CN100557139C - 施工受潮水限制的混凝土工程的底模挂篮支撑方法 - Google Patents
施工受潮水限制的混凝土工程的底模挂篮支撑方法 Download PDFInfo
- Publication number
- CN100557139C CN100557139C CNB2007101195844A CN200710119584A CN100557139C CN 100557139 C CN100557139 C CN 100557139C CN B2007101195844 A CNB2007101195844 A CN B2007101195844A CN 200710119584 A CN200710119584 A CN 200710119584A CN 100557139 C CN100557139 C CN 100557139C
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- support
- load
- construction
- suspention
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Revetment (AREA)
Abstract
本发明公开了一种施工受潮水限制的混凝土工程的底模挂篮支撑方法,包括如下步骤:1)根据上部现浇承台的荷载确定挂篮的承力部、悬吊部和底模支撑部需要采用的钢板的厚度、宽度;2)根据待支撑挂篮的桩体,预制好钢挂篮,悬吊部对称设置在承力部的两端,底膜支撑部设置在悬吊部上;3)将挂篮放置在桩顶处,利用灌注桩的锚筋对承力部进行隔断;4)在支撑部上放置支撑型钢梁,然后在其上铺设木楞作为底模。本发明通过设置挂篮,从而解决了因水位影响承台底模支撑非常困难的问题,不仅能够有效地避开水位的影响,而且能够减小作业安全风险,确保了施工质量和施工进度,在码头改造类工程中具有广泛的应用和推广价值。
Description
技术领域
本发明涉及一种码头改造工程的施工方法。
背景技术
随着国家经济建设的高速发展,全国工业、航运业基础设施能力不足的问题暴露得日益突出,严重阻碍了经济高速和可持续发展的步伐。在我国沿海港口地区的基础设施中,普遍存在着码头面承重能力低下、港池浚深不足而导致难以停靠大型船舶的问题,这些问题给我国海运事业的发展和国民经济的建设带来极大的阻力。虽然可以投资修建新的码头来缓和这种需求的矛盾,但存在很多不利的因素:资金问题(投资巨大);建设周期问题(从立项、论证、到设计、施工周期很长);环境因素(建设工程对周围环境的影响)等等。
为解决上述问题,在近几年的港口基础设施建设中,常采取对老设施进行分段改造的方法。其优点在于:投资少见效快(在已有设施的基础上改造,能充分利用上老建筑的有用结构,因而造价低、工期短);分段进行改造可以保证港口的装卸工作不受太大的影响,可以保证港口的正常运营,保证投资方的利益;不牵扯对周围环境影响的问题。因此,在这种改造工程中,一些新技术、新工艺不断涌现。一些工程质量可靠,工程施工安全快捷,工程造价合理、节约的施工技术和措施,越来越受到重视。
但是,在这些新技术、新工艺中,对于现浇承台底面位于水面以下的底模支撑技术和工艺方法还比较单一,一般做法是在已有桩的桩身上进行水下焊接“牛腿”或作“抱箍”的方法,作为承台底模的承重支撑部分,如图1所示。由于牛腿焊接部4设在承台底标高2以下的工字钢3底部的位置,故此水下作业安全风险大,施工效率低,容易造成触电、坠海等事故的发生,经常给施工造成很大的困难,增大业主的资金投入。
发明内容
本发明所要解决的技术问题在于提供一种施工受潮水限制的混凝土工程的底模挂篮支撑方法,该方法能够有效地避开水位的影响,从而确保施工质量,减小作业安全风险。
本发明的一种施工受潮水限制的混凝土工程的底模挂篮支撑方法包括如下步骤:
1)根据上部现浇承台的荷载确定挂篮的承力部、悬吊部和底模支撑部需要采用的钢板的厚度、宽度;
2)根据待支撑挂篮的桩体,预制好钢挂篮,悬吊部对称设置在承力部的两端,底膜支撑部设置在悬吊部上;
3)将挂篮放置在桩顶处,利用灌注桩的锚筋对承力部进行隔断;
4)在支撑部上放置支撑型钢梁,然后在支撑型钢梁上铺设木楞作为底模。
优选地,所述悬吊部和承力部直接通过支撑加强部连接在一起。
本发明通过设置挂篮,从而解决了因水位影响承台底模支撑非常困难的问题,不仅能够有效地避开水位的影响,而且能够减小作业安全风险,确保了施工质量和施工进度,在码头改造类工程中具有广泛的应用和推广价值。
附图说明
图1为现有技术施工示意图。
图2a为本发明安装的纵向截面示意图。
图2b为本发明安装的横向截面示意图。
图3为图2b中挂篮的结构示意图。
1——桩体(上部包含钢护筒)
2——承台底标高位置
3——工字钢
4——钢制牛腿(与桩体护筒焊接在一起)
5——100mm厚的木楞一层(作为底模)
6——挂篮
61——挂篮的承力部(钢扁担)
62——挂篮的悬吊部
63——挂篮的支撑加强部
64——挂篮的底模支撑部(挂钩)
具体实施方式
如图1所示,在一待改造的码头老基础上,要求新建承台低标高2为+1.33m,而实测该季节海水(低潮)标高平均值为+1.45m,因此受到了海水的严重影响,无法在现场进行以往的牛腿支撑法,使得底模的铺设工作不能进行。采用本发明的挂篮法,具体如下所述。
为了能够浇注承台为7.2m×1.8m×1.8m钢筋混凝土,(考虑分两次浇注。)如图2~3所示,本发明采用了如下步骤进行:
首先,根据上部现浇承台的荷载确定挂篮6的承力部61(或称钢扁担)、悬吊部62和底模三角支撑部64需要采用的钢板的厚度、宽度;根据待支撑挂篮6的桩体1,预制好钢挂篮6,悬吊部62对称设置在承力部61的两端,底膜三角支撑部64设置在悬吊部62上。挂篮6完全先在地面预制好,赶低潮水时安放。具体是:钻孔混凝土灌注桩直径为¢1000mm,挂蓝6的承力部61则采用长度大于灌注桩桩径400mm左右(目的是要保证支撑加强部63与承力部61有足够长度的焊缝)宽200mm的钢板;悬吊部62(宽度为20cm,长度根据桩顶标高,承台底标高2和预留出工字钢4和木底板5的空间量来确定,本实施例中为70cm)与承力部61采用直角边长为20cm的三角钢板焊接,作为支撑加强部63,悬吊部62的每一面各设置两块,以保证承力部61与悬吊部62的连接具有足够的抗拉力和抗变形能力。底模支撑部64为挂篮6的挂钩部分,该部分也采用直角边长为20cm的三角钢板支撑焊接(可以采用双面搭接焊),悬吊部62的每一面各设置两块。另外,挂蓝6的底模支撑部64和支撑加强部63均采用厚度30mm的钢板。挂篮6底口三角支撑部64位于承台底标高2以下40cm处(预留出工字钢4和木底板5的空间量),能够支撑住1.8m宽、7.2m长、0.6m高,重量为7.8吨的钢筋混凝土。
其次,将做好的挂篮6采用绳索放在4个角桩的桩顶处,利用灌注桩的锚筋对承力部61进行隔断,防止侧翻。挂蓝6安装完成后,赶低潮位时在挂蓝6的挂钩上选用7.4m长30cm高的4根工字钢4进行底模横梁搭设,其上再铺设100mm厚的木楞5作为底模,随后安装侧模板(未图示出),赶低潮时将第一层60cm厚的砼浇筑。当混凝土强度达标后,即有了足够的支撑强度,这时低潮位时第一层砼完全可以露出水面,再进行第二层砼浇筑。从而有效地避开了潮汐,完成底模支设和承台浇注工作。
Claims (2)
1、一种施工受潮水限制的混凝土工程的底模挂篮支撑方法,其特征在于,包括如下步骤:
1)根据上部现浇承台的荷载确定挂篮的承力部、悬吊部和底模支撑部需要采用的钢板的厚度、宽度;
2)根据待支撑挂篮的桩体,预制好钢挂篮,悬吊部对称设置在承力部的两端,底膜支撑部设置在悬吊部上;
3)将挂篮放置在桩顶处,利用灌注桩的锚筋对承力部进行隔断;
4)在支撑部上放置支撑型钢梁,然后在支撑型钢梁上铺设木楞作为底模。
2、如权利要求1所述的方法,其特征在于,所述悬吊部和承力部直接通过支撑加强部连接在一起。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2007101195844A CN100557139C (zh) | 2007-07-26 | 2007-07-26 | 施工受潮水限制的混凝土工程的底模挂篮支撑方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2007101195844A CN100557139C (zh) | 2007-07-26 | 2007-07-26 | 施工受潮水限制的混凝土工程的底模挂篮支撑方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101130947A CN101130947A (zh) | 2008-02-27 |
CN100557139C true CN100557139C (zh) | 2009-11-04 |
Family
ID=39128346
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2007101195844A Active CN100557139C (zh) | 2007-07-26 | 2007-07-26 | 施工受潮水限制的混凝土工程的底模挂篮支撑方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100557139C (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109356088A (zh) * | 2018-11-21 | 2019-02-19 | 安徽省交通航务工程有限公司 | 高桩码头现浇横梁模板悬吊支撑装置及支撑体系 |
CN111764281A (zh) * | 2020-04-29 | 2020-10-13 | 中交路桥建设有限公司 | 一种基于挂篮施工的桥梁建设施工方法 |
-
2007
- 2007-07-26 CN CNB2007101195844A patent/CN100557139C/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN101130947A (zh) | 2008-02-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103741657B (zh) | 大型多功能水上施工平台的施工方法 | |
CN101538833B (zh) | 竖向分条双壁钢围堰止水施工工法 | |
CN102425167A (zh) | 潮间带施打大直径钢管桩沉桩方法 | |
CN107700366B (zh) | 深水高墩大跨度桥梁施工用坚石裸岩河床栈桥及施工方法 | |
CN101418571B (zh) | 宽大基坑逆作法施工的中板施工方法 | |
CN102561191A (zh) | 一种拱桥拱肋的整体提升系统及施工方法 | |
CN105350526B (zh) | 钢平台的搭设方法 | |
CN104563119A (zh) | 旋转式水上打桩导架 | |
CN106012960A (zh) | 一种装配式高桩码头上部结构体系及其施工方法 | |
CN104727227A (zh) | 一种中承式钢箱系杆拱桥敞口格构式钢梁整节段架设方法 | |
CN108457243A (zh) | 一种装配式混凝土挡浪墙的施工方法 | |
CN104480865A (zh) | 一种大型钢沉井精确定位方法 | |
CN205152883U (zh) | 一种装配框架式码头结构 | |
CN107142954A (zh) | 一种整体吊装的钢吊箱吊装系统及其吊装方法 | |
CN208251156U (zh) | 一种利用围护结构减少地下结构隆沉的装置 | |
CN100557139C (zh) | 施工受潮水限制的混凝土工程的底模挂篮支撑方法 | |
CN207452738U (zh) | 深水高墩大跨度桥梁施工用坚石裸岩河床栈桥 | |
CN203782670U (zh) | 水上施工浮箱平台 | |
CN207176731U (zh) | 一种装配式预制混凝土管廊支架 | |
CN204510221U (zh) | 旋转式水上打桩导架 | |
CN102477716A (zh) | 栈桥式梁板桥在两岸为滩涂的内陆河流中的应用 | |
CN216515566U (zh) | 基于螺旋锚的紧张式单点系泊组合锚碇结构 | |
CN108999143A (zh) | 一种多港池大型全天候码头结构及其建造方法 | |
CN212452552U (zh) | 一种存打一体的低波浪影响海上施工平台 | |
CN104746476A (zh) | 后沿增设斜桩码头及码头后沿施打斜桩加固的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing Co-patentee after: China Oilfield Services Limited Patentee after: China Offshore Oil Group Co., Ltd. Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing Co-patentee before: China Oilfield Services Limited Patentee before: China National Offshore Oil Corporation |