CN106480900A - Factory Building upright post basic - Google Patents

Factory Building upright post basic Download PDF

Info

Publication number
CN106480900A
CN106480900A CN201611067988.9A CN201611067988A CN106480900A CN 106480900 A CN106480900 A CN 106480900A CN 201611067988 A CN201611067988 A CN 201611067988A CN 106480900 A CN106480900 A CN 106480900A
Authority
CN
China
Prior art keywords
base station
base
length
concrete base
upright post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611067988.9A
Other languages
Chinese (zh)
Inventor
俞雪峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI LAIDA HOT WORKING ENGIN CO Ltd
Original Assignee
WUXI LAIDA HOT WORKING ENGIN CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI LAIDA HOT WORKING ENGIN CO Ltd filed Critical WUXI LAIDA HOT WORKING ENGIN CO Ltd
Priority to CN201611067988.9A priority Critical patent/CN106480900A/en
Publication of CN106480900A publication Critical patent/CN106480900A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention provides a kind of Factory Building upright post basic, including pachyrhizus stone grout blanket, concrete base station, built-in fitting;Pachyrhizus stone grout blanket is square, is carried on the element soil of compacting;Concrete base station is connected to pachyrhizus stone grout blanket top middle position;Concrete base station includes bottom base, middle transition pedestal and top base;Bottom base and top base are square;The length of side of bottom base is less than the length of side of pachyrhizus stone grout blanket, and the length of side of top base is less than the length of side of bottom base;Middle transition pedestal is truncated rectangular pyramids shape;Bottom base, middle transition pedestal and top base are structure as a whole;Described built-in fitting includes steel top board and is connected to the anchoring piece of steel top board bottom;Anchoring piece is imbedded from top to bottom and is connected in concrete base station.This upright post basic is symmetrical structure, good stability;Anti-seismic performance is good.

Description

Factory Building upright post basic
Technical field
The present invention relates to a kind of building basis, especially a kind of basis of steel-structure factory building column.
Background technology
At present, with it from heavy and light, construction speed is fast for steel-structure factory building, and the structural strength of Factory Building is high, therefore by more and more wider General use.
In steel-structure factory building, column is the crucial component of comparison, and column lower end connects ground, upper end support beam or room Top;Carry the basis of column, its structure therefore also becomes most important.
Content of the invention
It is an object of the invention to provide a kind of Factory Building upright post basic, there is good bearing capacity, enable to column steady Admittedly be connected with ground;The technical solution used in the present invention is:
A kind of Factory Building upright post basic, including pachyrhizus stone grout blanket, concrete base station, built-in fitting;
Pachyrhizus stone grout blanket is square, is carried on the element soil of compacting;
Concrete base station is connected to pachyrhizus stone grout blanket top middle position;
Concrete base station includes bottom base, middle transition pedestal and top base;Bottom base and top base are positive four Side shape;The length of side of bottom base is less than the length of side of pachyrhizus stone grout blanket, and the length of side of top base is less than the length of side of bottom base;In Between transition pedestal be truncated rectangular pyramids shape;Bottom base, middle transition pedestal and top base are structure as a whole;
Built-in fitting is connected on concrete base station, and the link position of built-in fitting and concrete base station is located at the center of concrete base station Between;Described built-in fitting includes steel top board and is connected to the anchoring piece of steel top board bottom;Anchoring piece is imbedded from top to bottom and is connected It is connected in concrete base station.
Further, anchoring piece includes at least one pair of grasp, and the bending head of the pair of grasp sets, equal direction relatively The centre of concrete base station.
Further, anchoring piece includes three pairs of grasps, and two pairs of grasps are connected to the both sides position of steel top board bottom Put, a pair of grasp is connected to the centre position of steel top board bottom.
Further, the length of embedment of anchoring piece is the 1/2~4/5 of concrete base station height.
It is an advantage of the current invention that:
1)Change Factory Building upright post basic and adopt symmetrical structure, good stability;
2)Pachyrhizus stone grout blanket is bigger than concrete base station, it is possible to decrease the pressure to ground.
3)Anti-seismic performance is good.
Brief description
Fig. 1 is the structure composition schematic diagram of the present invention.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the anchoring piece schematic diagram of the present invention.
Specific embodiment
With reference to concrete drawings and Examples, the invention will be further described.
The present invention provide Factory Building upright post basic, as shown in Figure 1 and Figure 2, including pachyrhizus stone grout blanket 1, concrete base station 2, Built-in fitting 3;
Pachyrhizus stone grout blanket 1 is square, is carried on the element soil of compacting;The height of pachyrhizus stone grout blanket 1 is 200mm;
Concrete base station 2 is connected to pachyrhizus stone grout blanket 1 top middle position;The height of concrete base station 2 is 1000mm;
Concrete base station 2 includes bottom base 201, middle transition pedestal 202 and top base 203, height respectively 300mm, 300mm、400mm;Bottom base 201 and top base 203 are square;The length of side of bottom base 201 is less than pachyrhizus stone The length of side of grout blanket 1, the length of side of top base 203 is less than the length of side of bottom base 201;Middle transition pedestal 202 is positive four ribs Platform shape;Bottom base 201, middle transition pedestal 202 and top base 203 are structure as a whole;
Built-in fitting 3 is connected on concrete base station 2, and built-in fitting 3 is located at concrete base station 2 with the link position of concrete base station 2 Middle;Described built-in fitting 3 includes steel top board 301 and the anchoring piece 302 being connected to steel top board 301 bottom;Anchoring piece 302 imbed from top to bottom and are connected in concrete base station 2;Preferably, the length of embedment of anchoring piece 302 is concrete base station 2 The 1/2~4/5 of height;
Anchoring piece 302 includes at least one pair of grasp, and the bending head 3021 of the pair of grasp sets, relatively all towards concrete The centre of base station 2.More preferably, anchoring piece 302 includes three pairs of grasps, and two pairs of grasps are connected to steel top board 301 bottom Two side positions, a pair of grasp is connected to the centre position of steel top board 301 bottom, as shown in Figure 3.
Steel top board 301 is used for connecting the column of steel construction, specifically can be connected by modes such as welding, bolts.

Claims (4)

1. a kind of Factory Building upright post basic is it is characterised in that include pachyrhizus stone grout blanket (1), concrete base station (2), built-in fitting (3);
Pachyrhizus stone grout blanket (1) is square, is carried on the element soil of compacting;
Concrete base station (2) is connected to pachyrhizus stone grout blanket (1) top middle position;
Concrete base station (2) includes bottom base (201), middle transition pedestal (202) and top base (203);Bottom base And top base (203) is square (201);The length of side of bottom base (201) is less than the side of pachyrhizus stone grout blanket (1) Long, the length of side of top base (203) is less than the length of side of bottom base (201);Middle transition pedestal (202) is truncated rectangular pyramids shape; Bottom base (201), middle transition pedestal (202) and top base (203) are structure as a whole;
Built-in fitting (3) is connected on concrete base station (2), and built-in fitting (3) is located at coagulation with the link position of concrete base station (2) The middle of soil matrix platform (2);Described built-in fitting (3) includes steel top board (301) and the anchor being connected to steel top board (301) bottom Firmware (302);Anchoring piece (302) is imbedded from top to bottom and is connected in concrete base station (2).
2. Factory Building upright post basic as claimed in claim 1 it is characterised in that
Anchoring piece (302) includes at least one pair of grasp, and the bending head (3021) of the pair of grasp sets relatively, all towards mixing The centre of solidifying soil matrix platform (2).
3. Factory Building upright post basic as claimed in claim 2 it is characterised in that
Anchoring piece (302) is included three to grasp, and two pairs of grasps are connected to two side positions of steel top board (301) bottom, and one Grasp is connected to the centre position of steel top board (301) bottom.
4. Factory Building upright post basic as claimed in claim 1 it is characterised in that
The length of embedment of anchoring piece (302) is the 1/2~4/5 of concrete base station height.
CN201611067988.9A 2016-11-28 2016-11-28 Factory Building upright post basic Pending CN106480900A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611067988.9A CN106480900A (en) 2016-11-28 2016-11-28 Factory Building upright post basic

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611067988.9A CN106480900A (en) 2016-11-28 2016-11-28 Factory Building upright post basic

Publications (1)

Publication Number Publication Date
CN106480900A true CN106480900A (en) 2017-03-08

Family

ID=58274399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611067988.9A Pending CN106480900A (en) 2016-11-28 2016-11-28 Factory Building upright post basic

Country Status (1)

Country Link
CN (1) CN106480900A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403367A (en) * 2018-12-07 2019-03-01 华中科技大学 A kind of assembled case change basis and its component on site construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101100861A (en) * 2006-07-07 2008-01-09 杨建安 Construction method for detachable tower foundation and structure thereof
CN104328798A (en) * 2014-10-29 2015-02-04 王桂平 Integral type ground beam structure
JP2015038267A (en) * 2012-08-28 2015-02-26 株式会社 ゴウ構造 Method for constructing support foundation of photovoltaic power generation panel receiver
CN204238236U (en) * 2014-10-28 2015-04-01 苏州基业生态园林股份有限公司 The foundation structure of a kind of square lamppost
CN105002924A (en) * 2015-08-03 2015-10-28 瑞风能源(武汉)工程技术有限公司 Hollow ground anchor cage base
CN206220116U (en) * 2016-11-28 2017-06-06 无锡市莱达热工工程有限公司 Factory building upright post basic

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101100861A (en) * 2006-07-07 2008-01-09 杨建安 Construction method for detachable tower foundation and structure thereof
JP2015038267A (en) * 2012-08-28 2015-02-26 株式会社 ゴウ構造 Method for constructing support foundation of photovoltaic power generation panel receiver
CN204238236U (en) * 2014-10-28 2015-04-01 苏州基业生态园林股份有限公司 The foundation structure of a kind of square lamppost
CN104328798A (en) * 2014-10-29 2015-02-04 王桂平 Integral type ground beam structure
CN105002924A (en) * 2015-08-03 2015-10-28 瑞风能源(武汉)工程技术有限公司 Hollow ground anchor cage base
CN206220116U (en) * 2016-11-28 2017-06-06 无锡市莱达热工工程有限公司 Factory building upright post basic

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403367A (en) * 2018-12-07 2019-03-01 华中科技大学 A kind of assembled case change basis and its component on site construction method
CN109403367B (en) * 2018-12-07 2024-04-05 华中科技大学 Assembled box transformer foundation and field construction method thereof

Similar Documents

Publication Publication Date Title
CN206360402U (en) Basement roof ruggedized construction
CN205935236U (en) From square steel tube concrete frame column base node that restores to throne
CN206220116U (en) Factory building upright post basic
CN106480900A (en) Factory Building upright post basic
CN202509517U (en) +/-800 kV direct current ring-shaped arrangement rock anchor rod foundation
JP2014051848A (en) Solar panel installation base
CN104847161B (en) A kind of supporting rack for fixing pole
CN209227582U (en) A kind of foundation connection structure for large span steel structure rigidity suspension column and connection basis
CN205502561U (en) Scaffold pedestal
CN108527637A (en) A kind of supertronic device and method of Prefabricated bar bottom pre-embedded steel slab
CN207469743U (en) A kind of independent jacking of support
CN213477614U (en) Scaffold upright rod cushion block
CN207934203U (en) Modularization pre-embedded steel slab
KR101451793B1 (en) structure of the small crane lock
CN210064982U (en) Operating platform of standard knot convenient to horizontal installation
CN202509516U (en) +/-800 KV direct current composite clay anchor rod foundation
CN207568037U (en) The connection structure of complete prefabricated inclined roof and cast-in-place ridge pole
CN201620419U (en) Steel support structure
CN206971244U (en) A kind of prefabricated strip footing
CN205712154U (en) The base apparatus that a kind of building supports
CN204920416U (en) Simple and easy transmission tower structure
CN210659330U (en) Unloading platform's pre-buried structure for construction
CN211342041U (en) Pre-buried ground cage structure of street lamp installation ground
CN217556952U (en) Support structure for maintaining stable stress of lattice column
CN204643646U (en) One is anti-turns over type hoisting crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170308