CN100447336C - Single-layer completely intercommunicating flyover - Google Patents

Single-layer completely intercommunicating flyover Download PDF

Info

Publication number
CN100447336C
CN100447336C CNB2005100224145A CN200510022414A CN100447336C CN 100447336 C CN100447336 C CN 100447336C CN B2005100224145 A CNB2005100224145 A CN B2005100224145A CN 200510022414 A CN200510022414 A CN 200510022414A CN 100447336 C CN100447336 C CN 100447336C
Authority
CN
China
Prior art keywords
bridge
hand rotation
craspedodrome
track
lane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2005100224145A
Other languages
Chinese (zh)
Other versions
CN1804219A (en
Inventor
张宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2005100224145A priority Critical patent/CN100447336C/en
Publication of CN1804219A publication Critical patent/CN1804219A/en
Application granted granted Critical
Publication of CN100447336C publication Critical patent/CN100447336C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The present invention relates to a full-intercross crossroad system formed from single-layer bridges through a road changing mechanism. In the present invention, motor vehicles, non-motor vehicles and pedestrians thoroughly and separately run and walk without digging tunnels under the single-layer bridges and repairing overpasses above the single-layer bridges under the condition of the single-layer bridges. Through powerful functions of the full intercross of the motor vehicles and the full intercross of the pedestrians and the non-motor vehicles, the limit that a full-intercross overpass can not be repaired at a busy street of an urban area breaks through.

Description

Single-layer completely intercommunicating flyover
Technical field
The present invention relates to overpass bridge, particularly a kind of single-layer completely intercommunicating flyover.
Background branch art
Chinese patent CN 03117421.3 has announced a kind of straight bridge changeable paths type overpass bridge, and its weak point is that pedestrian and bicycle are made of underpass type tunnel or pedestrian overcrossing, is unfavorable for that pedestrian and bicycle are current; The utilization rate that all tracks are single function track thereby road is low.
Summary of the invention
The invention provides a kind of single-layer completely intercommunicating flyover that can overcome above-mentioned shortcoming, the cross road the axle Y to craspedodrome with the up-downlink direction track, right-turn lane places the road both sides, it is track 1,2,5,6, turn right for keeping straight on and merge the track in track 1,6, the back is connected axle Y left- hand rotation bridge 27,28 starting points with lane change bridge 25,26 is worn 3,4 times in the track, and draws on the left-hand and import wherein an X right-hand rotation bridge 15,16 a remittance Y craspedodrome bridge 19,20 when parallel with bridge 21,22; Left changing lane 9,10 holds left-hand rotation car and straightgoing vehicle simultaneously, and left-hand rotation craspedodrome bridge 21,22 is a double track bridge, left-hand rotation bridge 29,30 before a Y track of not jumping from left-hand rotation craspedodrome bridge bifurcated; Left-hand rotation craspedodrome bridge is admitted the left- hand rotation bridge 27,28 that imports from axle Y after finishing all tracks of a Y of jumping.
The beneficial effect that the present invention brings is
1, overcome in CN 03117421.3 scheme, pedestrian and bicycle are walked the inconvenience of underpass type tunnel or overline bridge.
2, right lateral track and the direct lane with axle Y merges, and with left turn lane and the direct lane merging of axle X, improved the utilization rate of road.
3, the direct lane with axle Y places road both sides straight-line travelling to improve the operation linearity of road.
4, thoroughly solve branch's problem of motor vehicle and bicycle pedestrian, and do not interweave mutually, complete separately intercommunication.
Description of drawings
Below in conjunction with accompanying drawing embodiment of the present invention is elaborated, but content of the present invention is not limited only to content related in the embodiment.
Fig. 1 is the floor map of embodiment 1.
Fig. 2 is the floor map of embodiment 2.
Thick line is that bridge, fine rule are the boundary line among the figure, and void is scribed ss lane line, the lane line of imaginary point line for being covered by the track: arrow represents that lane function and wagon flow direction, double-head arrow represent pedestrian and bicycle route.
The specific embodiment
Embodiment 1
Referring to a kind of single-layer completely intercommunicating flyover of Fig. 1, the first right-hand rotation bridge (13), the second right-hand rotation bridge (14), the 3rd right-hand rotation bridge (15), the 4th right-hand rotation bridge (16) that it is characterized in that the diaxon four-way of road are even stopped with the stage casing of the Y-axis first craspedodrome bridge (17), the second craspedodrome bridge (18), the 3rd craspedodrome bridge (19), the 4th craspedodrome bridge (20) respectively, the first craspedodrome bridge (17) of Y-axis places on first lane (1) and the second lane (2), the second craspedodrome bridge (18) places on third lane (5) and the Four-Lane Road (6), the 3rd craspedodrome bridge (19) place the 5th track (
Figure C20051002241400051
) and six-lane ( ) on, the 4th craspedodrome bridge (20) place the 7th track (
Figure C20051002241400053
) and the 8th track (
Figure C20051002241400054
) on, the starting point of the terminal point of the up direction first craspedodrome bridge (17) and up direction the 4th craspedodrome bridge (20) places the second craspedodrome left-hand rotation bridge (22), first craspedodrome left-hand rotation bridge (21) the upright projection edge, and the starting point of the terminal point of the down direction second craspedodrome bridge (18) and down direction the 3rd craspedodrome bridge (19) places the first craspedodrome left-hand rotation bridge (21), second straight left-hand rotation bridge (22) the upright projection edge equally; Y-axis is to also having the first left-hand rotation bridge (30) the second left-hand rotation bridges (29) that come out from the X-axis first craspedodrome left-hand rotation bridge (21), second craspedodrome left-hand rotation bridge (22) bifurcated, this first left-hand rotation bridge (30), the second left-hand rotation bridge (29) respectively by the first lane change bridge (26), the second lane change bridge (25) land in the 9th track (
Figure C20051002241400055
), the tenth track ( ), Y-axis the 3rd left-hand rotation bridge (27), the 4th left-hand rotation bridge (28) that turn to X-axis, up direction the 3rd left-hand rotation bridge (27) is starting point by wearing the second lane change bridge (25) back under the 11 track (3), cause the disjunctor of parallel back with the second craspedodrome left-hand rotation bridge (22) on the left-hand, down direction the 4th left-hand rotation bridge (28) is by wearing the first lane change bridge (26) back under the tenth two lane highways (4) for causing the disjunctor of parallel back with the first craspedodrome left-hand rotation bridge (21) on the starting point left-hand; X axis has the first craspedodrome left-hand rotation bridge (21), the second craspedodrome left-hand rotation bridge (22) and the 3rd lane change bridge (23), the 4th lane change bridge (24), wherein, the first craspedodrome left-hand rotation bridge (21) by wear under the 13 track (8), the tenth Four-Lane Road (9) coaxial the 4th lane change bridge (24) back for starting point leap all tracks of Y-axis after the 3rd lane change bridge (23) is finished the reduction lane change, land in the 15 track (
Figure C20051002241400061
), the tenth six-lane (
Figure C20051002241400062
), the first craspedodrome left-hand rotation bridge (21) flower cross over before each track of Y-axis bifurcated go out the first left-hand rotation bridge (30) through the first lane change bridge (26) land in Y-axis the 9th track (
Figure C20051002241400063
), the down direction second craspedodrome left-hand rotation bridge (22) by wear under the 17 track (10), the 18 track (11) coaxial the 3rd lane change bridge (23) back for starting point leap all tracks of Y-axis after the 4th lane change bridge (24) is finished the reduction lane change, land in the 19 track (
Figure C20051002241400064
), the 20 track (
Figure C20051002241400065
), the second craspedodrome left-hand rotation bridge (22) bifurcated before crossing over the Y-axis track go out the second left-hand rotation bridge (29) behind the second lane change bridge (25), land in Y-axis the tenth track (
Figure C20051002241400066
).For making vehicle few turning on bridge adopt Zhi Qiao dealings bridge, hidden danger is placed on the ground in the present embodiment; Because Zhi Qiao thoroughfare bridging is covered the track half, therefore will give prominence to the track half in the diaxon four-way stage casing of road.
Embodiment 2
Referring to Fig. 2, it is characterized in that the first lane change bridge (26), the second lane change bridge (25), the 3rd lane change bridge (23), the 4th lane change bridge (24) of road intersection diaxon four-way is made up of four capable bridges of S, promptly overlook into the bridge of S shape.In the present embodiment, the lane change bridge 23,24,25,26 of road intersection diaxon four-way changes S shape bridge into by straight bridge, promptly overlook into the bridge of S shape, all the other and embodiment 1 have no two to, S shape bridge makes unlikely outstanding half track, road stage casing, but vehicle is many twice turnings on bridge, make S shape bridge longer for the turning radius that guarantees speed of a motor vehicle defined simultaneously, stride both sides in the road there not to be a kind of selection of can yet be regarded as under the situation that expands leeway, road.

Claims (3)

1, a kind of single-layer completely intercommunicating flyover, the first right-hand rotation bridge (13), the second right-hand rotation bridge (14), the 3rd right-hand rotation bridge (15), the 4th right-hand rotation bridge (16) that it is characterized in that the diaxon four-way of road respectively with the stage casing disjunctor of the Y-axis first craspedodrome bridge (17), the second craspedodrome bridge (18), the 3rd craspedodrome bridge (19), the 4th craspedodrome bridge (20), the first craspedodrome bridge (17) of Y-axis places on first lane (1) and the second lane (2), the second craspedodrome bridge (18) places on third lane (5) and the Four-Lane Road (6), and the 3rd craspedodrome bridge (19) places the 5th track With six-lane
Figure C2005100224140002C2
On, the 4th craspedodrome bridge (20) places the 7th track With the 8th track
Figure C2005100224140002C4
On, the starting point of the terminal point of the up direction first craspedodrome bridge (17) and up direction the 4th craspedodrome bridge (20) places the second craspedodrome left-hand rotation bridge (22), first craspedodrome left-hand rotation bridge (21) the upright projection edge, and the starting point of the terminal point of the down direction second craspedodrome bridge (18) and down direction the 3rd craspedodrome bridge (19) places the first craspedodrome left-hand rotation bridge (21), second straight left-hand rotation bridge (22) the upright projection edge equally; Y-axis is to the first left-hand rotation bridge (30), the second left-hand rotation bridge (29) that come out from the X-axis first craspedodrome left-hand rotation bridge (21), second craspedodrome left-hand rotation bridge (22) bifurcated in addition, and this first left-hand rotation bridge (30), the second left-hand rotation bridge (29) land in the 9th track by the first lane change bridge (26), the second lane change bridge (25) respectively
Figure C2005100224140002C5
The tenth track The 3rd left-hand rotation bridge (27) that Y-axis turns to X-axis, the 4th left-hand rotation bridge (28), up direction the 3rd left-hand rotation bridge (27) is starting point by wearing the second lane change bridge (25) back under the 11 track (3), cause the disjunctor of parallel back with the second craspedodrome left-hand rotation bridge (22) on the left-hand, down direction the 4th left-hand rotation bridge (28) is by wearing the first lane change bridge (26) back under the tenth two lane highways (4) for causing the disjunctor of parallel back with the first craspedodrome left-hand rotation bridge (21) on the starting point left-hand; X axis has the first craspedodrome left-hand rotation bridge (21), the second craspedodrome left-hand rotation bridge (22) and the 3rd lane change bridge (23), the 4th lane change bridge (24), wherein, the first craspedodrome left-hand rotation bridge (21) is crossed over all tracks of Y-axis after the 3rd lane change bridge (23) is finished the reduction lane change by wearing coaxial the 4th lane change bridge (24) back under the 13 track (8), the tenth Four-Lane Road (9) for starting point, lands in the 15 track
Figure C2005100224140002C7
The tenth six-lane
Figure C2005100224140003C1
The first craspedodrome left-hand rotation bridge (21) bifurcated before crossing over each track of Y-axis goes out the first left-hand rotation bridge (30) and lands in Y-axis the 9th track through the first lane change bridge (26)
Figure C2005100224140003C2
The down direction second craspedodrome left-hand rotation bridge (22) is crossed over all tracks of Y-axis after the 4th lane change bridge (24) is finished the reduction lane change by wearing coaxial the 3rd lane change bridge (23) back under the 17 track (10), the 18 track (11) for starting point, lands in the 19 track The 20 track
Figure C2005100224140003C4
The second craspedodrome left-hand rotation bridge (22) bifurcated before crossing over the Y-axis track goes out the second left-hand rotation bridge (29) and lands in Y-axis the tenth track behind the second lane change bridge (25)
Figure C2005100224140003C5
2, single-layer completely intercommunicating flyover as claimed in claim 1, the first lane change bridge (26), the second lane change bridge (25), the 3rd lane change bridge (23), the 4th lane change bridge (24) that it is characterized in that road intersection diaxon four-way are made up of four capable bridges of S, promptly overlook into the bridge of S shape.
3, single-layer completely intercommunicating flyover as claimed in claim 1 or 2, it is characterized in that pedestrian and bicycle do not interweave with motor vehicle to walking arbitrarily in Y-axis, walk from the first craspedodrome bridge (17), the second craspedodrome bridge (18), the 3rd craspedodrome bridge (19), below, the 4th craspedodrome bridge (20) middle part at X axis; When entering the first left-hand rotation bridge (30), the second left-hand rotation bridge (29), the 3rd left-hand rotation bridge (27), the 4th left-hand rotation bridge (28) below along Y-axis in the middle of first lane (1), second lane (2) and third lane (5), Four-Lane Road (6), the first craspedodrome left-hand rotation bridge (21), the second craspedodrome left-hand rotation bridge (22) below are finished the X-shaped diagonal angle and are walked not independently pedestrian, the bicycle traffic system that interweaves with motorway.
CNB2005100224145A 2005-12-28 2005-12-28 Single-layer completely intercommunicating flyover Expired - Fee Related CN100447336C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100224145A CN100447336C (en) 2005-12-28 2005-12-28 Single-layer completely intercommunicating flyover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100224145A CN100447336C (en) 2005-12-28 2005-12-28 Single-layer completely intercommunicating flyover

Publications (2)

Publication Number Publication Date
CN1804219A CN1804219A (en) 2006-07-19
CN100447336C true CN100447336C (en) 2008-12-31

Family

ID=36866351

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100224145A Expired - Fee Related CN100447336C (en) 2005-12-28 2005-12-28 Single-layer completely intercommunicating flyover

Country Status (1)

Country Link
CN (1) CN100447336C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013009704A1 (en) * 2011-07-09 2013-01-17 Gingrich Michael A Double crossover merging interchange

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101787669A (en) * 2010-02-11 2010-07-28 汪洋翰 Expressway overpass easy for left turning
CN103161105A (en) * 2011-12-12 2013-06-19 洛阳丰兴机械科技有限公司 Crossroad unblocked bridge
CN102926301A (en) * 2012-11-19 2013-02-13 粟文钊 Transportation building design method
CN105002797B (en) * 2015-07-30 2017-01-11 钦州力达机械厂 Man-vehicle-layered interchange type overpass
WO2018085960A1 (en) * 2016-11-08 2018-05-17 汪光凯 Cross-shaped overpass
CN106894825A (en) * 2017-03-20 2017-06-27 上海市政工程设计研究总院(集团)有限公司 A kind of hidden digging structure of underground interchange offspur tunnel
CN107893350A (en) * 2017-11-13 2018-04-10 石家庄铁道大学 System and design method is canalized in intersection
CN110195389A (en) * 2018-02-26 2019-09-03 缪卓伦 The Chinese reverse left lateral smooth overpass of junction type
CN109930441A (en) * 2019-01-24 2019-06-25 缪卓伦 " satellite type " hyperbolic entirely drive in the wrong direction smooth overpass

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1105084A (en) * 1994-06-07 1995-07-12 阴继庞 4/4(4/3) lane double layer crossless stereo bridge on land
WO2003014474A1 (en) * 2001-08-08 2003-02-20 Bog Sung Kim Four roads for performing smooth traffic flow
CN2587923Y (en) * 2002-12-30 2003-11-26 王杰 Crossover bridge
CN2672150Y (en) * 2004-01-12 2005-01-19 肖为民 Overpass

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1105084A (en) * 1994-06-07 1995-07-12 阴继庞 4/4(4/3) lane double layer crossless stereo bridge on land
WO2003014474A1 (en) * 2001-08-08 2003-02-20 Bog Sung Kim Four roads for performing smooth traffic flow
CN2587923Y (en) * 2002-12-30 2003-11-26 王杰 Crossover bridge
CN2672150Y (en) * 2004-01-12 2005-01-19 肖为民 Overpass

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013009704A1 (en) * 2011-07-09 2013-01-17 Gingrich Michael A Double crossover merging interchange
US8950970B2 (en) 2011-07-09 2015-02-10 Michael A. Gingrich, SR. Double crossover merging interchange

Also Published As

Publication number Publication date
CN1804219A (en) 2006-07-19

Similar Documents

Publication Publication Date Title
CN100447336C (en) Single-layer completely intercommunicating flyover
JP2015535556A (en) Urban intersection structure
JP2005256578A (en) Urban type non-signal grade-separated road crossing using hierarchy roads on three levels
CN202688809U (en) T-junction flyover with pedestrian and vehicle lanes
CN102277807B (en) The full unblocked cross composite bridge in crossroad of two kinds of right-hand rotation bridges
CN102605694A (en) T-junction flyover with pedestrian and vehicle lanes
CN104389251A (en) Combined interchange road system of city bridge
CN101487214A (en) Humanized multifunctional intersection for urban crossroad
CN108867217A (en) Four crossway fast passing viaduct
CN104831595A (en) Intercommunication type grade-separated junction layout structure
CN201411610Y (en) Clothoid type intercommunicating flyover
CN101298749B (en) Winding across method of communicated crossroads
CN107630394A (en) A kind of assembly type is without lamp overpass at T-junction
CN106958173A (en) Urban road is designed without traffic lights
CN201010845Y (en) Simple vertical crossing T-shaped intersection
CN202247565U (en) Concave-convex flyover
CN207498761U (en) Viaduct
CN1587522A (en) Direct overrun flat tura city interchange cross road
CN200974950Y (en) Urban traffic combined overpass
CN201268814Y (en) City multi-crossing double-layer non-obstacle crossroads
CN201459557U (en) Completely interchanging flyover
CN201132919Y (en) Single-layer all-communicated crossroads
CN1554830A (en) Hidden plane overpass
CN204982578U (en) Crossroad does not have red light individual layer overpass
CN2883463Y (en) Five-way overhead crossing bridge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081231

Termination date: 20131228