CN2915948Y - Detachable tower footing - Google Patents

Detachable tower footing Download PDF

Info

Publication number
CN2915948Y
CN2915948Y CN 200620074757 CN200620074757U CN2915948Y CN 2915948 Y CN2915948 Y CN 2915948Y CN 200620074757 CN200620074757 CN 200620074757 CN 200620074757 U CN200620074757 U CN 200620074757U CN 2915948 Y CN2915948 Y CN 2915948Y
Authority
CN
China
Prior art keywords
cushion cap
inserts
variable cross
section
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620074757
Other languages
Chinese (zh)
Inventor
杨建安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200620074757 priority Critical patent/CN2915948Y/en
Application granted granted Critical
Publication of CN2915948Y publication Critical patent/CN2915948Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model offers a detachable tower footing, which aims at the problems that the existing tower footing of towers have a long construction period, the tower footing can not be used repeatedly and thus the waste problem is serious. At the base of analyzing the main force the column foot borne is positive pressure, the utility model discloses the construction methods and the structure of a detachable tower footing. The utility model decompounds the former tower footing with a structure of cement concrete into two parts which are respectively used as the filler for foundation ditch and as the tapered cushion cap for the decompression of bearing pressure; the method can eliminate the difficult problems of inadequate pressure and anti- overturning. The tower footing of the utility model can be detached and be used repeatedly, and thus has the advantages of reducing investment, shortening construction cycle; the installation is convenient, safe and reliable.

Description

A kind of detachable tower foundation
Technical field
The utility model relates to column foots such as all kinds of overweight tower cranes of building that need load-bearing or play supporting, electric power tower, communications tower, especially a kind of tower-base structure of the removable and cantilevered hoist tower base class tower being convenient to reuse, specifically a kind of detachable tower foundation.
Background technology
As everyone knows, in order to carry constructional materials to high level, some lifting tower cranes all need be built in each building site.Because lifting appliance belongs to special equipment, its safety requirements height, therefore person in charge's parts such as building, safety, quality inspection all have strict requirement to its installation, use, operation, wherein most critical is the installation on basis, because it is directly connected to the safe operation of crane gear, the column foot that requires crane gear is installed has very strong withstand voltage and resistance to capsizing, and designs part from security consideration, and its safety factor is generally all bigger.Thereby existing column foot all adopts steel bar concrete to add the structure of anchor pole, this manufacture method and structure one are that disposable input is bigger, tower crane for 40-80T/M, ten thousand yuan of the general equal 3-7 of its column foot input, and can not reuse, after engineering finishes, the column foot of building that spends huge sums will go out of use, and its cleaning difficulty is also quite big, generally all it is arranged on the position that does not influence normal performance of other function of building and expansion when therefore designing; The 2nd, the construction period is long, when adopting the concrete structure, because 28 days intensity level need detect in safety supervision department, body of the tower could be installed after qualified, and the manufacturing again of defective then need so not only has a strong impact on the construction period, and influences the reasonable use in place.
Summary of the invention
The purpose of this utility model is long at the construction period of existing all kinds of hoist towers, load-bearing tower, supporting tower, the existence of support tower column foot, and not reproducible utilization, waste serious problem,, provide a kind of detachable tower foundation having analyzed the main stressed of column foot on the basis of positive pressure.
The technical solution of the utility model is:
A kind of detachable building column foot comprises foundation ditch, inserts, variable cross-section cushion cap, and inserts is filled in the foundation ditch, it is characterized in that described variable cross-section cushion cap or all is arranged on the bearing stratum that meets load bearing requirements of foundation ditch, is filled with inserts around it; Or all being positioned at the foundation ditch surface, its undermost cushion cap piece is installed in the upper surface of the inserts that meets load bearing requirements; Or part is arranged in foundation ditch, and part is positioned at outside the foundation ditch, and the lower support of described variable cross-section cushion cap is meeting on the inserts bearing stratum of load bearing requirements, be arranged in foundation ditch the variable cross-section cushion cap around be filled with inserts; The cushion cap piece of the described variable cross-section cushion cap the superiors links to each other with the bottom of tower.
Described inserts is sandstone material, prefabricated section or the body structure that sand, building stones are housed.
Described prefabricated section is for having interlocking structure metal derby, cement block or cement steel prefabricated section.
Described prefabricated section links to each other by connecting rod, and the described body structure that sand, building stones are housed also links to each other by connecting rod.
Described variable cross-section cushion cap is connected with the anchor pole that inserts in the inserts.
The cushion cap piece of described variable cross-section cushion cap is rectangle, square, triangle, equilateral triangle, circle, polygon or its combination that size changes in gradient.
Described variable cross-section cushion cap or be monolithic construction, or split-type structural for linking to each other and form by some cushion cap pieces.
Described variable cross-section cushion cap or be solid, or be the hollow body of frame construction.
Be provided with reinforcing rib in the described frame construction.
The framework that is used to load inserts is installed in the described foundation ditch.
The utlity model has following advantage:
1, easy accessibility cuts the waste.
2, can shorten construction period.
3, the fabricating yard is unaffected, after especially use finishes, can easily foundation ditch be removed and recover former state.
4, safe and reliable, because the bottom active force of tower crane passes through the repeatedly transmission of variable cross-section cushion cap, its effect final and ground is repeatedly decomposed, no matter be that the normal pressure or the power of toppling are all very little, can not cause sinking of ground or inclination.Especially when the variable cross-section cushion cap is installed in the foundation ditch, rely on the active force of inserts and the pulling force of anchor pole can satisfy instructions for use fully, the overturning or slip resistance analysis bearing diagonal that adds when adding the tower crane installation and the effect of the girt that links to each other with wall, unstable active force on the tower crane is less, and therefore removable structure of the present utility model can satisfy safety requirements fully.
