CN101003963A - 抗地表大变形公路路面成型方法 - Google Patents

抗地表大变形公路路面成型方法 Download PDF

Info

Publication number
CN101003963A
CN101003963A CN 200710019563 CN200710019563A CN101003963A CN 101003963 A CN101003963 A CN 101003963A CN 200710019563 CN200710019563 CN 200710019563 CN 200710019563 A CN200710019563 A CN 200710019563A CN 101003963 A CN101003963 A CN 101003963A
Authority
CN
China
Prior art keywords
making
pavement
highway
layer
deformation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200710019563
Other languages
English (en)
Inventor
于广云
李宏波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN 200710019563 priority Critical patent/CN101003963A/zh
Publication of CN101003963A publication Critical patent/CN101003963A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

一种抗地表大变形公路路面成型方法,在路基顶层先全断面铺设一层抗拉土工材料,并在土工材料上路基两侧宽30~50cm范围内做包边处理,然后在土工材料上铺筑10cm~15cm碎石垫层,再根据路基不均匀沉降量逐层分别铺筑不同尺寸的路面底基层、基层和面层,各层路面结构板块之间根据沉降量填充不同宽度的柔性材料,该方法可以有效降低路面各层因不均匀沉降产生的附加应力,保护路面结构不发生破坏,适用于预防和治理存在不均匀沉降区道路沉降、屈曲变形等地表大变形,在地表下沉过程中,能保证公路正常运营,满足地表下沉后公路的功能完好,不均匀沉降量可达20cm,节约了道路维修或重建道路的费用,具有广泛的实用性。

Description

抗地表大变形公路路面成型方法
技术领域
本发明涉及抗地表大变形公路路面成型方法,尤其适用于预防和治理不均沉降地区地表大变形的新建道路。
背景技术
为了满足社会经济的发展,人们加大了对地下资源的开发和利用,煤炭、石油、天然气、地下水等资源被源源不断的从地下采出,这不可避免的会破坏地下岩体、士体的原始应力平衡状态,引起岩土体内的应力重分布,岩层产生移动、变形和破坏。当地下开采面积达到一定的范围后,起始于采场附近的移动将扩展到地表,形成一个地表变形区,而这种变形会直接波及到地面道路,使其产生附加应力和位移,严重影响道路的正常使用,但目前公路路面的设计只是按照小变形规范进行设计的,其抵抗变形的能力较小,而地表发生较大不均匀变形时,现有的道路不能满足正常使用要求的。对于.此类问题,目前一般都是采用公路改道或反复维修等解决方案,由此可能造成占用耕地多,手续繁琐,工期较长,费用高等问题。
发明内容
鉴于已有技术存在的不足,本发明的目的是提供一种无需改道,抵抗变形量大,效果好的抗地表大变形公路路面成型方法。
本发明的抗地表大变形公路路面成型方法:
a.在路基顶层全断面铺设抗拉土工材料,并在土工材料上路基两侧预留30cm~50cm的边宽;
b.对边宽进行包边处理,铺筑10~15cm碎石垫层;
c.铺筑二灰土层,在铺筑的二灰土层中分块设置变形缝,并在变形缝内填充柔性材料;
d.铺筑二灰碎石层,施工方法与铺筑二灰土层相同;
e.铺筑沥青路面面层,在铺筑沥青路面面层中分块设置与变形缝等宽的钢模板,待路面成型后拆除模板,用柔性材料填充变形缝。
所述的土工材料为土工格栅或土工布;所述边宽的处理用灰土或二灰土铺筑;所述柔性材料用橡胶材料。
本发明抗地表大变形公路路面成型方法,最适用于预防和治理地表变形较大地区的道路。采用由滑动路面底基层,以及由纵横变形缝组成的路面结构,能满足采动区不均匀沉降、屈曲变形等地表大变形,该方法可以有效降低路面各层因不均匀沉降产生的附加应力,保护路面结构不发生破坏,在地表下沉过程中,能保证道路正常运营,满足地表下沉后道路的功能完好,不均匀沉降量可达20cm。大大节约了改线后耕地资源或重建道路的费用,具有广泛的实用性。
附图说明
图1是本发明路面横断面结构示意图。
图2是本发明路面分层铺筑结构示意图。
具体实施方式
下面将结合附图对本发明的一个实施例作进一步的描述:
图1为抗地表大变形公路路面成型方法的路面横断面结构示意图,为了提供路面的抗变形能力,先在路基8顶层全断面铺设一层抗拉土工材料1,抗拉材料可以为土工格栅或为土工布,图2(a)所示。土工材料1上路基8两侧预留20cm~30cm的边宽2,用二灰土或灰土对边宽2裹边做包边处理后,铺筑10cm~15cm碎石垫层3,图2(b)所示;再整体铺筑一层二灰土层4,根据二灰上层板块的尺寸切变形缝7填充橡胶材料,图2(c)所示;铺筑二灰碎石层5,其做法和二灰土层4相同,图2(d)所示;最后铺筑沥青路面面层6,在铺筑沥青路面面层6之前根据面层板块的大小设置和缝宽相同厚度模板9,待路面成型后拆除模板9,用橡胶材料填充变形缝7,图2(e)所示。根据不均匀沉降曲率的正负和大小设置变形缝7断面形状可以为长方形或为梯形。

Claims (4)

1.一种抗地表大变形公路路面成型方法,其特征在于:
a.在路基(8)顶层全断面铺设抗拉土工材料(1),并在土工材料(1)上路基(8)两侧预留30cm~50cm的边宽(2);
b.对边宽(2)进行包边处理,铺筑10cm~15cm碎石垫层(3);
c.铺筑二灰土层(4),在铺筑的二灰土层(4)中分块设置变形缝(7),并在变形缝(7)内填充柔性材料;
d.铺筑二灰碎石层(5),施工方法与铺筑二灰土层(4)相同;
e.铺筑沥青路面面层(6),在铺筑沥青路面面层(6)中分块设置与变形缝(7)等宽的钢模板(9),待路面成型后拆除模板(9),用柔性材料填充变形缝(7)。
2.根据权利要求1所述的抗地表大变形公路路面成型方法,其特征在于:所述的土工材料(1)为土工格栅或土工布。
3.根据权利要求1所述的抗地表大变形公路路面成型方法,其特征在于:所述边宽(2)的处理用灰土或二灰土铺筑。
4.根据权利要求1所述的抗地表大变形公路路面成型方法,其特征在于:所述柔性材料用橡胶材料。
CN 200710019563 2007-01-06 2007-01-06 抗地表大变形公路路面成型方法 Pending CN101003963A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200710019563 CN101003963A (zh) 2007-01-06 2007-01-06 抗地表大变形公路路面成型方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200710019563 CN101003963A (zh) 2007-01-06 2007-01-06 抗地表大变形公路路面成型方法

Publications (1)

Publication Number Publication Date
CN101003963A true CN101003963A (zh) 2007-07-25

Family

ID=38703320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200710019563 Pending CN101003963A (zh) 2007-01-06 2007-01-06 抗地表大变形公路路面成型方法

Country Status (1)

Country Link
CN (1) CN101003963A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535502A (zh) * 2011-12-29 2012-07-04 中国一冶集团有限公司 软弱土层地区利用组合预应力砼梁预防大面积地坪沉降、开裂的方法
CN102561381A (zh) * 2011-12-29 2012-07-11 中国一冶集团有限公司 软弱土层地区利用有粘结预应力砼梁预防大面积地坪沉降、开裂的方法
CN102787532A (zh) * 2012-09-02 2012-11-21 中铁二院工程集团有限责任公司 高速铁路路肩及排水构造
CN103233406A (zh) * 2013-04-25 2013-08-07 中交四航工程研究院有限公司 一种长期耐久稳定使用的道路堆场铺面结构层及其施工方法
CN104652213A (zh) * 2013-11-20 2015-05-27 哈尔滨欧麦克科技开发有限公司 一种适用于山区道路的筑造方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535502A (zh) * 2011-12-29 2012-07-04 中国一冶集团有限公司 软弱土层地区利用组合预应力砼梁预防大面积地坪沉降、开裂的方法
CN102561381A (zh) * 2011-12-29 2012-07-11 中国一冶集团有限公司 软弱土层地区利用有粘结预应力砼梁预防大面积地坪沉降、开裂的方法
CN102535502B (zh) * 2011-12-29 2014-05-07 中国一冶集团有限公司 软弱土层地区利用组合预应力砼梁预防大面积地坪沉降、开裂的方法
CN102787532A (zh) * 2012-09-02 2012-11-21 中铁二院工程集团有限责任公司 高速铁路路肩及排水构造
CN103233406A (zh) * 2013-04-25 2013-08-07 中交四航工程研究院有限公司 一种长期耐久稳定使用的道路堆场铺面结构层及其施工方法
CN103233406B (zh) * 2013-04-25 2015-11-25 中交四航工程研究院有限公司 一种长期耐久稳定使用的道路堆场铺面结构层及其施工方法
CN104652213A (zh) * 2013-11-20 2015-05-27 哈尔滨欧麦克科技开发有限公司 一种适用于山区道路的筑造方法

Similar Documents

Publication Publication Date Title
CN103669399B (zh) 混凝土面板加筋挡土墙及其施工方法
CN103882884B (zh) 一种锚索土工格栅支挡结构及其施工方法
CN100510278C (zh) 填砂路基空心块生态防护方法
CN107503257B (zh) 一种傍山高填路堤稳定与变形控制结构及施工方法
CN104631254A (zh) 一种土工格栅加筋粘土包边尾矿砂路基的施工方法
CN102296507B (zh) 一种路基裂缝处理方法
CN104480963A (zh) 一种预制模块式面板土工格栅加筋尾矿砂挡墙的施工方法
CN104818732A (zh) 一种互嵌式生态砌块挡土墙及其施工方法
CN208777093U (zh) 山区公路填挖交界路段防差异沉降结构
CN209039896U (zh) 一种桩-织结合式软土路基立体加筋结构
CN103233406A (zh) 一种长期耐久稳定使用的道路堆场铺面结构层及其施工方法
CN104358196B (zh) 已通车公路路堤沉降处置结构的施工方法
CN101003963A (zh) 抗地表大变形公路路面成型方法
CN105804007A (zh) 一种基于滩涂软基的加筋土岸墙结构
CN105781556A (zh) 一种盾构下穿浅覆土城市景观湖的施工方法
CN204570720U (zh) 一种路基加宽涵洞地基
CN207079601U (zh) 一种治理膨胀土挖方边坡滑坡的柔性支挡结构
CN205399440U (zh) 一种膨胀土路堑结构
CN204690780U (zh) 一种互嵌式生态砌块挡土墙
CN113802426A (zh) 采用片石挤密加筋垫层法处理新近填土路基的方法
CN203034328U (zh) 一种高速公路改扩建工程结合部处治结构
CN112012064A (zh) 一种用土工袋处理道路软土地基的技术
CN207552833U (zh) 一种高架桥梁基础周边地面道路结构
CN218842755U (zh) 一种岩溶地基的高强复合土工合成材料加筋褥垫层结构
CN103276717A (zh) 复合土工合成材料加筋垫层处理软土地基的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication