CH712123B1 - Calendar mechanism, movement and timepiece. - Google Patents

Calendar mechanism, movement and timepiece. Download PDF

Info

Publication number
CH712123B1
CH712123B1 CH00149/17A CH1492017A CH712123B1 CH 712123 B1 CH712123 B1 CH 712123B1 CH 00149/17 A CH00149/17 A CH 00149/17A CH 1492017 A CH1492017 A CH 1492017A CH 712123 B1 CH712123 B1 CH 712123B1
Authority
CH
Switzerland
Prior art keywords
date
month
day
lever
indicator
Prior art date
Application number
CH00149/17A
Other languages
French (fr)
Other versions
CH712123A2 (en
Inventor
Suzuki Shigeo
Original Assignee
Seiko Instr Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seiko Instr Inc filed Critical Seiko Instr Inc
Publication of CH712123A2 publication Critical patent/CH712123A2/en
Publication of CH712123B1 publication Critical patent/CH712123B1/en

Links

Classifications

    • GPHYSICS
    • G04HOROLOGY
    • G04BMECHANICALLY-DRIVEN CLOCKS OR WATCHES; MECHANICAL PARTS OF CLOCKS OR WATCHES IN GENERAL; TIME PIECES USING THE POSITION OF THE SUN, MOON OR STARS
    • G04B19/00Indicating the time by visual means
    • G04B19/24Clocks or watches with date or week-day indicators, i.e. calendar clocks or watches; Clockwork calendars
    • G04B19/243Clocks or watches with date or week-day indicators, i.e. calendar clocks or watches; Clockwork calendars characterised by the shape of the date indicator
    • G04B19/247Clocks or watches with date or week-day indicators, i.e. calendar clocks or watches; Clockwork calendars characterised by the shape of the date indicator disc-shaped
    • G04B19/253Driving or releasing mechanisms
    • GPHYSICS
    • G04HOROLOGY
    • G04BMECHANICALLY-DRIVEN CLOCKS OR WATCHES; MECHANICAL PARTS OF CLOCKS OR WATCHES IN GENERAL; TIME PIECES USING THE POSITION OF THE SUN, MOON OR STARS
    • G04B19/00Indicating the time by visual means
    • G04B19/24Clocks or watches with date or week-day indicators, i.e. calendar clocks or watches; Clockwork calendars
    • G04B19/243Clocks or watches with date or week-day indicators, i.e. calendar clocks or watches; Clockwork calendars characterised by the shape of the date indicator
    • G04B19/247Clocks or watches with date or week-day indicators, i.e. calendar clocks or watches; Clockwork calendars characterised by the shape of the date indicator disc-shaped
    • G04B19/253Driving or releasing mechanisms
    • G04B19/25333Driving or releasing mechanisms wherein the date indicators are driven or released mechanically by a clockwork movement
    • G04B19/25353Driving or releasing mechanisms wherein the date indicators are driven or released mechanically by a clockwork movement driven or released stepwise by the clockwork movement
    • G04B19/2536Driving or releasing mechanisms wherein the date indicators are driven or released mechanically by a clockwork movement driven or released stepwise by the clockwork movement automatically corrected at the end of months having less than 31 days

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Electromechanical Clocks (AREA)

Abstract

La présente invention concerne un mécanisme de calendrier, un mouvement, et une pièce d'horlogerie qui sont de structure simple et qui peuvent être facilement produits. Un indicateur de quantième (20) ayant une partie de détermination du trentième quantième, un indicateur des mois (30) effectuant une rotation par année, un mécanisme principal de commande d'indicateur de quantième (40), et un mécanisme de commande d'indicateur de quantième de mois court (70) faisant tourner l'indicateur de quantième (20) à la fin d'un mois court sont fournis. L'indicateur des mois (30) possède une came des mois (33) ayant sur sa surface périphérique externe des entailles (34b) correspondant aux mois courts; le mécanisme principal de commande d'indicateur de quantième (40) possède une roue d'entraînement d'indicateur de quantième (43), et un rochet d'avancement de jour (47); le mécanisme de commande d'indicateur de quantième de mois court (70) comporte un levier d'actionnement (71), un rochet d'avancement de jour de mois court (76), et une roue de date intermédiaire (85); le levier d'actionnement (71) tourne depuis une première position vers une deuxième position lorsque le levier de détermination du trentième quantième (74) suit la partie de détermination de trentième quantième (29), et le levier de détermination de mois court (75) suit l'entaille (34b); la roue de date intermédiaire (85) est espacée du rochet d'avancement de jour (47) lorsque le levier d'actionnement (71) se trouve dans la première position, et engrène avec le rochet d'avancement de jour (47) lorsque le levier d'actionnement (71) se trouve dans la deuxième position.The present invention relates to a calendar mechanism, a movement, and a timepiece which are simple in structure and can be easily produced. A date indicator (20) having a thirtieth calendar determining part, a month indicator (30) rotating by year, a date indicator main control mechanism (40), and a date control mechanism. short month date indicator (70) rotating the date indicator (20) at the end of a short month are provided. The month indicator (30) has a month cam (33) having on its outer peripheral surface notches (34b) corresponding to short months; the date indicator main control mechanism (40) has a date indicator drive wheel (43), and a day advancing ratchet (47); the short month date indicator control mechanism (70) includes an operating lever (71), a short month day advancement ratchet (76), and an intermediate date wheel (85); the operating lever (71) rotates from a first position to a second position when the thirtieth date determining lever (74) follows the thirtieth date determining part (29), and the month determining lever (75 ) follows the notch (34b); the intermediate date wheel (85) is spaced from the day advancement ratchet (47) when the operating lever (71) is in the first position, and meshes with the day advancement ratchet (47) when the operating lever (71) is in the second position.

Description

ARRIÈRE-PLAN DE L'INVENTIONBACKGROUND OF THE INVENTION

1. Domaine de l'invention1. Field of the invention

[0001] Cette invention se rapporte à un mécanisme de calendrier, un mouvement, et une pièce d'horlogerie. This invention relates to a calendar mechanism, a movement, and a timepiece.

2. Description de l'art antérieur2. Description of the prior art

[0002] En ce qui concerne les pièces d'horlogerie comportant un calendrier capable d'afficher une date, on connaît des mécanismes de calendrier dans lesquels la correction de la date est réduite à un minimum en effectuant un changement de quantième de deux jours à la fin d'un mois court ayant 30 jours ou moins (voir, par exemple, le brevet japonais No. 5105467). With regard to timepieces comprising a calendar capable of displaying a date, calendar mechanisms are known in which the correction of the date is reduced to a minimum by making a date change from two days to the end of a short month having 30 days or less (see, for example, Japanese Patent No. 5105467).

[0003] Ce document de brevet divulgue un mécanisme de calendrier équipé d'un disque de date (indicateur de quantième) équipé d'une première rangée de dents internes et une deuxième rangée de dents internes, un rouage de changement de date ayant un doigt d'entraînement qui contrôle, via les dents de la première rangée de dents internes, l'affichage de date, un rouage correcteur coopérant avec la deuxième rangée de dents internes pour faire avancer le disque de date d'un pas de plus à la fin d'un mois court, et un rouage de changement de mois entraînant une roue en forme d'étoile des mois à la fin de chaque mois. En tant qu'éléments de type levier, on y trouve un levier contrôlé par un tenon du disque de date, un premier levier pivotant pour faire fonctionner le rouage de changement de date et le rouage de changement de mois, un deuxième levier pivotant pour faire fonctionner le rouage correcteur, et un levier coopérant avec la roue en forme d'étoile des mois pour contrôler la rotation du deuxième levier pivotant. This patent document discloses a calendar mechanism equipped with a date disc (date indicator) equipped with a first row of internal teeth and a second row of internal teeth, a date change gear having a finger drive which controls, via the teeth of the first row of internal teeth, the date display, a corrector gear co-operating with the second row of internal teeth to advance the date disc one more step at the end a short month, and a month-changing cog driving a star-shaped month wheel at the end of each month. As lever-type elements, there is a lever controlled by a tenon of the date disc, a first pivot lever to operate the date change gear and month change gear, a second swivel lever to operate operate the corrector gear, and a lever cooperating with the star-shaped month wheel to control the rotation of the second pivoting lever.

[0004] Dans la technique de l'art antérieur cependant, le nombre d'éléments de type levier est très important et implique une structure compliquée, de telle sorte qu'on peut craindre des coûts plutôt élevés. En outre, pour actionner les leviers de manière coordonnée à des horaires prédéterminés, il est nécessaire de monter chaque levier dans un état dans lequel il est réglé dans une position prédéterminée, de telle sorte qu'on peut également craindre que le procédé de fabrication devienne assez compliqué. In the technique of the prior art, however, the number of lever-type elements is very large and involves a complicated structure, so that rather high costs can be feared. Further, to operate the levers in a coordinated manner at predetermined times, it is necessary to mount each lever in a state in which it is set in a predetermined position, so that there is also a fear that the manufacturing process will become quite complicated.

Résumé de l'inventionSummary of the invention

[0005] La présente invention a été conçue au vu des problèmes ci-dessus. Un but de la présente invention de fournir un mécanisme de calendrier, un mouvement, et une pièce d'horlogerie qui soient d'une simple structure et qui puissent être produits facilement. The present invention has been conceived in view of the above problems. An object of the present invention to provide a calendar mechanism, a movement, and a timepiece which are of simple structure and which can be produced easily.

[0006] Pour réaliser cet objectif ci-dessus, on fournit, conformément à la présente invention, un mécanisme de calendrier comprenant: un indicateur des mois effectuant une rotation par année; un indicateur de quantième effectuant une rotation par mois et possédant une partie de détermination du trentième quantième défini dans une position prédéterminée au niveau de sa périphérie; un mécanisme de commande principal d'indicateur de quantième effectuant une rotation par jour et faisant tourner l'indicateur de quantième; et un mécanisme de commande d'indicateur de mois court faisant tourner l'indicateur de quantième à la fin d'un mois court ayant 30 jours ou moins, dans lequel: l'indicateur des mois comporte une came des mois possédant, sur sa surface périphérique externe, des parties de détermination de mois court correspondant à des mois courts; le mécanisme de commande principal d'indicateur de quantième est équipé d'une roue d'entraînement d'indicateur de quantième, et possède une came d'actionnement, superposée à ladite roue d'entraînement d'indicateur de quantième, et agencée mobile en rotation par rapport à celle-ci selon un angle prédéterminé, et qui est configurée pour effectuer une rotation par jour à vitesse constante autour d'un premier axe, et un rochet d'avancement de jour tournant de manière synchronisée avec la came d'actionnement et faisant tourner l'indicateur de quantième; le mécanisme de commande d'indicateur de mois court est muni d'un levier de détermination de trentième quantième capable de suivre la partie de détermination du trentième quantième, et un levier de détermination de mois court capable de suivre les parties de détermination de mois court, et comporte un élément de levier d'actionnement tournant autour d'un deuxième axe prédéterminé, un rochet d'avancement de jour de mois court faisant tourner l'indicateur de quantième à la fin d'un mois court, et d'une roue de date intermédiaire montée sur le levier d'actionnement et mobile en rotation par rapport à celui-ci autour d'un troisième axe lorsqu'elle engrène avec le rochet d'avancement de jour de mois court; levier d'actionnement se déplace d'une première position vers une deuxième position lorsque le levier de détermination du trentième quantième suit la partie de détermination du trentième quantième, et le levier de détermination de mois court suit la partie de détermination de mois court; et la roue de date intermédiaire est espacée du rochet d'avancement de jour lorsque le levier d'actionnement se trouve dans la première position, et en prise avec le rochet d'avancement de jour lorsque le levier d'actionnement se trouve dans la deuxième position.To achieve this above objective, there is provided, in accordance with the present invention, a calendar mechanism comprising: an indicator of the months rotating per year; a date indicator rotating per month and having a thirtieth date determining part defined in a predetermined position at its periphery; a date indicator main control mechanism rotating per day and rotating the date indicator; and a short month indicator control mechanism rotating the date indicator at the end of a short month having 30 days or less, wherein: the month indicator comprises a month cam having, on its outer peripheral surface, short month determination parts corresponding to short months; the date indicator main control mechanism is equipped with a date indicator drive wheel, and has an actuating cam, superimposed on said date indicator drive wheel, and arranged movably in rotation relative thereto at a predetermined angle, and which is configured to perform one rotation per day at constant speed about a first axis, and a day advancement ratchet rotating in synchronization with the actuating cam and rotating the date indicator; the short month indicator control mechanism is provided with a thirtieth date determining lever capable of following the thirtieth date determining part, and a short month determining lever capable of following the short month determining parts , and comprises an actuating lever element rotating about a second predetermined axis, a short month day advancement ratchet rotating the date indicator at the end of a short month, and a wheel of intermediate date mounted on the actuating lever and movable in rotation with respect to the latter about a third axis when it meshes with the short month day advancement ratchet; operating lever moves from a first position to a second position when the thirtieth day determining lever follows the thirtieth date determining part, and the short month determining lever follows the short month determining part; and the intermediate date wheel is spaced from the day advancement ratchet when the actuation lever is in the first position, and in engagement with the day advancement ratchet when the actuation lever is in the second position .

[0007] Selon la présente invention, il est possible d'actionner le mécanisme de calendrier par le biais du seul levier d'actionnement, de telle sorte que, comparé à la technique de l'art antérieur, où quatre leviers sont nécessaires, il est possible de réduire le nombre de composants et de simplifier la structure. [0007] According to the present invention, it is possible to actuate the calendar mechanism by means of the single actuating lever, so that, compared to the technique of the prior art, where four levers are required, it It is possible to reduce the number of components and simplify the structure.

[0008] En outre, le levier d'actionnement est muni du levier de détermination du trentième quantième et le levier de détermination de mois court, de telle sorte que, seulement en montant le levier d'actionnement, le levier de détermination du trentième quantième et le levier de détermination de mois court sont agencés dans des positions prédéterminées. Autrement dit, il n'y a pas besoin d'effectuer d'alignement individuel sur le levier de détermination du trentième quantième et le levier de détermination de mois court, de sorte que la production du mécanisme en est facilitée. [0008] In addition, the actuating lever is provided with the thirtieth date determining lever and the short month determining lever, so that, only by mounting the actuating lever, the thirtieth date determining lever and the short month determining lever are arranged in predetermined positions. In other words, there is no need to perform individual alignment on the thirtieth date setting lever and the short month setting lever, so that the production of the mechanism is facilitated.

[0009] En outre, le levier d'actionnement tourne de la première position vers la position deuxième lorsque le levier de détermination du trentième quantième 30 suit la partie de détermination de trentième quantième et lorsque le levier de détermination de mois court suit la partie de détermination de mois court, et la roue de date intermédiaire vient en prise avec le rochet d'avancement de jour lorsqu'il se trouve dans la deuxième position, de sorte qu'il soit possible de transmettre l'énergie du rochet d'avancement de jour au rochet d'avancement de jour de mois court via la roue de date intermédiaire. Donc, à la fin d'un mois court, l'indicateur de quantième est entraîné en rotation par le rochet d'avancement de jour et le rochet d'avancement de jour de mois court, rendant possible d'effectuer de manière précise l'avancement des jours. [0009] Further, the actuating lever rotates from the first position to the second position when the thirtieth date determining lever 30 follows the thirtieth date determining portion and when the short month determining lever follows the portion of short month determination, and the intermediate date wheel engages the day advancing ratchet when in the second position, so that it is possible to transmit the energy of the advancing ratchet from day to month day advancement ratchet via intermediate date wheel. So, at the end of a short month, the date indicator is rotated by the day advancing ratchet and the month short month day advancing ratchet, making it possible to accurately perform the advancement of days.

[0010] Le mécanisme principal de commande d'indicateur de quantième est équipé d'une came de contrôle tournant de manière synchronisée avec la came d'actionnement et ayant une partie de détermination d'avancement de jour au niveau de sa surface périphérique externe; et le levier d'actionnement possède un levier de détermination d'avancement de jour en contact glissant avec la surface périphérique externe de la came de contrôle, et lorsque le levier de détermination d'avancement de jour entre en contact glissant avec la partie de détermination d'avancement de jour, le levier de détermination de trentième quantième suit la partie de détermination du trentième quantième, et le levier de détermination de mois court suit la partie de détermination de mois court. The main date indicator control mechanism is equipped with a control cam rotating in synchronization with the actuating cam and having a day advancement determining part at its outer peripheral surface; and the operating lever has a day advancement determining lever in sliding contact with the outer peripheral surface of the control cam, and when the day advancement determining lever is in sliding contact with the determining portion advancing day, the thirtieth date determining lever follows the thirtieth date determining part, and the short month determining lever follows the short month determining part.

[0011] Selon la présente invention, le levier d'actionnement est agencé de manière à ce que le levier de détermination d'avancement de jour entre en contact glissant avec la surface périphérique externe de la came de contrôle, de sorte qu'il soit possible que le levier de détermination de trentième quantième puisse suivre la partie de détermination de trentième quantième sans le mettre en contact avec l'indicateur de quantième. Par conséquent, il est possible de supprimer la génération d'une charge du levier d'actionnement envers l'indicateur de quantième, de telle sorte qu'il est possible d'empêcher une déviation de l'indicateur de quantième, rendant possible l'affichage du quantième dans une position prédéterminée. According to the present invention, the actuating lever is arranged so that the day advancement determining lever comes into sliding contact with the outer peripheral surface of the control cam, so that it is It is possible that the thirtieth date determining lever can follow the thirtieth date determining part without bringing it into contact with the date indicator. Therefore, it is possible to suppress the generation of a load of the operating lever to the date indicator, so that it is possible to prevent a deviation of the date indicator, making possible the display of the date in a predetermined position.

[0012] En outre, le mécanisme de commande d'indicateur de quantième de mois court est équipé d'un moyen de compression pour appliquer une force de rappel sur le rochet d'avancement de jour de mois court visant à l'amener depuis une position précédant le changement de date, c'est-à-dire avant d'entraîner en rotation l'indicateur de quantième, vers une position suivant le changement de date, c'est après avoir entraîné en rotation l'indicateur de quantième. [0012] In addition, the short month calendar indicator control mechanism is equipped with a compression means for applying a restoring force to the short month day advancement ratchet aimed at bringing it from a position preceding the date change, that is to say before rotating the date indicator, to a position following the date change, this is after having rotated the date indicator.

[0013] Selon la présente invention, le rochet d'avancement de jour de mois court peut être ramené dans la position correspondant à celle précédant le changement de date après avoir entraîné l'indicateur de quantième en rotation lors d'un mois court. Ainsi il est possible d'effectuer avec précision les changements de date aussi pour le mois court suivant. According to the present invention, the short month day advancement ratchet can be returned to the position corresponding to that preceding the date change after having driven the date indicator in rotation during a short month. Thus it is possible to perform date changes with precision also for the following short month.

[0014] En outre, le rochet d'avancement de jour de mois court est équipé d'un doigt d'avancement de jour de mois court appuyant contre une dent de l'indicateur de quantième pour faire tourner l'indicateur de quantième; et un support élastique soutenant de manière élastique le doigt d'avancement de jour de mois court est agencée de telle sorte qu'elle puisse être déplacée vers l'intérieur, dans le sens radial, du rochet d'avancement de jour de mois court lorsque le doigt d'avancement de jour de mois court se déplace depuis la position suivant le changement de date vers la position précédant un changement de date pour entrer en contact avec la dent. In addition, the short month day advancement ratchet is equipped with a short month day advancement finger pressing against a tooth of the date indicator to rotate the date indicator; and a resilient holder resiliently supporting the short month day advancing finger is arranged such that it can be moved radially inwardly of the short month day advancing ratchet when the short month day advancement finger moves from the position following the date change to the position prior to a date change to contact the tooth.

[0015] Selon la présente invention, on prévoit un support élastique soutenant de manière élastique le doigt d'avancement de jour de mois court déplaçable vers l'intérieur dans le sens radial du rochet d'avancement de jour de mois court, de sorte qu'il soit possible d'empêcher de manière fiable une rotation inverse de l'indicateur de quantième lorsque le doigt d'avancement de jour de mois court est rétabli de sa position correspondant à celle suivant le changement de date vers la position précédant le changement de date. Donc, il est possible de faire tourner l'indicateur de quantième par le rochet d'avancement de jour et le rochet d'avancement de jour de mois court à la fin d'un mois court, de telle sorte que le changement de jour puisse être effectué avec précision. According to the present invention, there is provided an elastic support resiliently supporting the short month day advancement finger movable inwardly in the radial direction of the short month day advancement ratchet, so that 'it is possible to reliably prevent reverse rotation of the date indicator when the short month day advancement finger is restored from its position corresponding to that following the change of date to the position prior to the change of dated. So, it is possible to rotate the date indicator by the day advancement ratchet and the short month day advancement ratchet at the end of a short month, so that the day change can be carried out with precision.

[0016] En outre, la présente invention concerne également un mouvement équipé d'un mécanisme de calendrier tel que celui décrit ci-dessus. In addition, the present invention also relates to a movement equipped with a calendar mechanism such as that described above.

[0017] En outre, la présente invention concerne également une pièce d'horlogerie équipée d'un mouvement tel que celui décrit ci-dessus. In addition, the present invention also relates to a timepiece equipped with a movement such as that described above.

[0018] Selon la présente invention, on fournit par conséquent un mécanisme de calendrier de structure simple et de fabrication facile, de telle sorte qu'on peut obtenir un mouvement et une pièce d'horlogerie de meilleure fiabilité et dont les coûts de fabrication sont bas. According to the present invention, therefore provides a calendar mechanism of simple structure and easy to manufacture, so that one can obtain a movement and a timepiece of better reliability and whose manufacturing costs are low.

[0019] Selon la présente invention, il est possible de faire fonctionner le mécanisme de calendrier par l'intermédiaire du seul levier d'actionnement, de telle sorte que, comparé à la technique de l'art antérieur où quatre leviers sont prévus à cet effet, il est possible de diminuer le nombre de composants et d'obtenir une structure plus simple. According to the present invention, it is possible to operate the calendar mechanism via the single actuating lever, so that, compared to the technique of the prior art where four levers are provided for this Indeed, it is possible to reduce the number of components and obtain a simpler structure.

[0020] En outre, le levier d'actionnement est muni du levier de détermination du trentième quantième et du levier de détermination de mois court, de sorte que, seulement en montant le levier d'actionnement, le levier de détermination du trentième quantième et le levier de détermination de mois court sont agencés dans des positions prédéterminées. Autrement dit, il n'y a pas besoin d'effectuer de positionnement individuel pour le levier de détermination du trentième quantième et le levier de détermination de mois court, de sorte que la production est facilitée. In addition, the actuating lever is provided with the thirtieth date determining lever and the short month determining lever, so that, only by mounting the actuating lever, the thirtieth date determining lever and the short month determination lever are arranged in predetermined positions. In other words, there is no need to perform individual positioning for the thirtieth calendar determining lever and the short month determining lever, so that production is facilitated.

