CN101063374A - 钢筋砼结构中已建预应力体系破坏后重建预应力体系的施工工艺 - Google Patents

钢筋砼结构中已建预应力体系破坏后重建预应力体系的施工工艺 Download PDF

Info

Publication number
CN101063374A
CN101063374A CN 200710068793 CN200710068793A CN101063374A CN 101063374 A CN101063374 A CN 101063374A CN 200710068793 CN200710068793 CN 200710068793 CN 200710068793 A CN200710068793 A CN 200710068793A CN 101063374 A CN101063374 A CN 101063374A
Authority
CN
China
Prior art keywords
former
prestressing force
reinforcing bar
new
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200710068793
Other languages
English (en)
Inventor
吴利民
张卫星
周东波
陈春雷
张幸祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG PROVINCIAL ERJIAN CONSTRUCTION GROUP CO Ltd
Original Assignee
ZHEJIANG PROVINCIAL ERJIAN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG PROVINCIAL ERJIAN CONSTRUCTION GROUP CO Ltd filed Critical ZHEJIANG PROVINCIAL ERJIAN CONSTRUCTION GROUP CO Ltd
Priority to CN 200710068793 priority Critical patent/CN101063374A/zh
Publication of CN101063374A publication Critical patent/CN101063374A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明公开了一种钢筋砼结构中已建预应力体系被破坏后重建预应力体系的施工工艺,它包括如下步骤:将被破坏的原预应力钢绞线锚具去除,将与原预应力钢绞线同规格等强度的新的钢绞线剥除表面塑料护套,准备一根直径小于原预应力钢绞线直径的钢筋,钢筋长度应比原来的钢绞线长50厘米以上,将被破坏的原预应力钢绞线拔出,将钢筋穿入原结构的孔道内,将新的预应力钢绞线的一端与钢筋的一端焊接,用手拉葫芦连接钢筋的另一端,并拉动钢筋,利用孔内的钢筋将新的预应力钢绞线穿入孔内,再对新的预应力钢铰线进行张拉,张拉达到单根钢绞线的原设计应力后锚固。

Description

钢筋砼结构中已建预应力体系破坏后重建预应力体系的施工工艺
技术领域
本发明涉及建筑工程的施工工艺,具体地说是一种对建筑工程中钢筋混凝土框架结构在已建预应力体系的部分无粘结预应力钢绞线锚具遭破坏后,在原结构中重建预应力体系的施工工艺。
背景技术
目前,无粘结预应力钢筋混凝土在工程结构上广泛应用。通常的预应力框架梁施工工艺是木工安装底模,再由钢筋工绑扎大梁钢筋,然后由预应力专业人员将预应力钢绞线按设计要求安放在大梁体内,最后再由木工封闭梁的侧面,经验收合格后浇筑砼,砼达到强度后对无粘结预应力钢绞线实施张拉并锚固。但是,在后续分部、分项工程的施工过程中,往往由于施工人员经验不足,使原有已建预应力体系遭到破坏。例如,由于预应力体系的锚固端锚具突出墙面影响玻璃幕墙安装,幕墙安装人员将锚具割除,导致已建预应力钢筋的张拉应力丧失殆尽。如果按照常规方法只有采用体外预应力加固、碳纤维加固、粘钢加固等技术的补救措施。但是经上述技术进行补救加固后都会改变原结构截面、增加自重荷载、影响表面美观甚至使用功能,并最终影响工程的创优夺杯。
发明内容
本发明的目的在于克服现有技术的不足,提供一种钢筋砼结构中已建预应力体系被破坏后重建预应力体系的施工工艺,它不改变原设计的结构受力,重新建立的预应力体系能完全满足原设计要求。
本发明解决上述技术问题所采用的技术方案为:
一种钢筋砼结构中已建预应力体系被破坏后重建预应力体系的施工工艺,其特征包括如下步骤:
将被破坏的原预应力钢绞线锚具去除,
将与原预应力钢绞线同规格等强度的新的钢绞线剥除表面塑料护套,
准备一根直径小于原预应力钢绞线直径的钢筋,钢筋长度应比原来的钢绞线长50厘米以上,
将被破坏的原预应力钢绞线拔出,
将钢筋穿入原结构的孔道内,
将新的预应力钢绞线的一端与钢筋的一端焊接,
用手拉葫芦连接钢筋的另一端,并拉动钢筋,利用孔内的钢筋将新的预应力钢绞线穿入孔内,
再对新的预应力钢铰线进行张拉,张拉达到单根钢绞线的原设计应力后锚固。
由于本发明采取了上述的技术措施,它与现有技术相比具有如下优点:
不改变原结构截面的尺寸,不增加荷载、不影响外观质量,能满足原设计的受力要求,施工工期短、成本低。
附图说明
图1是本发明实施例梁的横截面的结构示意图;
图2是本发明实施例的结构示意图。
具体实施方式
以下结合附图对本发明作进一步详细描述。
图2中,1为框架梁,2为柱头,3为钢筋,4为新的钢绞线,5为手拉葫芦,6为操作平台。
参照图1,
Figure A20071006879300041
为被错误施工割掉的5只锚具7,其中上部3只为张拉端锚具(夹片式),下部2只为固定端锚具(P型挤压锚)。因设计为同一梁中的张拉端、固定端锚具错开布置,分别单根一端张拉锚固。“○”为正常的锚具8。
参照图1和图2,将部分被破坏的原预应力钢绞线锚具7全部去除。将与原预应力钢绞线同规格等强度的新的预应力钢绞线4剥除表面塑料护套。准备一根直径小于原预应力钢绞线直径的钢筋3,本实施例为直径6毫米的钢筋,钢筋3长度应比原来的钢绞线长50厘米以上。将被破坏的原预应力钢绞线从框架梁1中拔出。将钢筋3穿入框架梁1原孔道内。将新的预应力钢绞线4的一端与钢筋3的一端焊接。用5吨手拉葫芦5连接钢筋3的另一端,并拉动钢筋3,待新的预应力钢铰线4进入孔道后,一端用人力推送,另一端用手拉葫芦5牵拉,两端同时作用,分别采用对讲机联络协调,做到人力与手拉葫芦5同步进行,将新的预应力钢绞线4穿入孔道内。再对新的预应力钢铰线4进行张拉,达到单根钢绞线的原设计应力后锚固。
按照相同方法,将所有被破坏的预应力钢绞线一一修复。

Claims (1)

1、一种钢筋砼结构中已建预应力体系破坏后重建预应力体系的施工工艺,其特征是包括如下步骤:
将被破坏的原预应力钢绞线锚具去除,
将与原预应力钢绞线同规格等强度的新的钢绞线剥除表面塑料护套,
准备一根直径小于原预应力钢绞线直径的钢筋(3),钢筋(3)长度应比原来的钢绞线长50厘米以上,
将被破坏的原预应力钢绞线拔出,
将钢筋(3)穿入原结构的孔道内,
将新的预应力钢绞线(4)的一端与钢筋(3)的一端焊接,
用手拉葫芦(5)连接钢筋(3)的另一端,并拉动钢筋(3),利用孔内的钢筋(3)将新的预应力钢绞线(4)穿入孔内,
再对新的预应力钢铰线(4)进行张拉,张拉达到单根钢绞线的原设计应力后锚固。
CN 200710068793 2007-05-23 2007-05-23 钢筋砼结构中已建预应力体系破坏后重建预应力体系的施工工艺 Pending CN101063374A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200710068793 CN101063374A (zh) 2007-05-23 2007-05-23 钢筋砼结构中已建预应力体系破坏后重建预应力体系的施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200710068793 CN101063374A (zh) 2007-05-23 2007-05-23 钢筋砼结构中已建预应力体系破坏后重建预应力体系的施工工艺

Publications (1)

Publication Number Publication Date
CN101063374A true CN101063374A (zh) 2007-10-31

Family

ID=38964624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200710068793 Pending CN101063374A (zh) 2007-05-23 2007-05-23 钢筋砼结构中已建预应力体系破坏后重建预应力体系的施工工艺

Country Status (1)

Country Link
CN (1) CN101063374A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485545A (zh) * 2013-09-13 2014-01-01 中南林业科技大学 一种无粘结预应力钢绞线试拆再锚施工的方法
CN105019662A (zh) * 2015-06-23 2015-11-04 上海建工四建集团有限公司 预应力施工中的无粘结预应力钢绞线断筋处理方法
CN105178351A (zh) * 2015-10-14 2015-12-23 天津城建大学 超长预应力钢筋牵引锁扣装置
CN112982187A (zh) * 2021-02-10 2021-06-18 同济大学 更换病害桥梁体内曲线预应力钢束及加固桥梁结构的方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485545A (zh) * 2013-09-13 2014-01-01 中南林业科技大学 一种无粘结预应力钢绞线试拆再锚施工的方法
CN103485545B (zh) * 2013-09-13 2016-01-20 中南林业科技大学 一种无粘结预应力钢绞线试拆再锚施工的方法
CN105019662A (zh) * 2015-06-23 2015-11-04 上海建工四建集团有限公司 预应力施工中的无粘结预应力钢绞线断筋处理方法
CN105178351A (zh) * 2015-10-14 2015-12-23 天津城建大学 超长预应力钢筋牵引锁扣装置
CN105178351B (zh) * 2015-10-14 2017-03-08 天津城建大学 超长预应力钢筋牵引锁扣装置
CN112982187A (zh) * 2021-02-10 2021-06-18 同济大学 更换病害桥梁体内曲线预应力钢束及加固桥梁结构的方法
CN112982187B (zh) * 2021-02-10 2022-06-21 同济大学 更换病害桥梁体内曲线预应力钢束及加固桥梁结构的方法

Similar Documents

Publication Publication Date Title
CN106522561B (zh) 大跨度混凝土框架梁有粘结预应力后浇带内张拉施工方法
CN105863145B (zh) 张弦结构、张弦梁和建筑
CN203007856U (zh) 空心板梁桥的体外预应力加固系统
CN101063374A (zh) 钢筋砼结构中已建预应力体系破坏后重建预应力体系的施工工艺
CN1916289A (zh) 菱形桁架式挂篮
CN1702270A (zh) 一种纤维板材预应力张拉装置
CN108978471A (zh) 一种增大斜拉桥异形索塔刚度的支撑装置及其安装方法
CN2813778Y (zh) 建筑物整体平移装置
CN104631329A (zh) 一种悬索桥连续式猫道整体线形调整方法
CN200978388Y (zh) 钢绞线斜拉索索力转换装置
CN106401196A (zh) 一种预应力锚具用钢绞线张拉装置
CN110130234B (zh) 一种新型桥梁加固体系及其施工方法
CN104328747A (zh) 一种桥梁单板受力的加固方法及其施工方法
CN209760863U (zh) 一种体外预应力钢绞线连接器及配套张拉装置
CN111663447A (zh) 一种先张法预制梁板的预应力弯起锚固装置及施工方法
CN202787099U (zh) 加固混凝土盖梁的体外预应力结构
CN107034785A (zh) 一种可换式锚碇预应力锚固装置及其安装换索施工方法
CN106884371A (zh) 一种变截面梁与悬索组合桥梁结构体系
CN106906753B (zh) 无锚固装置预应力高强u型钢绞线网加固混凝土构件的方法
CN201972415U (zh) 无粘结预应力钢绞线张拉后损伤的更换装置
CN102619338B (zh) 超长环梁的预应力筋的施工方法
CN209873586U (zh) 一种用于精轧螺纹钢筋预应力张拉的位置调节装置
CN200967962Y (zh) 打桩机起吊机构
CN108316162A (zh) 一种桥梁挂篮悬臂施工的预压系统安装方法
CN201778287U (zh) 预应力钢绞线折向器

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication