CL2011003356A1 - Method for the removal of excavated material from a mine shaft, during the formation of the mine shaft for an underground mine, comprises transporting the excavated material upward on a continuous basis, depositing the transported excavated material; apparatus for the removal of excavated material. - Google Patents
Method for the removal of excavated material from a mine shaft, during the formation of the mine shaft for an underground mine, comprises transporting the excavated material upward on a continuous basis, depositing the transported excavated material; apparatus for the removal of excavated material.Info
- Publication number
- CL2011003356A1 CL2011003356A1 CL2011003356A CL2011003356A CL2011003356A1 CL 2011003356 A1 CL2011003356 A1 CL 2011003356A1 CL 2011003356 A CL2011003356 A CL 2011003356A CL 2011003356 A CL2011003356 A CL 2011003356A CL 2011003356 A1 CL2011003356 A1 CL 2011003356A1
- Authority
- CL
- Chile
- Prior art keywords
- mine
- excavated material
- excavated
- removal
- pique
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D1/00—Sinking shafts
- E21D1/03—Sinking shafts mechanically, e.g. by loading shovels or loading buckets, scraping devices, conveying screws
Abstract
MÉTODO PARA LA REMOCIÓN DEL MATERIAL EXCAVADO DESDE UN PIQUE DE LA MINA 19, DURANTE LA FORMACIÓN DEL PIQUE DE LA MINA 19 PARA UNA MINA SUBTERRÁNEA QUE PROPORCIONA UN SISTEMA DE REMOCIÓN MÁS ROBUSTO Y MÁS EFECTIVO, EL CUAL PERMITE EL ABASTECIMIENTO CONTINUO DEL MATERIAL<br /> EXCAVADO, CON EL FIN DE CONTINUAR INCLUSO SI LOS DISPOSITIVOS DE LLENADO NO<br /> SE ENCUENTRAN EN LA ESTACIÓN, QUE COMPRENDE EL TRANSPORTE DEL MATERIAL<br /> EXCAVADO DESDE UNA REGIÓN DE EXCAVACIÓN, ENCIMA DE LA REGIÓN DE<br /> EXCAVACIÓN, SOBRE UNA BASE CONTINUADA DURANTE LA EXCAVACIÓN DEL<br /> MATERIAL; LA DEPOSITACIÓN DEL MATERIAL EXCAVADO TRANSPORTADO, DENTRO DE<br /> UNA PLURALIDAD DE TOLVAS DE ALMACENAMIENTO, PARA FORMAR CARGAS DE<br /> TOLVA, DISCRETAS Y ESTÁTICAS, DEL MATERIAL; LA DESCARGA DE FORMA CÍCLICA DE<br /> LAS CARGAS DISCRETAS DE LA TOLVA CON EL MATERIAL EXCAVADO, DESDE UNA<br /> PLURALIDAD DE TOLVAS DE ALMACENAMIENTO, DENTRO DE UNA SIMILAR PLURALIDAD<br /> DE CAJONES; EL IZAMIENTO DE FORMA CÍCLICA DE CADA CAJÓN, Y DESCENDIENDO<br /> DE RETORNO EL CAJÓN HACIA LA ESTACIÓN DE TRANSFERENCIA, PARA RECIBIR OTRA<br /> DISCRETA CARGA DEL MATERIAL DE LA TOLVA, DESDE LA RESPECTIVA TOLVA<br /> ASOCIADA; Y EL RESPOSICIONAMIENTO DE FORMA PERIÓDICA DE LA ESTACIÓN DE<br /> TRANSFERENCIA Y DE LAS TOLVAS DE ALMACENAMIENTO, EN UBICACIONES<br /> DESPLAZADAS HACIA DEBAJO DE FORMA SUCESIVA EN EL PIQUE CUANDO<br /> PROCEDE LA EXCAVACIÓN. ADEMÁS, SE TIENE EL MÉTODO DE FORMACIÓN DE UN<br /> PIQUE DE LA MINA, EL APARATO PARA LA REMOCIÓN DEL MATERIAL EXCAVADO<br /> DESDE UN PIQUE DE LA MINA, EL APARATO PARA FORMAR UN PIQUE DE LA MINAMETHOD FOR THE REMOVAL OF MATERIAL EXCAVATED FROM A PIQUE OF MINE 19, DURING THE FORMATION OF THE PIQUE OF MINE 19 FOR AN UNDERGROUND MINE THAT PROVIDES A MORE ROBUST AND EFFECTIVE REMOVAL SYSTEM, WHICH ALLOWS THE CONTINUOUS SUPPLY OF MATERIAL < /> EXCAVATED, IN ORDER TO CONTINUE EVEN IF THE FILLING DEVICES ARE NOT <br /> IN THE STATION, WHICH INCLUDES THE TRANSPORTATION OF THE MATERIAL <br /> EXCAVATED FROM AN EXCAVATION REGION, ABOVE THE REGION OF <br /> EXCAVATION, ON A CONTINUED BASIS DURING THE EXCAVATION OF THE MATERIAL <br />; THE DEPOSITATION OF THE TRANSPORTED EXCAVATED MATERIAL, WITHIN <br /> A PLURALITY OF STORAGE HOPPERS, TO FORM DISCREET AND STATIC <br /> HOPPER LOADS OF THE MATERIAL; THE CYCLICAL UNLOADING OF <br /> DISCREET LOADS FROM THE HOPPER WITH THE EXCAVATED MATERIAL, FROM A PLURALITY OF STORAGE HOPPERS, INSIDE A SIMILAR PLURALITY <br /> OF DRAWERS; THE CYCLICALLY LIFTING OF EACH DRAWER, AND THE DRAWER LOWERING <br /> BACK TO THE TRANSFER STATION, TO RECEIVE ANOTHER DISCREET <br /> DISCREET LOAD OF THE HOPPER MATERIAL FROM THE RESPECTIVE HOPPER <br /> ASSOCIATED; AND THE PERIODIC REPOSITIONING OF THE TRANSFER STATION AND STORAGE HOPPERS, IN LOCATIONS <br /> SUCCESSFULLY DISPLACED IN THE PITCH WHEN THE EXCAVATION PROCESSES. IN ADDITION, THERE IS THE FORMATION METHOD OF A PIQUE DE LA MINE, THE DEVICE FOR REMOVING THE EXCAVATED MATERIAL <br /> FROM A PIQUE DE LA MINE, THE DEVICE TO FORM A PIQUE DE LA MINE
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2009903054A AU2009903054A0 (en) | 2009-06-30 | Forming a shaft for an underground mine |
Publications (1)
Publication Number | Publication Date |
---|---|
CL2011003356A1 true CL2011003356A1 (en) | 2012-06-22 |
Family
ID=43410362
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CL2011003356A CL2011003356A1 (en) | 2009-06-30 | 2011-12-29 | Method for the removal of excavated material from a mine shaft, during the formation of the mine shaft for an underground mine, comprises transporting the excavated material upward on a continuous basis, depositing the transported excavated material; apparatus for the removal of excavated material. |
Country Status (12)
Country | Link |
---|---|
EP (1) | EP2449214B1 (en) |
CN (1) | CN102472101B (en) |
AU (1) | AU2010268761B2 (en) |
BR (1) | BRPI1014138B1 (en) |
CA (1) | CA2765758C (en) |
CL (1) | CL2011003356A1 (en) |
DE (2) | DE10793425T8 (en) |
EA (1) | EA021979B1 (en) |
MX (1) | MX2012000112A (en) |
PE (1) | PE20121376A1 (en) |
PL (1) | PL2449214T3 (en) |
WO (1) | WO2011000037A1 (en) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103046931B (en) * | 2012-12-03 | 2015-01-14 | 云南建工水利水电建设有限公司 | Method for forming holes of vertical shaft/pilot shaft through impact type drilling machine in impacting mode |
WO2014169337A1 (en) * | 2013-04-16 | 2014-10-23 | Technological Resources Pty. Limited | A method of moving a component or a material to and within a level of a shaft boring system |
WO2014194370A1 (en) | 2013-06-07 | 2014-12-11 | Technological Resources Pty. Limited | Guide system |
US10150649B2 (en) | 2013-06-07 | 2018-12-11 | Technological Resources Pty. Limited | Overwind conveyance drop protection |
RU2669971C2 (en) | 2013-08-23 | 2018-10-17 | Текнолоджикал Ресорсиз Пти. Лимитед | Skip and crosshead |
CN103821519B (en) * | 2013-11-14 | 2017-05-24 | 北京中煤矿山工程有限公司 | Integrated propulsion and tangential fore bearing support structure |
WO2015124728A2 (en) * | 2014-02-21 | 2015-08-27 | China Railway Engineering Equipment Group Co., Ltd (Creg) | Shaft installation system with a multi-purpose service column |
CN103924977B (en) * | 2014-02-27 | 2016-01-06 | 中铁工程装备集团有限公司 | Center stand column tunneling boring shaft drilling machine |
CA3044325A1 (en) * | 2016-09-21 | 2018-03-29 | Master Sinkers (Pty) Ltd | Shaft enlargement arrangement for a boring system |
US10732020B1 (en) | 2017-09-11 | 2020-08-04 | Grass Skirt Oilfield Consulting Inc. | Apparatus systems, and methods for determining cuttings level or volume in an enclosed cuttings skip |
US11014762B1 (en) | 2017-09-11 | 2021-05-25 | Grass Skirt Oilfield Consulting Inc. | Apparatus, systems and methods for weighing and distributing drill cuttings in an enclosed cuttings skip |
RU2685365C1 (en) * | 2018-08-28 | 2019-04-17 | Общество с ограниченной ответственностью "Скуратовский опытно-экспериментальный завод" | Method of mine shaft construction and a shaft-penetrating combine |
CN113482623B (en) * | 2021-06-28 | 2024-02-02 | 山西工程技术学院 | Vertical shaft shield machine and cutterhead system thereof |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1608290B2 (en) | 1968-03-15 | 1976-12-09 | Westfälische Berggewerkschaftskasse, 4630 Bochum; Schachtbau Thyssen GmbH, 4330 Mülheim | DEVICE FOR BUMPING SHAFTS WITH AT LEAST ONE PICK UP THE PILE ON THE MANHOLE SOLE AND A LOADING DEVICE CONSISTING OF A GRAPPLE, AND WITH A BUCKET CONVEYOR |
US3965995A (en) * | 1975-03-06 | 1976-06-29 | The Robbins Company | Machine for boring a large diameter blind hole |
US4589502A (en) * | 1984-05-04 | 1986-05-20 | Cementation Company Of America, Incorporated | Earth boring apparatus |
US4646853A (en) * | 1984-07-31 | 1987-03-03 | The Robbins Company | Shaft boring machine and method |
US5112111A (en) * | 1990-12-10 | 1992-05-12 | Addington Resources, Inc. | Apparatus and method for continuous mining |
CN1036674C (en) * | 1993-01-15 | 1997-12-10 | 山西矿业学院 | Apparatus for sinking shaft and its job practice |
CN2300726Y (en) * | 1997-05-19 | 1998-12-16 | 王家喜 | Vertical lifting conveyer |
JP4486766B2 (en) * | 2001-06-19 | 2010-06-23 | 株式会社大林組 | Vertical hole drilling rig |
CN1525043A (en) * | 2003-02-24 | 2004-09-01 | 蔡德彬 | Cycle type vertical shaft drilling and digging equipment and construction method thereof |
WO2005049966A1 (en) * | 2003-11-20 | 2005-06-02 | J.S. Redpath Limited | Earth boring apparatus for sinking shafts and method of excavating a shaft |
ES2392575T3 (en) * | 2008-07-31 | 2012-12-11 | Herrenknecht Ag | Method for performing a vertical well and a well digging machine |
-
2010
- 2010-06-30 PE PE2011002185A patent/PE20121376A1/en active IP Right Grant
- 2010-06-30 EA EA201270083A patent/EA021979B1/en not_active IP Right Cessation
- 2010-06-30 DE DE10793425T patent/DE10793425T8/en active Active
- 2010-06-30 CA CA2765758A patent/CA2765758C/en active Active
- 2010-06-30 AU AU2010268761A patent/AU2010268761B2/en active Active
- 2010-06-30 MX MX2012000112A patent/MX2012000112A/en active IP Right Grant
- 2010-06-30 WO PCT/AU2010/000820 patent/WO2011000037A1/en active Application Filing
- 2010-06-30 BR BRPI1014138-3A patent/BRPI1014138B1/en active IP Right Grant
- 2010-06-30 DE DE202010017762U patent/DE202010017762U1/en not_active Expired - Lifetime
- 2010-06-30 EP EP10793425.9A patent/EP2449214B1/en active Active
- 2010-06-30 CN CN201080029789.3A patent/CN102472101B/en active Active
- 2010-06-30 PL PL10793425T patent/PL2449214T3/en unknown
-
2011
- 2011-12-29 CL CL2011003356A patent/CL2011003356A1/en unknown
Also Published As
Publication number | Publication date |
---|---|
MX2012000112A (en) | 2012-02-29 |
DE202010017762U1 (en) | 2012-07-17 |
EA201270083A1 (en) | 2012-06-29 |
DE10793425T8 (en) | 2013-04-25 |
DE10793425T1 (en) | 2012-11-08 |
CA2765758A1 (en) | 2011-01-06 |
CA2765758C (en) | 2013-04-02 |
PL2449214T3 (en) | 2021-08-23 |
EA021979B1 (en) | 2015-10-30 |
CN102472101B (en) | 2014-03-12 |
CN102472101A (en) | 2012-05-23 |
EP2449214A1 (en) | 2012-05-09 |
EP2449214B1 (en) | 2020-12-30 |
BRPI1014138B1 (en) | 2019-11-05 |
AU2010268761B2 (en) | 2012-07-26 |
AU2010268761A1 (en) | 2012-01-19 |
PE20121376A1 (en) | 2012-10-15 |
EP2449214A4 (en) | 2013-01-23 |
WO2011000037A1 (en) | 2011-01-06 |
BRPI1014138A2 (en) | 2019-04-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CL2011003356A1 (en) | Method for the removal of excavated material from a mine shaft, during the formation of the mine shaft for an underground mine, comprises transporting the excavated material upward on a continuous basis, depositing the transported excavated material; apparatus for the removal of excavated material. | |
ES2499065T3 (en) | Procedure for storage and order preparation | |
AR068474A1 (en) | WASTE TRANSPORTATION SYSTEM | |
MX2022001844A (en) | Material handling system. | |
ES2421430T3 (en) | System of preparation for the shipment and procedure for loading a load carrier | |
MX2016000433A (en) | Method of order fulfilling by preparing storage units at a picking station. | |
CO7141423A2 (en) | Support apparatus for moving the propping agent from a container in a propping agent discharge system | |
EA201590919A1 (en) | STORAGE SYSTEM | |
AR082143A1 (en) | MINING SYSTEM OF CONTINUOUS EXTRACTION | |
CL2015003540A1 (en) | Lifting system to lift a means of transport in the form of a drawer of an extraction well, to overcome an overcooling condition | |
ES2531416T3 (en) | Trench platform with loader for twistlocks | |
CL2015001244A1 (en) | Conveyor | |
BR112017016835A2 (en) | conveyor system for open pit mining | |
AR109675A1 (en) | COMMUNICATIONS WITH MULTIPLE METERS THROUGH A FOOD BAR | |
CL2017000295A1 (en) | Improved device to automatically palletize containers and respective method | |
AR097745A1 (en) | WELL MAINTENANCE METHODS AND COMPOSITIONS CONTAINING DEGRADABLE POLYMERS | |
CL2013002435A1 (en) | Loading support comprising a container made from a flexible material, such as a geotextile fabric, having at least one side wall whose predetermined height is selected to be greater than the installation height of the support, which once filled allows its accommodation under of irregular surfaces of the unstable support ceiling of an underground gallery or other structure on it. | |
CO6670532A2 (en) | Circular compartment discharge system and method | |
ES2586303T3 (en) | 2 DESCRIPTION Component and installation power device comprising such a device | |
CL2014003142A1 (en) | Pouring system for material, such as the filling of an old open pit operation, comprises a conveyor belt with ribbon modules suspended from cables and a belt carriage arranged in a transportable manner in the direction of transport; procedure to move a discharge system. | |
CN204253082U (en) | A kind of clear device for coal | |
CL2016001736A1 (en) | Installation to automatically carry out the loading and unloading operations of an apparatus capable of opening the closed side walls of a number of boxes. | |
CN203997534U (en) | A kind of testudinate embryonated egg conveying arrangement | |
AR088946A1 (en) | PROCEDURE AND DEVICE FOR HANDLING BAGS GROUPED IN FAJOS | |
CL2021000060A1 (en) | Apparatus and method for transporting in and out of a shaft |