[0021] En outre, le levier d'actionnement est entraîné en rotation depuis la première position vers la deuxième position lorsque le levier de détermination du trentième quantième suit la partie de détermination de trentième quantième, que le levier de détermination de mois court suit la partie de détermination de mois court, et que la roue de date intermédiaire vient en prise avec le rochet d'avancement de jour lorsqu'il se trouve dans la deuxième position, de sorte qu'il soit possible de transmettre la puissance du rochet d'avancement de jour au rochet d'avancement de jour de mois court via la roue de date intermédiaire. Donc, à la fin d'un mois court, l'indicateur de quantième est entraîné en rotation par le rochet d'avancement de jour et le rochet d'avancement de jour de mois court, ce qui permet d'effectuer un changement de quantième avec précision. Further, the actuating lever is rotated from the first position to the second position when the thirtieth date determining lever follows the thirtieth date determining part, the short month determining lever follows the short month determining part, and that the intermediate date wheel engages with the day advancement ratchet when it is in the second position, so that it is possible to transmit the power of the ratchet to day advancement to the short month day advancement ratchet via the intermediate date wheel. Therefore, at the end of a short month, the date indicator is rotated by the day advancement ratchet and the short month day advancement ratchet, which makes it possible to perform a date change. precisely.

BRÈVE DESCRIPTION DES DESSINSBRIEF DESCRIPTION OF THE DRAWINGS

[0022] La figure 1 est une vue externe d'une pièce d'horlogerie selon un premier mode de réalisation préférentiel. La figure 2 est une vue en plan d'un mouvement équipé d'un mécanisme de calendrier. La figure 3 est une vue en coupe prise le long de la ligne A-A de la figure 2. La figure 4 est une vue en coupe prise le long de la ligne B-B de la figure 2. La figure 5 est une vue en plan élargie d'un mécanisme principal de commande d'indicateur de quantième. La figure 6 est une vue en plan élargie d'un levier de détermination du trentième quantième et d'un rochet d'avancement de jour de mois court. La figure 7 est une vue en plan illustrant l'état vers 23 heures 50 minutes lors du dernier jour pour le changement de jour lors d'un mois court. La figure 8 est une vue en plan illustrant l'état vers 23 heures 55 minutes lors du dernier jour pour le changement de jour lors d'un mois court. La figure 9 est un schéma illustrant un parcours de transmission de puissance dans un mécanisme de calendrier. La figure 10 est une vue en plan illustrant l'état vers 24 heures lors du dernier jour pour le changement de jour lors d'un mois court, avec un premier changement de quantième qui commence. La figure 11 est une vue en plan illustrant l'état vers 24 heures lors du dernier jour pour le changement de jour lors d'un mois court, avec le premier changement de quantième à moitié effectué. La figure 12 est une vue en plan illustrant l'état vers 24 heures lors du dernier jour pour l'avancement de jour lors d'un mois court, avec le premier changement de quantième effectué. La figure 13 est une vue en plan illustrant l'état vers 24 heures lors du dernier jour pour l'avancement de jour lors d'un mois court, avec un deuxième changement de quantième qui commence. La figure 14 est une vue en plan illustrant l'état vers 24 heures lors du dernier jour pour l'avancement de jour lors d'un mois court, avec le deuxième changement de quantième à moitié effectué. La figure 15 est une vue en plan illustrant l'état vers 24 heures lors du dernier jour pour l'avancement de jour lors d'un mois court, avec le deuxième changement de quantième effectué. La figure 16 est une vue en plan illustrant l'état vers 23 heures 50 minutes lors du trentième quantième pour le changement de date lors d'un mois long. La figure 17 est une vue en plan illustrant l'état vers 24 heures lors du trentième quantième pour le changement de date lors d'un mois long, avec le deuxième changement de quantième à moitié effectué. La figure 18 est une vue en plan illustrant l'état vers 24 heures lors du trentième quantième pour le changement de date lors d'un mois long, avec le deuxième changement de quantième effectué. La figure 19 est une vue en plan d'un mouvement équipé d'un mécanisme de calendrier selon un mode de réalisation modifié. La figure 20 est une vue en coupe prise le long de la ligne C-C de la figure 19. La figure 21 est une vue en plan illustrant l'état vers minuit lors du dernier jour pour l'avancement de jour lors d'un mois court. La figure 22 est une vue en plan illustrant l'état vers 5 heures 55 minutes lors du dernier jour pour l'avancement d'un jour lors d'un mois court. La figure 23 est une vue en plan illustrant l'état vers 24 heures lors du dernier jour pour l'avancement d'un jour lors d'un mois court, immédiatement avant un premier changement de quantième. La figure 24 est une vue en plan illustrant l'état vers 24 heures lors du dernier jour pour l'avancement d'un jour lors d'un mois court, avec un premier changement de quantième qui commence. La figure 25 est une vue en plan illustrant l'état vers 24 heures lors du dernier jour pour l'avancement d'un jour lors d'un mois court, avec le premier changement de quantième à moitié effectué. La figure 26 est une vue en plan illustrant l'état vers 24 heures lors du dernier jour pour l'avancement d'un jour lors d'un mois court, avec un deuxième changement de quantième qui commence. La figure 27 est une vue en plan illustrant l'état vers 24 heures lors du dernier jour pour l'avancement d'un jour lors d'un mois court, avec le premier changement de quantième effectué. La figure 28 est une vue explicative illustrant le changement de quantième d'un mois long. La figure 29 est une vue explicative illustrant une came de contrôle selon un autre mode de réalisation. La figure 30 est une vue externe d'une pièce d'horlogerie selon un autre mode de réalisation. La figure 31 est une vue en coupe d'un mouvement de la pièce d'horlogerie selon l'autre mode de réalisation représenté à la figure 30.Figure 1 is an external view of a timepiece according to a first preferred embodiment. Figure 2 is a plan view of a movement equipped with a calendar mechanism. Figure 3 is a sectional view taken along line AA of Figure 2. Figure 4 is a sectional view taken along line BB of Figure 2. Figure 5 is an enlarged plan view of Figure 2. 'a main date indicator control mechanism. FIG. 6 is an enlarged plan view of a lever for determining the thirtieth date and of a short month day advancement ratchet. Fig. 7 is a plan view showing the state at around 11.50pm on the last day for the day change in a short month. Fig. 8 is a plan view illustrating the state at about 23 hours 55 minutes on the last day for the day change in a short month. Fig. 9 is a diagram illustrating a power transmission path in a calendar mechanism. Fig. 10 is a plan view showing the state around 24 hours on the last day for the day change in a short month, with a first date change starting. Fig. 11 is a plan view showing the state at around 24 hours on the last day for the day change in a short month, with the first date change half completed. Fig. 12 is a plan view showing the state around 24 hours on the last day for day advancement in a short month, with the first date change made. Fig. 13 is a plan view showing the state around 24 hours on the last day for day advancement in a short month, with a second date change starting. Fig. 14 is a plan view showing the state at around 24 hours on the last day for day advancement in a short month, with the second date change halfway made. Fig. 15 is a plan view showing the state at around 24 hours on the last day for day advancement in a short month, with the second date change made. Fig. 16 is a plan view illustrating the state at around 23 hours 50 minutes on the thirtieth date for the date change during a long month. Fig. 17 is a plan view illustrating the state at around 24 o'clock on the thirtieth date for the date change during a long month, with the second date change halfway made. FIG. 18 is a plan view illustrating the state at around 24 o'clock during the thirtieth date for the date change during a long month, with the second date change performed. Fig. 19 is a plan view of a movement equipped with a calendar mechanism according to a modified embodiment. Fig. 20 is a sectional view taken along line CC of Fig. 19. Fig. 21 is a plan view showing the state around midnight on the last day for day advancement in a short month. . Fig. 22 is a plan view showing the state at about 5 hours 55 minutes on the last day for the advancement of one day in a short month. Fig. 23 is a plan view illustrating the state around 24 hours on the last day for advancing by one day in a short month, immediately before a first date change. Fig. 24 is a plan view showing the state around 24 hours on the last day for advancing one day in a short month, with a first date change starting. Fig. 25 is a plan view showing the state at around 24 hours on the last day for advancing by one day in a short month, with the first date change halfway made. Fig. 26 is a plan view showing the state at around 24 hours on the last day for advancing one day in a short month, with a second date change starting. Fig. 27 is a plan view showing the state around 24 hours on the last day for advancing one day in a short month, with the first date change made. FIG. 28 is an explanatory view illustrating the change in date of a month long. Fig. 29 is an explanatory view illustrating a control cam according to another embodiment. FIG. 30 is an external view of a timepiece according to another embodiment. Figure 31 is a sectional view of a movement of the timepiece according to the other embodiment shown in Figure 30.

DESCRIPTION DES MODES DE RÉALISATIONDESCRIPTION OF EMBODIMENTS

[0023] Dans ce qui suit, on décrira un mode de réalisation préférentiel de la présente invention en référence aux dessins. In what follows, a preferred embodiment of the present invention will be described with reference to the drawings.

[0024] Dans ce qui suit, on décrira une montre-bracelet mécanique (qui correspond à la „pièce d'horlogerie“ des revendications; ci-après il sera simplement fait référence à la „pièce d'horlogerie“), et ensuite un mécanisme de calendrier selon le mode de réalisation sera décrit en détail. In the following, we will describe a mechanical wristwatch (which corresponds to the "timepiece" of the claims; hereinafter reference will simply be made to the "timepiece"), and then a Calendar mechanism according to the embodiment will be described in detail.

(Pièce d'horlogerie)(Timepiece)

[0025] On se réfère généralement au corps mécanique incluant la partie menante d'une pièce d'horlogerie comme étant le „mouvement.“ Ce qui est obtenu comme produit complet en montant un cadran et des aiguilles à ce mouvement et en mettant l'ensemble dans un boîtier de pièce d'horlogerie constitue l' „ensemble“ de la pièce d'horlogerie. Parmi les deux faces d'une platine constituant la plaque de base de la pièce d'horlogerie, la face où se situe la glace du boîtier de pièce d'horlogerie, c'est-à-dire, le côté où se trouve le cadran est communément appelée „côté arrière“ du mouvement; la face où se situe le fond du boîtier de pièce d'horlogerie, c'est-à-dire, la face opposée au cadran, est communément appelée „côté avant“ du mouvement. [0025] The mechanical body including the driving part of a timepiece is generally referred to as the "movement." Which is obtained as a complete product by fitting a dial and hands to this movement and putting the together in a timepiece case constitutes the “whole” of the timepiece. Among the two faces of a plate constituting the base plate of the timepiece, the face where the crystal of the timepiece case is located, that is to say, the side where the dial is located is commonly referred to as the “back side” of the movement; the face where the back of the timepiece case is located, that is to say, the face opposite the dial, is commonly referred to as the “front side” of the movement.

[0026] La figure 1 est une vue externe d'une pièce d'horlogerie 1 selon le mode de réalisation préférentiel. Dans la description qui suit, on se référera à la direction du sens des aiguilles d'une montre dans la vue en plan de la figure 1 ultérieure comme étant le sens CW („clockwise), et la direction contraire au sens des aiguilles d'une montre comme étant le sens CCW („counterclockwise“). Figure 1 is an external view of a timepiece 1 according to the preferred embodiment. In the following description, the clockwise direction in the plan view of subsequent Figure 1 will be referred to as the CW direction ("clockwise), and the counterclockwise direction. a watch as being the CCW direction ("counterclockwise").

[0027] Comme représenté sur la figure 1, l'ensemble de la pièce d'horlogerie 1 du présent mode de réalisation contient, dans un boîtier de pièce d'horlogerie 3 consistant en un fond (non représenté) et une glace 2, un mouvement 10, un cadran 11 ayant une échelle ou similaire indiquant une information horaire, et des aiguilles indicatrices incluant une aiguille des heures 12 indiquant l'heure, une aiguille des minutes 13 indiquant les minutes, et une aiguille des secondes 14 indiquant les secondes. Sont aménagés dans le cadran 11 une fenêtre de quantième 11a exposant un nombre indiquant le quantième, c'est-à-dire le jour du mois, et une fenêtre des mois 11b exposant des lettres indiquant le mois. En raison de cette construction, la pièce d'horlogerie 1 peut afficher l'heure, le jour du mois, et le mois. As shown in Figure 1, the assembly of the timepiece 1 of this embodiment contains, in a timepiece housing 3 consisting of a bottom (not shown) and a crystal 2, a movement 10, a dial 11 having a scale or the like indicating time information, and indicator hands including an hour hand 12 indicating the time, a minute hand 13 indicating the minutes, and a seconds hand 14 indicating the seconds. In the dial 11 are arranged a date window 11a exposing a number indicating the date, that is to say the day of the month, and a month window 11b exposing letters indicating the month. Due to this construction, the timepiece 1 can display the time, day of the month, and month.

[0028] La figure 2 est une vue en plan du mouvement équipé d'un mécanisme de calendrier, et la figure 3 est une vue en coupe prise le long de la ligne A-A de la figure 2. Figure 2 is a plan view of the movement equipped with a calendar mechanism, and Figure 3 is a sectional view taken along the line A-A of Figure 2.

[0029] Comme représenté sur les figures 2 et 3, le mouvement 10 a une platine 5 constituant la plaque de base du mouvement 10. Comme représenté à la figure 3, sur la face avant de la platine 5, sont agencés au moins un mécanisme d'échappement/régulateur (non représenté) incluant un balancierspiral, un mobile d'échappement, une ancre, etc., et rouage avant incluant un deuxième mobile (roue & pignon) 8, un troisième mobile (roue & pignon), un mobile de centre (roue & pignon) 9, un barillet de mouvement, etc. L'aiguille des secondes 14 est montée à une extrémité du côté arrière du deuxième mobile 8, qui fait une rotation en 60 secondes dans le sens CW autour d'un axe de centre O. L'aiguille des minutes 13 est montée à une extrémité du côté arrière du mobile de centre 9, qui fait une rotation en 60 minutes dans le sens CW autour de l'axe de centre O. As shown in Figures 2 and 3, the movement 10 has a plate 5 constituting the base plate of the movement 10. As shown in Figure 3, on the front face of the plate 5, are arranged at least one mechanism exhaust / regulator (not shown) including a spiral balance, an escape mobile, an anchor, etc., and front gear including a second mobile (wheel & pinion) 8, a third mobile (wheel & pinion), a mobile center (wheel & pinion) 9, a movement barrel, etc. The seconds hand 14 is mounted at one end of the rear side of the second mobile 8, which rotates in 60 seconds in the CW direction around an axis of center O. The minute hand 13 is mounted at one end on the rear side of the center mobile 9, which rotates in 60 minutes in the CW direction around the axis of center O.

(Mécanisme de calendrier)(Calendar mechanism)

[0030] Comme représenté sur les figures 2 et 3, un mécanisme de calendrier 100 est équipé d'une roue des heures 16, un indicateur de quantième 20, un indicateur des mois 30, un mécanisme principal de commande d'indicateur de quantième 40, et un mécanisme de commande d'indicateur de quantième de mois court 70. Dans ce qui suit, le mécanisme de calendrier 100 sera décrit en détail en référence aux dessins. As shown in Figures 2 and 3, a calendar mechanism 100 is equipped with an hours wheel 16, a date indicator 20, a month indicator 30, a main date indicator control mechanism 40 , and a short month calendar indicator control mechanism 70. In the following, the calendar mechanism 100 will be described in detail with reference to the drawings.

[0031] Dans la description qui suit, on se référera aux mois ayant 30 jours ou moins (février, avril, juin, septembre et novembre) comme étant les mois courts, et les mois ayant 31 jours (janvier, mars, mai, juillet, août, octobre et décembre) comme étant les mois longs. In the following description, we will refer to the months having 30 days or less (February, April, June, September and November) as being the short months, and the months having 31 days (January, March, May, July , August, October and December) as the long months.

[0032] L'extrémité avant de la roue des heures 16 est formée comme une roue dentée des heures 16a. La roue des heures 16 est en prise, c'est-à-dire engrène avec un barillet de mouvement (non représenté) servant de source d'énergie via la roue dentée des heures 16a et le rouage. La roue des heures 16 est entraînée en rotation par l'énergie transmise depuis le barillet du mouvement. L'aiguille des heures 12 est montée à l'extrémité arrière de la roue des heures 16, et fait une rotation en 12 heures dans le sens CW autour de l'axe de centre O. La roue des heures 16 comporte une roue intermédiaire des heures 16bà l'arrière de la roue dentée des heures 16a. La rotation de la roue des heures 16 est transmise à un mécanisme principal de commande d'indicateur de quantième 40 tel que décrit ci-dessous via le rouage consistant, par exemple, en la roue intermédiaire des heures 16 bet une roue intermédiaire 17. The front end of the hour wheel 16 is formed as an hour toothed wheel 16a. The hour wheel 16 is engaged, that is to say meshes with a movement barrel (not shown) serving as a source of energy via the hour toothed wheel 16a and the cog. The hour wheel 16 is rotated by the energy transmitted from the barrel of the movement. The hour hand 12 is mounted at the rear end of the hour wheel 16, and rotates in 12 hours in the CW direction around the center axis O. The hour wheel 16 has an intermediate wheel. hours 16b at the rear of the hours gear 16a. The rotation of the hour wheel 16 is transmitted to a main date indicator control mechanism 40 as described below via the cog consisting, for example, of the intermediate hour wheel 16 bet an intermediate wheel 17.

[0033] L'indicateur de quantième 20 est un élément en forme d'anneau monté mobile en rotation sur la platine 5. Comme représenté sur la figure 2, les inscriptions des jours 21 représentant le quantième du premier au trente-et-unième jour du mois sont affichées successivement sur la surface de l'indicateur de quantième 20 tout au long de sa périphérie. Des exemples relatifs à la méthode d'affichage des inscriptions du jour 21 incluent l'impression, le marquage, et le scellage, sans pour autant que cette énumération soit restrictive. L'indicateur de quantième 20 tourne dans le sens CW. Les inscriptions des jours 21 sont affichées successivement conformément à la direction rotationnelle de l'indicateur de quantième 20. The date indicator 20 is a ring-shaped element mounted movably in rotation on the plate 5. As shown in Figure 2, the inscriptions of days 21 representing the date from the first to the thirty-first day of the month are displayed successively on the surface of the date indicator 20 all along its periphery. Examples relating to the method of displaying Day 21 entries include printing, marking, and sealing, without this listing being restrictive. The date indicator 20 rotates in the CW direction. The entries for 21 days are displayed successively in accordance with the rotational direction of the date indicator 20.

[0034] Une surface périphérique interne 20a de l'indicateur de quantième 20 est formée sur deux étages. Du côté avant du mouvement 10, sur la surface périphérique interne 20a de l'indicateur de quantième 20, sont formées une pluralité de dents 22 faisant saillie radialement vers l'intérieur et à des intervalles réguliers au niveau de la périphérie. En accord avec les 31 jours que comportent un mois long, 31 dents 22 sont formées selon les pas suivants : 360°/31 = approximativement tous les 11.6°. Les dents 22 sont poussées une fois par jour par un doigt d'avancement de jour 47b d'un rochet d'avancement de jour 47 décrit ci-dessous et configuré pour faire une rotation par jour. Par conséquent, l'indicateur de quantième 20 tourne dans le sens CW et effectue une rotation par mois. An internal peripheral surface 20a of the date indicator 20 is formed over two stages. On the front side of the movement 10, on the inner peripheral surface 20a of the date indicator 20, are formed a plurality of teeth 22 projecting radially inwardly and at regular intervals at the periphery. In accordance with the 31 days of a long month, 31 teeth 22 are formed in the following steps: 360 ° / 31 = approximately every 11.6 °. Teeth 22 are pushed once per day by a day advancing finger 47b of a day advancing ratchet 47 described below and configured to rotate once per day. Therefore, the date indicator 20 rotates in the CW direction and performs one rotation per month.

[0035] Un sautoir de date 25 indexe la position dans la direction rotationnelle de l'indicateur de quantième 20, et aide à la rotation de l'indicateur de quantième 20. L'extrémité proximale du sautoir de date 25 est fixée à la platine 5, et son extrémité distale 25a est formée comme une extrémité libre. Le sautoir de date 25 est équipé d'un bras de date 25b capable de se déformer élastiquement. Le bras de date 25b compresse l'extrémité distale 25a vers l'indicateur de quantième 20. L'extrémité distale 25a du sautoir de date 25 est en prise avec une dent 22 de l'indicateur de quantième 20, indexant de cette manière la rotation de l'indicateur de quantième 20. Par conséquent, l'indicateur de quantième 20 peut tourner pas à pas au même pas angulaire que celui correspondant à l'angle de la dent 22 (approximativement 11.6°). A date jumper 25 indexes the position in the rotational direction of the date indicator 20, and assists in the rotation of the date indicator 20. The proximal end of the date jumper 25 is fixed to the plate 5, and its distal end 25a is formed as a free end. The date jumper 25 is equipped with a date arm 25b capable of being elastically deformed. The date arm 25b compresses the distal end 25a towards the date indicator 20. The distal end 25a of the date jumper 25 engages a tooth 22 of the date indicator 20, thereby indexing the rotation. of the date indicator 20. Therefore, the date indicator 20 can be rotated step by step at the same angular step as that corresponding to the angle of the tooth 22 (approximately 11.6 °).

[0036] Sur la surface périphérique interne 20a de l'indicateur de quantième 20 et à l'arrière des dents 22, est formée une partie d'avancement de mois 26. La partie d'avancement de mois 26 est formée pour faire saillie intérieurement dans la direction radiale. La partie d'avancement de mois 26 pousse une dent 28a d'une roue intermédiaire des mois 28 prévue à l'intérieur de l'indicateur de quantième 20 lorsqu'une commutation est effectuée depuis le dernier jour d'un mois au premier jour du mois suivant, tournant de cette manière la roue intermédiaire des mois 28. On the inner peripheral surface 20a of the date indicator 20 and at the rear of the teeth 22, is formed a month advancing part 26. The month advancing part 26 is formed to protrude internally in the radial direction. The month advancing part 26 pushes a tooth 28a of an intermediate month wheel 28 provided inside the date indicator 20 when a switchover is made from the last day of a month to the first day of the month. following month, thus turning the intermediate wheel of the 28 months.

[0037] En outre, sur la surface périphérique interne 20a de l'indicateur de quantième 20 et sur le côté arrière des dents 22, est formée une partie de détermination de trentième quantième 29. La partie de détermination de trentième quantième 29 est formée comme un renfoncement vers l'extérieur dans la direction radiale. La partie de détermination de trentième quantième 29 est formée à une position correspondant à une extrémité distale 74a d'un levier de détermination de trentième quantième 74 décrit ci-dessous fourni sur le côté interne de l'indicateur de quantième 20 lorsque l'indicateur de quantième affiche le trentième quantième. Lorsque le passage de changement de mois est effectué du trentième quantième, qui est la fin d'un mois court, au premier jour du mois suivant, la partie de détermination de trentième quantième 29 permet de suivre la commutation par l'extrémité distale 74a du levier de détermination de trentième quantième 74 y pénétrant. Further, on the inner peripheral surface 20a of the date indicator 20 and on the rear side of the teeth 22, a thirtieth date determining part 29 is formed. The thirtieth date determining part 29 is formed as an outward recess in the radial direction. The thirtieth date determining part 29 is formed at a position corresponding to a distal end 74a of a thirtieth date determining lever 74 described below provided on the inner side of the date indicator 20 when the date indicator. date displays the thirtieth date. When the month change passage is performed from the thirtieth date, which is the end of a short month, to the first day of the following month, the thirtieth date determining part 29 makes it possible to follow the switching by the distal end 74a of the thirtieth date determination lever 74 penetrating therein.

(Roue des mois)(Wheel of months)

[0038] L'indicateur des mois 30 est inséré dans la roue des heures 16 avec du jeu pour être mobile en rotation. La roue des mois 30 possède une roue dentée des mois 31 et une came de mois 33. La roue des mois 30 fait une rotation par année. The month indicator 30 is inserted into the hours wheel 16 with play to be mobile in rotation. The 30-month wheel has a 31-month gear and a 33-month cam. The 30-month wheel rotates per year.

[0039] La roue dentée des mois 31 engrène avec la roue intermédiaire des mois 28. Conformément aux 12 mois constituant l'année, la roue dentée des mois 31 possède 12 dents espacées selon les pas suivants: 360°/12 = 30°. La roue dentée des mois 31 tourne avec la rotation de l'indicateur de quantième 20 et la roue intermédiaire des mois 28 à la fin de chaque mois. Sur la figure 2, pour rendre le dessin plus facile à comprendre, le nombre de chaque mois correspondant à chaque dent de la roue dentée de mois 31 est indiqué. The toothed wheel of the months 31 meshes with the intermediate wheel of the months 28. In accordance with the 12 months constituting the year, the toothed wheel of the months 31 has 12 teeth spaced in the following steps: 360 ° / 12 = 30 °. The month gear 31 rotates with the rotation of the date indicator 20 and the month intermediate wheel 28 at the end of each month. In Fig. 2, to make the drawing easier to understand, the number of each month corresponding to each tooth of the month gear 31 is indicated.

[0040] La came des mois 33 fait une rotation par année de manière synchronisée avec la roue dentée des mois 31 autour de l'axe de centre O. La surface périphérique externe de la came de mois 33 comporte cinq saillies 34a dans la direction périphérique, et cinq renfoncements 34b (correspondant à la „partie de détermination de mois court“ dans les revendications) situées entre les saillies 34a. The month cam 33 rotates per year synchronously with the month toothed wheel 31 around the center axis O. The outer peripheral surface of the month cam 33 has five projections 34a in the peripheral direction , and five recesses 34b (corresponding to the "short month determining part" in the claims) located between the projections 34a.

[0041] La pluralité de saillies 34a de la came de mois 33 est formée à des positions correspondant aux mois longs (janvier, mars, mai, juillet, août, octobre et décembre) lorsque la surface périphérique externe de la came de mois 33 est divisée en 12 secteurs égaux correspondant à un angle de 30° autour de l'axe de centre O et les mois de janvier à décembre sont successivement attribués à chacun de ces secteurs dans le sens CW. La pluralité d'entailles 34b de la came de mois 33 est formée aux positions correspondant aux mois courts (février, avril, juin, septembre, et novembre). The plurality of protrusions 34a of the month cam 33 are formed at positions corresponding to the long months (January, March, May, July, August, October and December) when the outer peripheral surface of the month cam 33 is divided into 12 equal sectors corresponding to an angle of 30 ° around the axis of center O and the months from January to December are successively assigned to each of these sectors in the CW direction. The plurality of notches 34b of the month cam 33 are formed at the positions corresponding to the short months (February, April, June, September, and November).

[0042] Une disque d'affichage des mois 15 est inséré sur l'extrémité de la roue de mois 30, du côté arrière. La disque d'affichage des mois 15 est une plaque en forme de disque, et est agencée du côté avant du mouvement 10 par rapport au cadran 11. Comme représenté sur la figure 2, sur la surface principale de l'indicateur de quantième 20, des lettres de mois 15a sont successivement affichées représentant les mois de janvier à décembre le long de la direction périphérique. Des exemples pour la méthode d'affichage des lettres de mois 15a incluent l'impression, le marquage, et le scellage, sans que cette énumération soit restrictive pour autant. La disque d'affichage des mois 15 fait une rotation par année dans le sens CCW autour de l'axe de centre O de manière synchronisée avec la roue dentée des mois 31 et la came des mois 33. Les lettres des mois 15a sont affichées successivement conformément à la direction rotationnelle de la disque d'affichage des mois 15, et sont visibles depuis l'extérieur à travers la fenêtre de mois 11 b. A month display disk 15 is inserted on the end of the month wheel 30, on the rear side. The month display disc 15 is a disc-shaped plate, and is arranged on the front side of the movement 10 relative to the dial 11. As shown in Fig. 2, on the main surface of the date indicator 20, month letters 15a are successively displayed representing the months from January to December along the peripheral direction. Examples for the month letter display method 15a include printing, marking, and sealing, without this listing being restrictive. The month display disc 15 rotates per year in the CCW direction around the center axis O in synchronization with the month toothed wheel 31 and the month cam 33. The letters of the months 15a are displayed successively. in accordance with the rotational direction of the month display disk 15, and are visible from the outside through the month window 11 b.

[0043] Un sautoir des mois 35 règle la position dans la direction rotationnelle de la roue des mois 30, et aide à la rotation de la roue des mois 30. L'extrémité proximale du sautoir des mois 35 est connectée de manière rotative à la platine 5, et son extrémité distale 35a est formée comme une extrémité libre. L'extrémité distale 35a du sautoir des mois 35 est compressé vers la roue de mois 30 par un ressort-sautoir des mois 36. L'extrémité distale 35a du sautoir des mois 35 est engagée avec les dents de la roue des mois 30, réglant de cette manière la rotation de la roue des mois 30. Par conséquent, la roue dentée des mois 31, la came des mois 33, et la disque d'affichage des mois 15 de la roue des mois 30 tournent d'un pas par mois dans le sens CCW selon le même angle de 30° que l'angle de la dent (30°) autour de l'axe de centre O, effectuant une rotation par année. A month jumper 35 adjusts the position in the rotational direction of the month wheel 30, and assists in the rotation of the month wheel 30. The proximal end of the month jumper 35 is rotatably connected to the plate 5, and its distal end 35a is formed as a free end. The distal end 35a of the month jumper 35 is compressed towards the month wheel 30 by a month jumper spring 36. The distal end 35a of the month jumper 35 is engaged with the teeth of the month wheel 30, adjusting in this way the rotation of the month wheel 30. Consequently, the month gear 31, the month cam 33, and the month display disk 15 of the month wheel 30 are rotated by one step per month. in the CCW direction at the same angle of 30 ° as the angle of the tooth (30 °) around the axis of center O, performing one rotation per year.

(Mécanisme principal de commande d'indicateur de quantième)(Main mechanism for controlling date indicator)

[0044] La figure 4 est une vue en coupe prise le long de la ligne B-B de la figure 2, et la figure 5 est une vue en plan élargie du mécanisme principal de commande d'indicateur de quantième. Figure 4 is a sectional view taken along line B-B of Figure 2, and Figure 5 is an enlarged plan view of the main date indicator control mechanism.

[0045] Comme représenté sur les figures 2, 4, et 5, dans une position entre l'axe de centre O et la surface périphérique interne 20a de l'indicateur de quantième 20 et correspondant à la direction de 5 heures, un arbre 6 fait saillie verticalement depuis la platine 5 le long d'un premier axe C1. Le mécanisme principal de commande d'indicateur de quantième 40 est soutenu de manière rotative autour du premier axe C1 par l'arbre 6. As shown in Figures 2, 4, and 5, in a position between the axis of center O and the inner peripheral surface 20a of the date indicator 20 and corresponding to the direction of 5 o'clock, a shaft 6 protrudes vertically from the plate 5 along a first axis C1. The main date indicator control mechanism 40 is rotatably supported about the first axis C1 by the shaft 6.

[0046] Le mécanisme principal de commande d'indicateur de quantième 40 est équipé d'une goupille de date 41, d'une roue d'entraînement d'indicateur de quantième 43, d'une came d'actionnement 50, d'un levier de came d'actionnement 52, d'un rochet d'avancement de jour 47, et d'une came de contrôle 45. La goupille de date 41, la roue d'entraînement d'indicateur de quantième 43, la came d'actionnement 50, le rochet d'avancement de jour 47, et la came de contrôle 45 sont agencés de manière coaxiale pour tourner autour du premier axe C1. The main date indicator control mechanism 40 is equipped with a date pin 41, a date indicator drive wheel 43, an actuating cam 50, a actuating cam lever 52, a day advancement ratchet 47, and a control cam 45. The date pin 41, the date indicator drive wheel 43, the date cam actuation 50, the day advancement ratchet 47, and the control cam 45 are arranged coaxially to rotate about the first axis C1.

[0047] La goupille de date 41 est formée selon une configuration tubulaire, et est simplement insérée dans l'arbre 6 de manière à être rotative autour du premier axe C1. The date pin 41 is formed in a tubular configuration, and is simply inserted into the shaft 6 so as to be rotatable about the first axis C1.

[0048] La roue d'entraînement d'indicateur de quantième 43 est simplement insérée sur la goupille de date 41 pour être rotative. La roue d'entraînement d'indicateur de quantième 43 engrène avec la roue intermédiaire 17. L'énergie de la roue des heures 16 est transmise à la roue d'entraînement d'indicateur de quantième 43 via la roue des heures 16b intermédiaire et la roue intermédiaire 17. La roue d'entraînement d'indicateur de quantième 43 fait une rotation par jour à une vitesse fixe autour du premier axe C1. The date indicator drive wheel 43 is simply inserted on the date pin 41 to be rotatable. The date indicator drive wheel 43 meshes with the intermediate wheel 17. The energy from the hour wheel 16 is transmitted to the date indicator drive wheel 43 via the intermediate hour wheel 16b and the hour wheel 16b. intermediate wheel 17. The date indicator drive wheel 43 rotates once per day at a fixed speed about the first axis C1.

[0049] En outre, la roue d'entraînement d'indicateur de quantième 43 est munie d'une rainure arquée 43a au centre de laquelle se trouve le premier axe C1 dans la vue en plan, et dont la largeur s'étend dans la direction radiale de la roue d'entraînement d'indicateur de quantième 43. L'angle de centre de la rainure arquée 43a est, par exemple, approximativement 90°. In addition, the date indicator drive wheel 43 is provided with an arcuate groove 43a at the center of which is the first axis C1 in the plan view, and the width of which extends in the radial direction of the date indicator drive wheel 43. The center angle of the arcuate groove 43a is, for example, approximately 90 °.

[0050] La came d'actionnement 50 est une plaque configurée en forme de secteur dans son ensemble, et est plus petite que le contour de la roue d'entraînement d'indicateur de quantième 43. Du côté avant de la roue d'entraînement d'indicateur de quantième 43, la came d'actionnement 50 est empilée sur la roue d'entraînement d'indicateur de quantième 43. La came d'actionnement 50 est insérée et fixée sur la goupille de date 41. Par conséquent, la came d'actionnement 50 est montée rotative autour du premier axe C1 par rapport à la roue d'entraînement d'indicateur de quantième 43. The actuating cam 50 is a plate configured in the form of a sector as a whole, and is smaller than the outline of the date indicator drive wheel 43. On the front side of the drive wheel date indicator 43, the actuation cam 50 is stacked on the date indicator drive wheel 43. The actuation cam 50 is inserted and fixed on the date pin 41. Therefore, the cam actuator 50 is rotatably mounted about the first axis C1 relative to the date indicator drive wheel 43.

[0051] La came d'actionnement 50 est équipée d'une surface de came d'actionnement 50a formée dans une configuration arquée, une surface de compression 50b sur laquelle agit un levier de came d'actionnement 52 décrit ci-dessous, et une partie renflée 50c pénétrant dans une extrémité distale 53 du levier de came d'actionnement 52. La surface de came d'actionnement 50a est agencée de telle sorte que son rayon se réduise graduellement alors qu'elle s'étend dans le sens CW. La surface de compression 50b est agencée de telle sorte qu'elle fasse face, dans le sens CCW, à une extrémité de la surface de came d'actionnement 50a. La partie renflée 50c est aménagée du côté opposé à la surface de came d'actionnement 50a dans le sens radial par rapport au premier axe C1, et le renflement est orienté vers l'extérieur dans le sens radial. The actuating cam 50 is equipped with an actuating cam surface 50a formed in an arcuate configuration, a compression surface 50b on which acts an actuating cam lever 52 described below, and a bulging portion 50c penetrating into a distal end 53 of the actuating cam lever 52. The actuating cam surface 50a is arranged so that its radius gradually decreases as it extends in the CW direction. The compression surface 50b is arranged such that it faces, in the CCW direction, one end of the actuating cam surface 50a. The bulged part 50c is arranged on the side opposite to the actuating cam surface 50a in the radial direction with respect to the first axis C1, and the bulge is oriented outwards in the radial direction.

[0052] La came d'actionnement 50 est équipée d'une goupille de régulation 51 faisant saillie du côté arrière du mouvement 10 le long de la direction axiale. La goupille de régulation 51 est insérée dans la rainure 43a de la roue d'entraînement d'indicateur de quantième 43 et y est logée. La goupille de régulation 51 possède un diamètre plus petit que la largeur de la rainure 43a, et est simplement insérée dans la rainure 43a; en même temps, elle peut se déplacer dans la rainure 43a le long de la direction périphérique. The actuating cam 50 is equipped with a regulating pin 51 projecting from the rear side of the movement 10 along the axial direction. The regulating pin 51 is inserted into and seated in the groove 43a of the date indicator drive wheel 43. The regulating pin 51 has a diameter smaller than the width of the groove 43a, and is simply inserted into the groove 43a; at the same time, it can move in the groove 43a along the peripheral direction.

[0053] Par l'intermédiaire de la rotation dans le sens CW de la roue d'entraînement d'indicateur de quantième 43, la goupille de régulation 51 jouxte l'extrémité de la rainure 43a dans le sens CCW. Dans l'état dans lequel la goupille de régulation 51 jouxte l'extrémité de la rainure 43a, la roue d'entraînement d'indicateur de quantième 43 tourne dans le sens CW, la came d'actionnement 50 étant montée rotative dans le sens CW avec la roue d'entraînement d'indicateur de quantième 43. By means of the rotation in the CW direction of the date indicator drive wheel 43, the regulating pin 51 adjoins the end of the groove 43a in the CCW direction. In the state in which the regulating pin 51 abuts the end of the groove 43a, the date indicator drive wheel 43 rotates in the CW direction, the actuating cam 50 being rotatably mounted in the CW direction. with the date indicator drive wheel 43.

[0054] Lorsque la surface de compression 50b de la came d'actionnement 50 est compressée par le levier de came d'actionnement 52 décrit ci-dessous, la goupille de régulation 51 se déplace vers l'intérieur de la rainure 43a dans le sens CW à une vitesse plus élevée que celle de rotation de la roue d'entraînement d'indicateur de quantième 43. Par conséquent, la came d'actionnement 50 peut être entraînée en rotation dans le sens CW par rapport à la roue d'entraînement d'indicateur de quantième 43 selon un angle prédéterminé (approximativement 90° selon le présent mode de réalisation) correspondant à la plage de formation de la rainure 43a. When the compression surface 50b of the actuating cam 50 is compressed by the actuating cam lever 52 described below, the regulating pin 51 moves inwardly of the groove 43a in the direction CW at a higher speed than that of rotation of the date indicator drive wheel 43. Therefore, the actuating cam 50 can be rotated in the CW direction relative to the drive wheel d. Date indicator 43 at a predetermined angle (approximately 90 ° according to the present embodiment) corresponding to the range of formation of the groove 43a.

[0055] Dans son ensemble, le levier de came d'actionnement 52 est formé dans une configuration en forme de L. Le levier de came d'actionnement 52 peut être entraîné en rotation lorsqu'il est pivoté sur la platine 5. Le levier de came d'actionnement 52 est compressé par un ressort de levier de came d'actionnement 54 de telle sorte que l'extrémité distale 53 se déplace en direction de la came d'actionnement 50. L'extrémité distale 53 du levier de came d'actionnement 52 entre en contact glissant avec la surface de came d'actionnement 50a et la surface de pression 50b de la came d'actionnement 50; au même moment, avec la rotation du levier de came d'actionnement 52, il se déplace vers et depuis le premier axe C1, qui est le centre de rotation de la came d'actionnement 50. As a whole, the actuating cam lever 52 is formed in an L-shaped configuration. The actuating cam lever 52 can be rotated when pivoted on the plate 5. The lever actuator cam 52 is compressed by an actuator cam lever spring 54 such that the distal end 53 moves toward the actuator cam 50. The distal end 53 of the actuator cam lever the actuator 52 comes into sliding contact with the actuating cam surface 50a and the pressing surface 50b of the actuating cam 50; at the same time, with the rotation of the actuating cam lever 52, it moves to and from the first axis C1, which is the center of rotation of the actuating cam 50.

[0056] Au niveau de l'extrémité distale 53 du levier de came d'actionnement 52, sont formées une première saillie 53a faisant saillie en direction de la came d'actionnement 50, et une deuxième saillie 53b agencée au niveau de l'extrémité proximale du levier de came d'actionnement 52 par rapport à la première saillie 53a. Lorsque la came d'actionnement 50 tourne dans le sens CW, la deuxième saillie 53b de l'extrémité distale 53 du levier de came d'actionnement 52 entre en contact glissant avec la surface de came d'actionnement 50a. A instant prédéterminé autour de 0 heure a.m., lorsque la date est changée, la deuxième saillie 53b de l'extrémité distale 53 du levier de came d'actionnement 52 atteint la surface de compression 50b de la came d'actionnement 50, et vient compresser la surface de compression 50b par la force de compression du ressort de levier de came d'actionnement 54. Il en résulte que la came d'actionnement 50 peut tourner instantanément dans le sens CW par rapport à la roue d'entraînement d'indicateur de quantième 43 selon un angle prédéterminé (qui est approximativement de 90° selon le présent mode de réalisation) correspondant à la plage de formation de la rainure 43a de la roue d'entraînement d'indicateur de quantième 43. En outre, la came d'actionnement 50 tourne selon un angle prédéterminé, et ensuite la partie renflée 50c vient pénétrer entre la première saillie 53a et la deuxième saillie 53b du levier de came d'actionnement 52, et y est retenue temporairement. At the distal end 53 of the actuating cam lever 52, are formed a first projection 53a projecting in the direction of the actuating cam 50, and a second projection 53b arranged at the end proximal of the actuating cam lever 52 to the first projection 53a. As the actuation cam 50 rotates in the CW direction, the second protrusion 53b of the distal end 53 of the actuation cam lever 52 slidably contacts the actuation cam surface 50a. At a predetermined time around 0 o'clock am, when the date is changed, the second projection 53b of the distal end 53 of the actuation cam lever 52 reaches the compression surface 50b of the actuation cam 50, and comes to compress compressing surface 50b by the compressive force of the actuating cam lever spring 54. As a result, the actuating cam 50 can instantly rotate in the CW direction relative to the indicator drive wheel. date 43 at a predetermined angle (which is approximately 90 ° according to the present embodiment) corresponding to the range of formation of the groove 43a of the date indicator drive wheel 43. Further, the cam cam actuator 50 rotates through a predetermined angle, and then the swelling portion 50c enters between the first protrusion 53a and the second protrusion 53b of the actuating cam lever 52, and is temporarily retained therein.

[0057] Le rochet d'avancement de jour 47 est composé d'une roue dentée de rochet d'avancement de jour 47a en forme de disque et d'un doigt d'avancement de jour 47b. Le rochet d'avancement de jour 47 est inséré et fixé sur l'extrémité du côté arrière de la goupille de date 41, et tourne de manière synchronisée avec la came d'actionnement 50. The day advancement ratchet 47 is composed of a day advancement ratchet toothed wheel 47a in the form of a disc and of a day advancement finger 47b. The day advancing ratchet 47 is inserted and fixed on the end of the rear side of the date pin 41, and rotates in synchronization with the actuating cam 50.

[0058] La roue dentée de rochet d'avancement de jour 47a est insérée sur la goupille de date 41 et fixée à celle-ci. Des dents sont formées sur la surface périphérique externe de la roue dentée de rochet d'avancement de jour 47a. La roue dentée de rochet d'avancement de jour 47a peut être amenée en prise d'engrenage avec une roue intermédiaire de date 85 du mécanisme de commande d'indicateur de quantième de mois court 70 décrit ci-dessous. The day advancement ratchet toothed wheel 47a is inserted on the date pin 41 and fixed thereto. Teeth are formed on the outer peripheral surface of the day advancement ratchet sprocket 47a. The day advancing ratchet toothed wheel 47a can be meshed with an intermediate date wheel 85 of the short month date indicator control mechanism 70 described below.

[0059] Du côté arrière de la roue dentée de rochet d'avancement de jour 47a, le doigt d'avancement de jour 47b est inséré et fixé sur la goupille de date 41. Sur la surface périphérique externe du doigt d'avancement de jour 47b, un doigt 47c est formé faisant saillie vers l'extérieur dans la direction radiale de manière à pouvoir venir en prise avec les dents 22 de l'indicateur de quantième 20. A un instant prédéterminé d'autour de 0 heure a.m., lorsque la date change, le rochet d'avancement de jour 47 tourne de manière synchronisée avec la rotation instantanée de la came d'actionnement 50. Par conséquent, le doigt d'avancement de jour 47b vient agir contre la dent 22 de l'indicateur de quantième 20 pour le faire tourner d'un cran dans le sens CW. On the rear side of the day advance ratchet toothed wheel 47a, the day advance finger 47b is inserted and fixed on the date pin 41. On the outer peripheral surface of the day advance finger 47b, a finger 47c is formed projecting outwardly in the radial direction so as to be able to engage the teeth 22 of the date indicator 20. At a predetermined time of around 0 o'clock am, when the date changes, the day advancement ratchet 47 rotates synchronously with the instantaneous rotation of the actuating cam 50. Consequently, the day advancement finger 47b acts against the tooth 22 of the date indicator. 20 to turn it one step in the CW direction.

[0060] La came de contrôle 45 est superposée mobile en rotation sur la roue d'entraînement d'indicateur de quantième 43, et est agencée entre la roue d'entraînement d'indicateur de quantième 43 et le rochet d'avancement de jour 47. La came de contrôle 45 est insérée sur la goupille de date 41 et fixée à celle-ci, et tourne de manière synchronisée avec la came d'actionnement 50 et le rochet d'avancement de jour 47. Une extrémité distale 73a d'un levier de détermination d'avancement de jour 73 fourni sur le mécanisme de commande d'indicateur de quantième de mois court 70 décrit ci-dessous entre en contact glissant avec la surface périphérique externe de la came de contrôle 45. The control cam 45 is rotatably superimposed on the date indicator drive wheel 43, and is arranged between the date indicator drive wheel 43 and the day advancement ratchet 47 Control cam 45 is inserted over and attached to date pin 41, and rotates synchronously with actuating cam 50 and day advancement ratchet 47. A distal end 73a of a Day advancement determining lever 73 provided on the short month calendar indicator control mechanism 70 described below makes sliding contact with the outer peripheral surface of the control cam 45.

[0061] Une partie de détermination d'avancement de jour 46 est formée sur la surface périphérique externe de la came de contrôle 45. La partie de détermination d'avancement de jour 46 est formée pour être enfoncée dans le côté interne dans la direction radiale. Une surface latérale 46a dans le sens CW de la partie de détermination d'avancement de jour 46 est formée pour s'étendre le long de la direction radiale. Une surface latérale 46b dans le sens CCW de la partie de détermination d'avancement de jour 46 est inclinée dans le sens CCW depuis l'intérieur vers l'extérieur dans la direction radiale, de sorte que l'ouverture de la partie de détermination d'avancement de jour 46 est élargie. Lorsque le passage de changement de mois est effectué lors du trentième quantième, qui est le dernier jour d'un mois court, au premier jour du mois suivant, l'extrémité distale 73a du levier de détermination d'avancement de jour 73 entre dans la partie de détermination d'avancement de jour 46 et vient en contact glissant avec elle. A day advancement determining part 46 is formed on the outer peripheral surface of the control cam 45. The day advancement determining part 46 is formed to be pressed into the inner side in the radial direction. . A side surface 46a in the CW direction of the daylight advancement determining portion 46 is formed to extend along the radial direction. A side surface 46b in the CCW direction of the day advancement determining part 46 is inclined in the CCW direction from the inside to the outside in the radial direction, so that the opening of the day advancement determining part The advancement of day 46 is broadened. When the month change passage is performed on the thirtieth calendar, which is the last day of a short month, on the first day of the following month, the distal end 73a of the day advancement determining lever 73 enters the day progress determining part 46 and comes into sliding contact with it.

(Mécanisme de commande d'indicateur de quantième de mois court)(Short month calendar indicator control mechanism)

[0062] Dans une position située entre l'axe de centre O et la surface périphérique interne 20a de l'indicateur de quantième 20, correspondant à la direction de 7 heures, un arbre 7 fait saillie verticalement depuis la platine 5 le long d'un deuxième axe C2 (qui correspond à „l'axe prédéterminé“ dans les revendications). In a position located between the center axis O and the inner peripheral surface 20a of the date indicator 20, corresponding to the direction of 7 o'clock, a shaft 7 protrudes vertically from the plate 5 along a second axis C2 (which corresponds to the “predetermined axis” in the claims).

[0063] Le mécanisme de commande d'indicateur de quantième de mois court 70 comporte un levier d'actionnement 71, un rochet d'avancement de jour du mois court 76, et la roue de date intermédiaire 85. The short month calendar indicator control mechanism 70 comprises an actuating lever 71, a short month day advancement ratchet 76, and the intermediate date wheel 85.

[0064] Le levier d'actionnement 71 est un élément plat similaire à une plaque formé, par exemple, d'un matériau en métal. Le levier d'actionnement 71 est simplement inséré dans une partie tubulaire 77 du rochet d'avancement de jour de mois court 76 décrit ci-dessous qui est inséré sans serrage dans l'arbre 7, et est supporté par l'arbre 7 pour être mobile en rotation autour du deuxième axe C2. Le levier d'actionnement 71 est compressé dans le sens CCW autour du deuxième axe C2 par un ressort de levier d'actionnement 72 agencé vers l'extérieur dans le sens radial du levier d'actionnement 71. The actuating lever 71 is a flat member similar to a plate formed, for example, from a metal material. The operating lever 71 is simply inserted into a tubular portion 77 of the short month day advancement ratchet 76 described below which is loosely inserted into the shaft 7, and is supported by the shaft 7 to be. movable in rotation about the second axis C2. The actuating lever 71 is compressed in the CCW direction about the second axis C2 by an actuating lever spring 72 arranged outwardly in the radial direction of the actuating lever 71.

[0065] Le levier d'actionnement 71 est équipé d'une goupille de régulation 71a, d'un levier de détermination d'avancement de jour 73, d'un levier de détermination de trentième quantième 74, et d'un levier de détermination de mois court 75. Le levier de détermination d'avancement de jour 73, le levier de détermination de trentième quantième 74, et le levier de détermination de mois court 75 sont formés de façon monobloc. The actuating lever 71 is equipped with a regulating pin 71a, a day advance determination lever 73, a thirtieth date determination lever 74, and a determination lever month short 75. The day advancement determining lever 73, the thirtieth calendar determining lever 74, and the short month determining lever 75 are integrally formed.

[0066] La goupille de régulation 71a est agencée de telle sorte qu'elle se dresse vers l'arrière dans le voisinage du deuxième axe C2. La goupille de régulation 71a est insérée dans une rainure 78a d'une roue dentée de doigt 78 d'un rochet d'avancement de jour de mois court 76 tel que celui décrit ci-dessous, et y est agencé pour indexer la rotation du rochet d'avancement de jour de mois court 76. The regulating pin 71a is arranged such that it rises towards the rear in the vicinity of the second axis C2. The regulating pin 71a is inserted into a groove 78a of a finger gear 78 of a short month day advancement ratchet 76 such as that described below, and is arranged therein to index the rotation of the ratchet. short month day advancement 76.

[0067] L'extrémité distale 73a du levier de détermination d'avancement de jour 73 est formée pour être courbée vers la came de contrôle 45. L'extrémité distale 73a du levier de détermination d'avancement de jour 73 est maintenue en contact avec la surface périphérique externe de la came de contrôle 45 par la force de compression du ressort du levier d'actionnement 72, et, par la rotation de la came de contrôle 45, entre en contact glissant avec la surface périphérique externe de la came de contrôle 45. Lorsque le trentième quantième, qui est le dernier jour d'un mois court, est changé pour passer au premier jour du mois suivant (par exemple, entre 23 heures 55 et 24 heures du dernier jour d'un mois court), l'extrémité distale 73a du levier de détermination d'avancement de jour 73 tend à entrer dans la partie de détermination d'avancement de jour 46 de la came de contrôle 45, et est mis en contact glissant avec celle-ci par la force de compression du ressort du levier d'actionnement 72. The distal end 73a of the day advancement determining lever 73 is formed to be bent towards the control cam 45. The distal end 73a of the day advancement determining lever 73 is kept in contact with the outer peripheral surface of the control cam 45 by the compressive force of the spring of the actuating lever 72, and, by the rotation of the control cam 45, comes into sliding contact with the outer peripheral surface of the control cam 45. When the thirtieth day, which is the last day of a short month, is changed to the first day of the following month (for example, between 11:55 p.m. and midnight of the last day of a short month), l the distal end 73a of the day advancement determining lever 73 tends to enter the day advancement determining portion 46 of the control cam 45, and is slidably contacted therewith by the compressive force of the actuating lever spring 72.

[0068] La figure 6 est une vue en plan élargie du levier de détermination de trentième quantième et du rochet d'avancement de jour de mois court. FIG. 6 is an enlarged plan view of the thirtieth date setting lever and of the short month day advancement ratchet.

[0069] L'extrémité distale 74a du levier de détermination de trentième quantième 74 est formée de telle sorte qu'elle est courbée vers la surface périphérique interne 20a de l'indicateur de quantième 20. L'extrémité distale 74a du levier de détermination de trentième quantième 74 est espacée de la surface périphérique interne 20a de l'indicateur de quantième 20 par une distance prédéterminée. Lorsque l'indicateur de quantième 20 affiche le trentième quantième, l'extrémité distale 74a du levier de détermination de trentième quantième 74 est agencée pour se trouver dans une position correspondant à la partie de détermination de trentième quantième 29 de l'indicateur de quantième 20 (voir la figure 6). The distal end 74a of the thirtieth date setting lever 74 is formed such that it is curved towards the inner peripheral surface 20a of the date indicator 20. The distal end 74a of the date setting lever. thirtieth date 74 is spaced from the inner peripheral surface 20a of the date indicator 20 by a predetermined distance. When the date indicator 20 displays the thirtieth date, the distal end 74a of the thirtieth date determining lever 74 is arranged to be in a position corresponding to the thirtieth date determining part 29 of the date indicator 20. (see figure 6).

[0070] Le levier de détermination de mois court 75 s'étend entre l'axe de centre O et le premier axe C1 selon une vue en plan, et son extrémité distale 75a est formée de telle sorte qu'elle est recourbée vers la came de mois 33. L'extrémité distale 75a du levier de détermination de mois court 75 est espacée de la surface périphérique externe de la came de mois 33 d'une distance prédéterminée. Dans un mois long, l'extrémité distale 75a du levier de détermination de mois court 75 se trouve dans une position correspondant à la saillie 34a de chaque mois; dans un mois court, il se trouve dans une position correspondant à l'entaille 34b de chaque mois. The short month determination lever 75 extends between the center axis O and the first axis C1 in a plan view, and its distal end 75a is formed such that it is curved towards the cam month 33. The distal end 75a of the short month setting lever 75 is spaced from the outer peripheral surface of the month cam 33 by a predetermined distance. In a long month, the distal end 75a of the short month setting lever 75 is in a position corresponding to the protrusion 34a of each month; in a short month, it is in a position corresponding to notch 34b of each month.

[0071] La figure 7 est une vue en plan illustrant l'état vers 23 heures 50 minutes lors du dernier jour pour les changements de jour lors d'un mois court, et la figure 8 est une vue en plan illustrant l'état vers 23 heures 55 minutes lors du dernier jour pour les changements de jour d'un mois court. [0071] Figure 7 is a plan view illustrating the state at approximately 11.50 p.m. on the last day for day changes in a short month, and Figure 8 is a plan view illustrating the state at 23 hours 55 minutes on the last day for day changes of a short month.

[0072] Comme représenté sur la figure 2, lorsque l'extrémité distale 73a du levier de détermination d'avancement de jour 73 est en contact glissant avec la région de la came de contrôle 45 autre que la partie de détermination d'avancement de jour 46, le levier d'actionnement 71 est agencé pour se trouver dans une position (à laquelle on se réfère ci-après comme étant la „première position“) inclinée dans le sens CW autour du deuxième axe C2 contre la force de compression du ressort du levier d'actionnement 72. As shown in Fig. 2, when the distal end 73a of the day advancement determining lever 73 is in sliding contact with the region of the control cam 45 other than the day advancement determining part. 46, the actuating lever 71 is arranged to be in a position (hereinafter referred to as the "first position") inclined in the CW direction about the second axis C2 against the compressive force of the spring of the operating lever 72.

[0073] En outre, comme représenté sur la figure 7, comme pour le levier d'actionnement 71, lors du trentième quantième, qui est le dernier jour d'un mois court, l'extrémité distale 75a du levier de détermination de mois court 75 est agencée dans une position correspondant à l'entaille 34b, et l'extrémité distale 74a du levier de détermination de trentième quantième 74 est agencée pour se trouver dans une position correspondant à la partie de détermination de trentième quantième 29. In addition, as shown in Figure 7, as for the actuating lever 71, during the thirtieth date, which is the last day of a short month, the distal end 75a of the short month determination lever 75 is arranged in a position corresponding to the notch 34b, and the distal end 74a of the thirtieth date determining lever 74 is arranged to be in a position corresponding to the thirtieth date determining part 29.

[0074] Et, comme représenté à la figure 8, lorsque le trentième quantième, qui est le dernier jour d'un mois court, est changé pour passer au premier jour du mois suivant (par exemple, entre 23 heures 55 minutes et 24 heures du dernier jour d'un mois court), l'extrémité distale 73a du levier de détermination d'avancement de jour 73 vient pénétrer dans la partie de détermination d'avancement de jour 46, et entre en contact glissant avec cette dernière, et l'extrémité distale 74a du levier de détermination de trentième quantième 74 entre dans la partie de détermination de trentième quantième 29 pour le suivre, et l'extrémité distale 75a du levier de détermination de mois court 75 pénètre dans l'entaille 34b de la came de mois 33 pour la suivre. Lorsque l'extrémité distale 73a du levier de détermination d'avancement de jour 73 pénètre dans la partie de détermination d'avancement de jour 46 pour entrer en contact glissant avec elle, le levier d'actionnement 71 est agencé pour se trouver dans une position (à laquelle l'on se réfère ci-après comme étant la „deuxième position“) plus inclinée en outre dans le sens CCW que la première position autour du deuxième axe C2 par la force de compression du ressort du levier d'actionnement 72. And, as shown in Figure 8, when the thirtieth date, which is the last day of a short month, is changed to go to the first day of the following month (for example, between 23 hours 55 minutes and 24 hours the last day of a short month), the distal end 73a of the day advancement determining lever 73 enters the day advancement determining portion 46, and comes into sliding contact therewith, and The distal end 74a of the thirtieth date determining lever 74 enters the thirtieth date determining part 29 to follow it, and the distal end 75a of the short month determining lever 75 enters the notch 34b of the date cam. 33 months to follow it. When the distal end 73a of the day advancement determining lever 73 enters the day advancement determining portion 46 to slidably contact it, the actuating lever 71 is arranged to be in a position. (hereinafter referred to as the "second position") further inclined in the CCW direction than the first position about the second axis C2 by the compressive force of the spring of the operating lever 72.

[0075] Comme représenté sur la figure 6, le rochet d'avancement de jour de mois court 76 possède une partie tubulaire 77, une roue dentée de doigt 78, une plaque de doigt 79, et une partie de liaison de ressort de rappel 80. La partie tubulaire 77, la roue dentée de doigt 78, la plaque de doigt 79, et la partie de liaison de ressort de rappel 80 sont fixées l'une à l'autre de façon monobloc, et tournent autour du deuxième axe C2 de manière synchronisée l'un avec l'autre. As shown in Fig. 6, the short month day advancement ratchet 76 has a tubular portion 77, a finger gear 78, a finger plate 79, and a return spring link portion 80. The tubular portion 77, the finger gear 78, the finger plate 79, and the return spring link portion 80 are attached to each other integrally, and rotate about the second axis C2 of synchronized with each other.

[0076] La partie tubulaire 77 est insérée de manière rotative sur l'arbre 7. The tubular part 77 is inserted in a rotary manner on the shaft 7.

[0077] Du côté arrière du levier d'actionnement 71 est simplement insérée sans serrage, c'est-à-dire via un serrage gras, la roue dentée de doigt 78 dans la partie tubulaire 77, qui demeure ainsi malgré tout fixée sur la partie tubulaire 77. Sur la surface périphérique externe de la roue dentée de doigt 78, une pluralité de dents est formée dans la direction périphérique. La roue dentée de doigt 78 est munie d'une rainure arquée 78a, le centre de laquelle est formé par le deuxième axe C2 selon une vue en plan, et dont la largeur s'étend dans la direction radiale de la roue dentée de doigt 78. L'angle de centre de la rainure 78a formée selon une configuration arquée est, par exemple, d'approximativement 90°. La goupille de régulation 71a faisant saillie verticalement depuis le levier d'actionnement 71 est insérée dans la rainure 78a et agencée pour être déplaçable. The rear side of the actuating lever 71 is simply inserted without clamping, that is to say via a greasy clamping, the finger toothed wheel 78 in the tubular part 77, which thus remains fixed on the tubular portion 77. On the outer peripheral surface of the finger gear 78, a plurality of teeth are formed in the peripheral direction. The finger toothed wheel 78 is provided with an arcuate groove 78a, the center of which is formed by the second axis C2 in plan view, and the width of which extends in the radial direction of the finger toothed wheel 78. The center angle of the groove 78a formed in an arcuate configuration is, for example, approximately 90 °. The regulating pin 71a projecting vertically from the operating lever 71 is inserted into the groove 78a and arranged to be movable.

[0078] La plaque de doigt 79 est fixée à la roue dentée de doigt 78 du côté arrière de la roue dentée de doigt 78. La plaque de doigt 79 comprend principalement une base 79a, un doigt d'avancement de jour de mois court 79b, et un support élastique 79c. The finger plate 79 is attached to the finger gear 78 on the rear side of the finger gear 78. The finger plate 79 mainly comprises a base 79a, a short month day advancement finger 79b , and an elastic support 79c.

[0079] La base 79a est prévue pour couvrir la majorité de la roue dentée de doigt 78, et possède une rainure de doigt 79d s'étendant le long de la direction radiale. The base 79a is intended to cover the majority of the finger gear 78, and has a finger groove 79d extending along the radial direction.

[0080] Le doigt d'avancement de jour de mois court 79b possède une forme allongée selon la direction radiale, et fait saillie vers l'extérieur de la roue dentée de doigt 78 dans le sens radial. Dans une position précédant le changement de date (à laquelle on se réfère ci-après simplement comme la „position de pré-avancement“), avant qu'il ne vienne agir sur les dents 22 de l'indicateur de quantième 20 pour le faire tourner, le doigt d'avancement de jour de mois court 79b est dirigé approximativement dans la direction de 6 heures. Le doigt d'avancement de jour de mois court 79b se trouve dans la rainure de doigt 79d, et est déplaçable le long de la direction radiale. La surface latérale dans le sens CW du doigt d'avancement de jour de mois court 79b est formée comme une surface plate, et peut être engagée avec les dents 22 de l'indicateur de quantième 20. La surface latérale dans le sens CCW du doigt d'avancement de jour de mois court 79b est une surface recourbée, qui peut être séparée des dents 22 de l'indicateur de quantième 20. The short month day advancing finger 79b has an elongated shape in the radial direction, and projects outwardly from the finger gear 78 in the radial direction. In a position preceding the change of date (which is referred to hereafter simply as the „pre-advancement position“), before it comes to act on the teeth 22 of the date indicator 20 to do so rotating, the short month day advancing finger 79b is pointed in the direction of 6 o'clock approximately. The short month day advancing finger 79b is located in the finger groove 79d, and is movable along the radial direction. The CW side surface of the short month day advancing finger 79b is formed as a flat surface, and can be engaged with the teeth 22 of the date indicator 20. The CCW side surface of the finger 79b is a curved surface, which can be separated from the teeth 22 of the date indicator 20.

[0081] Dans son ensemble, le support élastique 79c est formé selon une configuration en forme de C capable de déformation élastique, et relie la base 79a au doigt d'avancement de jour de mois court 79b. Le support élastique 79c soutient de manière élastique le doigt d'avancement de jour de mois court 79b de sorte qu'il peut se déplacer dans la rainure de doigt 79d vers l'intérieur dans le sens radial. As a whole, the elastic support 79c is formed in a C-shaped configuration capable of elastic deformation, and connects the base 79a to the short month day advancement finger 79b. The elastic holder 79c resiliently supports the short month day advancing finger 79b so that it can move in the finger groove 79d inwardly in the radial direction.

[0082] La partie de liaison de ressort de rappel 80 est un élément formé selon une configuration tubulaire, et est insérée et fixée sur la partie tubulaire 77 du côté avant du levier d'actionnement 71. The return spring link part 80 is an element formed in a tubular configuration, and is inserted and fixed on the tubular part 77 on the front side of the actuating lever 71.

[0083] Un ressort de rappel 82 (qui correspond au „moyen de compression“ dans les revendications) est relié à la partie de liaison de ressort de rappel 80. Le ressort de rappel 82 est configuré tout forme d'une spirale s'étendant le long d'une spirale d'Archimède dont le centre est, par exemple, le deuxième axe C2. L'extrémité interne du ressort de rappel 82 sous forme de spirale est fixée à la partie de liaison de ressort de rappel 80, et son extrémité externe est fixée à une goupille stationnaire 84 faisant saillie verticalement depuis la platine 5. A return spring 82 (which corresponds to the "compression means" in the claims) is connected to the return spring link portion 80. The return spring 82 is configured in the form of an extending spiral. along an Archimedean spiral whose center is, for example, the second axis C2. The inner end of the spiral return spring 82 is attached to the return spring linkage portion 80, and its outer end is attached to a stationary pin 84 protruding vertically from the stage 5.

[0084] Le ressort de rappel 82 agit sur la roue dentée de doigt 78 du rochet d'avancement de jour de mois court 76 dans le sens CCW vers la position de pré-changement de date depuis la position suivant le changement de date (à laquelle on se réfère ci-après simplement comme étant la „position post-changement“) après que le doigt d'avancement de jour de mois court 79b a agi sur les dents 22 de l'indicateur de quantième 20 pour le faire tourner. The return spring 82 acts on the finger toothed wheel 78 of the short month day advancement ratchet 76 in the CCW direction towards the pre-date change position from the position following the date change (at which is referred to hereinafter simply as the "post-change position") after the short month day advancing finger 79b has acted on the teeth 22 of the date indicator 20 to rotate it.

[0085] Le ressort de rappel 82 est fixé à la partie de liaison de ressort de rappel 80 et à la goupille stationnaire 84 tout en compressant le rochet d'avancement de jour de mois court 76 dans le sens CCW. Le rochet d'avancement de jour de mois court 76 est indexé en rotation dans le sens CCW et est maintenu en position lorsque la goupille de régulation 71a du levier d'actionnement 71 jouxte l'extrémité dans le sens CCW de la rainure 78a de la roue dentée de doigt 78. The return spring 82 is attached to the return spring connecting portion 80 and the stationary pin 84 while compressing the short month day advancement ratchet 76 in the CCW direction. The short month day advancement ratchet 76 is rotatably indexed in the CCW direction and is held in position when the regulating pin 71a of the actuating lever 71 abuts the CCW end of the groove 78a of the finger gear 78.

[0086] Comme représenté sur les figures 2 et 4, la roue intermédiaire de date 85 est agencée mobile en rotation par rapport au levier d'actionnement 71 autour d'un troisième axe C3 entre le premier axe C1 et le deuxième axe C2. La roue intermédiaire de date 85 engrène avec la roue dentée de doigt 78 du rochet d'avancement de jour de mois court 76. As shown in Figures 2 and 4, the intermediate date wheel 85 is arranged movable in rotation relative to the actuating lever 71 about a third axis C3 between the first axis C1 and the second axis C2. The intermediate date wheel 85 meshes with the finger gear 78 of the short month day advancement ratchet 76.

[0087] La roue intermédiaire de date 85 est séparée du rochet d'avancement de jour 47 dans la première position où le levier d'actionnement 71 est incliné dans le sens CW autour du deuxième axe C2. En outre, la roue intermédiaire de date 85 est mise en prise avec le rochet d'avancement de jour 47 dans la deuxième position où le levier d'actionnement 71 est incliné dans le sens CCW autour du deuxième axe C2. The intermediate date wheel 85 is separated from the day advancement ratchet 47 in the first position where the actuating lever 71 is inclined in the CW direction about the second axis C2. Further, the intermediate date wheel 85 is engaged with the day advancing ratchet 47 in the second position where the operating lever 71 is tilted in the CCW direction about the second axis C2.

(Fonctionnement)(Operation)

[0088] Dans ce qui suit, on décrira le fonctionnement du mécanisme de calendrier 100 décrit, et en particulier comment le mécanisme de calendrier 100 passe du dernier jour d'un mois au premier jour du mois suivant. In what follows, we will describe the operation of the calendar mechanism 100 described, and in particular how the calendar mechanism 100 passes from the last day of a month to the first day of the following month.

[0089] La figure 9 est un schéma illustrant le parcours de transmission d'énergie dans le mécanisme de calendrier. Sur la figure 9, la flèche en trait plein indique la direction de transmission de l'énergie. FIG. 9 is a diagram illustrating the energy transmission path in the calendar mechanism. In Figure 9, the solid arrow indicates the direction of energy transmission.

[0090] Les figures 10 à 15 sont des vues en plan illustrant l'état vers 24 heures pour un changement de date lors du dernier jour d'un mois court; les schémas sont donnés séquentiellement selon l'ordre des figures 10 à 15. En ce qui concerne les numéros de référence des composants du mécanisme de calendrier 100 décrit ci-dessous, les dessins s'y réfèrent le cas échéant. Figures 10 to 15 are plan views illustrating the state around 24 hours for a date change on the last day of a short month; the drawings are given sequentially in the order of Figures 10 to 15. As to the part numbers of the components of the calendar mechanism 100 described below, the drawings refer to them where appropriate.

[0091] Premièrement, on décrira le fonctionnement du mécanisme de calendrier 100 jusqu'au premier jour du mois suivant qui est atteint à partir du dernier jour d'un mois court. Dans ce qui suit, on décrit, à titre d'exemple, le fonctionnement du mécanisme de calendrier 100 lorsqu'une transition est effectuée du dernier jour d'avril (30 avril), qui est un mois court, au premier jour de mai (1<er>mai), qui est un mois long. Dans la description qui suit, l'opération du mécanisme de calendrier 100 lors du dernier jour d'un mois court correspond à l'opération du mécanisme de calendrier 100 lors du dernier jour d'avril, juin, septembre, et novembre, avec février constituant une exception. First, we will describe the operation of the calendar mechanism 100 until the first day of the following month which is reached from the last day of a short month. In the following, we describe, by way of example, the operation of the calendar mechanism 100 when a transition is made from the last day of April (April 30), which is a short month, to the first day of May ( May 1), which is a month long. In the following description, the operation of the calendar mechanism 100 on the last day of a short month corresponds to the operation of the calendar mechanism 100 on the last day of April, June, September, and November, with February constituting an exception.

[0092] Comme illustré sur la figure 7, l'inscription des jours 21 de „30“ indiquant le trentième quantième est affichée à travers la fenêtre de quantième 11a. En outre, les lettres des mois 15a „APR“ indiquant ici le mois d'avril, qui est un mois court, sont affichées à travers la fenêtre des mois 11b. L'extrémité distale 75a du levier de détermination de mois court 75 est agencée pour se trouver dans une position correspondant à l'entaille 34b d'avril, qui est un mois court. As illustrated in FIG. 7, the inscription of days 21 of "30" indicating the thirtieth date is displayed through the date window 11a. In addition, the month letters 15a „APR“ indicating here the month of April, which is a short month, are displayed through the month window 11b. The distal end 75a of the short month setting lever 75 is arranged to be in a position corresponding to the April notch 34b, which is a short month.

[0093] L'énergie de la source d'énergie (non représentée) telle qu'un moteur et un barillet de mouvement est transmise à la roue d'entraînement d'indicateur de quantième 43 du mécanisme principal de commande d'indicateur de quantième 40 via le rouage consistant en la roue des heures 16, la roue intermédiaire 17, etc. (voir la figure 9). Par conséquent, la roue d'entraînement d'indicateur de quantième 43 du mécanisme principal de commande d'indicateur de quantième 40 tourne dans le sens CW autour du premier axe C1 à une vitesse d'une rotation complète par jour. The energy of the energy source (not shown) such as a motor and a movement barrel is transmitted to the date indicator drive wheel 43 of the main date indicator control mechanism 40 via the cog consisting of the hour wheel 16, the intermediate wheel 17, etc. (see figure 9). Therefore, the date indicator drive wheel 43 of the date indicator main control mechanism 40 rotates in the CW direction about the first axis C1 at a speed of one full rotation per day.

[0094] Dans l'état dans lequel la goupille de régulation 51 jouxte l'extrémité de la rainure 43a, la came d'actionnement 50 tourne dans le sens CW avec la roue d'entraînement d'indicateur de quantième 43. Par conséquent, le rochet d'avancement de jour 47 et la came de contrôle 45 du mécanisme principal de commande d'indicateur de quantième 40 tournent dans le sens CW autour du premier axe C1 à une vitesse d'une rotation par jour de manière synchronisée avec la roue d'entraînement d'indicateur de quantième 43 et la came d'actionnement 50. In the state in which the regulating pin 51 adjoins the end of the groove 43a, the actuating cam 50 rotates in the CW direction with the date indicator drive wheel 43. Therefore, the day advancement ratchet 47 and the control cam 45 of the main date indicator control mechanism 40 rotate in the CW direction about the first axis C1 at a speed of one rotation per day in synchronization with the wheel date indicator drive 43 and the actuating cam 50.

[0095] En outre, la deuxième saillie 53b du levier de came d'actionnement 52 entre en contact glissant avec la surface de came d'actionnement 50a par l'intermédiaire de la rotation de la came d'actionnement 50. Further, the second projection 53b of the actuating cam lever 52 comes into sliding contact with the actuating cam surface 50a through the rotation of the actuating cam 50.

[0096] A ce moment-là, l'extrémité distale 73a du levier de détermination d'avancement de jour 73 du levier d'actionnement 71 est amenée en contact glissant avec la zone de la came de contrôle 45 autre que la partie de détermination d'avancement de jour 46. Le levier d'actionnement 71 est agencé dans la première position où il est incliné dans le sens CW autour du deuxième axe C2. La roue intermédiaire de date 85 est espacée du rochet d'avancement de jour 47. At this time, the distal end 73a of the day advancement determining lever 73 of the actuating lever 71 is brought into sliding contact with the area of the control cam 45 other than the determining part. day advancement 46. The actuating lever 71 is arranged in the first position where it is inclined in the CW direction about the second axis C2. The intermediate date wheel 85 is spaced from the day advancement ratchet 47.

[0097] Ensuite, lorsque le rochet d'avancement de jour 47, la came de contrôle 45, la roue d'entraînement d'indicateur de quantième 43, et la came d'actionnement 50 tournent encore dans le sens CW avec le temps qui passe, l'extrémité distale 73a du levier de détermination d'avancement de jour 73 atteint la partie de détermination d'avancement de jour 46 de la came de contrôle 45. Then, when the day advancement ratchet 47, the control cam 45, the date indicator drive wheel 43, and the actuating cam 50 still rotate in the CW direction with the time which passes, the distal end 73a of the day advancement determining lever 73 reaches the day advancement determining portion 46 of the control cam 45.

[0098] Ensuite, comme représenté sur la figure 8, lorsqu'on atteint 23 heures 55 minutes, l'extrémité distale 73a du levier de détermination d'avancement de jour 73 pénètre dans la partie de détermination d'avancement de jour 46 de la came de contrôle 45 en raison de la force de compression du ressort d'élément de levier d'opération 72. En outre, l'extrémité distale 74a du levier de détermination de trentième quantième 74 pénètre à l'intérieur de la partie de détermination de trentième quantième 29 et suit ce dernier. En outre, l'extrémité distale 75a du levier de détermination de mois court 75 pénètre dans l'entaille 34b de la came de mois 33 et suit cette dernière. Par conséquent, le levier d'actionnement 71 tourne dans le sens CCW autour du deuxième axe C2, et se déplace depuis la première position, où il est incliné dans le sens CW autour du deuxième axe C2, vers la deuxième position où il est incliné dans le sens CCW autour du deuxième axe C2. La roue intermédiaire de date 85 se déplace avec la rotation du levier d'actionnement 71, et vient en prise avec le rochet d'avancement de jour 47. Then, as shown in Figure 8, when 23 hours 55 minutes is reached, the distal end 73a of the day advancement determining lever 73 enters the day advancement determining portion 46 of the control cam 45 due to the compressive force of the operation lever member spring 72. Further, the distal end 74a of the thirtieth date determining lever 74 enters the interior of the determining portion. thirtieth date 29 and follows the latter. Further, the distal end 75a of the short month setting lever 75 enters the notch 34b of the month cam 33 and follows the latter. Therefore, the operating lever 71 rotates in the CCW direction around the second axis C2, and moves from the first position, where it is tilted in the CW direction around the second axis C2, to the second position where it is tilted. in the CCW direction around the second axis C2. The intermediate date wheel 85 moves with the rotation of the operating lever 71, and engages the day advancement ratchet 47.

[0099] Par ailleurs, la deuxième saillie 53b du levier de came d'actionnement 52 atteint la surface de compression 50b par l'intermédiaire de la rotation de la came d'actionnement 50. Furthermore, the second projection 53b of the actuating cam lever 52 reaches the compression surface 50b by means of the rotation of the actuating cam 50.

[0100] Ensuite, comme représenté sur la figure 10, lorsque 24 heures est atteint, la deuxième saillie 53b du levier de came d'actionnement 52 agit sur la surface de pression 50b de la came d'actionnement 50 en raison de la force de compression du ressort de levier de came d'actionnement 54. Par conséquent, le rochet d'avancement de jour 47, la came de contrôle 45, et la came d'actionnement 50 du mécanisme principal de commande d'indicateur de quantième 40 tournent dans le sens CW à une vitesse plus grande que celle de la roue d'entraînement d'indicateur de quantième 43. [0100] Then, as shown in Fig. 10, when 24 hours is reached, the second projection 53b of the actuating cam lever 52 acts on the pressure surface 50b of the actuating cam 50 due to the force of compression of the actuating cam lever spring 54. As a result, the day advancing ratchet 47, the control cam 45, and the actuating cam 50 of the date indicator main control mechanism 40 rotate in. CW direction at a speed greater than that of the date indicator drive wheel 43.

[0101] En outre, avec l'énergie transmise par le rochet d'avancement de jour 47, la roue intermédiaire de date 85 tourne à grande vitesse dans le sens CCW autour du troisième axe C3, et la roue dentée de doigt 78 du rochet d'avancement de jour de mois court 76, en prise avec la roue de date intermédiaire 85, tourne à grande vitesse dans le sens CW contre la force de compression du ressort de rappel 82. [0101] In addition, with the energy transmitted by the day advancement ratchet 47, the intermediate date wheel 85 rotates at high speed in the CCW direction around the third axis C3, and the finger toothed wheel 78 of the ratchet short month day advancement 76, meshed with intermediate date wheel 85, rotates at high speed in the CW direction against the compressive force of return spring 82.

[0102] Ensuite, comme représenté sur la figure 11, le doigt d'avancement de jour de mois court 79b du rochet d'avancement de jour de mois court 76 tourne à grande vitesse dans le sens CW autour du deuxième axe C2, et vient en appui contre les dents 22 de l'indicateur de quantième 20. Le doigt d'avancement de jour de mois court 79b du rochet d'avancement de jour de mois court 76 agit en compression sur les dents 22 de l'indicateur de quantième 20. L'indicateur de quantième 20 est dégagé du sautoir de date 25, et amené à tourner dans le sens CW autour de l'axe de centre O. [0102] Then, as shown in Fig. 11, the short month day advancing finger 79b of the short month day advancing ratchet 76 rotates at high speed in the CW direction around the second axis C2, and comes resting against the teeth 22 of the date indicator 20. The short month day advancement finger 79b of the short month day advancement ratchet 76 acts in compression on the teeth 22 of the date indicator 20 The date indicator 20 is released from the date jumper 25, and caused to rotate in the CW direction around the axis of center O.

[0103] En outre, avec la rotation de l'indicateur de quantième 20, la partie de détermination de trentième quantième 29 se déplace dans le sens CW. A ce moment-là, l'extrémité distale 74a du levier de détermination de trentième quantième 74, qui a été positionné à l'intérieur de la partie de détermination de trentième quantième 29, se déplace le long de la partie de détermination de trentième quantième 29, et tend à sortir de la partie de détermination de trentième quantième 29. En outre, le levier d'opération 71 tourne dans le sens CW autour du deuxième axe C2. [0103] Further, with the rotation of the date indicator 20, the thirtieth date determining part 29 moves in the CW direction. At this time, the distal end 74a of the thirtieth date determining lever 74, which has been positioned within the thirtieth date determining part 29, moves along the thirtieth date determining part. 29, and tends to exit from the thirtieth date determining part 29. Further, the operation lever 71 rotates in the CW direction about the second axis C2.

[0104] Ensuite, comme représenté à la figure 12, l'indicateur de quantième 20 vient s'engager à nouveau avec le sautoir de date 25, et tourne d'un cran dans le sens CW autour de l'axe de centre O. L'inscription de quantième 21 affichée dans la fenêtre de quantième 11a est changée de „30“ à „31.“ [0104] Then, as shown in FIG. 12, the date indicator 20 engages again with the date jumper 25, and rotates one notch in the CW direction around the center axis O. The date inscription 21 displayed in the date window 11a is changed from "30" to "31."

[0105] En outre, l'extrémité distale 74a du levier de détermination de trentième quantième 74 sort de la partie de détermination de trentième quantième 29 tout en étant en contact glissant avec celui-ci. Par conséquent, le levier d'actionnement 71 tourne dans le sens CW autour du deuxième axe C2 depuis la deuxième position où il est incliné dans le sens CCW autour du deuxième axe C2 vers la première position où il est incliné dans le sens CW autour du deuxième axe C2. Par conséquent, la roue intermédiaire de date 85 est séparée du rochet d'avancement de jour 47. En outre, en ce qui concerne le rochet d'avancement de jour de mois court 76, la transmission d'énergie à ce dernier depuis le rochet d'avancement de jour 47 via la roue intermédiaire de date 85 est désormais libérée. [0105] Further, the distal end 74a of the thirtieth date determining lever 74 exits from the thirtieth date determining part 29 while being in sliding contact therewith. Therefore, the operating lever 71 rotates in the CW direction around the second axis C2 from the second position where it is tilted in the CCW direction around the second axis C2 to the first position where it is tilted in the CW direction around the second axis. second axis C2. Therefore, the date intermediate wheel 85 is separated from the day advancing ratchet 47. Further, with respect to the short month day advancing ratchet 76, power transmission to the latter from the ratchet. day advancement via the intermediate date wheel 85 is now released.

[0106] Dans cette position, le rochet d'avancement de jour de mois court 76 est compressé depuis la position de post-changement de date vers la position de pré-changement par le ressort de rappel 82. Donc, lorsque la transmission de l'énergie depuis le rochet d'avancement de jour 47 est libérée, le rochet d'avancement de jour de mois court 76 est entraîné en rotation à grande vitesse dans le sens CCW autour du deuxième axe par la force de compression du ressort de rappel 82. Par conséquent, le doigt d'avancement de jour de mois court 79b revient instantanément dans la position de pré-changement depuis la position de post-changement. Le rochet d'avancement de jour de mois court 76 est maintenu élastiquement par le support élastique 79c de telle sorte qu'il puisse être déplacé vers l'intérieur dans le sens radial. Donc, lorsqu'il revient dans la position de pré-changement depuis la position de post-changement, le doigt d'avancement de jour de mois court 79b se déplace vers l'intérieur dans le sens radial même quand il vient en appui contre les dents 22 de l'indicateur de quantième 20. Par conséquent, un engagement entre le doigt d'avancement de jour de mois court 79b et les dents 22 est évité, de sorte que l'indicateur de quantième 20 n'effectue pas de rotation inverse dans le sens CCW. [0106] In this position, the short month day advancement ratchet 76 is compressed from the post-date change position to the pre-change position by the return spring 82. Thus, when the transmission of l energy from the day advancement ratchet 47 is released, the short month day advancement ratchet 76 is rotated at high speed in the CCW direction about the second axis by the compressive force of the return spring 82 Therefore, the short month day advancing finger 79b instantly returns to the pre-change position from the post-change position. The short month day advancing ratchet 76 is resiliently held by the elastic support 79c so that it can be moved inwardly in a radial direction. Therefore, when it returns to the pre-change position from the post-change position, the short month day advancing finger 79b moves inward in the radial direction even when it comes to rest against them. teeth 22 of the date indicator 20. Therefore, an engagement between the short month day advancing finger 79b and the teeth 22 is avoided, so that the date indicator 20 does not reverse-rotate. in the CCW direction.

[0107] Ensuite, comme représenté sur la figure 13, le rochet d'avancement de jour 47, la came de contrôle 45, et la came d'actionnement 50 du mécanisme principal de commande d'indicateur de quantième 40 tournent à grande vitesse dans le sens CW autour du premier axe C1. La partie de doigt 47c du rochet d'avancement de jour 47 vient en appui contre les dents 22 de l'indicateur de quantième 20 et agit en compression sur celles-ci. [0107] Then, as shown in Figure 13, the day advancement ratchet 47, the control cam 45, and the actuating cam 50 of the date indicator main control mechanism 40 rotate at high speed in CW direction around the first axis C1. The finger portion 47c of the day advancement ratchet 47 bears against the teeth 22 of the date indicator 20 and acts in compression thereon.

[0108] Ensuite, comme représenté sur la figure 14, l'indicateur de quantième 20 est dégagé du sautoir de date 25, et tourne dans le sens CW autour de l'axe de centre O. En outre, avec la rotation de l'indicateur de quantième 20, la partie d'avancement de mois 26 agit sur la dent 28a d'une roue intermédiaire des mois 28 prévue à l'intérieur de l'indicateur de quantième 20. Par conséquent, la roue intermédiaire des mois 28 tourne dans le sens CW. En outre, la roue de mois 30 en prise avec la roue intermédiaire des mois 28 est dégagée du sautoir de mois 35, et tourne dans le sens CCW. Par conséquent, une disque d'affichage des mois 15 affichant des lettres de mois 15a tourne de manière synchronisée avec la roue de mois 30. [0108] Then, as shown in Figure 14, the date indicator 20 is released from the date jumper 25, and rotates in the CW direction around the center axis O. In addition, with the rotation of the date indicator 20, the month advancing part 26 acts on the tooth 28a of an intermediate month wheel 28 provided inside the date indicator 20. Consequently, the intermediate month wheel 28 rotates in CW meaning. Further, the month wheel 30 engaged with the intermediate month wheel 28 is disengaged from the month jumper 35, and rotates in the CCW direction. Therefore, a month display disk 15 displaying month letters 15a rotates synchronously with the month wheel 30.

[0109] Ensuite, comme représenté sur la figure 15, l'indicateur de quantième 20 est amené à s'engager à nouveau avec le sautoir de date 25, et tourne encore d'un cran dans le sens CW autour de l'axe de centre O. Par conséquent, l'inscription de quantième 21 affichée à travers la fenêtre de quantième 11a est changée de „31“ à „1.“ [0109] Then, as shown in FIG. 15, the date indicator 20 is caused to re-engage with the date jumper 25, and again rotates one notch in the CW direction around the axis of center O. Consequently, the date inscription 21 displayed through the date window 11a is changed from "31" to "1."

[0110] En outre, la roue des mois 30 est amenée à s'engager à nouveau avec le sautoir de mois 35, et tourne d'un cran dans le sens CCW autour de l'axe de centre O. La disque d'affichage des mois 15 affichant les lettres de mois 15a tourne d'un cran dans le sens CCW autour de l'axe de centre O de manière synchronisée avec la roue de mois 30. Les lettres de mois 15a affichées dans la fenêtre des mois 11b sont changées de „APR“ représentant le mois d'avril à „MAY“ représentant le mois de mai. [0110] In addition, the month wheel 30 is brought to engage again with the month jumper 35, and rotates one notch in the CCW direction around the center axis O. The display disc month 15 displaying the month letters 15a rotates one notch in the CCW direction around the center axis O in synchronization with the month wheel 30. The month letters 15a displayed in the month window 11b are changed from “APR” representing the month of April to “MAY” representing the month of May.

[0111] Ainsi, la transition du dernier jour d'avril, qui est un mois court, au premier jour de mai, qui est un mois long, effectuée par le mécanisme de calendrier 100, est terminée. [0111] Thus, the transition from the last day of April, which is a short month, to the first day of May, which is a long month, performed by the calendar mechanism 100, is completed.

[0112] La figure 16 est une vue en plan illustrant l'état vers 23 heures et 55 minutes lors du trentième quantième pour le changement de jour lors d'un mois long. [0112] FIG. 16 is a plan view illustrating the state around 23 hours and 55 minutes during the thirtieth date for the change of day during a long month.

[0113] La figure 17 est une vue en plan illustrant l'état vers 24 heures lors du trentième quantième pour le changement de jour lors d'un mois long, avec le changement de date effectué à moitié. [0113] FIG. 17 is a plan view illustrating the state at around 24 hours during the thirtieth date for the day change during a long month, with the date change being made halfway.

[0114] La figure 18 est une vue en plan illustrant l'état vers 24 heures lors du trentième quantième pour le changement de jour lors d'un mois long, avec le changement de date effectué dans son intégralité. [0114] FIG. 18 is a plan view illustrating the state around 24 hours during the thirtieth date for the change of day during a long month, with the change of date effected in its entirety.

[0115] Dans ce qui suit on donnera, à titre d'exemple, le mode de fonctionnement du mécanisme de calendrier 100 lorsqu'une transition est effectuée depuis le trentième quantième du mois de mai, qui est un mois long, au premier jour de juin (1<er>juin), qui est un mois court, lors du trente-et-unième jour de mai. Pour tout ce qui concerne n'importe quelle opération qui est la même que celle qui est décrite ci-dessus du mécanisme de calendrier 100 pour une transition depuis le dernier jour d'avril, qui est un mois court, au premier jour de mai, qui est un mois long, on se référera à ce qui précède sans fournir une nouvelle fois de description détaillée. In what follows will be given, by way of example, the mode of operation of the calendar mechanism 100 when a transition is effected from the thirtieth day of the month of May, which is a long month, to the first day of June (June 1), which is a short month, on the thirty-first day of May. For anything related to any operation which is the same as described above of the calendar mechanism 100 for a transition from the last day of April, which is a short month, to the first day of May, which is a long month, reference will be made to the above without once again providing a detailed description.

[0116] Comme représenté sur la figure 16, l'inscription de quantième 21 de „30“, indiquant le trentième quantième, est affichée dans la fenêtre de quantième 11a. Dans la fenêtre des mois 11b, les lettres de mois 15a de „MAY“ indiquant mai, qui est un mois long, sont affichées. As shown in FIG. 16, the date inscription 21 of "30", indicating the thirtieth date, is displayed in the date window 11a. In month window 11b, the month letters 15a of "MAY" indicating May, which is a long month, are displayed.

[0117] Par ailleurs, puisque l'indicateur de quantième 20 affiche le trentième quantième, l'extrémité distale 74a du levier de détermination de trentième quantième 74 est agencée pour se trouver dans une position correspondant à la partie de détermination de trentième quantième 29 de l'indicateur de quantième 20. Furthermore, since the date indicator 20 displays the thirtieth date, the distal end 74a of the thirtieth date determining lever 74 is arranged to be in a position corresponding to the thirtieth date determining part 29 of the date indicator 20.

[0118] En outre, l'extrémité distale 75a du levier de détermination de mois court 75 est agencée pour se trouver dans une position correspondant à la saillie 34a de mai, qui est un mois long. [0118] Further, the distal end 75a of the short month setting lever 75 is arranged to be in a position corresponding to the protrusion 34a of May, which is one month long.

[0119] Lorsque le temps s'écoule, le rochet d'avancement de jour 47, la came de contrôle 45, la roue d'entraînement d'indicateur de quantième 43, et la came d'actionnement 50 tournent dans le sens CW. L'extrémité distale 73a du levier de détermination d'avancement de jour 73 atteint la partie de détermination d'avancement de jour 46 de la came de contrôle 45. When the time passes, the day advancement ratchet 47, the control cam 45, the date indicator drive wheel 43, and the actuating cam 50 rotate in the CW direction. The distal end 73a of the day advancement determining lever 73 reaches the day advancement determining portion 46 of the control cam 45.

[0120] Ensuite, comme représenté sur la figure 16, lorsqu'on atteint 23 heures 55 minutes lors du trentième quantième, l'extrémité distale 73a du levier de détermination d'avancement de jour 73 tend à pénétrer dans la partie de détermination d'avancement de jour 46 de la came de contrôle 45 en raison de la force de compression exercée par le ressort d'élément de levier d'opération 72. [0120] Then, as shown in FIG. 16, when 23 hours 55 minutes are reached on the thirtieth date, the distal end 73a of the day advancement determining lever 73 tends to enter the determining part of the day. day advance 46 of the control cam 45 due to the compressive force exerted by the operation lever element spring 72.

[0121] Dans cette position, l'extrémité distale 75a du levier de détermination de mois court 75 est agencée dans une position correspondant à la saillie 34a. Donc, en ce qui concerne le levier d'actionnement 71, l'extrémité distale 75a du levier de détermination de mois court 75 vient en appui contre la saillie 34a, et sa rotation dans le sens CCW (c'est-à-dire, son mouvement de la première position à la deuxième position) est indexée. La roue intermédiaire de date 85 est maintenue dans un état dans lequel elle demeure espacée du rochet d'avancement de jour 47. Donc, la transmission d'énergie du rochet d'avancement de jour 47 à la roue intermédiaire de date 85 et à la roue dentée de doigt 78 du rochet d'avancement de jour de mois court 76 est coupée, et elles sont maintenues en position sans tourner. In this position, the distal end 75a of the short month determining lever 75 is arranged in a position corresponding to the projection 34a. Therefore, with respect to the actuating lever 71, the distal end 75a of the short month determining lever 75 abuts against the protrusion 34a, and its rotation in the CCW direction (i.e., its movement from the first position to the second position) is indexed. The date intermediate wheel 85 is maintained in a state in which it remains spaced from the day advancing ratchet 47. Thus, the transmission of energy from the day advancing ratchet 47 to the date intermediate wheel 85 and the Finger gear 78 of the short month day advancing ratchet 76 is cut off, and they are held in position without rotating.

[0122] Ensuite, lorsqu'on atteint 24 heures (minuit) lors du trentième quantième, la deuxième saillie 53b du levier de came d'actionnement 52 agit contre la surface de compression 50b de la came d'actionnement 50 en raison de la force de compression exercée par le ressort de levier de came d'actionnement 54. Par conséquent, le rochet d'avancement de jour 47, la came de contrôle 45, et la came d'actionnement 50 du mécanisme principal de commande d'indicateur de quantième 40 tournent dans le sens CW à une vitesse plus grande que la roue d'entraînement d'indicateur de quantième 43. [0122] Then, when 24 hours (midnight) is reached during the thirtieth date, the second projection 53b of the actuating cam lever 52 acts against the compression surface 50b of the actuating cam 50 due to the force. of compression exerted by the actuating cam lever spring 54. Accordingly, the day advancing ratchet 47, the control cam 45, and the actuating cam 50 of the date indicator main control mechanism 40 rotate in the CW direction at a speed greater than the date indicator drive wheel 43.

[0123] Ensuite, comme représenté sur la figure 17, le rochet d'avancement de jour 47, la came de contrôle 45, et la came d'actionnement 50 du mécanisme principal de commande d'indicateur de quantième 40 tournent dans le sens CW à grande vitesse autour du premier axe C1. La partie de doigt 47c du rochet d'avancement de jour 47 vient en appui sur les dents 22 de l'indicateur de quantième 20 et exerce une compression sur ces dernières. L'indicateur de quantième 20 est dégagé du sautoir de date 25, et tourne dans le sens CW autour de l'axe de centre O. A ce moment-là, l'extrémité distale 73a du levier de détermination d'avancement de jour 73 est amenée en contact glissant avec la zone de la came de contrôle 45 autre que la partie de détermination d'avancement de jour 46. [0123] Then, as shown in FIG. 17, the day advancement ratchet 47, the control cam 45, and the actuating cam 50 of the main date indicator control mechanism 40 rotate in the CW direction. at high speed around the first axis C1. The finger portion 47c of the day advancement ratchet 47 bears against the teeth 22 of the date indicator 20 and exerts a compression thereon. The date indicator 20 is released from the date jumper 25, and rotates in the CW direction around the center axis O. At this time, the distal end 73a of the day advance determination lever 73 is brought into sliding contact with the area of the control cam 45 other than the day advancement determining portion 46.

[0124] Ensuite, comme représenté sur la figure 18, l'indicateur de quantième 20 vient s'engager à nouveau avec le sautoir de date 25, et tourne d'un cran dans le sens CW autour de l'axe de centre O. L'inscription de quantième 21 affichée dans la fenêtre de quantième 11a est changée de „30“ à „31.“ [0124] Then, as shown in FIG. 18, the date indicator 20 engages again with the date jumper 25, and rotates one notch in the CW direction around the center axis O. The date inscription 21 displayed in the date window 11a is changed from "30" to "31."

[0125] Une opération similaire est également effectuée lors du passage du 31 mai, qui est le dernier jour d'un mois long, au 1<er>juin, qui est le premier jour d'un mois court. Autrement dit, lorsqu'on atteint 24 heures le 31 mai, la deuxième saillie 53b du levier de came d'actionnement 52 vient agir sur la surface de compression 50b de la came d'actionnement 50 en raison de la force de compression du ressort de levier de came d'actionnement 54. Le rochet d'avancement de jour 47, la came de contrôle 45, et la came d'actionnement 50 du mécanisme principal de commande d'indicateur de quantième 40 tournent à grande vitesse dans le sens CW autour du premier axe C1. Le doigt 47c du rochet d'avancement de jour 47 vient en appui contre les dents 22 de l'indicateur de quantième 20 et exerce une force de compression sur ces dernières. Par conséquent, l'indicateur de quantième 20 est dégagé du sautoir de date 25, et tourne dans le sens CW autour de l'axe de centre O. [0125] A similar operation is also performed when switching from May 31, which is the last day of a long month, to June 1, which is the first day of a short month. In other words, when 24 hours is reached on May 31, the second projection 53b of the actuating cam lever 52 acts on the compression surface 50b of the actuating cam 50 due to the compressive force of the actuating spring. Actuating cam lever 54. The day advancing ratchet 47, control cam 45, and actuating cam 50 of the main date indicator control mechanism 40 rotate at high speed in the CW direction around of the first axis C1. The finger 47c of the day advancement ratchet 47 bears against the teeth 22 of the date indicator 20 and exerts a compressive force on the latter. Consequently, the date indicator 20 is released from the date jumper 25, and rotates in the CW direction around the axis of center O.

[0126] En outre, avec la rotation de l'indicateur de quantième 20, la partie d'avancement de mois 26 vient agir sur la dent 28a de la roue intermédiaire des mois 28 agencée vers l'intérieur de l'indicateur de quantième 20. Par conséquent, la roue intermédiaire des mois 28 tourne dans le sens CW. En outre, la roue des mois 30 en prise avec la roue intermédiaire des mois 28 est dégagée du sautoir de mois 35 et tourne dans le sens CCW. Par conséquent, la disque d'affichage des mois 15 affichant les lettres des mois 15a tourne dans le sens CCW de manière synchronisée avec la roue des mois 30. [0126] In addition, with the rotation of the date indicator 20, the month advancement part 26 acts on the tooth 28a of the intermediate month wheel 28 arranged inwardly of the date indicator 20. Therefore, the 28-month intermediate wheel turns in the CW direction. Further, the month wheel 30 engaged with the intermediate month wheel 28 is disengaged from the month jumper 35 and rotates in the CCW direction. Therefore, the month display disk 15 displaying the letters of the months 15a rotates in the CCW direction in synchronization with the month wheel 30.

[0127] Ensuite, l'indicateur de quantième 20 est vient s'engager à nouveau avec le sautoir de date 25, et tourne encore d'un cran dans le sens CW autour de l'axe de centre O. Par conséquent, l'inscription de quantième 21 affichée dans la fenêtre de quantième 11a passe de „31“ à „1.“ [0127] Then, the date indicator 20 is again engages with the date jumper 25, and turns one more notch in the CW direction around the axis of center O. Consequently, the date inscription 21 displayed in date window 11a changes from "31" to "1."

[0128] En outre, la roue des mois 30 vient à nouveau s'engager avec le sautoir des mois, et tourne d'un cran dans le sens CCW autour de l'axe de centre O. Par conséquent, les lettres de mois 15a affichées dans la fenêtre de mois 11b sont changées de „MAY“, indiquant le mois de mai, à „JUN“ indiquant le mois de juin. [0128] In addition, the month wheel 30 again engages the month jumper, and rotates one notch in the CCW direction around the center axis O. Consequently, the month letters 15a displayed in month window 11b are changed from "MAY", indicating the month of May, to "JUN" indicating the month of June.

[0129] Ainsi, la transition du trentième quantième du mois de mai, qui est un mois long, au 1<er>juin, qui est le premier jour d'un mois court, est complètement effectuée grâce au mécanisme de calendrier 100 via le trente-et-unième jour de mai. [0129] Thus, the transition from the thirtieth day of the month of May, which is a long month, to June 1, which is the first day of a short month, is completely effected thanks to the calendar mechanism 100 via the thirty-first day of May.

[0130] Selon le présent mode de réalisation, il est possible de faire fonctionner le mécanisme de calendrier 100 par le biais du levier d'actionnement 71, de telle sorte que, comparé à la technique de l'art antérieur dans lequel quatre leviers sont prévus, on réalise une réduction du nombre de composants et une simplification structurelle. [0130] According to the present embodiment, it is possible to operate the calendar mechanism 100 through the actuating lever 71, so that, compared to the technique of the prior art in which four levers are planned, a reduction in the number of components and a structural simplification is achieved.

[0131] Par ailleurs, le levier d'actionnement 71 est muni du levier de détermination de trentième quantième 74 et du levier de détermination de mois court 75, de telle sorte que, seulement en montant le levier d'actionnement 71, il est possible d'agencer le levier de détermination de trentième quantième 74 et le levier de détermination de mois court 75 dans des positions prédéterminées. Autrement dit, il n'y a pas besoin d'effectuer de positionnement individuel du levier de détermination de trentième quantième 74 et du levier de détermination de mois court 75, de telle sorte que la production d'un tel mécanisme en est facilitée. [0131] Furthermore, the actuating lever 71 is provided with the thirtieth date determining lever 74 and the short month determining lever 75, so that, only by mounting the actuating lever 71, it is possible to arrange the thirtieth date determining lever 74 and the short month determining lever 75 in predetermined positions. In other words, there is no need to perform individual positioning of the thirtieth date setting lever 74 and the short month setting lever 75, so that the production of such a mechanism is facilitated.

[0132] En outre, le levier d'actionnement 71 tourne depuis la première position vers la deuxième position lorsque le levier de détermination de trentième quantième 74 suit la partie de détermination de trentième quantième 29, et le levier de détermination de mois court 75 suit l'entaille 34b de la came de mois 33; et la roue intermédiaire de date 85 vient en prise avec le rochet d'avancement de jour 47 lorsqu'il se trouve dans la deuxième position, de sorte qu'il est possible de transmettre l'énergie du rochet d'avancement de jour 47 au rochet d'avancement de jour de mois court 76 par la roue de date intermédiaire 85. Donc, il est possible de faire tourner l'indicateur de quantième 20 lors du dernier jour d'un mois court par le biais du rochet d'avancement de jour 47 et du rochet d'avancement de jour de mois court 76 pour effectuer avec précision le changement de date. [0132] Further, the operating lever 71 rotates from the first position to the second position when the thirtieth date determining lever 74 follows the thirtieth date determining portion 29, and the short month determining lever 75 follows. notch 34b of month cam 33; and the intermediate date wheel 85 engages the day advancing ratchet 47 when in the second position, so that it is possible to transmit the energy of the day advancing ratchet 47 to the day advancement ratchet 47. short month day advancement ratchet 76 through intermediate date wheel 85. Thus, it is possible to rotate date indicator 20 on the last day of a short month through intermediate date advancement ratchet. day 47 and the short month day advancement ratchet 76 to accurately perform the date change.

[0133] En outre, le levier d'actionnement 71 est agencé de telle sorte que le levier de détermination d'avancement de jour 73 est en contact glissant avec la surface périphérique externe de la came de contrôle 45, de telle sorte qu'il est possible d'engendrer le suivi de la partie de détermination de trentième quantième 29 par levier de détermination de trentième quantième 74 sans pour autant le mettre en contact avec l'indicateur de quantième 20. Par conséquent, il est possible de supprimer la génération d'une charge sur l'indicateur de quantième 20 provenant du levier d'actionnement 71, de telle sorte qu'il est possible d'empêcher une déviation de l'indicateur de quantième 20 et d'afficher un jour dans une position prédéterminée. [0133] Further, the actuating lever 71 is arranged such that the day advancement determining lever 73 is in sliding contact with the outer peripheral surface of the control cam 45, so that it It is possible to generate the tracking of the thirtieth date determining part 29 by the thirtieth date determining lever 74 without however bringing it into contact with the date indicator 20. Consequently, it is possible to suppress the generation of d. a load on the date indicator 20 from the operating lever 71, so that it is possible to prevent a deviation of the date indicator 20 and display a day in a predetermined position.

[0134] En outre, le mécanisme de commande d'indicateur de quantième de mois court 70 est équipé du ressort de rappel 82 venant agir en compression sur le rochet d'avancement de jour de mois court 76 depuis la position de post-changement de date vers la position de pré-changement de date, de sorte que le rochet d'avancement de jour de mois court 76 peut être ramené en position de pré-avancement après la rotation de l'indicateur de quantième 20 lors d'un mois court. Donc, il est possible d'effectuer avec précision un changement de date par avancement d'un jour également durant le mois court suivant. [0134] In addition, the short month calendar indicator control mechanism 70 is equipped with the return spring 82 which acts in compression on the short month day advancement ratchet 76 from the post-change position. date to the pre-date change position, so that the short month day advancement ratchet 76 can be returned to the pre-advancement position after rotating the date indicator 20 into a short month . Therefore, it is possible to perform a date change with precision by advancing one day also during the following short month.

[0135] En outre, le support élastique 79c soutenant de manière élastique le doigt d'avancement de jour de mois court 79 est prévu pour permettre un mouvement vers l'intérieur dans le sens radial du rochet d'avancement de jour de mois court 76, de telle sorte que, lorsque le doigt d'avancement de jour de mois court 79b est ramené en position de pré-changement de date vers la position de post-changement de date, il est possible d'empêcher l'indicateur de quantième 20 de tourner. Donc, il est possible de faire tourner l'indicateur de quantième par le biais du rochet d'avancement de jour 47 et du rochet d'avancement de jour de mois court 76 à la fin d'un mois court pour effectuer un changement de date avec précision. [0135] Further, the resilient support 79c resiliently supporting the short month day advancing finger 79 is provided to allow radial inward movement of the short month day advancing ratchet 76. , so that, when the short month day advancing finger 79b is returned from the pre-date change position to the post-date change position, it is possible to prevent the date indicator 20 to turn. So, it is possible to rotate the date indicator through the day advancement ratchet 47 and the short month day advancement ratchet 76 at the end of a short month to effect a date change. precisely.

[0136] Ainsi, on fournit un mécanisme de calendrier 100 comme décrit ci-dessus qui est d'une structure simple et qui peut être produit facilement, de telle sorte qu'il est possible d'avoir un mouvement 10 et une pièce d'horlogerie 1 qui sont de meilleure fiabilité et de faible coût de revient. [0136] Thus, there is provided a calendar mechanism 100 as described above which is of a simple structure and which can be produced easily, so that it is possible to have a movement 10 and a workpiece. timepieces 1 which are of better reliability and of low cost price.

(Variantes du mode de réalisation précédent)(Variants of the previous embodiment)

[0137] La figure 19 est une vue en plan d'un mouvement équipé d'un mécanisme de calendrier selon une variante, et la figure 20 est une vue en coupe prise le long de la ligne C-C de la figure 19. [0137] Figure 19 is a plan view of a movement equipped with an alternate calendar mechanism, and Figure 20 is a sectional view taken along the line C-C of Figure 19.

[0138] Dans ce qui suit, on décrit une variante du mode de réalisation précédent. In what follows, a variant of the previous embodiment is described.

[0139] Le mécanisme de calendrier 100 du mode de réalisation décrit ci-dessus est équipé de la came de contrôle 45 superposée de manière rotative à la roue d'entraînement d'indicateur de quantième 43, et le levier de détermination d'avancement de jour 73 est en contact glissant avec la came de contrôle 45 (voir les figures 2 et 4). [0139] The calendar mechanism 100 of the embodiment described above is equipped with the control cam 45 rotatably superimposed on the date indicator drive wheel 43, and the progress determining lever of day 73 is in sliding contact with control cam 45 (see Figures 2 and 4).

[0140] De cette manière, comme représenté sur les figures 19 et 20, le mécanisme de calendrier 100 selon la variante du mode de réalisation diffère du mode de réalisation ci-dessus en ce qu'il n'est pas équipé de la came de contrôle et du levier de détermination d'avancement de jour. Dans ce qui suit, une description détaillée des composants qui sont les mêmes que ceux du mode de réalisation décrit ci-dessus ne sera par conséquent pas réitérée. [0140] In this way, as shown in Figures 19 and 20, the calendar mechanism 100 according to the variant of the embodiment differs from the above embodiment in that it is not equipped with the cam. day progress control and leverage. In the following, a detailed description of the components which are the same as those of the embodiment described above will therefore not be reiterated.

(Mécanisme principal de commande d'indicateur de quantième)(Main mechanism for controlling date indicator)

[0141] Comme représenté sur les figures 19 et 20, le mécanisme principal de commande d'indicateur de quantième 40 est équipé de la goupille de date 41, de la roue d'entraînement d'indicateur de quantième 43, de la came d'actionnement 50, du levier de came d'actionnement 52, et du rochet d'avancement de jour 47. [0141] As shown in Figures 19 and 20, the main date indicator control mechanism 40 is equipped with the date pin 41, the date indicator drive wheel 43, the date cam. actuation 50, actuation cam lever 52, and day advancement ratchet 47.

[0142] La goupille de date 41 est d'une configuration tubulaire, et est insérée sans serrage sur l'arbre 6 pour être mobile en rotation autour du premier axe C1. Au niveau de la partie intermédiaire dans la direction axiale de la goupille de date 41 se trouve une plaque de soutien 41a. La plaque de soutien 41a est agencée à l'arrière du mouvement 10 par rapport à la roue d'entraînement d'indicateur de quantième 43. La plaque de soutien 41a est configurée en forme de disque selon la direction axiale, et est d'un diamètre plus petit que la roue d'entraînement d'indicateur de quantième 43. [0142] The date pin 41 is of a tubular configuration, and is inserted without clamping on the shaft 6 so as to be movable in rotation about the first axis C1. At the intermediate part in the axial direction of the date pin 41 there is a support plate 41a. The backing plate 41a is arranged at the rear of the movement 10 with respect to the date indicator drive wheel 43. The backing plate 41a is configured in the form of a disc in the axial direction, and is of a diameter. diameter smaller than the date indicator drive wheel 43.

[0143] Le rochet d'avancement de jour 47 est inséré et fixé sur l'extrémité arrière de la goupille de date 41. La roue dentée de rochet d'avancement de jour 47a du rochet d'avancement de jour 47 est agencée dans un état dans lequel il est en contact avec la plaque de soutien 41a. [0143] The day advancement ratchet 47 is inserted and fixed on the rear end of the date pin 41. The day advancement ratchet toothed wheel 47a of the day advancement ratchet 47 is arranged in a state in which it is in contact with the support plate 41a.

[0144] Le mécanisme de commande d'indicateur de quantième de mois court 70 est équipé du levier d'actionnement 71. [0144] The short month calendar indicator control mechanism 70 is equipped with the actuating lever 71.

[0145] Le levier d'actionnement 71 est équipé de la goupille de régulation 71a, du levier de détermination de trentième quantième 74, et du levier de détermination de mois court 75. Le levier de détermination de trentième quantième 74 et le levier de détermination de mois court 75 sont agencés de façon monobloc les uns par rapport aux autres. The actuating lever 71 is equipped with the regulating pin 71a, the thirtieth date determination lever 74, and the short month determination lever 75. The thirtieth date determination lever 74 and the determination lever of short months 75 are arranged integrally with respect to each other.

[0146] L'extrémité 74a du levier de détermination de trentième quantième 74 possède une forme recourbée vers la surface périphérique interne 20a de l'indicateur de quantième 20. L'extrémité 74a du levier de détermination de trentième quantième 74 est maintenu en contact avec la surface périphérique interne 20a de l'indicateur de quantième 20 par la force de compression du ressort du levier d'actionnement 72. [0146] The end 74a of the thirtieth date determining lever 74 has a curved shape towards the internal peripheral surface 20a of the date indicator 20. The end 74a of the thirtieth date determining lever 74 is kept in contact with it. the internal peripheral surface 20a of the date indicator 20 by the compressive force of the spring of the actuating lever 72.

[0147] Lorsque le passage de changement de mois est effectué lors du trentième quantième, qui est le dernier jour d'un mois court, l'extrémité distale 74a du levier de détermination de trentième quantième 74 vient pénétrer dans la partie de détermination de trentième quantième 29 et vient en contact glissant avec celle-ci pour lui permettre ainsi de la suivre. When the passage of the month change is made during the thirtieth date, which is the last day of a short month, the distal end 74a of the thirtieth date determination lever 74 enters the thirtieth determination part. date 29 and comes into sliding contact with it to allow it to follow it.

[0148] Le doigt d'avancement de jour de mois court 79b s'étend le long de la direction radiale. Le doigt d'avancement de jour de mois court 79b fait saillie vers l'extérieur dans le sens de direction radiale au-delà de la roue dentée de doigt 78, et est aligné approximativement dans la direction de 9 heures. [0148] The short month day advancement finger 79b extends along the radial direction. The short month day advancing finger 79b protrudes outward in the radial direction beyond the finger gear 78, and is aligned approximately in the 9 o'clock direction.

[0149] Lorsque l'extrémité distale 74a du levier de détermination de trentième quantième 74 est en contact glissant avec la zone de la surface périphérique interne 20a de l'indicateur de quantième 20 autre que la partie de détermination de trentième quantième 29, le levier d'actionnement 71 est agencé pour se trouver dans la première position où il est incliné dans le sens CW autour du deuxième axe C2. Lorsque l'extrémité distale 74a du levier de détermination de trentième quantième 74 a pénétré à l'intérieur de la partie de détermination de trentième quantième 29 de l'indicateur de quantième 20, et se trouve en contact glissant avec celle-ci, le levier d'actionnement 71 est agencé pour se trouver dans la deuxième position où il est encore plus incliné dans le sens CCW autour du deuxième axe C2 que lorsqu'il se trouve dans la première position. When the distal end 74a of the thirtieth date determining lever 74 is in sliding contact with the area of the internal peripheral surface 20a of the date indicator 20 other than the thirtieth date determining part 29, the lever actuator 71 is arranged to be in the first position where it is inclined in the CW direction around the second axis C2. When the distal end 74a of the thirtieth date determining lever 74 has entered the interior of the thirtieth date determining portion 29 of the date indicator 20, and is in sliding contact therewith, the lever actuator 71 is arranged to be in the second position where it is even more inclined in the CCW direction around the second axis C2 than when it is in the first position.

(Fonctionnement)(Operation)

[0150] Dans ce qui suit, on décrira le fonctionnement du mécanisme de calendrier 100 selon la variante du mode de réalisation décrit ci-dessus, et en particulier lors d'un changement de mois, c'est-à-dire lors du basculement du dernier jour d'un mois au premier jour du mois suivant. In what follows, we will describe the operation of the calendar mechanism 100 according to the variant of the embodiment described above, and in particular during a change of month, that is to say during the changeover. from the last day of a month to the first day of the following month.

[0151] La figure 21 est une vue en plan illustrant l'état vers minuit lors du dernier jour du mois pour un changement de date lors d'un mois court. [0151] Fig. 21 is a plan view illustrating the state around midnight on the last day of the month for a date change during a short month.

[0152] La figure 22 est une vue en plan illustrant l'état vers 5 heures 55 minutes lors du dernier jour d'un mois court pour un changement de date. [0152] Fig. 22 is a plan view illustrating the state at around 5 hours 55 minutes on the last day of a short month for a date change.

[0153] Les figures 23 à 27 sont des vues en plan illustrant l'état vers minuit lors du dernier jour d'un mois court pour un changement de date, les dessins étant ordonnés selon une séquence suivant l'écoulement du temps. [0153] Figures 23 to 27 are plan views illustrating the state around midnight on the last day of a short month for a date change, the drawings being ordered in a sequence according to the passage of time.

[0154] Tout d'abord, on décrira le fonctionnement du mécanisme de calendrier 100 lors du passage du dernier jour d'un mois court vers le premier jour du mois suivant; à titre d'exemple, on décrira comment le mécanisme de calendrier 100 opère lorsqu'une transition est effectuée du dernier jour d'avril, qui est un mois court (30 avril), au premier jour de mai, qui est un mois long (1<er>mai). First of all, we will describe the operation of the calendar mechanism 100 during the passage from the last day of a short month to the first day of the following month; As an example, we will describe how the calendar mechanism 100 operates when a transition is made from the last day of April, which is a short month (April 30), to the first day of May, which is a long month ( May 1).

[0155] Comme représenté sur la figure 19, l'inscription de quantième 21 du „29“ indiquant le 29<ème>jour est exposée et affichée dans la fenêtre de quantième 11a. La lettre des mois 15a de „APR“ indiquant avril, qui est un mois court, est exposée et affichée dans la fenêtre des mois 11b. [0155] As represented in FIG. 19, the date inscription 21 of "29" indicating the 29th day is exposed and displayed in the date window 11a. The month letter 15a of „APR“ indicating April, which is a short month, is exposed and displayed in the month window 11b.

[0156] Par ailleurs, l'extrémité distale 75a du levier de détermination de mois court 75 est agencée pour se trouver dans une position correspondant à l'entaille d'un mois court 34b. [0156] Furthermore, the distal end 75a of the short month determination lever 75 is arranged to be in a position corresponding to the notch of a short month 34b.

[0157] Immédiatement avant 24 heures du 29<ème>jour, qui est le jour précédant le dernier jour pour le changement de quantième d'un mois court, le rochet d'avancement de jour 47 et la came d'actionnement 50 du mécanisme principal de commande d'indicateur de quantième 40 tournent dans le sens CW à une vitesse plus grande que la roue d'entraînement d'indicateur de quantième 43. Le doigt 47c du rochet d'avancement de jour 47 vient en appui contre les dents 22 de l'indicateur de quantième 20 et agit sur ces dernières. Immediately before 24 hours of the 29th day, which is the day preceding the last day for the date change of a short month, the day advancement ratchet 47 and the actuating cam 50 of the mechanism date indicator control main 40 rotate in the CW direction at a speed greater than the date indicator drive wheel 43. The finger 47c of the day advancement ratchet 47 bears against the teeth 22 of the date indicator 20 and acts on them.

[0158] Ensuite, comme représenté sur la figure 21, à 0 heure lors du trentième quantième, qui est le dernier jour pour le changement de quantième lors d'un mois court, l'indicateur de quantième 20 tourne d'un cran, et l'inscription de quantième 21 exposée à travers la fenêtre de quantième 11a est changée de „29“ à „30.“ [0158] Then, as represented in FIG. 21, at 0 o'clock during the thirtieth date, which is the last day for the date change during a short month, the date indicator 20 rotates by one notch, and the date inscription 21 exposed through the date window 11a is changed from "29" to "30."

[0159] Ensuite, l'extrémité distale 74a du levier de détermination de trentième quantième 74 atteint la partie de détermination de trentième quantième 29 de l'indicateur de quantième 20 et, en même temps, pénètre à l'intérieur de la partie de détermination de trentième quantième 29 de l'indicateur de quantième 20 en raison de la force de compression exercée par le ressort du levier d'actionnement 72. En outre, l'extrémité distale 75a du levier de détermination de mois court 75 pénètre dans l'entaille 34b de la came de mois 33 et suit cette dernière. Par conséquent, le levier d'actionnement 71 tourne dans le sens CCW autour du deuxième axe C2, et se déplace depuis la première position, où il est incliné dans le sens CW par rapport au deuxième axe C2, vers la deuxième position où il est encore plus incliné dans le sens CCW par rapport au deuxième axe C2 que quand il se trouve dans la première position. Et, la roue intermédiaire de date 85 se déplace conjointement à la rotation du levier d'actionnement 71, et vient en prise avec le rochet d'avancement de jour 47. [0159] Then, the distal end 74a of the thirtieth date determining lever 74 reaches the thirtieth date determining part 29 of the date indicator 20 and, at the same time, enters the interior of the determining part. date indicator 29 of the date indicator 20 due to the compressive force exerted by the spring of the actuating lever 72. Further, the distal end 75a of the short month setting lever 75 enters the notch 34b of the month cam 33 and follows the latter. Therefore, the operating lever 71 rotates in the CCW direction about the second axis C2, and moves from the first position, where it is inclined in the CW direction relative to the second axis C2, to the second position where it is. even more inclined in the CCW direction with respect to the second axis C2 than when it is in the first position. And, the intermediate date wheel 85 moves in conjunction with the rotation of the operating lever 71, and engages the day advancing ratchet 47.

[0160] La goupille de régulation 51 de la came d'actionnement 50 se déplace dans la rainure 43a par le biais du mouvement à grande vitesse du rochet d'avancement de jour 47 et la came d'actionnement 50, et lorsque, après l'écoulement d'une période de temps prédéterminée (qui, dans le présent mode de réalisation, est d'approximativement 5 heures et 55 minutes), vient en appui contre l'extrémité dans le sens CCW de la rainure 43a de la roue d'entraînement d'indicateur de quantième 43 tournant à une vitesse fixe. Donc, la came d'actionnement 50 et le rochet d'avancement de jour 47 sont au repos sans tourner jusqu'à 5 heures 55 minutes lors du trentième quantième. [0160] The regulating pin 51 of the actuating cam 50 moves in the groove 43a through the high speed movement of the day advancing ratchet 47 and the actuating cam 50, and when after the The elapse of a predetermined period of time (which in the present embodiment is approximately 5 hours and 55 minutes), abuts against the CCW end of the groove 43a of the wheel. date indicator drive 43 rotating at a fixed speed. Therefore, the actuating cam 50 and the day advancement ratchet 47 are at rest without turning until 5 hours 55 minutes during the thirtieth date.

[0161] Ensuite, comme représenté sur la figure 22, lorsque, par exemple, l'heure de 5 heures 55 minutes est atteinte lors du trentième quantième, la goupille de régulation 51 de la came d'actionnement 50 vient en appui contre l'extrémité de la rainure 43a de la roue d'entraînement d'indicateur de quantième 43 dans le sens CCW. Par conséquent, l'énergie de la roue d'entraînement d'indicateur de quantième 43, tournant dans le sens CW à une vitesse fixe, est transmise à la came d'actionnement 50 et le rochet d'avancement de jour 47 via la goupille de régulation 51. La came d'actionnement 50 et le rochet d'avancement de jour 47 tournent de manière synchronisée avec la roue d'entraînement d'indicateur de quantième 43. En outre, l'énergie est transmise du rochet d'avancement de jour 47 à la roue intermédiaire de date 85 en prise avec le rochet d'avancement de jour 47, et la roue intermédiaire de date 85 tourne dans le sens CCW à une vitesse prédéterminée autour d'un troisième axe C3. [0161] Then, as shown in FIG. 22, when, for example, the hour of 5 hours 55 minutes is reached during the thirtieth date, the regulating pin 51 of the actuating cam 50 bears against the end of the groove 43a of the date indicator drive wheel 43 in the CCW direction. Therefore, the energy of the date indicator drive wheel 43, rotating in the CW direction at a fixed speed, is transmitted to the actuating cam 50 and the day advancing ratchet 47 via the pin. control 51. The actuating cam 50 and the day advancing ratchet 47 rotate synchronously with the date indicator drive wheel 43. Further, energy is transmitted from the day advancing ratchet. day 47 to the intermediate date wheel 85 engaged with the day advancing ratchet 47, and the intermediate date wheel 85 rotates in the CCW direction at a predetermined speed about a third axis C3.

[0162] Comme représenté sur la figure 23, au fur et à mesure que le temps s'écoule, la roue dentée de doigt 78 du rochet d'avancement de jour de mois court 76, en prise avec la roue intermédiaire de date 85 tourne dans le sens CW à une vitesse prédéterminée contre la force de compression du ressort de rappel 82. [0162] As shown in Figure 23, as time passes, finger gear 78 of the short month day advancement ratchet 76, in engagement with intermediate date wheel 85, rotates. in the CW direction at a predetermined speed against the compressive force of the return spring 82.

[0163] Ensuite, comme représenté sur la figure 24, lorsqu'on atteint 24 heures lors du trentième quantième, le doigt d'avancement de jour de mois court 79b du rochet d'avancement de jour de mois court 76 vient en appui contre les dents 22 de l'indicateur de quantième 20. Et, le doigt d'avancement de jour de mois court 79b du rochet d'avancement de jour de mois court 76 vient agir sur les dents 22 de l'indicateur de quantième 20. [0163] Then, as shown in FIG. 24, when 24 hours are reached during the thirtieth date, the short month day advancement finger 79b of the short month day advancement ratchet 76 bears against the teeth 22 of the date indicator 20. And, the short month day advancement finger 79b of the short month day advancement ratchet 76 acts on the teeth 22 of the date indicator 20.

[0164] Ensuite, comme représenté sur la figure 25, l'indicateur de quantième 20 est dégagé du sautoir de date 25, et tourne dans le sens CW autour de l'axe de centre O. En outre, avec la rotation de l'indicateur de quantième 20, la partie de détermination de trentième quantième 29 se déplace dans le sens CW. A ce moment-là, l'extrémité distale 74a du levier de détermination de trentième quantième 74, qui a été positionné à l'intérieur de la partie de détermination de trentième quantième 29, tend à sortir de la partie de détermination de trentième quantième 29. En outre, le levier d'actionnement 71 tourne dans le sens CW autour du deuxième axe C2. [0164] Then, as shown in Figure 25, the date indicator 20 is released from the date jumper 25, and rotates in the CW direction around the center axis O. In addition, with the rotation of the date indicator 20, the thirtieth date determining part 29 moves in the CW direction. At this time, the distal end 74a of the thirtieth date determining lever 74, which has been positioned inside the thirtieth date determining part 29, tends to exit from the thirtieth date determining part 29. Further, the operating lever 71 rotates in the CW direction about the second axis C2.

[0165] Ensuite, comme représenté sur la figure 26, l'indicateur de quantième 20 vient s'engager à nouveau avec le sautoir de date 25, et tourne d'un cran dans le sens CW autour de l'axe de centre O. L'inscription de quantième 21 affichée dans la fenêtre de quantième 11a est changée de „30“ à „31.“ [0165] Then, as shown in FIG. 26, the date indicator 20 again engages with the date jumper 25, and rotates one notch in the CW direction around the center axis O. The date inscription 21 displayed in the date window 11a is changed from "30" to "31."

[0166] Le levier d'actionnement 71 tourne dans le sens CW autour du deuxième axe C2 depuis la deuxième position où il est incliné dans le sens CCW autour du deuxième axe C2 en direction de la première position où il est incliné dans le sens CW autour du deuxième axe C2. Par conséquent, la roue intermédiaire de date 85 est espacée du rochet d'avancement de jour 47. The actuating lever 71 rotates in the CW direction around the second axis C2 from the second position where it is inclined in the CCW direction around the second axis C2 in the direction of the first position where it is inclined in the CW direction around the second axis C2. Therefore, the intermediate date wheel 85 is spaced from the day advancing ratchet 47.

[0167] En outre, la transmission d'énergie au rochet d'avancement de jour de mois court 76 depuis le rochet d'avancement de jour 47 via la roue intermédiaire de date 85 est libérée. Le rochet d'avancement de jour de mois court 76 tourne à grande vitesse dans le sens CCW autour du deuxième axe en raison de la force de compression exercée par le ressort de rappel 82, et est instantanément ramené dans la position de pré-changement de date depuis la position de post-changement de date. [0167] Further, the power transmission to the short month day advancing ratchet 76 from the day advancing ratchet 47 via the intermediate date wheel 85 is released. The short month day advancing ratchet 76 rotates at high speed in the CCW direction around the second axis due to the compressive force exerted by the return spring 82, and is instantly returned to the pre-change position. date from the post-date change position.

[0168] La deuxième saillie 53b du levier de came d'actionnement 52 atteint la surface de compression 50b et vient agir sur cette dernière en raison de la rotation de la came d'actionnement 50. Par conséquent, le rochet d'avancement de jour 47 et la came d'actionnement 50 du mécanisme principal de commande d'indicateur de quantième 40 tournent dans le sens CW à une vitesse plus grande que la roue d'entraînement d'indicateur de quantième 43. Le doigt d'avancement de jour de mois court 79b du rochet d'avancement de jour de mois court 79b vient agir sur les dents 22 de l'indicateur de quantième 20. L'indicateur de quantième 20 est dégagé du sautoir de date 25, et tourne dans le sens CW autour de l'axe de centre O. [0168] The second projection 53b of the actuating cam lever 52 reaches the compression surface 50b and acts on the latter due to the rotation of the actuating cam 50. Consequently, the day advancement ratchet 47 and the actuating cam 50 of the main date indicator control mechanism 40 rotate in the CW direction at a speed greater than the date indicator drive wheel 43. The day advancing finger of short month 79b of the short month day advancement ratchet 79b acts on teeth 22 of the date indicator 20. The date indicator 20 is released from the date jumper 25, and rotates in the CW direction around the axis of center O.

[0169] Et, comme représenté sur la figure 27, l'indicateur de quantième 20 est à nouveau en prise avec le sautoir de date 25, et tourne d'un cran dans le sens CW autour l'axe de centre O. L'inscription de quantième 21 affichée dans la fenêtre de quantième 11a est changée de „31“ à „1.“ [0169] And, as shown in FIG. 27, the date indicator 20 is again engaged with the date jumper 25, and rotates one notch in the CW direction around the center axis O. L ' date entry 21 displayed in date window 11a is changed from "31" to "1."

[0170] En outre, en raison de la rotation de l'indicateur de quantième 20, la partie d'avancement de mois 26 vient agir sur la dent 28a de la roue intermédiaire des mois 28 agencée à l'intérieur de l'indicateur de quantième 20. Par conséquent, les lettres des mois 15a affichées dans la fenêtre de mois 11b sont changées de „APR“ représentant le mois d'avril à „MAY“ représentant le mois de mai. [0170] In addition, due to the rotation of the date indicator 20, the month advancement part 26 acts on the tooth 28a of the intermediate month wheel 28 arranged inside the month indicator. date 20. Therefore, the letters of the months 15a displayed in the month window 11b are changed from "APR" representing the month of April to "MAY" representing the month of May.

[0171] De cette manière, le mécanisme de calendrier 100 a complètement effectué la transition du dernier jour d'avril, qui est un mois court, au premier jour de mai, qui est un mois long. [0171] In this way, the calendar mechanism 100 has completely made the transition from the last day of April, which is a short month, to the first day of May, which is a long month.

[0172] La figure 28 est une vue explicative illustrant le changement de quantième lors d'un mois long. [0172] FIG. 28 is an explanatory view illustrating the change of date during a long month.

[0173] Dans ce qui suit on donnera, à titre d'exemple, le mode de fonctionnement du mécanisme de calendrier 100 pour une transition du trentième quantième du mois de mai, qui est un mois long, au premier quantième de juin, qui est le premier jour d'un mois long, via le trente-et-unième jour, qui est le dernier jour de mai. En ce qui concerne les opérations similaires à celles du changement de date relatives à celles décrites dans le cadre du mécanisme de calendrier 100 du mode de réalisation décrit ci-dessus, et celle de changement de date en fin de mois court du mécanisme de calendrier 100 selon la variante décrite ci-dessus, une description détaillée ne sera pas réitérée. In what follows we will give, by way of example, the mode of operation of the calendar mechanism 100 for a transition from the thirtieth date of the month of May, which is a long month, to the first date of June, which is the first day of a month long, through the thirty-first day, which is the last day of May. As regards the operations similar to those of the change of date relating to those described in the context of the calendar mechanism 100 of the embodiment described above, and that of the change of date at the end of the short month of the calendar mechanism 100 according to the variant described above, a detailed description will not be repeated.

[0174] Comme représenté sur la figure 28, l'extrémité distale 75a du levier de détermination de mois court 75 est agencée dans une position correspondant à la saillie 34a du mois long (qui, sur la figure 28, correspond au mois de mai). L'extrémité distale 75a du levier de détermination de mois court 75 est en appui la saillie 34a, et le levier d'actionnement 71 est ajusté dans sa rotation dans le sens CCW (c'est-à-dire, le mouvement de la première position vers la deuxième position). La roue intermédiaire de date 85 est maintenue dans un état dans lequel il est espacé du rochet d'avancement de jour 47. Donc, la transmission d'énergie du rochet d'avancement de jour 47 à la roue intermédiaire de date 85 et la roue dentée de doigt 78 du rochet d'avancement de jour de mois court 76 est interrompue, et ces derniers sont maintenus en position sans être entraînés en rotation. [0174] As shown in Fig. 28, the distal end 75a of the short month determining lever 75 is arranged in a position corresponding to the protrusion 34a of the long month (which, in Fig. 28, corresponds to the month of May). . The distal end 75a of the short month determining lever 75 abuts the protrusion 34a, and the actuating lever 71 is adjusted in its rotation in the CCW direction (i.e., the movement of the first position towards the second position). The date intermediate wheel 85 is maintained in a state in which it is spaced from the day advancing ratchet 47. Thus, the transmission of energy from the day advancing ratchet 47 to the date intermediate wheel 85 and the wheel Finger tooth 78 of the short month day advancing ratchet 76 is interrupted, and the latter are held in position without being rotated.

[0175] Ensuite, lorsque l'horaire prédéterminé du trentième quantième (par exemple, 24 heures) est atteint, la deuxième saillie 53b du levier de came d'actionnement 52 vient agir sur la surface de compression 50b de la came d'actionnement 50 en raison de la force de compression exercée par le ressort de levier de came d'actionnement 54. Par conséquent, le rochet d'avancement de jour 47 et la came d'actionnement 50 du mécanisme principal de commande d'indicateur de quantième 40 tournent dans le sens CW à une vitesse plus grande que la roue d'entraînement d'indicateur de quantième 43. Il en résulte que l'indicateur de quantième 20 tourne d'un cran dans le sens CW autour de l'axe de centre O, et l'inscription de quantième 21 affichée dans la fenêtre de quantième 11a est changée de „30“ à „31.“ [0175] Then, when the predetermined time of the thirtieth date (for example, 24 hours) is reached, the second projection 53b of the actuating cam lever 52 acts on the compression surface 50b of the actuating cam 50 due to the compressive force exerted by the actuating cam lever spring 54. Therefore, the day advancing ratchet 47 and the actuating cam 50 of the date indicator main control mechanism 40 rotate. in the CW direction at a speed greater than the date indicator drive wheel 43. As a result, the date indicator 20 rotates one notch in the CW direction around the center axis O, and the date entry 21 displayed in the date window 11a is changed from "30" to "31."

[0176] Lorsqu'un changement de date est effectué lors du 31 mai, qui est le dernier jour d'un mois long, pour passer au 1<er>juin, qui est le premier jour d'un mois court, une opération similaire est effectuée. En d'autres termes, lorsqu'on atteint 24 heures lors du 31 mai, la deuxième saillie 53b du levier de came d'actionnement 52 vient agir sur la surface de pression 50b de la came d'actionnement 50 en raison de la force de compression exercée par le ressort de levier de came d'actionnement 54. Par conséquent, l'indicateur de quantième 20 tourne dans le sens CW autour de l'axe de centre O d'un cran, et l'inscription de quantième 21 affichée dans la fenêtre de quantième 11a passe du „31“ au „1“. [0176] When a date change is made on May 31, which is the last day of a long month, to go to June 1, which is the first day of a short month, a similar operation is done. In other words, when 24 hours is reached on May 31st, the second projection 53b of the actuating cam lever 52 acts on the pressure surface 50b of the actuating cam 50 due to the force of the actuator. compression exerted by the actuating cam lever spring 54. Consequently, the date indicator 20 rotates in the CW direction about the center axis O by one notch, and the date inscription 21 displayed in date window 11a changes from "31" to "1".

[0177] Par ailleurs, en raison de la rotation de l'indicateur de quantième 20, la partie d'avancement de mois 26 vient agir sur la dent 28a de la roue intermédiaire des mois 28 agencée à l'intérieur de l'indicateur de quantième 20. Par conséquent, les lettres des mois 15a affichées dans la fenêtre de mois 11b sont modifiées de „MAY,“ qui représente le mois de mai, à „JUN,“ qui représente le mois de juin. [0177] Furthermore, due to the rotation of the date indicator 20, the month advancement part 26 acts on the tooth 28a of the intermediate month wheel 28 arranged inside the month indicator. date 20. Therefore, the letters of the months 15a displayed in the month window 11b are changed from "MAY," which represents the month of May, to "JUN," which represents the month of June.

[0178] De cette manière, la transition est complètement effectuée par le mécanisme de calendrier 100 pour passer du trentième quantième du mois de mai, qui est un mois long, au 1<er>juin, qui est le premier jour d'un mois court, via le trente-et-unième jour de mai. [0178] In this way, the transition is completely effected by the calendar mechanism 100 to go from the thirtieth day of the month of May, which is a long month, to June 1, which is the first day of a month. short, via the thirty-first day of May.

[0179] Selon la variante proposée du mode de réalisation, il est possible d'obtenir les mêmes effets bénéfiques que ceux obtenus par le mode de réalisation décrit précédemment. En outre, il n'y a plus besoin de fournir de came de contrôle, de sorte qu'il est possible de fournir un mécanisme de calendrier 100 permettant une réduction supplémentaire en taille et en épaisseur. According to the proposed variant of the embodiment, it is possible to obtain the same beneficial effects as those obtained by the embodiment described above. Further, there is no longer a need to provide a control cam, so that it is possible to provide a calendar mechanism 100 allowing further reduction in size and thickness.

[0180] La portée technique de cette invention n'est pas restreinte à celle des modes de réalisation ci-dessus mais permet diverses autres modifications sans s'écarter du champ d'application de l'esprit de la présente invention. [0180] The technical scope of this invention is not restricted to that of the above embodiments but allows various other modifications without departing from the scope of the spirit of the present invention.

[0181] La figure 29 est une vue explicative illustrant une came de contrôle selon un autre mode de réalisation. [0181] FIG. 29 is an explanatory view illustrating a control cam according to another embodiment.

[0182] La came de contrôle 45 selon le mode de réalisation ci-dessus est formée de sorte que la surface latérale 46a dans le sens CW de la partie de détermination d'avancement de jour 46 s'étend dans la direction radiale (voir la figure 5). [0182] The control cam 45 according to the above embodiment is formed so that the side surface 46a in the CW direction of the day advance determining portion 46 extends in the radial direction (see Fig. figure 5).

[0183] En revanche, comme pour la came de contrôle 45 représentée à la figure 29, la surface latérale 46a dans le sens CW de la partie de détermination d'avancement de jour 46 peut être inclinée dans le sens CW depuis l'intérieur vers l'extérieur dans la direction radiale de sorte que l'ouverture de la partie de détermination d'avancement de jour 46 peut être élargie. [0183] On the other hand, as for the control cam 45 shown in Fig. 29, the side surface 46a in the CW direction of the day advancement determining part 46 can be tilted in the CW direction from the inside towards. outside in the radial direction so that the opening of the day advancement determining part 46 can be widened.

[0184] Selon cette architecture, l'extrémité distale 73a du levier de détermination d'avancement de jour 73 pénètre dans la partie de détermination d'avancement de jour 46 à une vitesse plus basse que dans le mode de réalisation ci-dessus tout en glissant sur la surface latérale inclinée 46a. A ce moment-là, le levier d'actionnement 71 tourne de la première position vers la deuxième position à une vitesse plus basse que dans le mode de réalisation ci-dessus, de telle sorte que le rochet d'avancement de jour 47 et la roue intermédiaire de date 85 viennent en prise l'un avec l'autre à une vitesse plus basse que dans le mode de réalisation ci-dessus. Par conséquent, il est possible de supprimer l'usure des dents du rochet d'avancement de jour 47 et de la roue de date intermédiaire 85, de sorte qu'on peut fournir un mécanisme de calendrier 100 de plus grande longévité. [0184] According to this architecture, the distal end 73a of the day advancement determining lever 73 enters the day advancement determining part 46 at a slower speed than in the above embodiment while at the same time. sliding on the inclined side surface 46a. At this time, the operating lever 71 rotates from the first position to the second position at a lower speed than in the above embodiment, so that the day advancing ratchet 47 and the intermediate date wheel 85 engage each other at a slower speed than in the above embodiment. Therefore, it is possible to suppress the wear of the teeth of the day advancing ratchet 47 and the intermediate date wheel 85, so that a calendar mechanism 100 of longer life can be provided.

[0185] La figure 30 est une vue externe d'une pièce d'horlogerie selon un autre mode de réalisation, et la figure 31 est une vue en coupe du mouvement de la pièce d'horlogerie de cet autre mode de réalisation représenté à la figure 30. [0185] FIG. 30 is an external view of a timepiece according to another embodiment, and FIG. 31 is a sectional view of the movement of the timepiece of this other embodiment shown in FIG. figure 30.

[0186] Selon les modes de réalisation précédemment décrits, la disque d'affichage des mois 15 est agencée sur la face avant du mouvement 10 par rapport au cadran 11, et un mois est affiché en exposant les lettres des mois 15a de la disque d'affichage des mois 15 à travers la fenêtre des mois 11b (voir les figures 1 et 3). [0186] According to the embodiments described above, the month display disk 15 is arranged on the front face of the movement 10 relative to the dial 11, and a month is displayed by exposing the letters of the months 15a of the disk d. displaying the months 15 through the month window 11b (see Figures 1 and 3).

[0187] En revanche, comme représenté sur les figures 30 et 31, une aiguille des mois 18 est agencée sur la face arrière du mouvement 10 par rapport au cadran 11, et un mois peut être affiché en indiquant les nombres 1 à 12 représentés sur le cadran 11 par l'aiguille des mois 18. On the other hand, as shown in Figures 30 and 31, a month hand 18 is arranged on the rear face of the movement 10 relative to the dial 11, and a month can be displayed by indicating the numbers 1 to 12 shown on the dial 11 by the month hand 18.

[0188] Tandis que dans le mode de réalisation ci-dessus un spiral est adopté en tant que ressort de rappel 82, ceci ne devrait pas être interprété de manière restrictive. Donc, un ressort hélicoïdal, par exemple, ou encore un ressort plat pourraient également être adoptés en tant que ressorts de rappel. [0188] While in the above embodiment a hairspring is adopted as the return spring 82, this should not be interpreted restrictively. So a coil spring, for example, or a flat spring could also be adopted as return springs.

[0189] En dehors de cela, il est possible de remplacer les composants du mode de réalisation décrit ci-dessus par des composants connus le cas échéant sans s'écarter du champ d'application de l'esprit de la présente invention. [0189] Apart from this, it is possible to replace the components of the embodiment described above with known components where appropriate without departing from the scope of the spirit of the present invention.

Liste des référencesList of references

[0190] [Fig. 9] 16 ROUE DES HEURES 16a ROUE DENTÉE DES HEURES 16b ROUE INTERMÉDIAIRE DES HEURES 17 ROUE INTERMÉDIAIRE 40 MÉCANISME PRINCIPAL DE COMMANDE D'INDICATEUR DE QUANTIÈME 47b DOIGT D'AVANCEMENT DE JOUR 47a ROUE DENTÉE DE ROCHET D'AVANCEMENT DE JOUR 45 CAME DE CONTRÔLE 43 ROUE D'ENTRAÎNEMENT D'INDICATEUR DE QUANTIÈME 50 CAME D'ACTIONNEMENT 52 LEVIER DE CAME D'ACTIONNEMENT 70 MÉCANISME DE COMMANDE D'INDICATEUR DE QUANTIÈME DE MOIS COURT 71 LEVIER D'ACTIONNEMENT 85 ROUE INTERMÉDIAIRE DE DATE 76 ROCHET D'AVANCEMENT DE JOUR DE MOIS COURT 78 ROUE DENTÉE DE DOIGT 82 RESSORT DE RAPPEL 79b DOIGT D'AVANCEMENT DE JOUR DE MOIS COURT 36 RESSORT SAUTOIR DES MOIS 35 SAUTOIR DES MOIS 33 CAME DE MOIS 31 ROUE DENTÉE DES MOIS 30 ROUE DES MOIS 25 SAUTOIR DE DATE 20 INDICATEUR DE QUANTIÈME 28 ROUE INTERMÉDIAIRE DES MOIS 72 RESSORT DE LEVIER D'ACTIONNEMENT [0190] [Fig. 9] 16 HOURS WHEEL 16a HOURS TOOTHWHEEL 16b HOURS INTERMEDIATE WHEEL 17 INTERMEDIATE WHEEL 40 DAY INDICATOR MAIN CONTROL MECHANISM 47b DAY FEEDING FINGER 47a DAY FEEDING RATCHET TOOTHED 45 CONTROL CAM 43 DATE INDICATOR DRIVE WHEEL 50 DRIVE CAM 52 DRIVE CAM LEVER 70 SHORT DATE MONTH INDICATOR CONTROL MECHANISM 71 DRIVE LEVER 85 DATE INTERMEDIATE WHEEL 76 RATCH SHORT DAY OF MONTH 78 FINGER GEAR 82 RETURN SPRING 79b SHORT MONTH DAY ADVANCING FINGER 36 SPRING MONTHS JUMP 35 MONTHS JUMP 33 MONTHS CAM 31 MONTHS TOOTH WHEEL 30 MONTHS WHEEL 25 DATE SLIP 20 DATE INDICATOR 28 MONTH INTERMEDIATE WHEEL 72 DRIVE LEVER SPRING

Claims (6)

1. Mécanisme de calendrier comprenant : un indicateur des mois (30) effectuant une rotation par année; un indicateur de quantième (20) effectuant une rotation par mois et ayant une partie de détermination de trentième quantième (29) se trouvant dans une position prédéterminée au niveau de sa périphérie; un mécanisme principal de commande d'indicateur de quantième (40) effectuant une rotation par jour et entraînant en rotation l'indicateur de quantième (20); et un mécanisme de commande d'indicateur de quantième de mois court (70) faisant tourner l'indicateur de quantième (20) à la fin d'un mois court ayant 30 jours ou moins, dans lequel l'indicateur des mois (30) possède une came des mois (33) ayant, sur sa surface périphérique externe, des parties de détermination de mois court (34b) correspondant aux mois courts; le mécanisme principal de commande d'indicateur de quantième (40) est équipé d'une roue d'entraînement d'indicateur de quantième (43), et possède une came d'actionnement (50) superposée à ladite roue d'entraînement d'indicateur de quantième (43), et agencée de manière rotative selon un angle prédéterminé par rapport à ladite roue d'entraînement d'indicateur de quantième (43) ladite roue d'indicateur de quantième (43) étant configurée pour effectuer une rotation par jour à une vitesse fixe autour d'un premier axe (C1); ledit mécanisme principal de commande comprenant par ailleurs un rochet d'avancement de jour (47) tournant de manière synchronisée avec la came d'actionnement (50) et faisant tourner l'indicateur de quantième (20); le mécanisme de commande d'indicateur de quantième de mois court (70) est muni d'un levier de détermination du trentième quantième (74) capable de suivre la partie de détermination de trentième quantième (29), et un levier de détermination de mois court (75) capable de suivre les parties de déterminations de mois court (34b) ; ledit mécanisme de commande d'indicateur de quantième de mois court (70) possède par ailleurs un levier d'actionnement (71) tournant autour d'un deuxième axe (C2) prédéterminé, ainsi qu'un rochet d'avancement de jour de mois court (76) faisant tourner l'indicateur de quantième (20) à la fin d'un mois court, et une roue de date intermédiaire (85) montée sur le levier d'actionnement (71) et agencée mobile en rotation par rapport à celui-ci autour d'un troisième axe (C3) lorsqu'elle est en prise avec le rochet d'avancement de jour de mois court (76); le levier d'actionnement (71) se déplace entre une première position et une deuxième position lorsque le levier de détermination du trentième quantième (74) suit la partie de détermination de trentième quantième (29), et que le levier de détermination de mois court (75) suit la partie de détermination de mois court; et la roue de date intermédiaire (85) est espacée du rochet d'avancement de jour (47) lorsque le levier d'actionnement (71) se trouve dans la première position, et étant en prise avec le rochet d'avancement de jour (47) lorsque le levier d'actionnement (71) se trouve dans la deuxième position.1. Calendar mechanism comprising: an indicator of the months (30) rotating per year; a date indicator (20) rotating per month and having a thirtieth date determining part (29) located in a predetermined position at its periphery; a main date indicator control mechanism (40) rotating per day and rotating the date indicator (20); and a short month calendar indicator control mechanism (70) rotating the date indicator (20) at the end of a short month having 30 days or less, in which the month indicator (30) has a month cam (33) having, on its outer peripheral surface, short month determining portions (34b) corresponding to short months; the date indicator main control mechanism (40) is provided with a date indicator drive wheel (43), and has an actuating cam (50) superimposed on said date indicator drive wheel. date indicator (43), and rotatably arranged at a predetermined angle relative to said date indicator drive wheel (43) said date indicator wheel (43) being configured to perform one rotation per day at a fixed speed about a first axis (C1); said main control mechanism further comprising a day advancement ratchet (47) rotating in synchronization with the actuating cam (50) and rotating the date indicator (20); the short month calendar indicator control mechanism (70) is provided with a thirtieth calendar determining lever (74) capable of following the thirtieth calendar determining part (29), and a month determining lever short (75) capable of following parts of short month determinations (34b); said short month calendar indicator control mechanism (70) furthermore has an actuating lever (71) rotating about a second predetermined axis (C2), as well as a ratchet for advancing the day of month short (76) rotating the date indicator (20) at the end of a short month, and an intermediate date wheel (85) mounted on the actuating lever (71) and arranged to be movable in rotation with respect to the latter about a third axis (C3) when it is in engagement with the advancement ratchet short month day (76); the operating lever (71) moves between a first position and a second position when the thirtieth date determining lever (74) follows the thirtieth date determining part (29), and the month determining lever is running (75) follows the short month determination part; and the intermediate date wheel (85) is spaced from the day advancement ratchet (47) when the operating lever (71) is in the first position, and being in engagement with the day advancement ratchet (47) ) when the operating lever (71) is in the second position. 2. Mécanisme de calendrier selon la revendication 1, dans lequel le mécanisme principal de commande d'indicateur de quantième (40) est équipé d'une came de contrôle (45) tournant de manière synchronisée avec la came d'actionnement (50) et ayant une partie de détermination d'avancement de jour (46) sur une surface périphérique externe; et le levier d'actionnement (71) possède un levier de détermination d'avancement de jour (73) en contact glissant avec la surface périphérique externe de la came de contrôle (45), et lorsque le levier de détermination d'avancement de jour (73) entre en contact glissant avec la partie de détermination d'avancement de jour (46), le levier de détermination de trentième quantième (74) suit la partie de détermination de trentième quantième (29), et le levier de détermination de mois court (75) suit la partie de détermination de mois court (34b).2. Calendar mechanism according to claim 1, wherein the main date indicator control mechanism (40) is equipped with a control cam (45) rotating in synchronization with the actuating cam (50) and having a day advancement determining part (46) on an outer peripheral surface; and the operating lever (71) has a day advance determining lever (73) in sliding contact with the outer peripheral surface of the control cam (45), and when the day advance determining lever ( 73) comes into sliding contact with the day advancement determining part (46), the thirtieth date determining lever (74) follows the thirtieth date determining part (29), and the month determining lever runs (75) follows the short month determination part (34b). 3. Mécanisme de calendrier selon la revendication 1 ou 2, dans lequel le mécanisme de commande d'indicateur de quantième de mois court (70) est équipé d'un moyen de compression (82) pour appliquer une force de rappel sur le rochet d'avancement de jour de mois court (76) visant à l'amener depuis une position précédant le changement de date, avant de faire tourner l'indicateur de quantième (20), vers une position suivant le changement de date après avoir entraîné en rotation l'indicateur de quantième (20).The calendar mechanism according to claim 1 or 2, wherein the short month calendar indicator control mechanism (70) is provided with compression means (82) for applying a restoring force to the ratchet. 'short month day advance (76) aiming to bring it from a position preceding the date change, before rotating the date indicator (20), to a position following the date change after having rotated the date indicator (20). 4. Mécanisme de calendrier selon la revendication 3, dans lequel le rochet d'avancement de jour de mois court (76) est équipé d'un doigt d'avancement de jour de mois court (79b) agissant sur une dent de l'indicateur de quantième (20) pour faire tourner l'indicateur de quantième (20); et dans lequel une partie de support élastique (79c) soutenant élastiquement le doigt d'avancement de jour de mois court (79b) est agencée pour être déplaçable vers l'intérieur dans le sens radial du rochet d'avancement de jour de mois court (76) lorsque le doigt d'avancement de jour de mois court (79b) se déplace depuis la position correspondant à celle suivant le changement de date vers la position correspondant à celle précédant le changement de date pour entrer en contact avec la dent.The calendar mechanism of claim 3, wherein the short month day advancement ratchet (76) is provided with a short month day advancement finger (79b) acting on a tooth of the indicator. date indicator (20) for rotating the date indicator (20); and wherein a resilient support portion (79c) resiliently supporting the short month day advancing finger (79b) is arranged to be movable in the radial direction of the short month day advancing ratchet (76 ) when the short month day advancing finger (79b) moves from the position corresponding to that following the date change to the position corresponding to that before the date change to come into contact with the tooth. 5. Mouvement équipé d'un mécanisme de calendrier selon la revendication 4.5. Movement equipped with a calendar mechanism according to claim 4. 6. Pièce d'horlogerie équipée d'un mouvement selon la revendication 5.6. Timepiece equipped with a movement according to claim 5.
CH00149/17A 2016-02-09 2017-02-09 Calendar mechanism, movement and timepiece. CH712123B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016023049A JP6636815B2 (en) 2016-02-09 2016-02-09 Calendar mechanism, movement and clock

Publications (2)

Publication Number Publication Date
CH712123A2 CH712123A2 (en) 2017-08-15
CH712123B1 true CH712123B1 (en) 2021-03-15

Family

ID=59544354

Family Applications (1)

Application Number Title Priority Date Filing Date
CH00149/17A CH712123B1 (en) 2016-02-09 2017-02-09 Calendar mechanism, movement and timepiece.

Country Status (3)

Country Link
JP (1) JP6636815B2 (en)
CN (1) CN107045276B (en)
CH (1) CH712123B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7260446B2 (en) * 2019-09-12 2023-04-18 セイコーウオッチ株式会社 Transmission wheel, self-winding mechanism, watch movement and watch

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1242512B (en) * 1964-08-25 1967-06-15 United States Time Corp Display device on a clock for displaying a variety of calendar information
JPS5214462Y2 (en) * 1971-07-08 1977-04-01
DE7411656U (en) * 1974-04-03 1974-07-04 Gebrueder Junghans Gmbh Date and weekday progression for a clock
CH685965B5 (en) * 1994-02-23 1996-05-31 Nardin Ulysse Sa horological piece which the hour hand can be an advance or backward by an hour steps.
US6108278A (en) * 1998-09-11 2000-08-22 Frederic Piguet S.A. Annual calendar mechanism for clockwork movement
CN2470857Y (en) * 2001-02-28 2002-01-09 杭州手表有限公司 Watch calendar instant jump mechanism
EP1536298A1 (en) * 2003-11-25 2005-06-01 Montres Breguet S.A. Calendar mechanism having entrainment and correction means for two indicators
ATE528699T1 (en) * 2005-11-11 2011-10-15 Omega Sa ANNUAL CALENDAR MECHANISM FOR CLOCK MOVEMENT
JP5819180B2 (en) * 2011-12-26 2015-11-18 セイコーインスツル株式会社 Calendar mechanism and watch having the same

Also Published As

Publication number Publication date
CH712123A2 (en) 2017-08-15
JP6636815B2 (en) 2020-01-29
CN107045276A (en) 2017-08-15
JP2017142134A (en) 2017-08-17
CN107045276B (en) 2020-03-27

Similar Documents

Publication Publication Date Title
EP1586962B1 (en) Ewiger Kalendermechanismus
CH705116B1 (en) calendar mechanism with training and correction means for both indicators.
CH710109A2 (en) Mechanism for automatic calendar, movement, and timepiece.
CH681761B5 (en) Part of clockwork mechanical and / or electromechanical, provided with automatic retrograde moving display means.
EP0987609B1 (en) Annual calendar mechanism for clockwork-movement
CH712222B1 (en) Date indicator drive wheel, calendar mechanism, movement and timepiece.
EP2663902B1 (en) Timepiece
EP3913442B1 (en) Retrograde display mechanism for a timepiece provided with a safety device
CH712123B1 (en) Calendar mechanism, movement and timepiece.
EP0606576A1 (en) Moslem calendar
CH714690A2 (en) Calendar mechanism, movement and timepiece.
CH705086B1 (en) Calendar mechanism and timepiece including such mechanism.
EP2721449B1 (en) Display mechanism
EP1660952B1 (en) Date corrector
EP3460588B1 (en) Date mechanism
EP2477080B1 (en) Timepiece showing the time zone corresponding to a selected time
CH713425A2 (en) Calendar mechanism, movement and timepiece.
EP1353244B1 (en) Timepiece with oblong shaped case
CH714267A1 (en) Correction device for a timepiece.
EP3588201B1 (en) Calendar mechanism for timepiece
WO2006108878A1 (en) Jumping hour display mechanism for timepiece
CH718804B1 (en) Perpetual or annual calendar mechanism.
EP1868049A1 (en) Timepiece provided with a simplified phase of the moon indicator
CH719977A1 (en) Watch mechanism with jumping display
WO2023072518A1 (en) Timepiece comprising a calendar mechanism and a mechanism for correcting the date or month