5, relatively simple for structure, sandstone material cost is lower, and can reuse, and prefabricated section have once drop into reusable, and install, dismantle very convenient, buckle structure design by prefabricated section itself or install mode such as connecting rod that each prefabricated section is connected into is as a whole, its carrying and resistance to capsizing are stronger.
6, purposes is wide, not only can be used for common building lifting column foot, and can be used for the often column foot of mounting or dismounting of needs such as electric power, communication, advertisement, is particularly suitable for the building site, crosses the column foot that work-yards are often changed in street advertisement etc.
Description of drawings
Fig. 1 is one of structural representation of the present utility model.
Fig. 2 is two of a structural representation of the present utility model.
Fig. 3 is three of a structural representation of the present utility model.
Fig. 4 is the plan structure schematic diagram of several variable cross-section cushion caps of the present utility model.
Fig. 5 is the buckle structure schematic diagram of prefabricated section of the present utility model.
Fig. 6 is the structural representation of cushion cap piece of the present utility model.
Fig. 7 is the structural representation of hollow cushion cap piece of the present utility model.
The specific embodiment
Following structure drawings and Examples are further described the utility model.
Embodiment one
Shown in Fig. 1,4,5,6,7.
A kind of construction method of detachable building lifting column foot, it may further comprise the steps:
At first, on the ground of need installation column foot, dig a foundation ditch 1 by designing requirement;
Secondly earlier variable cross-section cushion cap 2 is installed in the foundation ditch 1, in the foundation ditch 1 around the variable cross-section cushion cap 2, adds inserts 3 again.Inserts 3 can be the sandstone material, also can be prefabricated section shown in Figure 4.
At last, the bottom with hoist tower links to each other with the cushion cap piece of variable cross-section cushion cap 2 the superiors.And then mounting method installs diagonal brace 8 additional and progressively upwards connects body of the tower routinely.
The structure of utilizing the concrete detachable building lifting column foot that said method makes as shown in Figure 1, it comprises foundation ditch 1, inserts 3, variable cross-section cushion cap 2, inserts 3 is filled in the foundation ditch 1, described variable cross-section cushion cap 2 all is arranged on the bearing stratum that meets load bearing requirements 7 of foundation ditch 1, the part that this bearing stratum 7 can be used as ground is handled when digging foundation ditch 1 synchronously, even when removing, its waste is also limited, can not exert an influence to the building land used, bearing stratum 7 also can utilize inserts 3 to carry out compaction process and form, being filled with inserts 3 around variable cross-section cushion cap 2 (can adopt the sandstone material or sand is housed, the body structure of building stones, also can adopt the metal derby of buckle structure with lock shown in Figure 5, cement block or cement steel prefabricated section, work as metal derby, when cement block or cement steel prefabricated section do not adopt buckle structure, also can adopt the method that installs connecting rod with all metal derbies, cement block or cement steel prefabricated section are linked to be an integral body), the cushion cap piece of variable cross-section cushion cap 2 the superiors links to each other with the bottom of hoist tower 5.
For bearing capacity and the anti-roll capability that increases the variable cross-section cushion cap, also can on the variable cross-section cushion cap, connect anchor pole, earlier anchor pole 4 is inserted in the inserts 3.
During concrete enforcement, the shape and size of the cushion cap piece of variable cross-section cushion cap 2 can adopt one or more the combination in square that size shown in Figure 4 changes in gradient, equilateral triangle, the flange shape.Can link to each other by bolt or buckle structure between every layer of cushion cap piece.
Variable cross-section cushion cap 2 can be monolithic construction, also can be the split-type structural that is linked to each other and formed by some cushion cap pieces, and variable cross-section cushion cap 2 both can be solid, also can be the hollow body of frame construction, as shown in Figure 6.When adopting frame construction, can in adding, set up by frame reinforcing rib 6, as Fig. 7.
During concrete enforcement,, also it can be filled in a framework in order to improve the overall performance of inserts in the foundation ditch.
Embodiment two
Shown in Fig. 2,4,5,6,7.
A kind of construction method of detachable building lifting column foot, it may further comprise the steps:
At first, on the ground of need installation column foot, dig a foundation ditch 1 by designing requirement;
Secondly, filling inserts 3 and compacting make it meet load bearing requirements in foundation ditch 1, again variable cross-section cushion cap 2 is installed on the upper surface of inserts 3, must the time should increase the contact force of variable cross-section cushion cap 2 and filling material 3, increase resistance to capsizing by the method that installs anchor pole 4 additional;
At last, the bottom with hoist tower links to each other with the cushion cap piece of variable cross-section cushion cap 2 the superiors.And then mounting method installs diagonal brace 8 additional and progressively upwards connects body of the tower routinely.
