CN101144333A - Distributor for composite wall pouring and construction method thereof - Google Patents
Distributor for composite wall pouring and construction method thereof Download PDFInfo
- Publication number
- CN101144333A CN101144333A CNA2007101139488A CN200710113948A CN101144333A CN 101144333 A CN101144333 A CN 101144333A CN A2007101139488 A CNA2007101139488 A CN A2007101139488A CN 200710113948 A CN200710113948 A CN 200710113948A CN 101144333 A CN101144333 A CN 101144333A
- Authority
- CN
- China
- Prior art keywords
- concrete
- tripper
- distributor
- flow
- composite wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention relates to a distributor and a construction method used for pouring a composite wall body, and belongs to the building construction technology field. The invention comprises a splash proof enclosure (6), a filter (2), a supporting rack (3), a distributor (5) and a flow adjusting baffle (4), the splash proof enclosure (6) is a warehouse, the filter (2) is in a funnel shape, and is positioned in the middle part of the lower part of the splash proof enclosure (6), the feed opening of the filter (2) is supported through the supporting rack (3), the flow adjusting baffle (4) is arranged in the middle of a feed opening, the distributor (5) is arranged at the lower part of the flow adjusting baffle (4). The structure of the distributor is simple, the construction method is convenient and quick, an adjusting baffle is arranged at the feed opening of the distributor, to control the flow of the concrete feeding on the both sides, the honeycomb and the spongy surface phenomenon are effectively prevented, the polystyrene insulation board has no deformation and no displacement, and the high quality composite wall body is guaranteed.
Description
Technical field
Distributor for composite wall pouring and job practices belong to technical field of building construction.
Background technology
Energy conservation is the common objective in the China and the world, the national requirements new building is energy-conservation at present must reach more than 60%, in order to realize above-mentioned target, the method that adopts in the building field is to add in the inclined to one side middle part of construction wall to have certain thickness polystyrene thermal insulation plate, is made into the CL combined wall.The job practices of prior art is to utilize concrete delivery pump pipe directly to inject concrete, because the spacing of polystyrene thermal insulation plate both sides does not wait, easily cause concreting height tolerance in polystyrene thermal insulation plate both sides big, concrete lateral pressure causes polystyrene thermal insulation plate distortion, the displacement in the CL combined wall, cause both sides concrete thickness dimensional errors bigger, honeycomb, pitted skin phenomenon very easily occur, can not guarantee main body concrete structure quality.
Summary of the invention
The technical problem to be solved in the present invention is: overcome the problem that prior art exists, provide a kind of simple in structure, easy to install, can replace delivery pump pipe directly to inject concrete distributor for composite wall pouring and job practices.
The technical solution adopted for the present invention to solve the technical problems is: this distributor for composite wall pouring, it is characterized in that: comprise splash-proof enclosure, strainer, support, tripper, Flow-rate adjustment plate washer, splash-proof enclosure is a storage bin, strainer is a funnel-form, be installed in middle part, splash-proof enclosure bottom, the strainer feed opening passes through stent support, the middle partially Flow-rate adjustment plate washer of installing of feed opening, and tripper is installed in the below of Flow-rate adjustment plate washer.
The Flow-rate adjustment plate washer is provided with gear, and regulating handle is installed on the axle of Flow-rate adjustment plate washer.
Tripper top is horn shape.Effect is that the bottom is buckled on the polystyrene thermal insulation plate in the CL combined wall, utilizes tripper top horn shape when the composite wall pouring concrete, and concrete is assigned to the polystyrene thermal insulation plate both sides.
Strainer is a screen pack.Filtration.
The effect of splash-proof enclosure is to prevent that mud from spattering outward, the effect of tripper 5 guarantees the concrete proper flow in both sides, be poured into building in the space separately, the effect of Flow-rate adjustment handle is if undesired flowing, tilt by regulating the Flow-rate adjustment plate washer, concrete pouring material is flowed by building requirement, realized the controlled of concrete pouring material, effectively guarantee concrete pouring quality.
Utilize the job practices of above-mentioned distributor for composite wall pouring to be: to comprise the operating platform installation, go into the mould tripper and install that pumping of concrete injects tripper, both sides blanking flow-control, composite wall pouring, concrete leveling.
Preferred job practices is:
A, indoor utilization have been pricked and have been established the cast-in-place template die plate that finishes as operating platform, and the skin periphery utilizes external scaffolding to prick and establishes interim operating platform, and it is highly with indoor cast-in-place template die plate height;
B, tripper is installed on operating platform, during installation, angle type tripper below must be perpendicular to body of wall, and is stuck on the polystyrene thermal insulation plate, and the concrete outlet in tripper two outsides must coincide with polystyrene thermal insulation plate both sides concrete thickness;
C, utilize concrete pump that concrete is injected tripper;
D, the concrete blanking flow in adjusting tripper plate washer control polystyrene thermal insulation plate both sides;
E, concrete blanking point are located at an end of every grade of body of wall, begin one-time-concreting to the top from an end, move on to next grade blanking point then, progressively advance according to this;
F, concreting are used artificial levelling after design elevation, wood float is rubbed hair with the hands.
Operating principle:
In combined wall construction owing to adopted tripper, this tripper is according to the polystyrene thermal insulation plate both sides concreting thickness of design, weld the tripper that a top is a horn shape in feed hopper bottom, make it be infused in concrete in the hopper, be injected into the both sides of polystyrene thermal insulation plate equably through tripper, for preventing both sides concrete blanking inequality, cause the concrete blanking in both sides highly inconsistent, add a manual Flow-rate adjustment plate washer on tripper top, in order to the concrete blanking flow in control polystyrene thermal insulation plate both sides, for entering body of wall, the aggregate that prevents big specification causes mass defect, add a reinforcing bar screen pack (it filters mesh and is of a size of 50 * 50mm) on Flow-rate adjustment baffle plate top, this net has not only filtered concrete, and play cushioning effect, reduced owing to impact the huge lateral pressure that p-poly-phenyl ethene warming plate produces, can control the flow of self-compacting concrete effectively, the concrete blanking in polystyrene thermal insulation plate both sides highly is consistent, avoid the both sides concrete discrepancy in elevation to occur and cause the polystyrene thermal insulation plate metaboly, guaranteed wall quality.
Compared with prior art, distributor for composite wall pouring of the present invention and the beneficial effect that job practices had are: distributor for composite wall pouring is simple in structure, easy to install, the feed opening place establishes a controllable register, in order to control the flow of its both sides concrete blanking, regulate and adopt outside regulating handle to control, effectively prevent honeycomb, pitted skin phenomenon, polystyrene thermal insulation plate is indeformable, be not shifted, the polystyrene thermal insulation plate both sides are concrete flows smoothly, can effectively guarantee concrete pouring quality.Utilize tripper to carry out the job practices of combined wall, flow is controlled, can build high-quality CL combined wall.Realize purpose of energy saving.
Description of drawings
Fig. 1 is the main TV structure schematic diagram of the embodiment of the invention;
Fig. 2 is Flow-rate adjustment plate washer axle and the gear structural representation of Fig. 1;
Fig. 3 is the lateral view of Fig. 2.
Fig. 1-the 3rd, the most preferred embodiment of distributor for composite wall pouring of the present invention.Wherein 1 handle, 2 strainers, 3 supports, 4 Flow-rate adjustment plate washers, 5 trippers, 6 splash-proof enclosures, 7 Flow-rate adjustment handles, 8 gears.
The specific embodiment
With reference to Fig. 1-3:
This distributor for composite wall pouring, comprise splash-proof enclosure 6, strainer 2, support 3, tripper 5, Flow-rate adjustment plate washer 4, splash-proof enclosure 6 is a storage bin, strainer 2 is a funnel-form, be installed in middle part, splash-proof enclosure 6 bottom, strainer 2 feed openings support by support 3, the middle partially Flow-rate adjustment plate washer 4 of installing of feed opening, and tripper 5 is installed in the below of Flow-rate adjustment plate washer 4.Flow-rate adjustment plate washer 4 is provided with gear 8, and Flow-rate adjustment handle 7 is installed on the axle of Flow-rate adjustment plate washer 4.Tripper 5 tops are horn shape, lower vertical.Strainer 2 is a screen pack.
Splash-proof enclosure 6 adopts 3mm steel plate ∠ 40 * 4 angle steel to be welded, splash-back is established at its top, prevent that concrete from spilling, strainer 2 is a funnel-form, adopt the screen pack of 50 * 50mm mesh, screen pack 2 has not only filtered the bigger aggregate of specification in the concrete, and pumping of concrete is gone into mould played cushioning effect, guaranteed the concrete proper flow in both sides, the feed opening place establishes a flow controllable register 4, in order to control the flow of its both sides concrete blanking, regulate and adopt Flow-rate adjustment handle 7 to control, can effectively guarantee concrete pouring quality.
The job practices of combined wall is:
Operating platform is installed, and------pumping of concrete injects tripper---both sides blanking flow-control---composite wall pouring---concrete leveling to go into the installation of mould tripper
Preferred job practices is:
A, indoor utilization have been pricked and have been established the cast-in-place template die plate that finishes as operating platform; The skin periphery utilizes external scaffolding to prick and establishes interim operating platform, and it is highly with indoor cast-in-place template die plate height;
B, tripper is installed on operating platform, during installation, angle type tripper below must be perpendicular to body of wall, and is stuck on the polystyrene thermal insulation plate, and the concrete outlet in tripper two outsides must be coincide with polystyrene thermal insulation plate both sides concrete thickness;
C, utilize concrete pump that concrete is injected tripper, replaced the casting method of pumping directly into mould, splash-back 6 is established at its top of this utensil, prevent that concrete from spilling, the screen pack 2 (adopting Φ 12 reinforcing bars to be welded) of 50 * 50mm mesh is established in inside, screen pack 2 has not only filtered the bigger aggregate of specification in the concrete, and pumping of concrete is gone into mould played cushioning effect, has guaranteed the concrete proper flow in both sides;
D, for preventing both sides concrete blanking inequality, cause the concrete blanking in both sides highly inconsistent, utilize Flow-rate adjustment handle 7, regulate the concrete blanking flow in Flow-rate adjustment plate washer 4 control polystyrene thermal insulation plate both sides on tripper 5 tops, effectively control polystyrene thermal insulation plate both sides are built highly consistent, stop to be out of shape, to be shifted because of concrete lateral pressure causes the system polystyrene thermal insulation plate in the combined wall, it is bigger both sides concrete thickness dimensional errors to occur, influences the phenomenon of main body concrete structure quality.
When building, for the lateral pressure that prevents concreting causes door and window hole distortion displacement, the door and window hole bilateral symmetry is built.
E, concrete blanking point are located at an end of every grade of concrete wall, begin one-time-concreting to the top from an end, move on to next blanking point then, progressively advance according to this; When building, measure the concrete height of building in both sides with the chi bar at any time, it is highly consistent to keep both sides to build.
Claims (6)
1. distributor for composite wall pouring, it is characterized in that: comprise splash-proof enclosure (6), strainer (2), support (3), tripper (5), Flow-rate adjustment plate washer (4), splash-proof enclosure (6) is a storage bin, strainer (2) is a funnel-form, be installed in splash-proof enclosure (6) middle part, bottom, strainer (2) feed opening supports by support (3), the middle partially Flow-rate adjustment plate washer (4) of installing of feed opening, and tripper (5) is installed in the below of Flow-rate adjustment plate washer (4).
2. distributor for composite wall pouring according to claim 1 is characterized in that: Flow-rate adjustment plate washer (4) is provided with gear (8), and regulating handle (7) is installed on the axle of Flow-rate adjustment plate washer (4).
3. distributor for composite wall pouring according to claim 1 is characterized in that: tripper (5) top is horn shape.
4. distributor for composite wall pouring according to claim 1 is characterized in that: strainer (2) is a screen pack.
5. the job practices of utilizing distributor for composite wall pouring according to claim 1 is characterized in that: comprise the operating platform installation, go into the mould tripper and install, pumping of concrete injects tripper, both sides blanking flow-control, composite wall pouring, concrete leveling.
6. the job practices of utilizing distributor for composite wall pouring according to claim 5 is characterized in that:
A, indoor utilization have been pricked and have been established the cast-in-place template die plate that finishes as operating platform, and the skin periphery utilizes external scaffolding to prick and establishes interim operating platform, and it is highly with indoor cast-in-place template die plate height;
B, tripper is installed on operating platform, during installation, angle type tripper below must be perpendicular to body of wall, and is stuck on the polystyrene thermal insulation plate, and the concrete outlet in tripper two outsides must coincide with polystyrene thermal insulation plate both sides concrete thickness;
C, utilize concrete pump that concrete is injected tripper;
D, the concrete blanking flow in adjusting tripper plate washer control polystyrene thermal insulation plate both sides;
E, concrete blanking point are located at an end of every grade of body of wall, begin one-time-concreting to the top from an end, move on to next grade blanking point then, progressively advance according to this;
F, concreting are used artificial levelling after design elevation, wood float is rubbed hair with the hands.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2007101139488A CN100449095C (en) | 2007-10-18 | 2007-10-18 | Distributor for composite wall pouring and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2007101139488A CN100449095C (en) | 2007-10-18 | 2007-10-18 | Distributor for composite wall pouring and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101144333A true CN101144333A (en) | 2008-03-19 |
CN100449095C CN100449095C (en) | 2009-01-07 |
Family
ID=39207045
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2007101139488A Active CN100449095C (en) | 2007-10-18 | 2007-10-18 | Distributor for composite wall pouring and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100449095C (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103075012A (en) * | 2013-01-25 | 2013-05-01 | 山东大学 | Concrete funnel capable of orienting and controlling flow speed |
CN105421782A (en) * | 2015-11-16 | 2016-03-23 | 黄淮学院 | Concrete flow divider |
CN106081788A (en) * | 2016-08-26 | 2016-11-09 | 天津利福特电梯部件有限公司 | Elevator counterweight block shell |
CN107245862A (en) * | 2017-07-27 | 2017-10-13 | 无锡小天鹅股份有限公司 | Liquid header and clothes treatment device |
CN108272259A (en) * | 2016-08-11 | 2018-07-13 | 海宁金茂五金有限公司 | Modified form paint finishing |
CN109555318A (en) * | 2018-12-27 | 2019-04-02 | 中建二局第二建筑工程有限公司 | Concrete distribution device for pouring heat-preservation integrated wall and pouring method thereof |
CN110451281A (en) * | 2019-08-14 | 2019-11-15 | 无锡雪浪环境科技股份有限公司 | A kind of feed inlet sub-material antispraying structure |
CN111139945A (en) * | 2020-01-09 | 2020-05-12 | 河南省育兴建设工程管理有限公司 | Cast-in-place concrete heat-insulating wall structure and construction method |
CN114811204A (en) * | 2022-06-21 | 2022-07-29 | 中国二十二冶集团有限公司 | Concrete placement is with dividing ware |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2825044B1 (en) * | 2001-05-23 | 2003-08-15 | Jerome Pousse | DEVICE FOR DISTRIBUTING A PREDETERMINED CONCRETE DOSE WITHIN A MOLD, ESPECIALLY FOR THE MANUFACTURE OF SIDING TILES |
FR2874950B1 (en) * | 2004-09-09 | 2006-10-27 | Francois George | INSULATING FORMWORK FOR REALIZING CONCRETE WALLS |
CN100357604C (en) * | 2006-01-23 | 2007-12-26 | 三一重工股份有限公司 | Distributing valve for concrete pump |
-
2007
- 2007-10-18 CN CNB2007101139488A patent/CN100449095C/en active Active
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103075012A (en) * | 2013-01-25 | 2013-05-01 | 山东大学 | Concrete funnel capable of orienting and controlling flow speed |
CN105421782A (en) * | 2015-11-16 | 2016-03-23 | 黄淮学院 | Concrete flow divider |
CN105421782B (en) * | 2015-11-16 | 2017-09-22 | 黄淮学院 | A kind of concrete current divider |
CN108272259A (en) * | 2016-08-11 | 2018-07-13 | 海宁金茂五金有限公司 | Modified form paint finishing |
CN106081788A (en) * | 2016-08-26 | 2016-11-09 | 天津利福特电梯部件有限公司 | Elevator counterweight block shell |
CN107245862A (en) * | 2017-07-27 | 2017-10-13 | 无锡小天鹅股份有限公司 | Liquid header and clothes treatment device |
CN107245862B (en) * | 2017-07-27 | 2019-09-17 | 无锡小天鹅电器有限公司 | Liquid header and clothes treatment device |
CN109555318A (en) * | 2018-12-27 | 2019-04-02 | 中建二局第二建筑工程有限公司 | Concrete distribution device for pouring heat-preservation integrated wall and pouring method thereof |
CN109555318B (en) * | 2018-12-27 | 2024-06-04 | 中建二局第二建筑工程有限公司 | Concrete distribution device for pouring heat-insulating integrated wall and pouring method thereof |
CN110451281A (en) * | 2019-08-14 | 2019-11-15 | 无锡雪浪环境科技股份有限公司 | A kind of feed inlet sub-material antispraying structure |
CN111139945A (en) * | 2020-01-09 | 2020-05-12 | 河南省育兴建设工程管理有限公司 | Cast-in-place concrete heat-insulating wall structure and construction method |
CN114811204A (en) * | 2022-06-21 | 2022-07-29 | 中国二十二冶集团有限公司 | Concrete placement is with dividing ware |
Also Published As
Publication number | Publication date |
---|---|
CN100449095C (en) | 2009-01-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100449095C (en) | Distributor for composite wall pouring and construction method thereof | |
CN103806646B (en) | Early-dismantling construction method for three-dimensional space size-adjustable template | |
CN207841701U (en) | The pouring mechanism of pipe pile die | |
CN102389657B (en) | Continuous sand filtration apparatus | |
CN201106285Y (en) | Concreting mold-entering distributor | |
CN104128029A (en) | Wastewater filtering and recycling device for water-jetting loom | |
CN205875479U (en) | Concrete insulation curtain wall concrete casting aggregate separator | |
CN202342963U (en) | Continuous type sand filtration equipment | |
CN207775935U (en) | City piping lane pre-buried channel flow mounting device | |
CN102287054B (en) | Hanging-type graded concrete converter | |
CN201292672Y (en) | Mold-entering distributor for construction | |
CN102635237B (en) | Method for pouring ABR (Acrylate Butadience Rubber) reaction tank baffle | |
CN203650687U (en) | Integral cast filter plate mould | |
CN206376557U (en) | Heavy grade Sloping roof concrete casting device | |
CN208266936U (en) | A kind of prefabricated board sky ditch vibration isolation measure | |
CN201609613U (en) | Inclined-tube sedimentation tank used for sewage treatment | |
CN201962948U (en) | Concrete beam pouring template with embedded part at top | |
CN202187560U (en) | Hanging type grading concrete converter | |
CN206103481U (en) | Filtering pond aqueous vapor distributor | |
CN110124385A (en) | A kind of filter tank | |
CN221398939U (en) | Building reinforcing deviation correcting grouting composite foundation | |
CN219840389U (en) | Irrigation device for civil engineering construction | |
CN219622358U (en) | Assembled supporting system for post-pouring belt part | |
CN204728698U (en) | The closed formwork structure of a kind of concrete suspension bridging piece | |
CN201658877U (en) | Novel water distribution device of filter tank |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |