided with these grooves respectively, so offered 6 grooves on the bottom deflection sheave 19 altogether in regular turn.
The following method for winding that the hoist cable 5 of this form of implementation is described with reference to Fig. 3.At first, the left part that the side the hoist cable 5 that extends from rope sheave 4 towards the below extends arrival bottom deflection sheave 19 from the left part of rope sheave 4 turns to via groove afterwards and extends towards the top.Then, this hoist cable 5 is via two lift cars usefulness deflection sheavies 22 that are arranged on hoist trunk 6 tops, and two underslung type pulleys, the 14 back hoist cable fixed parts 12 that arrive hoist trunk 6 tops by being arranged on lift car 1 bottom.And the opposing party the hoist cable 5 that extends from rope sheave 4 towards the below extends to the right side part that reaches bottom deflection sheave 19 from the right side part of rope sheave 4, turns to the back to extend towards the top by other the groove beyond the described groove.Then, this hoist cable 5 with deflection sheave 23, and arrives the hoist cable fixed part 13 on hoist trunk 6 tops via two counterbalanceds weight that are arranged on hoist trunk 6 tops with pulley 15 backs by the counterbalanced weight suspention that is arranged on counterbalanced weight 2 tops.In addition, because the slightly larger in diameter of bottom deflection sheave 19 is in the diameter of rope sheave 4, so can prevent the hoist cables 5 of 19 extensions from each rope sheave 4 towards the bottom deflection sheave and produce interference from bottom deflection sheave 19 towards the 3rd deflection sheave 9 or between the hoist cable 5 of the 4th deflection sheave 10 extensions.
And, according to this form of implementation, owing to below winch 3, be provided with 1 bottom deflection sheave 19, thus with compare in transversely arranged above-mentioned first form of implementation that two deflection sheavies are set, can further dwindle the width dimensions of driver train single-piece lateral dimension b or base 18.

Claims (7)

1. lift facility is driven by the lift car of hoist cable suspention and the counterbalanced weight rope sheave by winch in hoist trunk,
Below the middle body of described hoist trunk, winch is set, first deflection sheave and second deflection sheave are set below this winch, the axle of described first deflection sheave is positioned on the roughly the same position of the height on right side with respect to the axle of described second deflection sheave, the left end of described first deflection sheave is positioned at right-hand member than described rope sheave and keeps left on the position of side, and the right-hand member of described second deflection sheave is positioned on the left end position on the right side than described rope sheave, the described hoist cable that just extends down from the right side part of described rope sheave after extending the left part that arrives described first deflection sheave, turn to towards above extend, through arriving described lift car behind the 3rd deflection sheave on hoist trunk top, the described hoist cable that extends from the left part of described rope sheave towards the below after extending the right side part that arrives described second deflection sheave, turn to towards above extend, through arriving described counterbalanced weight behind the 4th deflection sheave on hoist trunk top.
2. lift facility as claimed in claim 1 is characterized in that, described winch is positioned at the space in the space of the moving area of described lift car and hoist trunk between the walls.
3. lift facility as claimed in claim 1 is characterized in that, described winch is slim winch.
4. lift facility as claimed in claim 1 is characterized in that, described first deflection sheave and/or described second deflection sheave are configured to the position of its above-below direction and can regulate.
5. lift facility as claimed in claim 1 is characterized in that, described winch and described first deflection sheave and described second deflection sheave are arranged on the pedestal of one.
6. lift facility is driven by the lift car of hoist cable suspention and the counterbalanced weight rope sheave by winch in hoist trunk,
Below the middle body of described hoist trunk, winch is set, the bottom deflection sheave is set below this winch, the described hoist cable that extends towards the below from the left part of described rope sheave extends the left part that arrives described bottom deflection sheave, and turn to by groove the back towards above extend, arrive described lift car through the lift car on hoist trunk top after with deflection sheave, the described hoist cable that just extends down from the right side part of described rope sheave is after extending the right side part that arrives described bottom deflection sheave, turn to and extend by other the groove beyond the described groove, arrive described counterbalanced weight after with deflection sheave through the counterbalanced weight on hoist trunk top towards the top.
7. lift facility as claimed in claim 6 is characterized in that, the diameter of described bottom deflection sheave is greater than the diameter of described rope sheave.
CNA2007101371371A 2006-11-09 2007-07-30 Elevator equipment Pending CN101177223A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2006303471 2006-11-09
JP2006303471A JP2008120478A (en) 2006-11-09 2006-11-09 Elevator device

Publications (1)

Publication Number Publication Date
CN101177223A true CN101177223A (en) 2008-05-14

Family

ID=39403676

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101371371A Pending CN101177223A (en) 2006-11-09 2007-07-30 Elevator equipment

Country Status (2)

Country Link
JP (1) JP2008120478A (en)
CN (1) CN101177223A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103231972A (en) * 2013-04-25 2013-08-07 江门市蒙德电气股份有限公司 Novel driving structure of elevator
CN110436316A (en) * 2019-07-11 2019-11-12 日立电梯(中国)有限公司 Elevator device, carriage and its hanging mechanism

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018144977A (en) * 2017-03-07 2018-09-20 東芝エレベータ株式会社 Emergency machine-roomless elevator

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11228058A (en) * 1998-02-13 1999-08-24 Toshiba Corp Double deck elevator
JP2002504473A (en) * 1998-02-26 2002-02-12 オーチス エレベータ カンパニー Double sheave rope type elevator system using flat flexible rope
JP4223613B2 (en) * 1999-01-13 2009-02-12 三菱電機株式会社 Self-propelled elevator equipment
JP2004001919A (en) * 2002-05-30 2004-01-08 Otis Elevator Co Elevator device
JP2004026424A (en) * 2002-06-26 2004-01-29 Toshiba Elevator Co Ltd Elevator facility
JP2005075575A (en) * 2003-09-01 2005-03-24 Mitsubishi Electric Corp Elevator apparatus
JP2006001698A (en) * 2004-06-17 2006-01-05 Meidensha Corp Elevator apparatus

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103231972A (en) * 2013-04-25 2013-08-07 江门市蒙德电气股份有限公司 Novel driving structure of elevator
CN103231972B (en) * 2013-04-25 2016-04-20 江门市蒙德电气股份有限公司 A kind of drive configuration of elevator
CN110436316A (en) * 2019-07-11 2019-11-12 日立电梯(中国)有限公司 Elevator device, carriage and its hanging mechanism

Also Published As

Publication number Publication date
JP2008120478A (en) 2008-05-29

Similar Documents

Publication Publication Date Title
US8636115B2 (en) Hosting machine supporting frame for jump lifts of elevators
US8616340B2 (en) Elevator arrangement and method
CN110844743B (en) Skip-floor elevator and skip-floor method
JP5889412B2 (en) Elevator suspension structure and guide shoe structure
US20120090144A1 (en) Method for modernizing an elevator
WO2012156583A1 (en) Elevator arrangement
CN101801833A (en) Elevator and elevator arrangement
TW200900343A (en) Lift with two lift cages, which are disposed one above the other, in a shaft
EP1591405B9 (en) Elevator
JP4774429B2 (en) Elevator equipment
KR101335800B1 (en) Elevator device
CN101177223A (en) Elevator equipment
JP2010208822A (en) Elevator car
CN1789103B (en) Elevator device
JPWO2018225140A1 (en) Elevator
CN1833981B (en) Elevator system
CN100556790C (en) Lift facility
EP1717185B1 (en) Elevator
CN206437748U (en) Elevator
JP4914030B2 (en) Machine room-less elevator
US20170210598A1 (en) Elevator system
JP2006151673A (en) Elevator device without machine room
JP2006176286A (en) Elevator device
WO2001046059A1 (en) Juxtaposed elevator system
JP2006036531A (en) Elevator exclusively for ascent and descent

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 1115572

Country of ref document: HK

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20080514

REG Reference to a national code

Ref country code: HK

Ref legal event code: WD

Ref document number: 1115572

Country of ref document: HK