CN101082211A - Large area soil dredging-filling ground treatment method and water percolation pipe - Google Patents

Large area soil dredging-filling ground treatment method and water percolation pipe Download PDF

Info

Publication number
CN101082211A
CN101082211A CN200710022364.XA CN200710022364A CN101082211A CN 101082211 A CN101082211 A CN 101082211A CN 200710022364 A CN200710022364 A CN 200710022364A CN 101082211 A CN101082211 A CN 101082211A
Authority
CN
China
Prior art keywords
dredging
fill
barged
soakaway trench
treatment method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200710022364.XA
Other languages
Chinese (zh)
Other versions
CN100595388C (en
Inventor
梅国雄
宋林辉
梅岭
周峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU CONSTRUCTION ENGINEERING GROUP NO3 CONSTRUCTION Co Ltd
Original Assignee
Nanjing Tech University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University filed Critical Nanjing Tech University
Priority to CN200710022364A priority Critical patent/CN100595388C/en
Publication of CN101082211A publication Critical patent/CN101082211A/en
Application granted granted Critical
Publication of CN100595388C publication Critical patent/CN100595388C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a treatment method of extensive dredging dredger fill foundation and its infiltration pipe. The treatment method contains the following steps: firstly, set the infiltration pipe (2) vertically on the dredger yard (5) and divide (5) into at least two dredger areas. Then, dredge the muddy dredger fill (3) into the dredge areas. Finally, set artificial hard shell (1) on (3). The head of (2) extends into the upper surface of (1). The treatment method in this invention firstly divides the extensive dredger yard into small areas and dredges simultaneously to improve the efficiency of foundation treatment. Setting discharge channels before dredging can realize dredging and discharge consolidation simultaneously instead of treating after dredging, which shorten the time to enhance the foundation strength.

Description

Large tracts of land dredging barged-in fill method for processing foundation and soakaway trench thereof
Technical field
The present invention relates to a kind of barged-in fill foundation treatment technology, relate in particular to a kind of large tracts of land dredging barged-in fill method for processing foundation and soakaway trench thereof.
Background technology
Along with the mushroom development of coastal cities expanding economy and city infrastructure, the situation of land-based area deficiency appears in more domestic harbours, and the mud that dredging is come out is used for sea reclamation, has become the important means of coastal cities land development.Correspondingly, the geotechnical engineering problems relevant with barged-in fill is more and more outstanding, and key problem is the processing of barged-in fill, at present, mainly contains methods such as two ash stakes, deep-mixed pile, piling prepressing, vacuum preloading for the reinforcement measure of barged-in fill ground.But because barged-in fill ground soil property is too poor, fixed performance is bad again, uses two ash method and deep-mixed pile method often not ideal; And preloading and vacuum method need fixed naturally through 1~3 year of barged-in fill ground, therefore, necessaryly in the hydraulic reclamation process it are carried out certain pre-consolidation process.
Summary of the invention
The invention provides a kind of discharging consolidation that can quicken ground, shorten foundation strength large tracts of land dredging barged-in fill method for processing foundation and the soakaway trench thereof of rise time.
The present invention adopts following technical scheme:
A kind of large tracts of land dredging barged-in fill method for processing foundation, this processing method may further comprise the steps:
1. soakaway trench vertically is set on blast-filled ground, and blast-filled ground is divided at least two hydraulic reclamation zones,
2. with mud matter barged-in fill hydraulic reclamation to the above-mentioned hydraulic reclamation zone,
3. on mud matter barged-in fill, artificial crust layer is set, and the opening of soakaway trench extends to the upper surface of artificial crust layer.
A kind of soakaway trench that is used for large tracts of land dredging barged-in fill method for processing foundation is provided with the hole on the surface of this soakaway trench.
Compared with prior art, the present invention has the following advantages:
1, the present invention can quicken the discharging consolidation of ground, shortens foundation strength rise time.Processing method of the present invention at first is divided into pocket with large-area blast-filled ground, carrying out hydraulic reclamation simultaneously handles, improved the efficient that ground is handled, simultaneously, just set drainage channel before native hydraulic reclamation, the limit hydraulic reclamation just can the limit discharging consolidation like this, rather than native hydraulic reclamation is well handled again, shorten foundation strength rise time, playing a multiplier effect aspect soil body discharging consolidation and the foundation strength growth.
2, the present invention can reduce the construction costs cost.Because the present invention is provided with artificial crust layer on mud matter barged-in fill, and artificial crust layer seeps water hardly, simultaneously because the wall of the soakaway trench that uses is provided with the hole, then the water in the barged-in fill is discharged fast at deadweight effect lower edge soakaway trench, and gather soil layer top, then the water of Pai Chuing directly is covered in the loading that becomes preloading on the soil layer, employs other objects with regard to not needing in addition for preloading, both make things convenient for construction, reduced the construction costs cost again.
Description of drawings
Fig. 1 is the sectional view of the embodiment of the invention.
Fig. 2 is the vertical view of the embodiment of the invention.
Fig. 3 is the processing procedure schematic diagram of the embodiment of the invention.
Fig. 4 is the structural representation of soakaway trench of the present invention.
Have among the above figure: 1, artificial crust layer 2, soakaway trench 3, mud matter barged-in fill 4, design elevation ground 5, blast-filled ground
The specific embodiment
Embodiment 1
A kind of large tracts of land dredging barged-in fill method for processing foundation, this processing method may further comprise the steps:
1. soakaway trench 2 vertically is set on blast-filled ground 5, and blast-filled ground 5 is divided at least two hydraulic reclamation zones,
2. with mud matter barged-in fill 3 hydraulic reclamations to the above-mentioned hydraulic reclamation zone,
3. artificial crust layer 1 is set, and the opening of soakaway trench 2 extends to the upper surface of artificial crust layer 1 on mud matter barged-in fill 3.
In the present embodiment, soakaway trench 2 becomes four zonules with the hydraulic reclamation region separation after vertically placing.
Embodiment 2
A kind of soakaway trench that is used for large tracts of land dredging barged-in fill method for processing foundation is provided with the hole on the surface of this soakaway trench 2, and is coated with filter screen at the external surface of soakaway trench 2.

Claims (3)

1, a kind of large tracts of land dredging barged-in fill method for processing foundation is characterized in that this processing method may further comprise the steps:
Soakaway trench (2) 1. vertically is set on blast-filled ground (5), and will be divided at least two hydraulic reclamation zones on the blast-filled ground (5),
2. with mud matter barged-in fill (3) hydraulic reclamation to the above-mentioned hydraulic reclamation zone,
Artificial crust layer (1) 3. is set, and the opening of soakaway trench (2) extends to the upper surface of artificial crust layer (1) on mud matter barged-in fill (3).
2, a kind of soakaway trench that is used for the described large tracts of land dredging of claim 1 barged-in fill method for processing foundation is characterized in that being provided with the hole on the surface of this soakaway trench (2).
3, soakaway trench according to claim 2 is characterized in that being coated with filter screen at the external surface of soakaway trench (2).
CN200710022364A 2007-05-15 2007-05-15 Large area soil dredging-filling ground treatment method Expired - Fee Related CN100595388C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200710022364A CN100595388C (en) 2007-05-15 2007-05-15 Large area soil dredging-filling ground treatment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200710022364A CN100595388C (en) 2007-05-15 2007-05-15 Large area soil dredging-filling ground treatment method

Publications (2)

Publication Number Publication Date
CN101082211A true CN101082211A (en) 2007-12-05
CN100595388C CN100595388C (en) 2010-03-24

Family

ID=38911974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200710022364A Expired - Fee Related CN100595388C (en) 2007-05-15 2007-05-15 Large area soil dredging-filling ground treatment method

Country Status (1)

Country Link
CN (1) CN100595388C (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101235635B (en) * 2008-02-05 2010-09-08 北京光彩恒溢科技有限公司 Blowing filling sludge ground-making construction technique and device thereof
CN101225656B (en) * 2008-01-31 2010-09-15 中交第四航务工程局有限公司 Method for rapidly reinforcing ultra-soft soil superficial layer
CN102312416A (en) * 2011-10-13 2012-01-11 长沙理工大学 Dredger fill sludge dewatering and solidification method
CN102817354A (en) * 2012-08-31 2012-12-12 宝钢工程技术集团有限公司 Method for dredging soft foundation by dredger fill and reinforcement
CN106192903A (en) * 2016-08-01 2016-12-07 中国建筑土木建设有限公司路桥分公司 Tidal-flat area land-based area forms the construction method building island
CN110241806A (en) * 2019-06-30 2019-09-17 华中科技大学 A kind of method and crust layer forming crust layer on dredging silt slurry stockyard surface
CN110241806B (en) * 2019-06-30 2024-05-14 华中科技大学 Method for forming crust layer on surface of dredging sludge storage yard and crust layer

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101225656B (en) * 2008-01-31 2010-09-15 中交第四航务工程局有限公司 Method for rapidly reinforcing ultra-soft soil superficial layer
CN101235635B (en) * 2008-02-05 2010-09-08 北京光彩恒溢科技有限公司 Blowing filling sludge ground-making construction technique and device thereof
CN102312416A (en) * 2011-10-13 2012-01-11 长沙理工大学 Dredger fill sludge dewatering and solidification method
CN102312416B (en) * 2011-10-13 2013-10-30 长沙理工大学 Dredger fill sludge dewatering and solidification method
CN102817354A (en) * 2012-08-31 2012-12-12 宝钢工程技术集团有限公司 Method for dredging soft foundation by dredger fill and reinforcement
CN102817354B (en) * 2012-08-31 2014-10-01 宝钢工程技术集团有限公司 Method for dredging soft foundation by dredger fill and reinforcement
CN106192903A (en) * 2016-08-01 2016-12-07 中国建筑土木建设有限公司路桥分公司 Tidal-flat area land-based area forms the construction method building island
CN106192903B (en) * 2016-08-01 2018-09-25 中国建筑土木建设有限公司路桥分公司 Tidal-flat area land-based area forms the construction method for building island
CN110241806A (en) * 2019-06-30 2019-09-17 华中科技大学 A kind of method and crust layer forming crust layer on dredging silt slurry stockyard surface
CN110241806B (en) * 2019-06-30 2024-05-14 华中科技大学 Method for forming crust layer on surface of dredging sludge storage yard and crust layer

Also Published As

Publication number Publication date
CN100595388C (en) 2010-03-24

Similar Documents

Publication Publication Date Title
CN102383413B (en) Method for constructing strengthened saturated-flow plastic silt soft soil foundation
CN101713291A (en) Filling-reclaiming method for building land in coal mining subsidence areas
CN110409359A (en) Row outdoor pit bottom water library is segmented building method in a kind of
CN105220674A (en) Deep soft foundation reinforcing and processing method
CN100595388C (en) Large area soil dredging-filling ground treatment method
CN105064383B (en) Pipe-inserting negative pressure air jet deep-well dewatering device
CN106638542A (en) Consolidation and drainage system for hydraulic fill soil and rapid reinforcement method for hydraulic fill soil
CN103510504B (en) High saturated uneven reclaimed ground processing method
CN104264653B (en) Ultra high energy level strong rammer construction technology compatible with displacement
CN101634139B (en) Dynamic compaction method for backfill foundation with drainage layer
CN103225306A (en) Method of preventing foundation pit leakage during excavation of foundation pit close to water source
CN110080169A (en) A kind of construction method reclaimed fields from the sea utilized based on basement
CN103215945B (en) The three-dimensional assembly power drain consolidation system of heterogeneous body place soft soil foundation and method
CN108277794B (en) Vacuum power consolidation composite drainage system for hydraulic filling soft soil foundation
CN106884427A (en) Immersed tube tunnel and immersed tube tunnel changeover portion soft soil foundation reinforcing method under water
CN203247575U (en) Stereoscopic combined type dynamic drainage consolidation system used for heterogeneous field soft foundation
CN208293556U (en) A kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system
CN103556641A (en) Grooving assisting method for in-pit underground diaphragm wall of existing basement
CN100532729C (en) High vacuum well-points dewatering groundwork treatment method by shallow ramming compaction and deep blasting compaction
CN108442356A (en) The construction technology of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system
CN110144871A (en) A kind of dark creek processing construction method
CN206667225U (en) A kind of novel solid drainage system of reinforcing soft ground
CN105002883A (en) Indirect hierarchical relay type drainage consolidation method of soft foundation
CN204982857U (en) Three -dimensional multichannel drainage combination tamping unit of low level negative pressure
CN107859040A (en) A kind of excavation method of foundation ditch large area soft soil horizon

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NANCHANG CONSTRUCTION ENGINEERING GROUP CO., LTD.

Free format text: FORMER OWNER: NANJING UNIVERSITY OF TECHNOLOGY

Effective date: 20110519

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 210009 NO. 200, ZHONGSHAN NORTH ROAD, NANJING CITY, JIANGSU PROVINCE TO: 33000 NO. 1318, FENGHE AVENUE, HONGGUTAN NEW DISTRICT, NANCHANG CITY

TR01 Transfer of patent right

Effective date of registration: 20110519

Address after: Thirty-three thousand No. 1318 Nanchang Honggutan and Fung Avenue

Patentee after: NANCHANG CONSTRUCTION ENGINEERING GROUP CO., LTD.

Address before: 210009 Zhongshan North Road, Jiangsu, No. 200,

Patentee before: Nanjing University of Technology

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150922

Address after: 330000 No. 248 West Beijing Road, Jiangxi, Nanchang

Patentee after: JIANGSU CONSTRUCTION ENGINEERING GROUP NO.3 CONSTRUCTION CO., LTD.

Address before: No. 1318 Nanchang Honggutan and Fung Avenue

Patentee before: NANCHANG CONSTRUCTION ENGINEERING GROUP CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100324

Termination date: 20190515

CF01 Termination of patent right due to non-payment of annual fee