CN101100861A CNA2006100882888A CN200610088288A CN101100861A CN 101100861 A CN101100861 A CN 101100861A CN A2006100882888 A CNA2006100882888 A CN A2006100882888A CN 200610088288 A CN200610088288 A CN 200610088288A CN 101100861 A CN101100861 A CN 101100861A
Authority
CN
China
Prior art keywords
cushion cap
variable cross
inserts
section
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2006100882888A
Other languages
Chinese (zh)
Inventor
杨建安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2006100882888A priority Critical patent/CN101100861A/en
Publication of CN101100861A publication Critical patent/CN101100861A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

This is a construction method of an assembled crane foot which substitutes traditional concrete structure by a combination of filling stuffs and a support platform of different section. The new structure is disassemble for reuse.

Description

A kind of construction method of detachable tower foundation and structure thereof
Technical field
The present invention relates to the construction method and the structure of column foots such as all kinds of overweight tower cranes of building that need load-bearing or play supporting, electric power tower, communications tower, especially a kind of construction method and structure thereof of the removable and cantilevered hoist tower base class tower being convenient to reuse, specifically a kind of construction method of detachable tower foundation and structure thereof.
Background technology
As everyone knows, in order to carry constructional materials to high level, some lifting tower cranes all need be built in each building site.Because lifting appliance belongs to special equipment, its safety requirements height, therefore person in charge's parts such as building, safety, quality inspection all have strict requirement to its installation, use, operation, wherein most critical is the installation on basis, because it is directly connected to the safe operation of crane gear, the column foot that requires crane gear is installed has very strong withstand voltage and resistance to capsizing, and designs part from security consideration, and its safety factor is generally all bigger.Thereby existing column foot all adopts steel bar concrete to add the structure of anchor pole, this manufacture method and structure one are that disposable input is bigger, tower crane for 40-80T/M, ten thousand yuan of the general equal 3-7 of its column foot input, and can not reuse, after engineering finishes, the column foot of building that spends huge sums will go out of use, and its cleaning difficulty is also quite big, generally all it is arranged on the position that does not influence normal performance of other function of building and expansion when therefore designing; The 2nd, the construction period is long, when adopting the concrete structure, because 28 days intensity level need detect in safety supervision department, body of the tower could be installed after qualified, and the manufacturing again of defective then need so not only has a strong impact on the construction period, and influences the reasonable use in place.
Summary of the invention
The objective of the invention is at the construction period of existing all kinds of hoist towers, load-bearing tower, supporting tower, the existence of support tower column foot long, and not reproducible utilization, waste serious problem, analyzing the main stressed of column foot, the construction method and the structure thereof of inventing a kind of detachable tower foundation on the basis of positive pressure.
Technical scheme of the present invention is:
A kind of construction method of detachable tower foundation is characterized in that it may further comprise the steps:
At first, on the ground of need installation column foot, dig a foundation ditch by designing requirement;
Secondly, or be installed in the foundation ditch the variable cross-section cushion cap is all or part of earlier, in the foundation ditch around the variable cross-section cushion cap, add inserts again; Or in foundation ditch, add earlier inserts, and then the variable cross-section cushion cap is installed on its surface;
At last, the bottom with tower links to each other with the cushion cap piece of the variable cross-section cushion cap the superiors.
The tower-base structure that matches with said method of the present invention is:
A kind of detachable building column foot comprises foundation ditch, inserts, variable cross-section cushion cap, and inserts is filled in the foundation ditch, it is characterized in that described variable cross-section cushion cap or all is arranged on the bearing stratum that meets load bearing requirements of foundation ditch, is filled with inserts around it; Or all being positioned at the foundation ditch surface, its undermost cushion cap piece is installed in the upper surface of the inserts that meets load bearing requirements; Or part is arranged in foundation ditch, and part is positioned at outside the foundation ditch, and the lower support of described variable cross-section cushion cap is meeting on the inserts bearing stratum of load bearing requirements, be arranged in foundation ditch the variable cross-section cushion cap around be filled with inserts; The cushion cap piece of the described variable cross-section cushion cap the superiors links to each other with the bottom of tower.
Described inserts is sandstone material, prefabricated section or the body structure that sand, building stones are housed.
Described prefabricated section is for having interlocking structure metal derby, cement block or cement steel prefabricated section.
Described prefabricated section links to each other by connecting rod, and the described body structure that sand, building stones are housed also links to each other by connecting rod.
Described variable cross-section cushion cap is connected with the anchor pole that inserts in the inserts.
The cushion cap piece of described variable cross-section cushion cap is rectangle, square, triangle, equilateral triangle, circle, polygon or its combination that size changes in gradient.
Described variable cross-section cushion cap or be monolithic construction, or split-type structural for linking to each other and form by some cushion cap pieces.
Described variable cross-section cushion cap or be solid, or be the hollow body of frame construction.
Be provided with reinforcing rib in the described frame construction.
The framework that is used to load inserts is installed in the described foundation ditch.
The present invention has the following advantages:
1, easy accessibility cuts the waste.
2, can shorten construction period.
3, the fabricating yard is unaffected, after especially use finishes, can easily foundation ditch be removed and recover former state.
4, safe and reliable, because the bottom active force of tower crane passes through the repeatedly transmission of variable cross-section cushion cap, its effect final and ground is repeatedly decomposed, no matter be that the normal pressure or the power of toppling are all very little, can not cause sinking of ground or inclination.Especially when the variable cross-section cushion cap is installed in the foundation ditch, rely on the active force of inserts and the pulling force of anchor pole can satisfy instructions for use fully, the overturning or slip resistance analysis bearing diagonal that adds when adding the tower crane installation and the effect of the girt that links to each other with wall, unstable active force on the tower crane is less, and therefore removable structure of the present invention can satisfy safety requirements fully.
5, relatively simple for structure, sandstone material cost is lower, and can reuse, and prefabricated section have once drop into reusable, and install, dismantle very convenient, buckle structure design by prefabricated section itself or install mode such as connecting rod that each prefabricated section is connected into is as a whole, its carrying and resistance to capsizing are stronger.
6, purposes is wide, not only can be used for common building lifting column foot, and can be used for the often column foot of mounting or dismounting of needs such as electric power, communication, advertisement, is particularly suitable for the building site, crosses the column foot that work-yards are often changed in street advertisement etc.
Description of drawings
Fig. 1 is one of structural representation of the present invention.
Fig. 2 is two of a structural representation of the present invention.
Fig. 3 is three of a structural representation of the present invention.
Fig. 4 is the plan structure schematic diagram of several variable cross-section cushion caps of the present invention.
Fig. 5 is the buckle structure schematic diagram of prefabricated section of the present invention.
Fig. 6 is the structural representation of cushion cap piece of the present invention.
Fig. 7 is the structural representation of hollow cushion cap piece of the present invention.
The specific embodiment
The present invention is further illustrated for following structure drawings and Examples.
Embodiment one
Shown in Fig. 1,4,5,6,7.
A kind of construction method of detachable building lifting column foot, it may further comprise the steps:
At first, on the ground of need installation column foot, dig a foundation ditch 1 by designing requirement;
Secondly earlier variable cross-section cushion cap 2 is installed in the foundation ditch 1, in the foundation ditch 1 around the variable cross-section cushion cap 2, adds inserts 3 again.Inserts 3 can be the sandstone material, also can be prefabricated section shown in Figure 4.
At last, the bottom with hoist tower links to each other with the cushion cap piece of variable cross-section cushion cap 2 the superiors.And then mounting method installs diagonal brace 8 additional and progressively upwards connects body of the tower routinely.
The structure of utilizing the concrete detachable building lifting column foot that said method makes as shown in Figure 1, it comprises foundation ditch 1, inserts 3, variable cross-section cushion cap 2, inserts 3 is filled in the foundation ditch 1, described variable cross-section cushion cap 2 all is arranged on the bearing stratum that meets load bearing requirements 7 of foundation ditch 1, the part that this bearing stratum 7 can be used as ground is handled when digging foundation ditch 1 synchronously, even when removing, its waste is also limited, can not exert an influence to the building land used, bearing stratum 7 also can utilize inserts 3 to carry out compaction process and form, being filled with inserts 3 around variable cross-section cushion cap 2 (can adopt the sandstone material or sand is housed, the body structure of building stones, also can adopt the metal derby of buckle structure with lock shown in Figure 5, cement block or cement steel prefabricated section, work as metal derby, when cement block or cement steel prefabricated section do not adopt buckle structure, also can adopt the method that installs connecting rod with all metal derbies, cement block or cement steel prefabricated section are linked to be an integral body), the cushion cap piece of variable cross-section cushion cap 2 the superiors links to each other with the bottom of hoist tower 5.
For bearing capacity and the anti-roll capability that increases the variable cross-section cushion cap, also can on the variable cross-section cushion cap, connect anchor pole, earlier anchor pole 4 is inserted in the inserts 3.
During concrete enforcement, the shape and size of the cushion cap piece of variable cross-section cushion cap 2 can adopt one or more the combination in square that size shown in Figure 4 changes in gradient, equilateral triangle, the flange shape.Can link to each other by bolt or buckle structure between every layer of cushion cap piece.
Variable cross-section cushion cap 2 can be monolithic construction, also can be the split-type structural that is linked to each other and formed by some cushion cap pieces, and variable cross-section cushion cap 2 both can be solid, also can be the hollow body of frame construction, as shown in Figure 6.When adopting frame construction, can in adding, set up by frame reinforcing rib 6, as Fig. 7.
During concrete enforcement,, also it can be filled in a framework in order to improve the overall performance of inserts in the foundation ditch.
Embodiment two
Shown in Fig. 2,4,5,6,7.
A kind of construction method of detachable building lifting column foot, it may further comprise the steps:
At first, on the ground of need installation column foot, dig a foundation ditch 1 by designing requirement;
Secondly, filling inserts 3 and compacting make it meet load bearing requirements in foundation ditch 1, again variable cross-section cushion cap 2 is installed on the upper surface of inserts 3, must the time should increase the contact force of variable cross-section cushion cap 2 and filling material 3, increase resistance to capsizing by the method that installs anchor pole 4 additional;
At last, the bottom with hoist tower links to each other with the cushion cap piece of variable cross-section cushion cap 2 the superiors.And then mounting method installs diagonal brace 8 additional and progressively upwards connects body of the tower routinely.
The structure of utilizing the concrete detachable building lifting column foot that said method makes as shown in Figure 2, it comprises foundation ditch 1, inserts 3, variable cross-section cushion cap 2, inserts 3 is filled in the foundation ditch 1, described variable cross-section cushion cap 2 is positioned on the upper surface of foundation ditch 1 and is carried on the inserts 3, the surface of inserts 3 should make it to meet load bearing requirements and forms on the bearing stratum 7 through handling, inserts 3 can adopt the sandstone material or sand is housed, the body structure of building stones, also can adopt the metal derby of buckle structure with lock shown in Figure 5, cement block or cement steel prefabricated section, work as metal derby, when cement block or cement steel prefabricated section do not adopt buckle structure, also can adopt the method that installs connecting rod with all metal derbies, cement block or cement steel prefabricated section are linked to be an integral body; The cushion cap piece of variable cross-section cushion cap 2 the superiors links to each other with the bottom of hoist tower 5.
For bearing capacity and the anti-roll capability that increases the variable cross-section cushion cap, also can on the variable cross-section cushion cap, connect anchor pole, earlier anchor pole 4 is inserted in the inserts 3.
During concrete enforcement, the shape and size of the cushion cap piece of variable cross-section cushion cap 2 can adopt one or more the combination in square that size shown in Figure 4 changes in gradient, equilateral triangle, the flange shape.Can link to each other by bolt or buckle structure between every layer of cushion cap piece.
Variable cross-section cushion cap 2 can be monolithic construction, also can be the split-type structural that is linked to each other and formed by some cushion cap pieces, and variable cross-section cushion cap 2 both can be solid, also can be the hollow body of frame construction, as shown in Figure 6.When adopting frame construction, can in adding, set up by frame reinforcing rib 6, as Fig. 7.
During concrete enforcement,, also it can be filled in a framework in order to improve the overall performance of inserts in the foundation ditch.
Embodiment three
Shown in Fig. 3,4,5,6,7.
A kind of construction method of detachable building lifting column foot, it may further comprise the steps:
At first, on the ground of need installation column foot, dig a foundation ditch 1 by designing requirement;
Secondly, in foundation ditch 1, load inserts 3 to setting height and compacting formation one and meet the bearing stratum 7 of load bearing requirements again with variable cross-section cushion cap 2 installation bearing stratums 7, must the time also can increase the contact force of variable cross-section cushion cap 2 and filling material 3 by the method that installs anchor pole 4 additional, increase resistance to capsizing, and then in the foundation ditch 1 around the variable cross-section cushion cap 2, add the upper surface place of inserts 3 to foundation ditch 1;
At last, the bottom with hoist tower links to each other with the cushion cap piece of variable cross-section cushion cap 2 the superiors.And then mounting method installs diagonal brace 8 additional and progressively upwards connects body of the tower routinely.
The structure of utilizing the concrete detachable building lifting column foot that said method makes as shown in Figure 3, it comprises foundation ditch 1, inserts 3, variable cross-section cushion cap 2, inserts 3 is filled in the foundation ditch 1, the part of described variable cross-section cushion cap 2 is arranged in foundation ditch 1, another part stretches out foundation ditch 1, the bottom surface of variable cross-section cushion cap 2 is bearing on the bearing stratum 7 that is formed by inserts 3 processing compactings in the foundation ditch 1, inserts 3 can adopt the sandstone material or sand is housed, the body structure of building stones, also can adopt the metal derby of buckle structure with lock shown in Figure 5, cement block or cement steel prefabricated section, work as metal derby, when cement block or cement steel prefabricated section do not adopt buckle structure, also can adopt the method that installs connecting rod with all metal derbies, cement block or cement steel prefabricated section are linked to be an integral body; The cushion cap piece of variable cross-section cushion cap 2 the superiors links to each other with the bottom of hoist tower 5.
For bearing capacity and the anti-roll capability that increases the variable cross-section cushion cap, also can on the variable cross-section cushion cap, connect anchor pole, earlier anchor pole 4 is inserted in the inserts 3.
During concrete enforcement, the shape and size of the cushion cap piece of variable cross-section cushion cap 2 can adopt one or more the combination in square that size shown in Figure 4 changes in gradient, equilateral triangle, the flange shape.Can link to each other by bolt or buckle structure between every layer of cushion cap piece.
Variable cross-section cushion cap 2 can be monolithic construction, also can be the split-type structural that is linked to each other and formed by some cushion cap pieces, and variable cross-section cushion cap 2 both can be solid, also can be the hollow body of frame construction, as shown in Figure 6.When adopting frame construction, can in adding, set up by frame reinforcing rib 6, as Fig. 7.
During concrete enforcement,, also it can be filled in a framework in order to improve the overall performance of inserts in the foundation ditch.
Assembly and disassembly methods of the present invention is opposite with mounting method.
Part that the present invention does not relate to is same as the prior art.
Embodiments of the invention are that example is described with building lifting column foot only, but are not limited only to build the lifting column foot, and all employing detachable tower foundation structures all are considered to belong among protection scope of the present invention as tower class ground.

Claims (10)

1, a kind of construction method of detachable tower foundation is characterized in that it may further comprise the steps:
At first, on the ground of need installation column foot, dig a foundation ditch by designing requirement;
Secondly, or be installed in the foundation ditch the variable cross-section cushion cap is all or part of earlier, in the foundation ditch around the variable cross-section cushion cap, add inserts again; Or in foundation ditch, add earlier inserts, and then the variable cross-section cushion cap is installed on its surface;
At last, the bottom with tower links to each other with the cushion cap piece of the variable cross-section cushion cap the superiors.
2, a kind of detachable tower foundation comprises foundation ditch, inserts, variable cross-section cushion cap, and inserts is filled in the foundation ditch, it is characterized in that described variable cross-section cushion cap or all is arranged on the bearing stratum that meets load bearing requirements of foundation ditch, is filled with inserts around it; Or all being positioned at the foundation ditch surface, its undermost cushion cap piece is installed in the upper surface of the inserts that meets load bearing requirements; Or part is arranged in foundation ditch, and part is positioned at outside the foundation ditch, be arranged in foundation ditch the variable cross-section cushion cap around be filled with inserts; The cushion cap piece of the described variable cross-section cushion cap the superiors links to each other with the bottom of tower.
3, detachable tower foundation according to claim 2 is characterized in that described inserts is sandstone material, prefabricated section or the body structure that sand, building stones are housed.
4, detachable tower foundation according to claim 3 is characterized in that described prefabricated section is for having interlocking structure metal derby, cement block or cement steel prefabricated section.
5, detachable tower foundation according to claim 3 is characterized in that described prefabricated section links to each other by connecting rod, and the described body structure that sand, building stones are housed also links to each other by connecting rod.
6, detachable tower foundation according to claim 2 is characterized in that described variable cross-section cushion cap is connected with the anchor pole that inserts in the inserts.
7, detachable tower foundation according to claim 2, the cushion cap piece that it is characterized in that described variable cross-section cushion cap are rectangle, square, triangle, equilateral triangle, circle, polygon or its combination that size changes in gradient.
8, detachable tower foundation according to claim 2 is characterized in that described variable cross-section cushion cap or is monolithic construction, or the split-type structural for being linked to each other and formed by some cushion cap pieces.
9, detachable tower foundation according to claim 2 is characterized in that described variable cross-section cushion cap or is solid, or is the hollow body of frame construction.
10, detachable tower foundation according to claim 2 is characterized in that being equipped with in the described foundation ditch framework that is used to load inserts.
CNA2006100882888A 2006-07-07 2006-07-07 Construction method for detachable tower foundation and structure thereof Pending CN101100861A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2006100882888A CN101100861A (en) 2006-07-07 2006-07-07 Construction method for detachable tower foundation and structure thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2006100882888A CN101100861A (en) 2006-07-07 2006-07-07 Construction method for detachable tower foundation and structure thereof

Publications (1)

Publication Number Publication Date
CN101100861A true CN101100861A (en) 2008-01-09

Family

ID=39035297

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2006100882888A Pending CN101100861A (en) 2006-07-07 2006-07-07 Construction method for detachable tower foundation and structure thereof

Country Status (1)

Country Link
CN (1) CN101100861A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720207A (en) * 2012-06-08 2012-10-10 北京金风科创风电设备有限公司 Tower foundation and tower of wind-driven generator
CN103015451A (en) * 2012-12-30 2013-04-03 张庆彬 Detachable tower footing
CN103508339A (en) * 2013-03-01 2014-01-15 李文泽 Mobile tower crane base
CN104555758A (en) * 2014-11-24 2015-04-29 中国科学院国家天文台南京天文光学技术研究所 Polar region derrick tower suitable for Antarctic inland areas
CN106480900A (en) * 2016-11-28 2017-03-08 无锡市莱达热工工程有限公司 Factory Building upright post basic
CN106948250A (en) * 2017-05-10 2017-07-14 湖州中辰建设有限公司 The small arch bridge in gardens
CN109056779A (en) * 2018-07-10 2018-12-21 国核电力规划设计研究院有限公司 A kind of key variable cross-section mat foundation
CN109296252A (en) * 2017-11-06 2019-02-01 福建省邮电规划设计院有限公司 Cement pole and cabinet based Joint body and construction method
CN111733863A (en) * 2020-06-24 2020-10-02 江苏省宁强建设有限公司 Tower crane foundation for foundation pit and construction method thereof

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720207A (en) * 2012-06-08 2012-10-10 北京金风科创风电设备有限公司 Tower foundation and tower of wind-driven generator
CN103015451A (en) * 2012-12-30 2013-04-03 张庆彬 Detachable tower footing
CN103015451B (en) * 2012-12-30 2016-01-20 张庆彬 A kind of detachable column foot
CN103508339A (en) * 2013-03-01 2014-01-15 李文泽 Mobile tower crane base
CN103508339B (en) * 2013-03-01 2015-11-25 李文泽 Mobile tower flap seat
CN104555758A (en) * 2014-11-24 2015-04-29 中国科学院国家天文台南京天文光学技术研究所 Polar region derrick tower suitable for Antarctic inland areas
CN106480900A (en) * 2016-11-28 2017-03-08 无锡市莱达热工工程有限公司 Factory Building upright post basic
CN106948250A (en) * 2017-05-10 2017-07-14 湖州中辰建设有限公司 The small arch bridge in gardens
CN109296252A (en) * 2017-11-06 2019-02-01 福建省邮电规划设计院有限公司 Cement pole and cabinet based Joint body and construction method
CN109296252B (en) * 2017-11-06 2024-03-29 福建省邮电规划设计院有限公司 Cement pole and cabinet foundation combination and construction method
CN109056779A (en) * 2018-07-10 2018-12-21 国核电力规划设计研究院有限公司 A kind of key variable cross-section mat foundation
CN111733863A (en) * 2020-06-24 2020-10-02 江苏省宁强建设有限公司 Tower crane foundation for foundation pit and construction method thereof

Similar Documents

Publication Publication Date Title
CN101100861A (en) Construction method for detachable tower foundation and structure thereof
CN201665819U (en) Detachable modularization temporary support used for installing steel box girder road surface
CN206815197U (en) A kind of prestress anchoraging angle-table bracket construction of mass concrete construction of encorbelmenting
CN102704705A (en) Building long-stroke redescending-free multi-point synchronous jacking method
CN101736909A (en) Method for restoring building construction with bottom frame posts damaged by vibration
CN107165039A (en) Encorbelment mass concrete construction prestress anchoraging angle-table bracket and its construction method
CN103452350B (en) Assembling electronic workshop and construction method thereof
CN113089491A (en) Construction method of large cantilever prestressed concrete bent cap
CN103410101A (en) Tower crane conversion method for construction of parabola-shaped ultrahigh pier
CN102425190A (en) Superposed tower crane foundation
CN2915948Y (en) Detachable tower footing
CN208039265U (en) A kind of prefabricated assembled composite structure support
KR20100073881A (en) Dummy bearing for bridge using sand and upper structure of bridge supporting method thterewith
CN210066504U (en) Large-span cantilever truss type bent cap support system
CN110318559B (en) Rescue reinforcement device and method for cultural relics and buildings
CN116150844A (en) Transmission line assembled rock anchor rod foundation series typical design drawing and design method
CN207933879U (en) A kind of bridge pier structure of segmented splicing
CN206655065U (en) Combined type support post and overhead rail system for overhead rail system
CN108193590A (en) A kind of bridge pier structure and joining method of segmented splicing
CN1093204C (en) Unidirectional combination type prefabricated cross concrete foundation for tower crane
CN212742154U (en) Steel reinforced concrete arch bridge
CN111910535B (en) Nondestructive reinforcement supporting system for single-column pier bridge and construction method
CN211396722U (en) Shoulder beam type reinforcing structure
CN113279702A (en) Design method of shaft expanding, excavating and drilling derrick
CN207406032U (en) The underpinning structure of existing building base isolation reinforcement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication