CN100513717C - Steel structure assisted layered installation and construction method for superhigh PRC partition plate - Google Patents
Steel structure assisted layered installation and construction method for superhigh PRC partition plate Download PDFInfo
- Publication number
- CN100513717C CN100513717C CNB2006102012935A CN200610201293A CN100513717C CN 100513717 C CN100513717 C CN 100513717C CN B2006102012935 A CNB2006102012935 A CN B2006102012935A CN 200610201293 A CN200610201293 A CN 200610201293A CN 100513717 C CN100513717 C CN 100513717C
- Authority
- CN
- China
- Prior art keywords
- steel structure
- prc
- partition wall
- lightweight composite
- board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Building Environments (AREA)
- Finishing Walls (AREA)
Abstract
一种超高PRC隔墙板钢结构辅助分层安装施工方法,先将钢结构柱脚连接件和钢结构横梁连接件安装在结构物上;然后将钢结构柱与钢结构柱脚连接件进行焊接;安装钢结构横梁以下的PRC轻质复合隔墙板后再安装钢结构横梁,然后安装钢结构横梁以上的PRC轻质复合隔墙板,将PRC轻质复合隔墙板底面沿板宽方向开凹槽,然后用水泥填缝砂浆将钢结构横梁凹槽处填平,安装PRC轻质复合隔墙板,使PRC轻质复合隔墙板底面的凹槽对准钢结构横梁并与之嵌固,板顶面与结构之间有水泥填缝砂浆;将PRC轻质复合隔墙板安装完毕后,用建筑胶粘剂封闭PRC轻质复合隔墙板的板缝。解决了超高隔墙难以施工的问题。
A super-high PRC partition board steel structure auxiliary layered installation construction method, first install the steel structure column foot connector and the steel structure beam connector on the structure; then install the steel structure column and the steel structure column foot connector Welding; install the PRC lightweight composite partition wall panel below the steel structure beam, then install the steel structure beam, and then install the PRC lightweight composite partition wall panel above the steel structure beam, and place the bottom surface of the PRC lightweight composite partition wall panel along the board width direction Open the groove, then fill the groove of the steel structure beam with cement mortar, install the PRC lightweight composite partition wall panel, and make the groove on the bottom surface of the PRC lightweight composite partition wall panel align with the steel structure beam and inlay it. There is cement joint mortar between the top surface of the board and the structure; after the PRC lightweight composite partition wall board is installed, use construction adhesive to seal the board seam of the PRC lightweight composite partition wall board. It solves the problem that the ultra-high partition wall is difficult to construct.
Description
(一)技术领域 (1) Technical field
本发明涉及一种墙体结构及其墙体结构的安装施工方法。The invention relates to a wall structure and an installation and construction method for the wall structure.
(二)背景技术 (2) Background technology
五棵松体育馆是北京2008奥运会篮球馆,该体育馆每层建筑的高度较高,最高的隔墙要达到10米,大多数隔墙也要5米高,这种超高墙体的施工存在着传统技术无法解决的难点问题。为了达到绿色奥运的目标,该体育馆对隔墙的品质、强度、隔音、防火及环保等各个方面,都提出了较高的要求。第一、要求建筑防火及防水等级均为一级。第二、要求体育馆内的记者室、声控室、新闻发布室、运动员休息室、热身室及贵宾室等用房,应有确保安静环境的噪声限值。记者室、声控室、新闻发布室及贵宾室等,隔墙的空气隔声量,应大于50dB。一般房间隔墙的空气隔声量,应大于40dB。传统的隔墙,比如轻钢龙骨石膏板墙及空心砖,很难达到这一指标,而且墙也做的很厚。另外,还要求墙体不能钉钉子,不能挂重物等。第三、要求所有建筑材料必须满足绿色环保的要求,而传统隔墙很难达到满意的效果。Wukesong Gymnasium is the basketball stadium for the Beijing 2008 Olympic Games. The height of each floor of the gymnasium is relatively high. The highest partition wall must reach 10 meters, and most of the partition walls are also 5 meters high. There are some problems in the construction of such super high walls. Difficult problems that cannot be solved by traditional technology. In order to achieve the goal of a green Olympics, the gymnasium puts forward higher requirements on the quality, strength, sound insulation, fire prevention and environmental protection of the partition walls. First, it is required that the fireproof and waterproof grades of buildings are all first-class. Second, it is required that the press room, voice control room, press release room, athlete lounge, warm-up room and VIP room in the gymnasium should have noise limits to ensure a quiet environment. For press rooms, sound control rooms, press conference rooms and VIP rooms, etc., the air sound insulation of the partition walls should be greater than 50dB. The air sound insulation of the general room partition wall should be greater than 40dB. Traditional partition walls, such as light steel keel plasterboard walls and hollow bricks, are difficult to achieve this target, and the walls are also made very thick. In addition, it is also required that no nails be nailed on the wall, and heavy objects cannot be hung. Third, all building materials are required to meet the requirements of green environmental protection, while traditional partition walls are difficult to achieve satisfactory results.
传统隔墙板有空心砌块墙、轻钢龙骨石膏板墙及陶粒板等等,在墙体的综合指标、性能和施工方面,都存在着许多问题:Traditional partition boards include hollow block walls, light steel keel gypsum board walls and ceramsite boards, etc. There are many problems in terms of comprehensive indicators, performance and construction of the wall:
(1)、隔音效果不好。传统墙体结构若要达到较好的隔音效果,就需要把墙体的厚度做的很厚,不但浪费了使用面积,还增加了造价。(1), the sound insulation effect is not good. If the traditional wall structure wants to achieve a better sound insulation effect, the thickness of the wall needs to be made very thick, which not only wastes the usable area, but also increases the cost.
(2)、耐火极限达不到规定时间。传统墙体结构的耐火极限达不到一个小时,有的还不到半个小时,不能满足发生火灾时的逃生时间要求。(2) The fire resistance limit cannot reach the specified time. The fire resistance limit of traditional wall structures is less than one hour, and some are less than half an hour, which cannot meet the escape time requirements in the event of a fire.
(3)、绿色环保指标达不到要求。传统墙体结构燃烧时,会放出有毒的气体,造成环境污染及伤害人身。(3), the green environmental protection indicators can not meet the requirements. When the traditional wall structure burns, it will release toxic gas, causing environmental pollution and personal injury.
(4)、变形指标达不到要求。在夏季潮湿的环境中,传统墙体结构会产生变形,造成墙面裂缝、翘曲。(4), the deformation index does not meet the requirements. In the humid environment in summer, the traditional wall structure will be deformed, resulting in cracks and warping of the wall.
(5)、施工繁琐。传统墙体结构需要现场湿作业,要使用大量的水和电,并且,墙体不容易进行切割,对后期埋管、开凹槽的工作造成一定的不便,在切割过程中,墙面容易裂缝,对建筑的质量会造成一定的影响,并且有时会延长工期。(5), construction is loaded down with trivial details. The traditional wall structure requires on-site wet work, which requires a lot of water and electricity. Moreover, the wall is not easy to cut, which will cause some inconvenience to the work of laying pipes and opening grooves in the later stage. During the cutting process, the wall surface is prone to cracks , will have a certain impact on the quality of the building, and sometimes prolong the construction period.
(三)发明内容 (3) Contents of the invention
本发明的目的是提供一种超高PRC隔墙板钢结构辅助分层安装施工方法,主要解决超高建筑物的隔墙同时满足一级防火、防水、隔音、环保技术要求的问题;并解决公共建筑超高隔墙难以施工的问题。The purpose of the present invention is to provide a super-high PRC partition wall plate steel structure auxiliary layered installation construction method, which mainly solves the problem that the partition wall of a super-high building meets the technical requirements of first-class fire protection, waterproof, sound insulation and environmental protection; and solves the problem of It is difficult to construct super high partition walls of public buildings.
本发明的目的是这样实现的:The purpose of the present invention is achieved like this:
一种超高PRC隔墙板钢结构辅助分层安装施工方法,其特征在于:A super-high PRC partition board steel structure auxiliary layered installation construction method, characterized in that:
步骤1:确定钢结构柱脚连接件及钢结构横梁连接件位置,将钢结构柱脚连接件用膨胀螺栓安装在结构物顶板及地面上;Step 1: Determine the position of the steel structure column foot connector and the steel structure beam connector, and install the steel structure column foot connector on the roof and ground of the structure with expansion bolts;
步骤2:将钢结构横梁连接件用膨胀螺栓安装在结构物上高度不超过5.5米的位置;Step 2: Install the steel structure beam connector with expansion bolts on the structure at a height of no more than 5.5 meters;
步骤3:沿墙体间隔安装钢结构柱,将钢结构柱竖起,其顶端和柱脚分别与钢结构柱脚连接件进行焊接;Step 3: install steel structure columns at intervals along the wall, erect the steel structure columns, and weld the top and column feet to the steel structure column foot connectors respectively;
步骤4:安装钢结构横梁以下的PRC轻质复合隔墙板,板底面、板缝的阴、阳榫处有水泥填缝砂浆;Step 4: Install the PRC lightweight composite partition wall panels below the steel structure beams, with cement joint mortar on the bottom surface of the panels and the male and female tenons of the panel seams;
步骤5:安装钢结构横梁,首先在安装好的PRC轻质复合隔墙板顶面沿板宽方向开凹槽,用水泥填缝砂浆将所开的凹槽填平,并将钢结构横梁压入凹槽内,钢结构横梁两端与固定在两侧墙体或结构柱上的钢结构横梁连接件进行焊接;Step 5: Install the steel structure beam. Firstly, open a groove on the top surface of the installed PRC lightweight composite partition wall along the board width direction, fill the opened groove with cement mortar, and press the steel structure beam. Into the groove, the two ends of the steel structural beam are welded with the steel structural beam connectors fixed on the walls or structural columns on both sides;
步骤6:安装钢结构横梁以上的PRC轻质复合隔墙板,先将PRC轻质复合隔墙板底面沿板宽方向开凹槽,然后用水泥填缝砂浆将钢结构横梁凹槽处填平,安装PRC轻质复合隔墙板,使PRC轻质复合隔墙板底面的凹槽对准钢结构横梁并与之嵌固,板顶面与结构物之间有水泥填缝砂浆;Step 6: Install the PRC light-weight composite partition wall above the steel structure beam. First, groove the bottom surface of the PRC light-weight composite partition wall along the width direction of the plate, and then fill the groove of the steel structure beam with cement mortar , install the PRC lightweight composite partition board, make the groove on the bottom surface of the PRC lightweight composite partition board align with the steel structure beam and fix it with it, and there is cement joint mortar between the top surface of the board and the structure;
步骤7:将PRC轻质复合隔墙板安装完毕后,待整个墙面水泥填缝砂浆干凝后,用建筑胶粘剂封闭PRC轻质复合隔墙板的板缝。Step 7: After the PRC lightweight composite partition board is installed, after the cement mortar on the entire wall has dried and set, seal the joints of the PRC lightweight composite partition board with construction adhesive.
在步骤3中,上述钢结构柱的间隔可为3-5米。In step 3, the interval between the steel structure columns may be 3-5 meters.
在步骤4中,上述PRC轻质复合隔墙板从门口或墙端侧开始逐块安装,在安装之前将PRC轻质复合隔墙板和与之连接的结构物刷水,使其充分湿润。In
上述钢结构横梁沿墙体高度方向每隔3—5.5米安装一根。The above-mentioned steel structure beams are installed at intervals of 3-5.5 meters along the height direction of the wall body.
上述PRC轻质复合隔墙板的上部与结构物的结合处,每隔0.5m—1m安装一个固定的角形钢件。A fixed angle-shaped steel piece is installed every 0.5m-1m at the joint between the upper part of the above-mentioned PRC lightweight composite partition wall and the structure.
上述PRC轻质复合隔墙板的板与板之间用钢钎斜插入连接。The boards of the above-mentioned PRC lightweight composite partition boards are connected by obliquely inserting steel brazing.
上述PRC轻质复合隔墙板的底部和顶部用木楔子楔紧,缝隙用水泥填缝砂浆填实。The bottom and top of the above-mentioned PRC lightweight composite partition board are wedged tightly with wooden wedges, and the gaps are filled with cement mortar.
上述水泥填缝砂浆的组分为:普硅水泥、中砂、水泥微膨胀剂、108胶溶液。The components of the above-mentioned cement joint mortar are: ordinary silicon cement, medium sand, cement micro-expansion agent, and 108 glue solution.
上述PRC轻质复合隔墙板与结构物的连接部位,阴、阳角连接部位,管线凹槽部位用聚合物砂浆粘贴网格布加强。The connection parts between the above-mentioned PRC lightweight composite partition board and the structure, the connection parts of the female and male corners, and the groove parts of the pipelines are reinforced with polymer mortar pasted with grid cloth.
一种应用上述超高PRC隔墙板钢结构辅助分层安装施工方法的超高建筑隔墙,该隔墙的四周分别与结构物的两侧墙体、地面、顶面固定连接,其特征在于:A super-high building partition wall using the above-mentioned ultra-high PRC partition wall plate steel structure auxiliary layered installation construction method, the surrounding walls of the partition wall are respectively fixedly connected with the walls on both sides, the ground, and the top surface of the structure, and it is characterized in that :
该隔墙沿两侧墙体跨度方向每隔3—5米分布一根钢结构柱,钢结构柱由膨胀螺栓分别与固定在结构物顶板及地面上的钢结构柱脚连接件连接。The partition wall distributes a steel structure column every 3-5 meters along the span direction of the walls on both sides. The steel structure column is connected with the steel structure column foot connectors fixed on the roof of the structure and the ground by expansion bolts.
该隔墙沿墙体高度方向每隔3—5.5米分布一根钢结构横梁,钢结构横梁由膨胀螺栓分别与固定在两侧墙体上的钢结构横梁连接件连接。The partition wall distributes a steel structure beam every 3-5.5 meters along the height direction of the wall, and the steel structure beam is respectively connected with the steel structure beam connectors fixed on the walls on both sides by expansion bolts.
在钢结构柱与钢结构横梁交叉形成的框架中固定连接PRC轻质复合隔墙板,PRC轻质复合隔墙板与钢结构横梁连接的端部开有凹槽,钢结构横梁嵌入凹槽内固定,由水泥填缝砂浆将凹槽填平,PRC轻质复合隔墙板的边部及板缝内有水泥填缝砂浆,板缝外面由建筑胶粘剂封闭。In the frame formed by the intersection of steel structure columns and steel structure beams, the PRC lightweight composite partition wall panels are fixedly connected. There is a groove at the end of the connection between the PRC lightweight composite partition wall panels and the steel structure beams, and the steel structure beams are embedded in the grooves. Fixing, the groove is filled with cement caulking mortar, the edge of the PRC lightweight composite partition wall board and the board seam are filled with cement caulking mortar, and the outside of the board seam is closed by construction adhesive.
本发明与现有传统技术相比具有的有益效果:施工简便、快捷、环保、造价低。解决了超高建筑物的隔墙同时满足一级防火、防水、隔音、环保技术要求的问题,并解决了公共建筑超高隔墙施工难以安装的问题。Compared with the existing traditional technology, the invention has the beneficial effects of simple and fast construction, environmental protection and low cost. It solves the problem that the partition walls of super high buildings meet the technical requirements of first-class fire protection, waterproof, sound insulation and environmental protection, and solves the problem that the super high partition walls of public buildings are difficult to install.
本发明选用了PRC轻质复合墙板,PRC轻质复合墙板是以无机填料、无机粘合剂、玻璃纤维布及无机增强改良剂组成的纤维增强水泥复合板(PlantfibreReinforceCe—ment)的简称,它具有如下优点:The present invention selects the PRC lightweight composite wallboard, which is the abbreviation of the fiber reinforced cement composite board (PlantfibreReinforceCement) composed of inorganic fillers, inorganic adhesives, glass fiber cloth and inorganic reinforcement modifiers. It has the following advantages:
实心轻质,强度高,经久耐用;Solid lightweight, high strength, durable;
绿色,环保,节能,无任何有害物质;Green, environmental protection, energy saving, without any harmful substances;
隔音,保温,抗冻;Sound insulation, heat preservation, frost resistance;
防火,防水,防蚁,防虫;Fireproof, waterproof, termite-proof, insect-proof;
装饰性好,表面贴瓷砖不用做拉毛处理;Good decoration, tiles on the surface do not need to be roughened;
抗冲击,可钉钉子,可挂重物;Impact resistance, nails can be nailed, and heavy objects can be hung;
易切割,可锯,可开凹槽埋设管线;Easy to cut, can be sawed, and can be grooved to bury pipelines;
可拼接特别高度,安装门窗简单方便;It can be spliced to a special height, and the installation of doors and windows is simple and convenient;
干作业、安装施工简便、缩短周期;Dry operation, easy installation and construction, shortening the cycle;
(10)增大建筑物的使用空间、减轻主体结构的负荷,降低综合造价。(10) Increase the use space of the building, reduce the load of the main structure, and reduce the overall cost.
(四)附图说明 (4) Description of drawings
图1是钢结构柱脚连接件的安装示意图;Figure 1 is a schematic diagram of the installation of steel structure column foot connectors;
图2是钢结构横梁连接件的安装示意图;Figure 2 is a schematic diagram of the installation of steel structure beam connectors;
图3是PRC轻质复合隔墙板纵向连接的结构示意图;Fig. 3 is a structural schematic diagram of the longitudinal connection of the PRC lightweight composite partition board;
图4是PRC轻质复合隔墙板横向连接的结构示意图。Fig. 4 is a structural schematic diagram of the lateral connection of the PRC lightweight composite partition board.
图5是本发明超高建筑隔墙的立面结构示意图。Fig. 5 is a schematic diagram of the facade structure of the super-high building partition wall of the present invention.
图中:1—钢结构柱脚连接件、2—钢结构横梁连接件、3—钢结构柱、4—膨胀螺栓、5—PRC轻质复合隔墙板、51—横梁以下的PRC轻质复合隔墙板、52—横梁以上的PRC轻质复合隔墙板、6—结构物顶面、7—钢结构横梁、81—横梁下的水泥填缝砂浆、82—横梁上的水泥填缝砂浆、9—建筑胶粘剂、10—地面、11—两侧墙体、12—角形钢件、13—钢钎。In the figure: 1—steel structure column foot connector, 2—steel structure beam connector, 3—steel structure column, 4—expansion bolt, 5—PRC lightweight composite partition wall, 51—PRC lightweight composite below the beam Partition board, 52—PRC lightweight composite partition board above the beam, 6—top surface of the structure, 7—steel structure beam, 81—cement caulking mortar under the beam, 82—cement caulking mortar on the beam, 9—construction adhesive, 10—ground, 11—walls on both sides, 12—angular steel parts, 13—steel brazing.
(五)具体实施方式 (5) Specific implementation methods
实施例参见图1-5,PRC轻质复合隔墙板在安装时,对于高度超过5.5米的墙体,其安装拟采用钢结构辅助分层安装法进行安装,即沿墙体长度方向每隔4米左右安装一个钢结构柱3、沿墙体高度方向每隔5米左右安装一个钢结构横梁7。钢结构柱3和钢结构横梁7的位置可根据墙体的实际尺寸及PRC轻质复合隔墙板材的规格作适当调整。The embodiment is shown in Figure 1-5. When installing the PRC lightweight composite partition wall, for the wall with a height of more than 5.5 meters, the installation is planned to be installed by the steel structure auxiliary layered installation method, that is, along the length of the wall, every Install a steel structure column 3 at about 4 meters, and install a steel structure beam 7 at intervals of about 5 meters along the height direction of the wall body. The positions of the steel structure columns 3 and the steel structure beams 7 can be adjusted appropriately according to the actual size of the wall and the specifications of the PRC lightweight composite partition wall panels.
超高超长PRC隔墙板钢结构辅助分层安装具体施工工艺如下:The specific construction process of super-high and super-long PRC partition wall steel structure auxiliary layered installation is as follows:
步骤1:根据图纸及现场放线情况确定钢结构柱脚及横梁连接件位置;Step 1: Determine the position of the steel structure column feet and beam connectors according to the drawings and on-site setting-out conditions;
步骤2:安装连接件。参见图1,将钢结构柱脚连接件1用膨胀螺栓4安装在结构顶板及地面10上。钢结构柱脚连接件1可选用220×220×10mm钢板;Step 2: Install the connectors. Referring to FIG. 1 , the steel structure column foot connector 1 is installed on the structural roof and the ground 10 with
参见图2,将钢结构横梁连接件2用膨胀螺栓4安装在结构柱或两侧墙体11上不超过5.5米高的位置。钢结构横梁连接件2可用150×150×10mm钢板;Referring to FIG. 2 , install the steel structure
步骤3:将175H型钢结构柱3竖起,钢结构柱3的顶端和柱脚与钢结构柱脚连接件1进行焊接,焊接要求依据《建筑钢结构焊接技术规程》施工。上述钢结构柱3沿墙体长度方向每隔4米左右安装一根;Step 3: erect the 175H-shaped steel structure column 3, and weld the top and column foot of the steel structure column 3 with the steel structure column foot connector 1, and the welding requirements shall be constructed in accordance with the "Technical Regulations for Welding of Building Steel Structures". Above-mentioned steel structure column 3 installs one every about 4 meters along the length direction of body of wall;
步骤4:首先安装钢结构横梁以下的PRC轻质复合隔墙板51。可用脚手架、墙板安装架配合安装,施工工人站在脚手架上,地上工人使用墙板安装车(架)将隔墙板提升到安装高度,由脚手架上的工人把隔墙板安装到位;Step 4: First install the PRC lightweight composite
步骤5:参见图3,横梁以下的PRC轻质复合隔墙板51安装完毕后,进行钢结构横梁7的安装,上述钢结构横梁7可采用H型钢,沿墙体高度方向每隔5米左右安装一根。首先在安装好的横梁以下的PRC轻质复合隔墙板51顶端用云石机开凹槽,开凹槽宽度140×60mm,用横梁下的水泥填缝砂浆81将所开的凹槽填平,将钢结构横梁7压入凹槽内,要求钢结构横梁压入后有水泥溢出,最后将钢结构横梁7两端与两侧墙体11上的钢结构横梁连接件2进行焊接,焊接要求依据《建筑钢结构焊接技术规程》施工;Step 5: See Figure 3. After the PRC lightweight
步骤6:参见图3,安装钢结构横梁以上的PRC轻质复合隔墙板52,先将隔墙板底部用云石机开凹槽,开凹槽宽度140×60mm,然后用横梁上的水泥填缝砂浆82将钢结构横梁凹槽处填平,隔墙板安装按照PRC轻质复合隔墙板安装方法进行安装;Step 6: Referring to Figure 3, install the PRC lightweight composite
步骤7:参见图4,PRC轻质复合隔墙板横向之间的侧面接缝用水泥填缝砂浆8粘接,将PRC轻质复合隔墙板安装完毕后,待整个墙面水泥填缝砂浆干凝后,用建筑胶粘剂9封闭隔墙板板缝。建筑胶粘剂9可采用BY-2型的建筑胶粘剂。Step 7: See Figure 4, the side seams between the lateral sides of the PRC lightweight composite partition boards are bonded with cement mortar 8. After the PRC lightweight composite partition boards are installed, the cement mortar on the entire wall is After drying, use construction adhesive 9 to close the gap between the partition boards. Construction adhesive 9 can adopt BY-2 type construction adhesive.
水泥填缝砂浆8的组分为:32.5普硅水泥、过筛中砂、水泥微膨胀剂、108胶溶液。其重量配合比为1:0.5:0.07,将水泥、中砂、水泥微膨胀剂混合拌均匀后用108胶溶液调和适当。其中108胶溶液是用环保108胶粉200g与水50kg伴和而成。The components of cement joint mortar 8 are: 32.5 ordinary silicon cement, sieved medium sand, cement micro-expansion agent, and 108 glue solution. Its weight mixing ratio is 1:0.5:0.07. Mix cement, medium sand, and cement micro-expansion agent evenly, and then use 108 glue solution to reconcile properly. Among them, the 108 glue solution is made by mixing 200g of environmentally friendly 108 glue powder and 50kg of water.
PRC轻质复合隔墙板在安装过程中,实行干法作业,应避免大面积淋水及泡水。安装隔墙板应注意的问题:在隔墙板中开洞安装管道和箱、盒时,应在隔墙板安装完5-7天后进行,开洞较大或管道并排多于三根时,按现场情况在管道两侧加钢纤或框架,洞口用砂浆浇筑密实,厚度同板厚。During the installation process of the PRC lightweight composite partition board, dry operation should be carried out, and large-scale water spraying and soaking should be avoided. Problems that should be paid attention to when installing partition boards: When opening holes in the partition boards to install pipes, boxes, and boxes, it should be done 5-7 days after the partition boards are installed. On-site conditions Add steel fibers or frames on both sides of the pipeline, and pour the hole with mortar to be dense, and the thickness is the same as that of the plate.
参见图5,上述PRC轻质复合隔墙板的上部与砼结构顶板或梁的结合处、下部与砼结构底板的结合处、板两侧与砼结构柱或墙的结合处,每隔0.5m—1m安装一个固定的角形钢件12。角形钢件12可采用40×40×125mm的角钢,角钢用32射钉或M6×50膨胀螺栓固定,PRC轻质复合隔墙板与固定角形钢件12连接要平整,不得有扭曲或移位。当墙高度超过3m时,墙、柱侧面每隔1m打一个固定角形钢件12,门垛与结构墙连接需用10mm×160mm膨胀螺栓加固。Referring to Fig. 5, the junction of the upper part of the above-mentioned PRC lightweight composite partition wall with the concrete structure roof or beam, the junction of the lower part with the concrete structure bottom plate, and the junction of both sides of the board with the concrete structure column or wall, every 0.5m - Install a fixed angle steel piece 12 at 1m. The angle steel piece 12 can be 40×40×125mm angle steel, and the angle steel is fixed with 32 nails or M6×50 expansion bolts. The connection between the PRC lightweight composite partition wall and the fixed angle steel piece 12 should be smooth without distortion or displacement . When the height of the wall exceeds 3m, a fixed angle steel piece 12 is placed every 1m on the side of the wall and column, and the connection between the door stack and the structural wall needs to be reinforced with 10mm×160mm expansion bolts.
参见图5,上述PRC轻质复合隔墙板的板与板之间用钢钎13斜插入连接,钢钎13可采用250×Φ6钢钎。Referring to Fig. 5, the boards of the above-mentioned PRC lightweight composite partition boards are connected by obliquely inserting steel brazing 13, and the steel brazing 13 can be 250×Φ6 steel brazing.
对于PRC轻质复合隔墙板与结构墙(柱)连接部位,阴、阳角连接部位,管线凹槽部位采用聚合物砂浆粘贴网格布处理,要求:聚合物粘贴网格带厚度控制在1.5mm—2mm以内,墙面缝的网格布宽度50mm,阴、阳角缝的网格布宽度100mm—150mm,纤维网格布必须全部埋入,不得皱纹外露。For the connection between the PRC lightweight composite partition board and the structural wall (column), the connection between the female and male corners, and the groove of the pipeline, the polymer mortar is used to paste the mesh cloth, and the requirement: the thickness of the polymer adhesive mesh belt is controlled at 1.5 Within mm-2mm, the width of the mesh cloth for the wall joints is 50mm, and the width of the mesh cloth for the inner and outer corner joints is 100mm-150mm. The fiber mesh cloth must be fully buried without wrinkles.
参见图5,这种应用上述超高PRC隔墙板钢结构辅助分层安装施工方法的超高建筑隔墙,该隔墙的四周分别与结构物的两侧墙体11、地面10、顶面6固定连接。Referring to Fig. 5, this super-high building partition wall using the above-mentioned super-high PRC partition wall plate steel structure auxiliary layered installation construction method, the surrounding walls of the partition wall are respectively connected to the two
该隔墙沿两侧墙体跨度方向每隔3—5米分布一根钢结构柱3,钢结构柱由膨胀螺栓分别与固定在结构物顶板及地面上的钢结构柱脚连接件1连接。The partition wall distributes a steel structure column 3 every 3-5 meters along the span direction of the walls on both sides, and the steel structure column is respectively connected with the steel structure column foot connectors 1 fixed on the roof of the structure and the ground by expansion bolts.
该隔墙沿墙体高度方向每隔3—5.5米分布一根钢结构横梁7,钢结构横梁由膨胀螺栓分别与固定在两侧墙体上的钢结构横梁连接件2连接。The partition wall distributes a steel structure beam 7 every 3-5.5 meters along the height direction of the wall, and the steel structure beam is respectively connected with the steel
在钢结构柱与钢结构横梁交叉形成的框架中固定连接PRC轻质复合隔墙板5,PRC轻质复合隔墙板与钢结构横梁连接的端部开有凹槽,钢结构横梁7嵌入凹槽内固定,由水泥填缝砂浆8将凹槽填平,PRC轻质复合隔墙板的边部及板缝内有水泥填缝砂浆8,板缝外面由建筑胶粘剂9封闭。In the frame formed by the intersection of the steel structure column and the steel structure beam, the PRC lightweight composite partition wall panel 5 is fixedly connected, the end of the connection between the PRC light weight composite partition wall panel and the steel structure beam is provided with a groove, and the steel structure beam 7 is embedded in the groove The groove is fixed, and the groove is filled with cement caulking mortar 8. There is cement caulking mortar 8 in the edge and board seam of the PRC lightweight composite partition wall board, and the outside of the board seam is closed by construction adhesive 9.
PRC轻质复合隔墙板安装方法举例:Example of installation method of PRC lightweight composite partition board:
按选配好的墙板从门口或墙端侧按型号顺序逐块安装。安装顺序:Install the selected wall panels piece by piece from the door or wall end side in order of model. Installation sequence:
1)、用毛刷清刷干净墙板顶部、底部、两侧。1) Clean the top, bottom and both sides of the wallboard with a brush.
2)、将与PRC轻质复合隔墙板连接的结构物及每块待安装的PRC轻质复合隔墙板刷水,使其充分湿润。2) Brush the structure connected with the PRC lightweight composite partition board and each PRC lightweight composite partition board to be installed with water to make it fully moist.
3)、在PRC轻质复合隔墙板的顶面、地面抹一层水泥填缝砂浆。3) Put a layer of cement joint mortar on the top surface and the ground of the PRC lightweight composite partition board.
4)、在两块PRC轻质复合隔墙板连接面的阴、阳榫处,即板的侧面刷水湿润,然后抹水泥砂浆。4) At the male and female joints of two PRC lightweight composite partition boards, that is, the sides of the boards, wet with water, and then apply cement mortar.
5)、水平推顶PRC轻质复合隔墙板使之就位,将PRC轻质复合隔墙板之间或PRC轻质复合隔墙板与墙结构挤紧拼严压实,并保证PRC轻质复合隔墙板侧面砂浆挤压密实,砂浆接缝厚度在5mm—10mm之间。5) Push the PRC light-weight composite partition board horizontally to make it in place, squeeze the PRC light-weight composite partition board or between the PRC light-weight composite partition board and the wall structure tightly, and ensure the PRC light weight The mortar on the side of the composite partition wall is extruded and compacted, and the thickness of the mortar joint is between 5mm and 10mm.
6)、调整PRC轻质复合隔墙板的板面、侧面垂直用木楔子楔紧板底部、顶部。6) Adjust the board surface and side of the PRC lightweight composite partition board vertically and tighten the bottom and top of the board with wooden wedges.
7)、用靠尺校正平整度,用垂线校正垂直度,如有误,用橡皮锤轻击找正,然后再用木楔子楔紧底部,底缝用砂浆填实。7) Use a ruler to correct the flatness, and use a vertical line to correct the verticality. If there is a mistake, lightly tap it with a rubber hammer to find the alignment, and then use a wooden wedge to wedge the bottom tightly, and fill the bottom seam with mortar.
8)、检查PRC轻质复合隔墙板与顶部、底部、板与板接缝的密实度,如密实不严,应及时补填密实砂浆。8) Check the compactness of the PRC lightweight composite partition wall panel and the top, bottom, and panel-to-panel joints. If the density is not tight, the dense mortar should be filled in time.
8)、清洁安装好的PRC轻质复合隔墙板表面,将挤出的多余砂浆刮平,清理干净。8) Clean the surface of the installed PRC lightweight composite partition wall, scrape off the excess mortar and clean it up.
10)、接缝处根据天气的湿度在70%—80%以下的必需喷水养护2日,防止填缝砂浆干缩。10) The joints must be sprayed with water for 2 days according to the humidity of the weather below 70%-80%, so as to prevent the caulking mortar from shrinking.
11)养护期过后,待板缝干透,用BY-2建筑胶粘剂封闭板缝。11) After the curing period, when the board seams are completely dry, use BY-2 construction adhesive to seal the board seams.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNB2006102012935A CN100513717C (en) | 2006-12-13 | 2006-12-13 | Steel structure assisted layered installation and construction method for superhigh PRC partition plate |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNB2006102012935A CN100513717C (en) | 2006-12-13 | 2006-12-13 | Steel structure assisted layered installation and construction method for superhigh PRC partition plate |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN1970914A CN1970914A (en) | 2007-05-30 |
| CN100513717C true CN100513717C (en) | 2009-07-15 |
Family
ID=38111924
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNB2006102012935A Expired - Fee Related CN100513717C (en) | 2006-12-13 | 2006-12-13 | Steel structure assisted layered installation and construction method for superhigh PRC partition plate |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN100513717C (en) |
Families Citing this family (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102505862B (en) * | 2011-11-03 | 2014-03-05 | 中山建华墙体材料有限公司 | Installing process of lightweight internal partition wallboards |
| CN102777042A (en) * | 2012-07-27 | 2012-11-14 | 中山建华墙体材料有限公司 | An installation process of a board-connected inner partition wall |
| CN102852251A (en) * | 2012-09-11 | 2013-01-02 | 苏州柯利达装饰股份有限公司 | Joggled light-weight partition |
| CN103266693B (en) * | 2013-04-15 | 2015-02-25 | 浙江海天建设集团有限公司 | Integral assembly type composite partition wall seamless mounting structure |
| CN103266692B (en) * | 2013-04-15 | 2015-02-25 | 浙江海天建设集团有限公司 | Top and bottom mounting structure for composite partition |
| CN105019580A (en) * | 2015-07-23 | 2015-11-04 | 苏州旭杰建筑新技术有限公司 | Moistureproof wall |
| CN105908848A (en) * | 2016-04-08 | 2016-08-31 | 天津住宅集团建设工程总承包有限公司 | Super long lightweight sand aerating partition plate seaming method |
| CN106930537A (en) * | 2016-05-19 | 2017-07-07 | 福建荣盛钢结构实业有限公司 | A kind of steel structure wall hoisting structure |
| CN106351362B (en) * | 2016-08-30 | 2019-06-07 | 江苏嘉洋华联建筑装饰股份有限公司 | Superelevation lightgage steel joist Thistle board partition wall and its construction method |
| CN111088859B (en) * | 2018-10-23 | 2024-08-02 | 山东大学 | Assembled outer wall structure and installation method thereof |
| CN110512774A (en) * | 2019-07-29 | 2019-11-29 | 中建四局第六建筑工程有限公司 | A super-height ALC strip-shaped inner partition wall and its construction method |
| CN112647619A (en) * | 2020-12-17 | 2021-04-13 | 西南科技大学 | Construction method of assembled large-span internal partition wall |
-
2006
- 2006-12-13 CN CNB2006102012935A patent/CN100513717C/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| CN1970914A (en) | 2007-05-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106013811B (en) | A kind of installation method of assembled architecture | |
| CN111945928A (en) | Energy-saving heat-insulating wall and roof | |
| CN101265723B (en) | Architecture structure system assembled by composite building board and building method | |
| CN102505779B (en) | A modular hoisting and assembling wall system and its construction method | |
| CN103114663B (en) | Assemble type multifunctional outer wall body and production and installation method thereof | |
| CN105421818B (en) | Built-in steel Standard house | |
| CN109322392B (en) | Light steel house and construction method thereof | |
| CN102630267B (en) | External insulated wall provided with reinforced polystyrene laminate anchored by mechanical fixing device | |
| CN113463796A (en) | Composite wall body of light steel keel with special-shaped cross section structure and construction method | |
| CN103835505A (en) | Outer wall compound heat preservation board construction method | |
| CN1970914A (en) | Steel structure assisted layered installation and construction method for superhigh PRC partition plate | |
| CN112982692A (en) | One-way superimposed sheet joint connecting structure and construction method | |
| CN108035485A (en) | Assembled CF steam pressures porcelain powder air entrained concrete shear wall Side fascia and production method | |
| CN117661844A (en) | A kind of lightweight energy-saving wall partition installation and construction method | |
| CN106049714B (en) | Plastic-steel net combined light partition wall and construction method | |
| CN205296893U (en) | Embedded steel construction assembly house | |
| CN111075107A (en) | A prefabricated composite concrete external wall panel and its preparation and installation method | |
| CN210288790U (en) | Firstly assembled steel mesh frame perlite concrete heat-insulating sound-insulating fireproof partition plate | |
| CN111962715A (en) | Hollow outer wall body structure and preparation method thereof | |
| CN104533012B (en) | One can light load-bearing lumber and preparation method thereof, assembled wall board and house | |
| CN116104224A (en) | A kind of external wall thermal insulation integrated gap assembly structure node and construction method | |
| CN207959692U (en) | A kind of assembled CF steam pressures porcelain powder air entrained concrete shear wall Side fascia | |
| CN205369690U (en) | A prefabricated building wall panel | |
| CN202064480U (en) | Outer separating wall built with lightweight concrete separating plates | |
| CN207419699U (en) | A kind of energy-saving and environment-friendly industrialization prefabricated buildings structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090715 |