The structure of utilizing the concrete detachable building lifting column foot that said method makes as shown in Figure 2, it comprises foundation ditch 1, inserts 3, variable cross-section cushion cap 2, inserts 3 is filled in the foundation ditch 1, described variable cross-section cushion cap 2 is positioned on the upper surface of foundation ditch 1 and is carried on the inserts 3, the surface of inserts 3 should make it to meet load bearing requirements and forms on the bearing stratum 7 through handling, inserts 3 can adopt the sandstone material or sand is housed, the body structure of building stones, also can adopt the metal derby of buckle structure with lock shown in Figure 5, cement block or cement steel prefabricated section, work as metal derby, when cement block or cement steel prefabricated section do not adopt buckle structure, also can adopt the method that installs connecting rod with all metal derbies, cement block or cement steel prefabricated section are linked to be an integral body; The cushion cap piece of variable cross-section cushion cap 2 the superiors links to each other with the bottom of hoist tower 5.
For bearing capacity and the anti-roll capability that increases the variable cross-section cushion cap, also can on the variable cross-section cushion cap, connect anchor pole, earlier anchor pole 4 is inserted in the inserts 3.
During concrete enforcement, the shape and size of the cushion cap piece of variable cross-section cushion cap 2 can adopt one or more the combination in square that size shown in Figure 4 changes in gradient, equilateral triangle, the flange shape.Can link to each other by bolt or buckle structure between every layer of cushion cap piece.
Variable cross-section cushion cap 2 can be monolithic construction, also can be the split-type structural that is linked to each other and formed by some cushion cap pieces, and variable cross-section cushion cap 2 both can be solid, also can be the hollow body of frame construction, as shown in Figure 6.When adopting frame construction, can in adding, set up by frame reinforcing rib 6, as Fig. 7.
During concrete enforcement,, also it can be filled in a framework in order to improve the overall performance of inserts in the foundation ditch.
Embodiment three
Shown in Fig. 3,4,5,6,7.
A kind of construction method of detachable building lifting column foot, it may further comprise the steps:
At first, on the ground of need installation column foot, dig a foundation ditch 1 by designing requirement;
Secondly, in foundation ditch 1, load inserts 3 to setting height and compacting formation one and meet the bearing stratum 7 of load bearing requirements again with variable cross-section cushion cap 2 installation bearing stratums 7, must the time also can increase the contact force of variable cross-section cushion cap 2 and filling material 3 by the method that installs anchor pole 4 additional, increase resistance to capsizing, and then in the foundation ditch 1 around the variable cross-section cushion cap 2, add the upper surface place of inserts 3 to foundation ditch 1;
At last, the bottom with hoist tower links to each other with the cushion cap piece of variable cross-section cushion cap 2 the superiors.And then mounting method installs diagonal brace 8 additional and progressively upwards connects body of the tower routinely.
The structure of utilizing the concrete detachable building lifting column foot that said method makes as shown in Figure 3, it comprises foundation ditch 1, inserts 3, variable cross-section cushion cap 2, inserts 3 is filled in the foundation ditch 1, the part of described variable cross-section cushion cap 2 is arranged in foundation ditch 1, another part stretches out foundation ditch 1, the bottom surface of variable cross-section cushion cap 2 is bearing on the bearing stratum 7 that is formed by inserts 3 processing compactings in the foundation ditch 1, inserts 3 can adopt the sandstone material or sand is housed, the body structure of building stones, also can adopt the metal derby of buckle structure with lock shown in Figure 5, cement block or cement steel prefabricated section, work as metal derby, when cement block or cement steel prefabricated section do not adopt buckle structure, also can adopt the method that installs connecting rod with all metal derbies, cement block or cement steel prefabricated section are linked to be an integral body; The cushion cap piece of variable cross-section cushion cap 2 the superiors links to each other with the bottom of hoist tower 5.
For bearing capacity and the anti-roll capability that increases the variable cross-section cushion cap, also can on the variable cross-section cushion cap, connect anchor pole, earlier anchor pole 4 is inserted in the inserts 3.
During concrete enforcement, the shape and size of the cushion cap piece of variable cross-section cushion cap 2 can adopt one or more the combination in square that size shown in Figure 4 changes in gradient, equilateral triangle, the flange shape.Can link to each other by bolt or buckle structure between every layer of cushion cap piece.
Variable cross-section cushion cap 2 can be monolithic construction, also can be the split-type structural that is linked to each other and formed by some cushion cap pieces, and variable cross-section cushion cap 2 both can be solid, also can be the hollow body of frame construction, as shown in Figure 6.When adopting frame construction, can in adding, set up by frame reinforcing rib 6, as Fig. 7.
During concrete enforcement,, also it can be filled in a framework in order to improve the overall performance of inserts in the foundation ditch.
Assembly and disassembly methods of the present utility model is opposite with mounting method.
It is same as the prior art that the utility model does not relate to part.
Embodiment of the present utility model is that example is described with building lifting column foot only, but is not limited only to build the lifting column foot, and all employing detachable tower foundation structures all are considered to belong among the protection domain of the present utility model as tower class ground.

Claims (10)

1, a kind of detachable tower foundation comprises foundation ditch, inserts, variable cross-section cushion cap, and inserts is filled in the foundation ditch, it is characterized in that described variable cross-section cushion cap or all is arranged on the bearing stratum that meets load bearing requirements of foundation ditch, is filled with inserts around it; Or all being positioned at the foundation ditch surface, its undermost cushion cap piece is installed in the upper surface of the inserts that meets load bearing requirements; Or part is arranged in foundation ditch, and part is positioned at outside the foundation ditch, be arranged in foundation ditch the variable cross-section cushion cap around be filled with inserts; The cushion cap piece of the described variable cross-section cushion cap the superiors links to each other with the bottom of tower.
2, detachable tower foundation according to claim 1 is characterized in that described inserts is sandstone material, prefabricated section or the body structure that sand, building stones are housed.
3, detachable tower foundation according to claim 2 is characterized in that described prefabricated section is for having interlocking structure metal derby, cement block or cement steel prefabricated section.
4, detachable tower foundation according to claim 2 is characterized in that described prefabricated section links to each other by connecting rod, and the described body structure that sand, building stones are housed also links to each other by connecting rod.
5, detachable tower foundation according to claim 1 is characterized in that described variable cross-section cushion cap is connected with the anchor pole that inserts in the inserts.
6, detachable tower foundation according to claim 1, the cushion cap piece that it is characterized in that described variable cross-section cushion cap are rectangle, square, triangle, equilateral triangle, circle, polygon or its combination that size changes in gradient.
7, detachable tower foundation according to claim 1 is characterized in that described variable cross-section cushion cap or is monolithic construction, or the split-type structural for being linked to each other and formed by some cushion cap pieces.
8, detachable tower foundation according to claim 1 is characterized in that described variable cross-section cushion cap or is solid, or is the hollow body of frame construction.
9, detachable tower foundation according to claim 1 is characterized in that being equipped with in the described foundation ditch framework that is used to load inserts.
10, detachable tower foundation according to claim 1 is characterized in that being equipped with in the described foundation ditch framework that is used to load inserts.
CN 200620074757 2006-07-07 2006-07-07 Detachable tower footing Expired - Fee Related CN2915948Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620074757 CN2915948Y (en) 2006-07-07 2006-07-07 Detachable tower footing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620074757 CN2915948Y (en) 2006-07-07 2006-07-07 Detachable tower footing

Publications (1)

Publication Number Publication Date
CN2915948Y true CN2915948Y (en) 2007-06-27

Family

ID=38186855

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620074757 Expired - Fee Related CN2915948Y (en) 2006-07-07 2006-07-07 Detachable tower footing

Country Status (1)

Country Link
CN (1) CN2915948Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104265046A (en) * 2014-10-21 2015-01-07 景县电讯金属构件制造有限公司 Novel base station communication signal launching tower
CN112279038A (en) * 2020-11-26 2021-01-29 江西省丰和泰重工科技有限公司 Windproof construction elevator base

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104265046A (en) * 2014-10-21 2015-01-07 景县电讯金属构件制造有限公司 Novel base station communication signal launching tower
CN104265046B (en) * 2014-10-21 2016-08-24 景县电讯金属构件制造有限公司 Base station communication signal transmitting tower
CN112279038A (en) * 2020-11-26 2021-01-29 江西省丰和泰重工科技有限公司 Windproof construction elevator base

Similar Documents

Publication Publication Date Title
CN101100861A (en) Construction method for detachable tower foundation and structure thereof
CN201665819U (en) Detachable modularization temporary support used for installing steel box girder road surface
CN206815197U (en) A kind of prestress anchoraging angle-table bracket construction of mass concrete construction of encorbelmenting
CN102704705A (en) Building long-stroke redescending-free multi-point synchronous jacking method
CN109914244B (en) Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof
CN108412128A (en) A kind of connection structure of steel core concrete column
CN107165039A (en) Encorbelment mass concrete construction prestress anchoraging angle-table bracket and its construction method
CN105926775A (en) Novel concrete-filled steel tube beam column joint
CN103452350B (en) Assembling electronic workshop and construction method thereof
CN104005569A (en) Construction method for supporting beam and removing columns
CN2915948Y (en) Detachable tower footing
CN208039265U (en) A kind of prefabricated assembled composite structure support
CN102425190A (en) Superposed tower crane foundation
CN111809528A (en) Pier column vertical back cage platform channel construction method and back cage platform channel device
CN116150844A (en) Transmission line assembled rock anchor rod foundation series typical design drawing and design method
CN203603542U (en) Fabricated electronic workshop
CN206655065U (en) Combined type support post and overhead rail system for overhead rail system
CN1093204C (en) Unidirectional combination type prefabricated cross concrete foundation for tower crane
CN212742154U (en) Steel reinforced concrete arch bridge
CN212176590U (en) Outer frame safety protection structure is exempted from to assembled building
CN212388567U (en) Structure of assembled anchor rod lattice beam
CN211396722U (en) Shoulder beam type reinforcing structure
CN108193590A (en) A kind of bridge pier structure and joining method of segmented splicing
CN207406032U (en) The underpinning structure of existing building base isolation reinforcement
CN113279702A (en) Design method of shaft expanding, excavating and drilling derrick

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070627