CH712123A2 - Calendar mechanism, movement and timepiece. - Google Patents

Calendar mechanism, movement and timepiece. Download PDF

Info

Publication number
CH712123A2
CH712123A2 CH00149/17A CH1492017A CH712123A2 CH 712123 A2 CH712123 A2 CH 712123A2 CH 00149/17 A CH00149/17 A CH 00149/17A CH 1492017 A CH1492017 A CH 1492017A CH 712123 A2 CH712123 A2 CH 712123A2
Authority
CH
Switzerland
Prior art keywords
month
day
date
lever
short
Prior art date
Application number
CH00149/17A
Other languages
French (fr)
Other versions
CH712123B1 (en
Inventor
Suzuki Shigeo
Original Assignee
Seiko Instr Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seiko Instr Inc filed Critical Seiko Instr Inc
Publication of CH712123A2 publication Critical patent/CH712123A2/en
Publication of CH712123B1 publication Critical patent/CH712123B1/en

Links

Classifications

    • GPHYSICS
    • G04HOROLOGY
    • G04BMECHANICALLY-DRIVEN CLOCKS OR WATCHES; MECHANICAL PARTS OF CLOCKS OR WATCHES IN GENERAL; TIME PIECES USING THE POSITION OF THE SUN, MOON OR STARS
    • G04B19/00Indicating the time by visual means
    • G04B19/24Clocks or watches with date or week-day indicators, i.e. calendar clocks or watches; Clockwork calendars
    • G04B19/243Clocks or watches with date or week-day indicators, i.e. calendar clocks or watches; Clockwork calendars characterised by the shape of the date indicator
    • G04B19/247Clocks or watches with date or week-day indicators, i.e. calendar clocks or watches; Clockwork calendars characterised by the shape of the date indicator disc-shaped
    • G04B19/253Driving or releasing mechanisms
    • G04B19/25333Driving or releasing mechanisms wherein the date indicators are driven or released mechanically by a clockwork movement
    • G04B19/25353Driving or releasing mechanisms wherein the date indicators are driven or released mechanically by a clockwork movement driven or released stepwise by the clockwork movement
    • G04B19/2536Driving or releasing mechanisms wherein the date indicators are driven or released mechanically by a clockwork movement driven or released stepwise by the clockwork movement automatically corrected at the end of months having less than 31 days
    • GPHYSICS
    • G04HOROLOGY
    • G04BMECHANICALLY-DRIVEN CLOCKS OR WATCHES; MECHANICAL PARTS OF CLOCKS OR WATCHES IN GENERAL; TIME PIECES USING THE POSITION OF THE SUN, MOON OR STARS
    • G04B19/00Indicating the time by visual means
    • G04B19/24Clocks or watches with date or week-day indicators, i.e. calendar clocks or watches; Clockwork calendars
    • G04B19/243Clocks or watches with date or week-day indicators, i.e. calendar clocks or watches; Clockwork calendars characterised by the shape of the date indicator
    • G04B19/247Clocks or watches with date or week-day indicators, i.e. calendar clocks or watches; Clockwork calendars characterised by the shape of the date indicator disc-shaped
    • G04B19/253Driving or releasing mechanisms

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Electromechanical Clocks (AREA)

Abstract

La présente invention concerne un mécanisme de calendrier, un mouvement, et une pièce d’horlogerie qui sont de structure simple et qui peuvent être facilement produits. Un indicateur de quantième (20) ayant une partie de détermination du trentième quantième, un indicateur des mois (30) effectuant une rotation par année, un mécanisme principal de commande d’indicateur de quantième (40), et un mécanisme de commande d’indicateur de quantième de mois court (70) faisant tourner l’indicateur de quantième (20) à la fin d’un mois court sont fournis. L’indicateur des mois (30) possède une came des mois (33) ayant sur sa surface périphérique externe une entaille (34b) correspondant au mois court; le mécanisme principal de commande d’indicateur de quantième (40) possède une roue d’entraînement d’indicateur de quantième (43), et un rochet d’avancement de jour (47); le mécanisme de commande d’indicateur de quantième de mois court (70) comporte un levier d’actionnement (71), un rochet d’avancement de jour de mois court (76), et une roue de date intermédiaire (85); le levier d’actionnement (71) tourne depuis une première position vers une deuxième position lorsque le levier de détermination du trentième quantième (74) suit la partie de détermination de trentième quantième (29), et le levier de détermination de mois court (75) suit l’entaille (34b); la roue de date intermédiaire (85) est espacée du rochet d’avancement de jour (47) lorsque le levier d’actionnement (71) se trouve dans la première position, et engrène avec le rochet d’avancement de jour (47) lorsque le levier d’actionnement (71) se trouve dans la deuxième position.The present invention relates to a calendar mechanism, a movement, and a timepiece that are simple in structure and can be easily produced. A date indicator (20) having a determination portion of the thirtieth calendar, an indicator of the months (30) rotating per year, a main date indicator control mechanism (40), and a control mechanism of short month calendar indicator (70) rotating the date indicator (20) at the end of a short month are provided. The month indicator (30) has a month cam (33) having on its outer peripheral surface a notch (34b) corresponding to the short month; the date indicator main control mechanism (40) has a date indicator drive wheel (43), and a day advance ratchet (47); the short month calendar indicator control mechanism (70) includes an actuating lever (71), a short month advancing ratchet (76), and an intermediate date wheel (85); the operating lever (71) rotates from a first position to a second position when the thirtieth-day determination lever (74) follows the thirtieth-day determination part (29), and the short-month determination lever (75). ) follows the notch (34b); the intermediate date wheel (85) is spaced from the day advance ratchet (47) when the operating lever (71) is in the first position, and meshes with the day advance ratchet (47) when the operating lever (71) is in the second position.

Description

DescriptionDescription

ARRIÈRE-PLAN DE L’INVENTION 1. Domaine de l’invention [0001] Cette invention se rapporte à un mécanisme de calendrier, un mouvement, et une pièce d’horlogerie. 2. Description de l’art antérieur [0002] En ce qui concerne les pièces d’horlogerie comportant un calendrier capable d’afficher une date, on connaît des mécanismes de calendrier dans lesquels la correction de la date est réduite à un minimum en effectuant un changement de quantième de deux jours à la fin d’un mois court ayant 30 jours ou moins (voir, par exemple, le brevet japonais No. 5 105 467).BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] This invention relates to a calendar mechanism, a movement, and a timepiece. 2. Description of the Prior Art [0002] With regard to timepieces having a calendar capable of displaying a date, there are known calendar mechanisms in which the correction of the date is reduced to a minimum by performing a two-day calendar change at the end of a short month having 30 days or less (see, for example, Japanese Patent No. 5,105,467).

[0003] Ce document de brevet divulgue un mécanisme de calendrier équipé d’un disque de date (indicateur de quantième) équipé d’une première rangée de dents internes et une deuxième rangée de dents internes, un rouage de changement de date ayant un doigt d’entraînement qui contrôle, via les dents de la première rangée de dents internes, l’affichage de date, un rouage correcteur coopérant avec la deuxième rangée de dents internes pour faire avancer le disque de date d’un pas de plus à la fin d’un mois court, et un rouage de changement de mois entraînant une roue en forme d’étoile des mois à la fin de chaque mois. En tant qu’éléments de type levier, on y trouve un levier contrôlé par un tenon du disque de date, un premier levier pivotant pour faire fonctionner le rouage de changement de date et le rouage de changement de mois, un deuxième levier pivotant pour faire fonctionner le rouage correcteur, et un levier coopérant avec la roue en forme d’étoile des mois pour contrôler la rotation du deuxième levier pivotant.[0003] This patent document discloses a calendar mechanism equipped with a date disk (date indicator) equipped with a first row of internal teeth and a second row of internal teeth, a date change gear having a finger. drive which controls, through the teeth of the first row of internal teeth, the date display, a corrective gear cooperating with the second row of internal teeth to advance the date disc a step closer to the end a short month, and a month change train driving a star-shaped wheel months at the end of each month. As a lever-type element, there is a lever controlled by a tenon of the date disc, a first pivoting lever for operating the date-change train and the month-shift gear, a second pivoting lever for operate the corrector gear, and a lever cooperating with the star-shaped wheel months to control the rotation of the second pivoting lever.

[0004] Dans la technique de l’art antérieur cependant, le nombre d’éléments de type levier est très important et implique une structure compliquée, de telle sorte qu’on peut craindre des coûts plutôt élevés. En outre, pour actionner les leviers de manière coordonnée à des horaires prédéterminés, il est nécessaire de monter chaque levier dans un état dans lequel il est réglé dans une position prédéterminée, de telle sorte qu’on peut également craindre que le procédé de fabrication devienne assez compliqué. Résumé de l’invention [0005] La présente invention a été conçue au vu des problèmes ci-dessus. Un but de la présente invention de fournir un mécanisme de calendrier, un mouvement, et une pièce d’horlogerie qui soient d’une simple structure et qui puissent être produits facilement.In the art of the prior art, however, the number of lever-type elements is very important and involves a complicated structure, so that one can fear rather high costs. In addition, to operate the levers in a coordinated manner at predetermined times, it is necessary to mount each lever in a state in which it is set in a predetermined position, so that it can also be feared that the manufacturing process becomes quite complicated. SUMMARY OF THE INVENTION [0005] The present invention has been designed in view of the above problems. An object of the present invention is to provide a calendar mechanism, a movement, and a timepiece that are of a simple structure and that can be produced easily.

[0006] Pour réaliser cet objectif ci-dessus, on fournit, conformément à la présente invention, un mécanisme de calendrier comprenant: un indicateur des mois effectuant une rotation par année; un indicateur de quantième effectuant une rotation par mois et possédant une partie de détermination du trentième quantième défini dans une position prédéterminée au niveau de sa périphérie; un mécanisme de commande principal d’indicateur de quantième effectuant une rotation par jour et faisant tourner l’indicateur de quantième; et un mécanisme de commande d’indicateur de mois court faisant tourner l’indicateur de quantième à la fin d’un mois court ayant 30 jours ou moins, dans lequel: - l’indicateur des mois comporte une came des mois possédant, sur sa surface périphérique externe, une partie de détermination de mois court correspondant à un mois court; - le mécanisme de commande principal d’indicateur de quantième possède une came d’actionnement, superposée à et agencée mobile en rotation par rapport à une roue menante d’indicateur de quantième, effectuant une rotation par jour à vitesse constante et configurée pour effectuer une rotation par jour, et un röchet d’avancement de jour tournant de manière synchronisée avec la came d’actionnement et faisant tourner l’indicateur de quantième; - le mécanisme de commande d’indicateur de mois court est muni d’un levier de détermination de trentième quantième capable de suivre la partie de détermination du trentième quantième, et un levier de détermination de mois court capable de suivre la partie de détermination de mois court, et comporte un élément de levier d’actionnement tournant autour d’un axe prédéterminé, un röchet d’avancement de jour de mois court faisant tourner l’indicateur de quantième à la fin d’un mois court, et une roue de date intermédiaire montée mobile en rotation par rapport au levier d’actionnement tout en engrenant avec le röchet d’avancement de jour de mois court; - levier d’actionnement se déplace d’une première position vers une deuxième position lorsque le levier de détermination du trentième quantième suit la partie de détermination du trentième quantième, et le levier de détermination de mois court suit la partie de détermination de mois court; et - la roue de date intermédiaire est espacée du röchet d’avancement de jour lorsque le levier d’actionnement se trouve dans la première position, et en prise avec le röchet d’avancement de jour lorsque le levier d’actionnement se trouve dans la deuxième position.To achieve this objective, a calendar mechanism is provided according to the present invention comprising: an indicator of the months rotating per year; a date indicator rotating one month and having a determination portion of the thirtieth calendar defined in a predetermined position at its periphery; a main date indicator control mechanism rotating one day and rotating the date indicator; and a short month indicator control mechanism rotating the date indicator at the end of a short month having 30 days or less, wherein: the month indicator includes a month cam having, on its outer peripheral surface, a short month determination portion corresponding to a short month; the main date indicator control mechanism has an actuating cam, superimposed on and rotatably arranged with respect to a date indicator driving wheel, rotating at a constant speed per day and configured to perform a rotation. rotation per day, and a day forward gear rotating synchronously with the actuating cam and rotating the date indicator; the short month indicator control mechanism is provided with a thirtieth calendar determination lever capable of following the determination part of the thirtieth calendar, and a short month determining lever capable of following the month determination part. short, and includes an actuating lever member rotating about a predetermined axis, a short month advancement pin rotating the date indicator at the end of a short month, and a date wheel. intermediate mounted movable in rotation with respect to the actuating lever while meshing with the short month advancement mark; - Actuating lever moves from a first position to a second position when the determination lever of the thirtieth day follows the determination part of the thirtieth day, and the short month determination lever follows the short month determination part; and - the intermediate date wheel is spaced from the forward gear when the operating lever is in the first position, and engaged with the forward gear when the operating lever is in the first gear position. second position.

[0007] Selon la présente invention, il est possible d’actionner le mécanisme de calendrier par le biais du seul levier d’actionnement, de telle sorte que, comparé à la technique de l’art antérieur, où quatre leviers sont nécessaires, il est possible de réduire le nombre de composants et de simplifier la structure.According to the present invention, it is possible to actuate the calendar mechanism by means of the single actuating lever, so that, compared to the technique of the prior art, where four levers are necessary, it It is possible to reduce the number of components and simplify the structure.

[0008] En outre, le levier d’actionnement est muni du levier de détermination du trentième quantième et le levier de détermination de mois court, de telle sorte que, seulement en montant le levier d’actionnement, le levier de détermination du trentième quantième et le levier de détermination de mois court sont agencés dans des positions prédéterminées. Autrement dit, il n’y a pas besoin d’effectuer d’alignement individuel sur le levier de détermination du trentième quantième et le levier de détermination de mois court, de sorte que la production du mécanisme en est facilitée.In addition, the actuating lever is provided with the determination lever of the thirtieth day and the month determination lever short, so that, only by mounting the actuating lever, the lever for determining the thirtieth day and the short month determining lever are arranged in predetermined positions. In other words, there is no need to perform individual alignment on the thirtieth day determination lever and the short month determination lever, so that the production of the mechanism is facilitated.

[0009] En outre, le levier d’actionnement tourne de la première position vers la position deuxième lorsque le levier de détermination du trentième quantième 30 suit la partie de détermination de trentième quantième et lorsque le levier de détermination de mois court suit la partie de détermination de mois court, et la roue de date intermédiaire vient en prise avec le röchet d’avancement de jour lorsqu’il se trouve dans la deuxième position, de sorte qu’il soit possible de transmettre l’énergie du röchet d’avancement de jour au röchet d’avancement de jour de mois court via la roue de date intermédiaire. Donc, à la fin d’un mois court, l’indicateur de quantième est entraîné en rotation par le röchet d’avancement de jour et le röchet d’avancement de jour de mois court, rendant possible d’effectuer de manière précise l’avancement des jours.In addition, the actuating lever rotates from the first position to the second position when the determination lever of the thirtieth day 30 follows the determination portion of thirtieth day and when the short month determination lever follows the part of determination of the short month, and the intermediate date wheel engages with the forward gear when in the second position, so that it is possible to transmit the energy of the forward gear of day at the short month day forwarding mark via the intermediate date wheel. Thus, at the end of a short month, the date indicator is rotated by the forward day mark and the short month forward record, making it possible to accurately perform the check. advancement of the days.

[0010] Le mécanisme principal de commande d’indicateur de quantième est équipé d’une came de contrôle tournant de manière synchronisée avec la came d’actionnement et ayant une partie de détermination d’avancement de jour au niveau de sa surface périphérique externe; et le levier d’actionnement possède un levier de détermination d’avancement de jour en contact glissant avec la surface périphérique externe de la came de contrôle, et lorsque le levier de détermination d’avancement de jour entre en contact glissant avec la partie de détermination d’avancement de jour, le levier de détermination de trentième quantième suit la partie de détermination du trentième quantième, et le levier de détermination de mois court suit la partie de détermination de mois court.The main date indicator control mechanism is equipped with a control cam rotating synchronously with the actuating cam and having a day progress determination portion at its outer peripheral surface; and the actuating lever has a day advance determining lever in sliding contact with the outer peripheral surface of the control cam, and when the day advance determining lever comes into sliding contact with the determining portion. the day 30, the thirtieth day determination lever follows the determination part of the thirtieth day, and the short month determination lever follows the short month determination part.

[0011] Selon la présente invention, le levier d’actionnement est agencé de manière à ce que le levier de détermination d’avancement de jour entre en contact glissant avec la surface périphérique externe de la came de contrôle, de sorte qu’il soit possible que le levier de détermination de trentième quantième puisse suivre la partie de détermination de trentième quantième sans le mettre en contact avec l’indicateur de quantième. Par conséquent, il est possible de supprimer la génération d’une charge du levier d’actionnement envers l’indicateur de quantième, de telle sorte qu’il est possible d’empêcher une déviation de l’indicateur de quantième, rendant possible l’affichage du quantième dans une position prédéterminée.According to the present invention, the actuating lever is arranged in such a way that the day advance determining lever comes into sliding contact with the outer peripheral surface of the control cam, so that it is it is possible for the thirtieth calendar determination lever to follow the thirtieth-day determination part without bringing it into contact with the date indicator. Therefore, it is possible to suppress the generation of a load of the operating lever towards the date indicator, so that it is possible to prevent a deviation of the date indicator, making possible the displaying the date in a predetermined position.

[0012] En outre, le mécanisme de commande d’indicateur de quantième de mois court est équipé d’un moyen de compression pour appliquer une force de rappel sur le röchet d’avancement de jour de mois court visant à l’amener depuis une position précédant le changement de date, c’est-à-dire avant d’entraîner en rotation l’indicateur de quantième, vers une position suivant le changement de date, c’est après avoir entraîné en rotation l’indicateur de quantième.In addition, the month month indicator control mechanism short is equipped with a compression means for applying a restoring force on the short month day forward gear for bringing it for a long time. position before the change of date, that is to say before rotating the date indicator to a position following the change of date is after having rotated the date indicator.

[0013] Selon la présente invention, le röchet d’avancement de jour de mois court peut être ramené dans la position correspondant à celle précédant le changement de date après avoir entraîné l’indicateur de quantième en rotation lors d’un mois court. Ainsi il est possible d’effectuer avec précision les changements de date aussi pour le mois court suivant.[0013] According to the present invention, the short month day advance ticket can be returned to the position corresponding to the one preceding the date change after driving the date indicator in rotation during a short month. Thus it is possible to accurately make the date changes also for the next short month.

[0014] En outre, le röchet d’avancement de jour de mois court est équipé d’un doigt d’avancement de jour de mois court appuyant contre une dent de l’indicateur de quantième pour faire tourner l’indicateur de quantième; et un support élastique soutenant de manière élastique le doigt d’avancement de jour de mois court est agencée de telle sorte qu’elle puisse être déplacée vers l’intérieur, dans le sens radial, du röchet d’avancement de jour de mois court lorsque le doigt d’avancement de jour de mois court se déplace depuis la position suivant le changement de date vers la position précédant un changement de date pour entrer en contact avec la dent.In addition, the short month day forward gear is equipped with a short month day advancement finger pressing against a tooth of the date indicator to rotate the date indicator; and an elastic support resiliently supporting the short month advancement finger is arranged such that it can be radially inwardly displaced from the short month advancement mark when the short month day advance finger moves from the position following the date change to the position prior to a date change to contact the tooth.

[0015] Selon la présente invention, on prévoit un support élastique soutenant de manière élastique le doigt d’avancement de jour de mois court déplaçable vers l’intérieur dans le sens radial du röchet d’avancement de jour de mois court, de sorte qu’il soit possible d’empêcher de manière fiable une rotation inverse de l’indicateur de quantième lorsque le doigt d’avancement de jour de mois court est rétabli de sa position correspondant à celle suivant le changement de date vers la position précédant le changement de date. Donc, il est possible de faire tourner l’indicateur de quantième par le röchet d’avancement de jour et le röchet d’avancement de jour de mois court à la fin d’un mois court, de telle sorte que le changement de jour puisse être effectué avec précision.According to the present invention, there is provided an elastic support elastically supporting the forward finger of the short month day movable inwards in the radial direction of the short month advancement mark, so that it is possible to reliably prevent an inverse rotation of the date indicator when the short month advancement finger is re-established from its position corresponding to that after the date change to the position before the change of date. dated. Thus, it is possible to rotate the date indicator by the day advance mark and the short month day forward mark at the end of a short month, so that the change of day can be done accurately.

[0016] En outre, la présente invention concerne également un mouvement équipé d’un mécanisme de calendrier tel que celui décrit ci-dessus.In addition, the present invention also relates to a movement equipped with a calendar mechanism such as that described above.

[0017] En outre, la présente invention concerne également une pièce d’horlogerie équipée d’un mouvement tel que celui décrit ci-dessus.In addition, the present invention also relates to a timepiece equipped with a movement such as that described above.

[0018] Selon la présente invention, on fournit par conséquent un mécanisme de calendrier de structure simple et de fabrication facile, de telle sorte qu’on peut obtenir un mouvement et une pièce d’horlogerie de meilleure fiabilité et dont les coûts de fabrication sont bas.According to the present invention, there is therefore provided a calendar mechanism of simple structure and easy to manufacture, so that one can obtain a movement and a timepiece of greater reliability and whose manufacturing costs are low.

[0019] Selon la présente invention, il est possible de faire fonctionner le mécanisme de calendrier par l’intermédiaire du seul levier d’actionnement, de telle sorte que, comparé à la technique de l’art antérieur où quatre leviers sont prévus à cet effet, il est possible de diminuer le nombre de composants et d’obtenir une structure plus simple.According to the present invention, it is possible to operate the calendar mechanism by means of the single actuating lever, so that, compared to the technique of the prior art where four levers are provided for this Indeed, it is possible to reduce the number of components and to obtain a simpler structure.

[0020] En outre, le levier d’actionnement est muni du levier de détermination du trentième quantième et du levier de détermination de mois court, de sorte que, seulement en montant le levier d’actionnement, le levier de détermination du trentième quantième et le levier de détermination de mois court sont agencés dans des positions prédéterminées. Autrement dit, il n’y a pas besoin d’effectuer de positionnement individuel pour le levier de détermination du trentième quantième et le levier de détermination de mois court, de sorte que la production est facilitée.In addition, the actuating lever is provided with the determination lever of the thirtieth day and the short month determination lever, so that, only by raising the actuating lever, the lever for determining the thirtieth day and the short month determining lever are arranged in predetermined positions. In other words, there is no need to perform individual positioning for the thirtieth day determination lever and the short month determination lever, so that production is facilitated.

[0021] En outre, le levier d’actionnement est entraîné en rotation depuis la première position vers la deuxième position lorsque le levier de détermination du trentième quantième suit la partie de détermination de trentième quantième, que le levier de détermination de mois court suit la partie de détermination de mois court, et que la roue de date intermédiaire vient en prise avec le röchet d’avancement de jour lorsqu’il se trouve dans la deuxième position, de sorte qu’il soit possible de transmettre la puissance du röchet d’avancement de jour au röchet d’avancement de jour de mois court via la roue de date intermédiaire. Donc, à la fin d’un mois court, l’indicateur de quantième est entraîné en rotation par le röchet d’avancement de jour et le röchet d’avancement de jour de mois court, ce qui permet d’effectuer un changement de quantième avec précision.In addition, the actuating lever is rotated from the first position to the second position when the determination lever of the thirtieth day follows the thirtieth day determination portion, the short month determination lever follows the part of determination of short month, and that the intermediate date wheel engages with the forward gear of day when it is in the second position, so that it is possible to transmit the power of the röchet of day advance at the short month day forwarding mark via the intermediate date wheel. So, at the end of a short month, the date indicator is rotated by the day forward gear and the short month forward gear, which allows a calendar change to be made. precisely.

BRÈVE DESCRIPTION DES DESSINSBRIEF DESCRIPTION OF THE DRAWINGS

[0022][0022]

La fig. 1 est une vue externe d’une pièce d’horlogerie selon un premier mode de réalisation préférentiel.Fig. 1 is an external view of a timepiece according to a first preferred embodiment.

La fig. 2 est une vue en plan d’un mouvement équipé d’un mécanisme de calendrier.Fig. 2 is a plan view of a movement equipped with a calendar mechanism.

La fig. 3 est une vue en coupe prise le long de la ligne A-A de la fig. 2.Fig. 3 is a sectional view taken along the line A-A of FIG. 2.

La fig. 4 est une vue en coupe prise le long de la ligne B-B de la fig. 2.Fig. 4 is a sectional view taken along the line B-B of FIG. 2.

La fig. 5 est une vue en plan élargie d’un mécanisme principal de commande d’indicateur de quantième.Fig. 5 is an enlarged plan view of a main date indicator control mechanism.

La fig. 6 est une vue en plan élargie d’un levier de détermination du trentième quantième et d’un röchet d’avancement de jour de mois court.Fig. 6 is an enlarged plan view of a thirtieth day determination lever and a short month day advance ticket.

La fig. 7 est une vue en plan illustrant l’état vers 23 heures 50 minutes lors du dernier jour pour le changement de jour lors d’un mois court.Fig. 7 is a plan view illustrating the state around 23 hours 50 minutes on the last day for the change of day in a short month.

La fig. 8 est une vue en plan illustrant l’état vers 23 heures 55 minutes lors du dernier jour pour le changement de jour lors d’un mois court.Fig. 8 is a plan view illustrating the state around 23 hours 55 minutes on the last day for the change of day in a short month.

La fig. 9 est un schéma illustrant un parcours de transmission de puissance dans un mécanisme de calendrier.Fig. 9 is a diagram illustrating a power transmission path in a calendar mechanism.

La fig. 10 est une vue en plan illustrant l’état vers 24 heures lors du dernier jour pour le changement de jour lors d’un mois court, avec un premier changement de quantième qui commence.Fig. 10 is a plan view illustrating the state around 24 hours on the last day for the change of day in a short month, with a first date change starting.

La fig. 11 est une vue en plan illustrant l’état vers 24 heures lors du dernier jour pour le changement de jour lors d’un mois court, avec le premier changement de quantième à moitié effectué.Fig. 11 is a plan view illustrating the state around 24 hours on the last day for the change of day in a short month, with the first date change half performed.

La fig. 12 est une vue en plan illustrant l’état vers 24 heures lors du dernier jour pour l’avancement de jour lors d’un mois court, avec le premier changement de quantième effectué.Fig. 12 is a plan view illustrating the state around 24 hours on the last day for day advancement in a short month, with the first date change made.

La fig. 13 est une vue en plan illustrant l’état vers 24 heures lors du dernier jour pour l’avancement de jour lors d’un mois court, avec un deuxième changement de quantième qui commence.Fig. 13 is a plan view illustrating the state around 24 hours on the last day for day advancement in a short month, with a second date change starting.

La fig. 14 est une vue en plan illustrant l’état vers 24 heures lors du dernier jour pour l’avancement de jour lors d’un mois court, avec le deuxième changement de quantième à moitié effectué.Fig. 14 is a plan view illustrating the state around 24 hours on the last day for day advancement in a short month, with the second date change half performed.

La fig. 15 est une vue en plan illustrant l’état vers 24 heures lors du dernier jour pour l’avancement de jour lors d’un mois court, avec le deuxième changement de quantième effectué.Fig. 15 is a plan view illustrating the state around 24 hours on the last day for day advancement in a short month, with the second date change made.

La fig. 16 est une vue en plan illustrant l’état vers 23 heures 50 minutes lors du trentième quantième pour le changement de date lors d’un mois long.Fig. 16 is a plan view illustrating the state around 23 hours 50 minutes on the thirtieth day for the change of date in a long month.

La fig. 17 est une vue en plan illustrant l’état vers 24 heures lors du trentième quantième pour le changement de date lors d’un mois long, avec le deuxième changement de quantième à moitié effectué.Fig. 17 is a plan view illustrating the state around 24 hours on the thirtieth day for the change of date in a long month, with the second change of date half performed.

La fig. 18 est une vue en plan illustrant l’état vers 24 heures lors du trentième quantième pour le changement de date lors d’un mois long, avec le deuxième changement de quantième effectué.Fig. 18 is a plan view illustrating the state around 24 o'clock on the thirtieth day for the change of date in a long month, with the second date change made.

La fig. 19 est une vue en plan d’un mouvement équipé d’un mécanisme de calendrier selon un mode de réalisation modifié.Fig. 19 is a plan view of a movement equipped with a calendar mechanism according to a modified embodiment.

La fig. 20 est une vue en coupe prise le long de la ligne C-C de la fig. 19.Fig. 20 is a sectional view taken along line C-C of FIG. 19.

La fig. 21 est une vue en plan illustrant l’état vers minuit lors du dernier jour pour l’avancement de jour lors d’un mois court.Fig. 21 is a plan view illustrating the state around midnight on the last day for day advancement in a short month.

La fig. 22 est une vue en plan illustrant l’état vers 5 heures 55 minutes lors du dernier jour pour l’avancement d’un jour lors d’un mois court.Fig. 22 is a plan view illustrating the state around 5 hours 55 minutes on the last day for the advancement of a day in a short month.

La fig. 23 est une vue en plan illustrant l’état vers 24 heures lors du dernier jour pour l’avancement d’un jour lors d’un mois court, immédiatement avant un premier changement de quantième.Fig. 23 is a plan view illustrating the state around 24 hours on the last day for the advancement of a day in a short month, immediately before a first date change.

La fig. 24 est une vue en plan illustrant l’état vers 24 heures lors du dernier jour pour l’avancement d’un jour lors d’un mois court, avec un premier changement de quantième qui commence.Fig. 24 is a plan view illustrating the state around 24 hours on the last day for the advancement of a day in a short month, with a first date change starting.

La fig. 25 est une vue en plan illustrant l’état vers 24 heures lors du dernier jour pour l’avancement d’un jour lors d’un mois court, avec le premier changement de quantième à moitié effectué.Fig. 25 is a plan view illustrating the state around 24 hours on the last day for the advancement of a day in a short month, with the first change of date half performed.

La fig. 26 est une vue en plan illustrant l’état vers 24 heures lors du dernier jour pour l’avancement d’un jour lors d’un mois court, avec un deuxième changement de quantième qui commence.Fig. 26 is a plan view illustrating the state around 24 hours on the last day for the advancement of a day in a short month, with a second date change starting.

La fig. 27 est une vue en plan illustrant l’état vers 24 heures lors du dernier jour pour l’avancement d’un jour lors d’un mois court, avec le premier changement de quantième effectué.Fig. 27 is a plan view illustrating the state around 24 hours on the last day for the advancement of a day in a short month, with the first date change made.

La fig. 28 est une vue explicative illustrant le changement de quantième d’un mois long.Fig. 28 is an explanatory view illustrating the change of date of a month long.

La fig. 29 est une vue explicative illustrant une came de contrôle selon un autre mode de réalisation.Fig. 29 is an explanatory view illustrating a control cam according to another embodiment.

La fig. 30 est une vue externe d’une pièce d’horlogerie selon un autre mode de réalisation.Fig. 30 is an external view of a timepiece according to another embodiment.

La fig. 31 est une vue en coupe d’un mouvement de la pièce d’horlogerie selon l’autre mode de réalisation repré senté à la fig. 30.Fig. 31 is a sectional view of a movement of the timepiece according to the other embodiment shown in FIG. 30.

DESCRIPTION DES MODES DE RÉALISATIONDESCRIPTION OF THE EMBODIMENTS

[0023] Dans ce qui suit, on décrira un mode de réalisation préférentiel de la présente invention en référence aux dessins.In what follows, we will describe a preferred embodiment of the present invention with reference to the drawings.

[0024] Dans ce qui suit, on décrira une montre-bracelet mécanique (qui correspond à la «pièce d’horlogerie» des revendications; ci-après il sera simplement fait référence à la «pièce d’horlogerie»), et ensuite un mécanisme de calendrier selon le mode de réalisation sera décrit en détail. (Pièce d’horlogerie) [0025] On se réfère généralement au corps mécanique incluant la partie menante d’une pièce d’horlogerie comme étant le «mouvement.» Ce qui est obtenu comme produit complet en montant un cadran et des aiguilles à ce mouvement et en mettant l’ensemble dans un boîtier de pièce d’horlogerie constitue I’ «ensemble» de la pièce d’horlogerie. Parmi les deux faces d’une platine constituant la plaque de base de la pièce d’horlogerie, la face où se situe la glace du boîtier de pièce d’horlogerie, c’est-à-dire, le côté où se trouve le cadran est communément appelée «côté arrière» du mouvement; la face où se situe le fond du boîtier de pièce d’horlogerie, c’est-à-dire, la face opposée au cadran, est communément appelée «côté avant» du mouvement.In what follows, we will describe a mechanical wristwatch (which corresponds to the "timepiece" of the claims, hereinafter it will simply refer to the "timepiece"), and then a Calendar mechanism according to the embodiment will be described in detail. (Timepiece) [0025] The mechanical body including the leading part of a timepiece is generally referred to as the "movement." What is obtained as a complete product by mounting a dial and needles at that time. movement and putting the whole in a timepiece case constitutes the "set" of the timepiece. Of the two faces of a platen constituting the base plate of the timepiece, the face where the crystal of the timepiece case is located, that is to say, the side where the dial is located. is commonly referred to as the "back side" of the movement; the face where is the bottom of the timepiece case, that is to say, the face opposite the dial, is commonly called "front side" of the movement.

[0026] La fig. 1 est une vue externe d’une pièce d’horlogerie 1 selon le mode de réalisation préférentiel. Dans la description qui suit, on se référera à la direction du sens des aiguilles d’une montre dans la vue en plan de la fig. 1 ultérieure comme étant le sens CW («clockwise), et la direction contraire au sens des aiguilles d’une montre comme étant le sens CCW («counterclockwise»).Fig. 3 1 is an external view of a timepiece 1 according to the preferred embodiment. In the description which follows, reference will be made to the direction of clockwise in the plan view of FIG. 1 as CW ("clockwise"), and the counter clockwise direction as CCW ("counterclockwise").

[0027] Comme représenté sur la fig. 1, l’ensemble de la pièce d’horlogerie 1 du présent mode de réalisation contient, dans un boîtier de pièce d’horlogerie 3 consistant en un fond (non représenté) et une glace 2, un mouvement 10, un cadran 11 ayant une échelle ou similaire indiquant une information horaire, et des aiguilles indicatrices incluant une aiguille des heures 12 indiquant l’heure, une aiguille des minutes 13 indiquant les minutes, et une aiguille des secondes 14 indiquant les secondes. Sont aménagés dans le cadran 11 une fenêtre de quantième 11a exposant un nombre indiquant le quantième, c’est-à-dire le jour du mois, et une fenêtre des mois 11b exposant des lettres indiquant le mois. En raison de cette construction, la pièce d’horlogerie 1 peut afficher l’heure, le jour du mois, et le mois.As shown in FIG. 1, the entire timepiece 1 of the present embodiment contains, in a timepiece case 3 consisting of a bottom (not shown) and a mirror 2, a movement 10, a dial 11 having a scale or the like indicating hourly information, and indicator hands including a 12 hour hand indicating the time, a minute hand 13 indicating minutes, and a seconds hand 14 indicating seconds. Are arranged in the dial 11 a date window 11a exposing a number indicating the date, that is to say the day of the month, and a month window 11b exposing letters indicating the month. Because of this construction, the timepiece 1 can display the time, the day of the month, and the month.

[0028] La fig. 2 est une vue en plan du mouvement équipé d’un mécanisme de calendrier, et la fig. 3 est une vue en coupe prise le long de la ligne A-A de la fig. 2.Fig. 2 is a plan view of the movement equipped with a calendar mechanism, and FIG. 3 is a sectional view taken along the line A-A of FIG. 2.

[0029] Comme représenté sur les fig. 2 et 3, le mouvement 10 a une platine 5 constituant la plaque de base du mouvement 10. Comme représenté à la fig. 3, sur la face avant de la platine 5, sont agencés au moins un mécanisme d’échappement/ régulateur (non représenté) incluant un balancier-spiral, un mobile d’échappement, une ancre, etc., et rouage avant incluant un deuxième mobile (roue & pignon) 8, un troisième mobile (roue & pignon), un mobile de centre (roue & pignon) 9, un barillet de mouvement, etc. La deuxième aiguille 14 est montée à une extrémité du côté arrière du deuxième mobile 8, qui fait une rotation en 60 secondes dans le sens CW autour d’un axe de centre O. L’aiguille des minutes 13 est montée à une extrémité du côté arrière du mobile de centre 9, qui fait une rotation en 60 minutes dans le sens CW autour de l’axe de centre O. (Mécanisme de calendrier) [0030] Comme représenté sur les fig. 2 et 3, un mécanisme de calendrier 100 est équipé d’une roue des heures 16, un indicateur de quantième 20, un indicateur des mois 30, un mécanisme principal de commande d’indicateur de quantième 40, et un mécanisme de commande d’indicateur de quantième de mois court 70. Dans ce qui suit, le mécanisme de calendrier 100 sera décrit en détail en référence aux dessins.As shown in FIGS. 2 and 3, the movement 10 has a plate 5 constituting the base plate of the movement 10. As shown in FIG. 3, on the front face of the plate 5, are arranged at least one exhaust mechanism / regulator (not shown) including a sprung balance, an escapement, an anchor, etc., and front wheel including a second mobile (wheel & pinion) 8, a third mobile (wheel & pinion), a center mobile (wheel & pinion) 9, a motion barrel, etc. The second needle 14 is mounted at one end of the rear side of the second movable 8, which rotates in 60 seconds in the CW direction about a center axis O. The minute hand 13 is mounted at one end of the side. rear of the center mobile 9, which rotates in 60 minutes in the CW direction about the center axis O. (Calendar mechanism) [0030] As shown in Figs. 2 and 3, a calendar mechanism 100 is equipped with an hour wheel 16, a date indicator 20, a month indicator 30, a date indicator main control mechanism 40, and a control mechanism of Short month calendar indicator 70. In the following, the calendar mechanism 100 will be described in detail with reference to the drawings.

[0031] Dans la description qui suit, on se référera aux mois ayant 30 jours ou moins (février, avril, juin, septembre et novembre) comme étant les mois courts, et les mois ayant 31 jours (janvier, mars, mai, juillet, août, octobre et décembre) comme étant les mois longs.In the description that follows, reference will be made to months having 30 days or less (February, April, June, September and November) as short months, and months having 31 days (January, March, May, July). , August, October and December) as the long months.

[0032] L’extrémité avant de la roue des heures 16 est formée comme une roue dentée des heures 16a. La roue des heures 16 est en prise, c’est-à-dire engrène avec un barillet de mouvement (non représenté) servant de source d’énergie via la roue dentée des heures 16a et le rouage. La roue des heures 16 est entraînée en rotation par l’énergie transmise depuis le barillet du mouvement. L’aiguille des heures 12 est montée à l’extrémité arrière de la roue des heures 16, et fait une rotation en 12 heures dans le sens CW autour de l’axe de centre O. La roue des heures 16 comporte une roue intermédiaire des heures 16bà l’arrière de la roue dentée des heures 16a. La rotation de la roue des heures 16 est transmise à un mécanisme principal de commande d’indicateur de quantième 40 décrit ci-dessous via le rouage consistant, par exemple, en la roue intermédiaire des heures 16bet une roue intermédiaire 17.The front end of the hour wheel 16 is formed as a toothed hour wheel 16a. The hour wheel 16 is engaged, that is to say meshes with a movement barrel (not shown) serving as a source of energy via the hour gear 16a and the gear train. The hour wheel 16 is rotated by the energy transmitted from the barrel of the movement. The hour hand 12 is mounted at the rear end of the hour wheel 16, and rotates in 12 hours in the CW direction around the center axis O. The hour wheel 16 includes an intermediate wheel 16 hours behind the hour wheel 16a. The rotation of the hour wheel 16 is transmitted to a main date indicator control mechanism 40 described below via the train consisting of, for example, the intermediate wheel hours 16b and an intermediate wheel 17.

[0033] L’indicateur de quantième 20 est un élément en forme d’anneau monté mobile en rotation sur la platine 5. Comme représenté sur la fig. 2, les inscriptions des jours 21 représentant le quantième du premier au trente-et-unième jour du mois sont affichées successivement sur la surface de l’indicateur de quantième 20 tout au long de sa périphérie. Des exemples relatifs à la méthode d’affichage des inscriptions du jour 21 incluent l’impression, le marquage, et le scellage, sans pour autant que cette énumération soit restrictive. L’indicateur de quantième 20 tourne dans le sens CW. Les inscriptions des jours 21 sont affichées successivement conformément à la direction rotationnelle de l’indicateur de quantième 20.The date indicator 20 is a ring-shaped element rotatably mounted on the plate 5. As shown in FIG. 2, the inscriptions of the days 21 representing the calendar of the first to the thirty-first day of the month are displayed successively on the surface of the date indicator 20 all along its periphery. Examples of the display method for day 21 entries include printing, marking, and sealing, without this enumeration being restrictive. The date indicator 20 rotates in the CW direction. The inscriptions of the days 21 are displayed successively in accordance with the rotational direction of the date indicator 20.

[0034] Une surface périphérique interne 20a de l’indicateur de quantième 20 est formée sur deux étages. Du côté avant du mouvement 10, sur la surface périphérique interne 20a de l’indicateur de quantième 20, sont formées une pluralité de dents 22 faisant saillie radialement vers l’intérieur et à des intervalles réguliers au niveau de la périphérie. En accord avec les 31 jours que comportent un mois long, 31 dents 22 sont formées selon les pas suivants: 360731 = approximativement tous les 11.6°. Les dents 22 sont poussées une fois par jour par un doigt d’avancement de jour 47b d’un röchet d’avancement de jour 47 décrit ci-dessous et configuré pour faire une rotation par jour. Par conséquent, l’indicateur de quantième 20 tourne dans le sens CW et effectue une rotation par mois.An inner peripheral surface 20a of the date indicator 20 is formed on two stages. On the front side of the movement 10, on the inner peripheral surface 20a of the date indicator 20, a plurality of teeth 22 projecting radially inwards and at regular intervals at the periphery are formed. In agreement with the 31 days that comprise a long month, 31 teeth 22 are formed according to the following steps: 360731 = approximately every 11.6 °. The teeth 22 are pushed once a day by a day advancing finger 47b of a forward advancement pin 47 described below and configured to rotate one day. As a result, the date indicator 20 rotates CW and rotates by month.

[0035] Un sautoir de date 25 indexe la position dans la direction rotationnelle de l’indicateur de quantième 20, et aide à la rotation de l’indicateur de quantième 20. L’extrémité proximale du sautoir de date 25 est fixée à la platine 5, et son extrémité distale 25a est formée comme une extrémité libre. Le sautoir de date 25 est équipé d’un bras de date 25b capable de se déformer élastiquement. Le bras de date 25b compresse l’extrémité distale 25a vers l’indicateur de quantième 20. L’extrémité distale 25a du sautoir de date 25 est en prise avec une dent 22 de l’indicateur de quantième 20, indexant de cette manière la rotation de l’indicateur de quantième 20. Par conséquent, l’indicateur de quantième 20 peut tourner pas à pas au même point angulaire comme l’angle de la dent 22 (approximativement 11.6°).A date jumper 25 indexes the position in the rotational direction of the date indicator 20, and helps the rotation of the date indicator 20. The proximal end of the date jumper 25 is fixed to the platen 5, and its distal end 25a is formed as a free end. The date jumper 25 is equipped with a date arm 25b capable of deforming elastically. The date arm 25b compresses the distal end 25a towards the date indicator 20. The distal end 25a of the date jumper 25 is engaged with a tooth 22 of the date indicator 20, thereby indexing the rotation of the date indicator 20. Therefore, the date indicator 20 can be rotated stepwise at the same angular point as the angle of the tooth 22 (approximately 11.6 °).

[0036] Sur la surface périphérique interne 20a de l’indicateur de quantième 20 et à l’arrière des dents 22, est formée une partie d’avancement de mois 26. La partie d’avancement de mois 26 est formée pour faire saillie intérieurement dans la direction radiale. La partie d’avancement de mois 26 pousse une dent 28a d’une roue intermédiaire des mois 28 prévue à l’intérieur de l’indicateur de quantième 20 lorsqu’une commutation est effectuée depuis le dernier jour d’un mois au premier jour du mois suivant, tournant de cette manière la roue intermédiaire des mois 28.On the inner peripheral surface 20a of the date indicator 20 and the back of the teeth 22, is formed an advancement portion of month 26. The advancing portion of the month 26 is formed to project internally. in the radial direction. The advancing part of month 26 pushes a tooth 28a of an intermediate wheel 28 months provided within the date indicator 20 when a switch is made from the last day of a month to the first day of the next month, turning in this way the intermediate wheel of the months 28.

[0037] En outre, sur la surface périphérique interne 20a de l’indicateur de quantième 20 et sur le côté arrière des dents 22, est formée une partie de détermination de trentième quantième 29. La partie de détermination de trentième quantième 29 est formée comme un renfoncement vers l’extérieur dans la direction radiale. La partie de détermination de trentième quantième 29 est formée aune position correspondant aune extrémité distale 74a d’un levier de détermination de trentième quantième 74 décrit ci-dessous fourni sur le côté interne de l’indicateur de quantième 20 lorsque l’indicateur de quantième affiche le trentième quantième. Lorsque le passage de changement de mois est effectué du trentième quantième, qui est la fin d’un mois court, au premier jour du mois suivant, la partie de détermination de trentième quantième 29 permet de suivre la commutation par l’extrémité distale 74a du levier de détermination de trentième quantième 74 y pénétrant. (Roue des mois) [0038] L’indicateur des mois 30 est inséré dans la roue des heures 16 avec du jeu pour être mobile en rotation. La roue des mois 30 possède une roue dentée des mois 31 et une came de mois 33. La roue des mois 30 fait une rotation par année.In addition, on the inner peripheral surface 20a of the date indicator 20 and on the rear side of the teeth 22, is formed a determination portion of thirtieth day 29. The thirtieth-day determination portion 29 is formed as an outward recess in the radial direction. The thirtieth-day determination portion 29 is formed at a position corresponding to a distal end 74a of a thirtieth-day determination lever 74 described below provided on the inner side of the date indicator 20 when the date indicator displays the thirtieth day. When the changeover month is effected from the thirtieth day, which is the end of a short month, to the first day of the following month, the thirtieth-day determination portion 29 makes it possible to follow the switching by the distal end 74a of the Thirtieth determination determination lever 74 penetrating it. (Month Wheel) The month indicator 30 is inserted into the hour wheel 16 with play to be rotatable. The 30 month wheel has a 31 month gear and a 33 month cam. The 30 month wheel rotates by year.

[0039] La roue dentée des mois 31 engrène avec la roue intermédiaire des mois 28. Conformément aux 12 mois constituant l’année, la roue dentée des mois 31 possède 12 dents espacées selon les pas suivants: 360712 = 30°. La roue dentée des mois 31 tourne avec la rotation de l’indicateur de quantième 20 et la roue intermédiaire des mois 28 à la fin de chaque mois. Sur la fig. 2, pour rendre le dessin plus facile à comprendre, le nombre de chaque mois correspondant à chaque dent de la roue dentée de mois 31 est indiqué.The gear 31 months meshes with the intermediate wheel months 28. In accordance with the 12 months constituting the year, the gear 31 months has 12 teeth spaced according to the following steps: 360712 = 30 °. The gear wheel 31 months rotates with the rotation of the date indicator 20 and the intermediate wheel months 28 at the end of each month. In fig. 2, to make the drawing easier to understand, the number of each month corresponding to each tooth of the tooth gear of month 31 is indicated.

[0040] La came des mois 33 fait une rotation par année de manière synchronisée avec la roue dentée des mois 31 autour de l’axe de centre O. La surface périphérique externe de la came de mois 33 comporte cinq saillies 34a dans la direction périphérique, et cinq renfoncements 346 (correspondant à la «partie de détermination de mois court» dans les revendications) situées entre les saillies 34a.The cam of the month 33 rotates by year synchronously with the gear 31 months around the center axis O. The outer peripheral surface of the month cam 33 has five projections 34a in the peripheral direction and five recesses 346 (corresponding to the "short month determining portion" in the claims) located between the projections 34a.

[0041] La pluralité de saillies 34a de la came de mois 33 est formée à des positions correspondant aux mois longs (janvier, mars, mai, juillet, août, octobre et décembre) lorsque la surface périphérique externe de la came de mois 33 est divisée en 12 secteurs égaux correspondant à un angle de 30° autour de l’axe de centre O et les mois de janvier à décembre sont successivement attribués à chacun de ces secteurs dans le sens CW. La pluralité d’entailles 34b de la came de mois 33 est formée aux positions correspondant aux mois courts (février, avril, juin, septembre, et novembre).The plurality of projections 34a of the month cam 33 is formed at positions corresponding to the long months (January, March, May, July, August, October and December) when the outer peripheral surface of the month cam 33 is divided into 12 equal sectors corresponding to an angle of 30 ° around the axis of center O and the months of January to December are successively attributed to each of these sectors in the CW direction. The plurality of notches 34b of the month cam 33 are formed at positions corresponding to the short months (February, April, June, September, and November).

[0042] Une plaque d’affichage des mois 15 est insérée sur l’extrémité de la roue de mois 30, du côté arrière. La plaque d’affichage des mois 15 est une plaque en forme de disque, et est agencée du côté avant du mouvement 10 par rapport au cadran 11. Comme représenté sur la fig. 2, sur la surface principale de l’indicateur de quantième 20, des lettres de mois 15a sont successivement affichées représentant les mois de janvier à décembre le long de la direction périphérique. Des exemples pour la méthode d’affichage des lettres de mois 15a incluent l’impression, le marquage, et le scellage, sans que cette énumération soit restrictive pour autant. La plaque d’affichage des mois 15 fait une rotation par année dans le sens CCW autour de l’axe de centre O de manière synchronisée avec la roue dentée des mois 31 et la came des mois 33. Les lettres des mois 15a sont affichées successivement conformément à la direction rotationnelle de la plaque d’affichage des mois 15, et sont visibles depuis l’extérieur à travers la fenêtre de mois 11b.A month display plate 15 is inserted on the end of the wheel 30 months, the rear side. The month display plate 15 is a disk-shaped plate, and is arranged on the front side of the movement relative to the dial 11. As shown in FIG. 2, on the main surface of the date indicator 20, month letters 15a are successively displayed representing the months of January to December along the peripheral direction. Examples for the method of displaying 15a month letters include printing, marking, and sealing, without this enumeration being restrictive. The month display plate 15 rotates in the CCW direction about the center axis O synchronously with the month gear 31 and the month cam 33. The letters of the month 15a are displayed successively according to the rotational direction of the display plate of the month 15, and are visible from the outside through the month window 11b.

[0043] Un sautoir des mois 35 règle la position dans la direction rotationnelle de la roue des mois 30, et aide à la rotation de la roue des mois 30. L’extrémité proximale du sautoir des mois 35 est connectée de manière rotative à la platine 5, et son extrémité distale 35a est formée comme une extrémité libre. L’extrémité distale 35a du sautoir des mois 35 est compressé vers la roue de mois 30 par un spiral de sautoir des mois 36. L’extrémité distale 35a du sautoir des mois 35 est engagée avec les dents de la roue des mois 30, réglant de cette manière la rotation de la roue des mois 30. Par conséquent, la roue dentée des mois 31, la came des mois 33, et la plaque d’affichage des mois 15 de la roue des mois 30 tournent d’un pas par mois dans le sens CCW selon le même angle de 30° que l’angle de la dent (30°) autour de l’axe de centre O, effectuant une rotation par année. (Mécanisme principal de commande d’indicateur de quantième) [0044] La fig. 4 est une vue en coupe prise le long de la ligne B-B de la fig. 2, et la fig. 5 est une vue en plan élargie du mécanisme principal de commande d’indicateur de quantième.A jumper months 35 sets the position in the rotational direction of the wheel 30 months, and helps the rotation of the wheel of the month 30. The proximal end of the jumper months 35 is connected rotatably to the platinum 5, and its distal end 35a is formed as a free end. The distal end 35a of the month jumper 35 is compressed towards the month wheel 30 by a spring jumper of the months 36. The distal end 35a of the month jumper 35 is engaged with the teeth of the wheel 30 months, regulating in this way the rotation of the wheel of the 30's months. Therefore, the 31-month gear wheel, the 33-month cam, and the 15-month wheel 15 month display plate rotate one step per month in the CCW direction at the same 30 ° angle as the tooth angle (30 °) around the center axis O, rotating one year. (Main date indicator control mechanism) FIG. 4 is a sectional view taken along the line B-B of FIG. 2, and FIG. 5 is an enlarged plan view of the main date indicator control mechanism.

[0045] Comme représenté sur les fig. 2,4, et 5, dans une position entre l’axe de centre O et la surface périphérique interne 20a de l’indicateur de quantième 20 et correspondant à la direction de 5 heures, un arbre 6 fait saillie verticalement depuis la platine 5 le long d’un premier axe C1. Le mécanisme principal de commande d’indicateur de quantième 40 est soutenu de manière rotative autour du premier axe C1 par l’arbre 6.As shown in FIGS. 2,4, and 5, in a position between the center axis O and the inner peripheral surface 20a of the date indicator 20 and corresponding to the direction of 5 hours, a shaft 6 protrudes vertically from the plate 5 the along a first axis C1. The main date indicator control mechanism 40 is rotatably supported about the first axis C1 by the shaft 6.

[0046] Le mécanisme principal de commande d’indicateur de quantième 40 est équipé d’une goupille de date 41, d’une roue menante d’indicateur de quantième 43, d’une came d’actionnement 50, d’un levier de came d’actionnement 52, d’un röchet d’avancement de jour 47, et d’une came de contrôle 45. La goupille de date 41, la roue menante d’indicateur de quantième 43, la came d’actionnement 50, le röchet d’avancement de jour 47, et la came de contrôle 45 sont agencés de manière coaxiale pour tourner autour du premier axe C1.The main date indicator control mechanism 40 is equipped with a date pin 41, a date indicator driving wheel 43, an actuating cam 50, a control lever actuating cam 52, a forward feed nose 47, and a control cam 45. The date pin 41, the date indicator driving wheel 43, the actuating cam 50, the the forward feed nose 47, and the control cam 45 are arranged coaxially to rotate about the first axis C1.

[0047] La goupille de date 41 est formée selon une configuration tubulaire, et est simplement insérée dans l’arbre 6 pour être rotatif autour du premier axe C1.The date pin 41 is formed in a tubular configuration, and is simply inserted into the shaft 6 to be rotatable about the first axis C1.

[0048] La roue menante d’indicateur de quantième 43 est simplement insérée dans la goupille de date 41 pour être rotative. La roue menante d’indicateur de quantième 43 engrène avec la roue intermédiaire 17. L’énergie de la roue des heures 16 est transmise à la roue menante d’indicateur de quantième 43 via la roue des heures 16b intermédiaire et la roue intermédiaire 17. La roue menante d’indicateur de quantième 43 fait une rotation par jour à une vitesse fixe autour du premier axe C1.The date indicator driving wheel 43 is simply inserted into the date pin 41 to be rotatable. The date indicator driving wheel 43 meshes with the intermediate wheel 17. The energy of the hour wheel 16 is transmitted to the date indicator driving wheel 43 via the intermediate hour wheel 16b and the intermediate wheel 17. The date indicator driving wheel 43 rotates daily at a fixed speed around the first axis C1.

[0049] En outre, la roue menante d’indicateur de quantième 43 est munie d’une rainure arquée 43a au centre de laquelle se trouve le premier axe C1 dans la vue en plan, et dont la largeur s’étend dans la direction radiale de la roue menante d’indicateur de quantième 43. L’angle de centre de la rainure arquée 43a est, par exemple, approximativement 90°.In addition, the date indicator driving wheel 43 is provided with an arcuate groove 43a in the center of which is the first axis C1 in the plan view, and whose width extends in the radial direction. of the date indicator driving wheel 43. The center angle of the arcuate groove 43a is, for example, approximately 90 °.

[0050] Une came d’actionnement 50 est une plaque configurée en forme de secteur dans son ensemble, et est plus petite que le contour de la roue menante d’indicateur de quantième 43. Du côté avant de la roue menante d’indicateur de quantième 43, la came d’actionnement 50 est empilée sur la roue menante d’indicateur de quantième 43. La came d’actionnement 50 est insérée et fixée sur la goupille de date 41. Par conséquent, la came d’actionnement 50 est montée rotative autour du premier axe C1 par rapport à la roue menante d’indicateur de quantième 43.An actuating cam 50 is a sector-shaped plate as a whole, and is smaller than the contour of the date indicator driving wheel 43. On the front side of the indicator gear wheel date 43, the actuating cam 50 is stacked on the date indicator driving wheel 43. The actuating cam 50 is inserted and fixed on the date pin 41. Therefore, the actuating cam 50 is mounted rotatable about the first axis C1 relative to the driving wheel of the date indicator 43.

[0051] La came d’actionnement 50 est équipée d’une surface de came d’actionnement 50a formée dans une configuration arquée, une surface de compression 50b sur laquelle agit un levier de came d’actionnement 52 décrit ci-dessous, et une partie renflée 50c pénétrant dans une extrémité distale 53 du levier de came d’actionnement 52. La surface de came d’actionnement 50a est agencée de telle sorte que son rayon se réduise graduellement alors qu’elle s’étend dans le sens CW. La surface de compression 50b est agencée de telle sorte qu’elle fasse face, dans le sens CCW, à une extrémité de la surface de came d’actionnement 50a. La partie renflée 50c est aménagée du côté opposé à la surface de came d’actionnement 50a dans le sens radial par rapport au premier axe C1, et le renflement est orienté vers l’extérieur dans le sens radial.The actuating cam 50 is provided with an actuating cam surface 50a formed in an arcuate configuration, a compression surface 50b on which an actuating cam lever 52, described below, and an actuating cam lever 52 are actuated. inflated portion 50c penetrating a distal end 53 of the actuating cam lever 52. The actuating cam surface 50a is arranged such that its radius decreases gradually as it extends in the CW direction. The compression surface 50b is arranged such that it faces, in the CCW direction, at one end of the actuating cam surface 50a. The bulged portion 50c is provided on the opposite side to the actuating cam surface 50a in the radial direction relative to the first axis C1, and the bulge is radially outwardly oriented.

[0052] La came d’actionnement 50 est équipée d’une goupille de régulation 51 faisant saillie du côté arrière du mouvement 10 le long de la direction axiale. La goupille de régulation 51 est insérée dans la rainure 43a de la roue menante d’indicateur de quantième 43 et y est logée. La goupille de régulation 51 possède un diamètre plus petit que la largeur de la rainure 43a, et est simplement insérée dans la rainure 43a; en même temps, il peut se déplacer dans la rainure 43a le long de la direction périphérique.The actuating cam 50 is equipped with a regulating pin 51 projecting from the rearward side of the movement 10 along the axial direction. The control pin 51 is inserted into the groove 43a of the calendar indicator driving wheel 43 and is housed therein. The control pin 51 has a diameter smaller than the width of the groove 43a, and is simply inserted into the groove 43a; at the same time, it can move in the groove 43a along the peripheral direction.

[0053] Par l’intermédiaire de la rotation dans le sens CW de la roue menante d’indicateur de quantième 43, la goupille de régulation 51 jouxte l’extrémité de la rainure 43a dans le sens CCW. Dans l’état dans lequel la goupille de régulation 51 jouxte l’extrémité de la rainure 43a, la roue menante d’indicateur de quantième 43 tourne dans le sens CW, la came d’actionnement 50 étant montée rotative dans le sens CW avec la roue menante d’indicateur de quantième 43.By means of the rotation in the CW direction of the date indicator driving wheel 43, the regulation pin 51 adjoins the end of the groove 43a in the CCW direction. In the state in which the regulating pin 51 adjoins the end of the groove 43a, the date indicator driving wheel 43 rotates in the CW direction, the actuating cam 50 being rotatively mounted in the CW direction with the driving wheel of date indicator 43.

[0054] Lorsque la surface de compression 50b de la came d’actionnement 50 est compressée par le levier de came d’actionnement 52 décrit ci-dessous, la goupille de régulation 51 se déplace vers l’intérieur de la rainure 43a dans le sens CW à une vitesse plus élevée que celle de rotation de la roue menante d’indicateur de quantième 43. Par conséquent, la came d’actionnement 50 peut être entraînée en rotation dans le sens CW par rapport à la roue menante d’indicateur de quantième 43 selon un angle prédéterminé (approximativement 90° selon le présent mode de réalisation) correspondant à la plage de formation de la rainure 43a.When the compression surface 50b of the actuating cam 50 is compressed by the actuating cam lever 52 described below, the regulating pin 51 moves inwardly of the groove 43a in the direction CW at a higher speed than that of rotation of the date indicator driving wheel 43. Therefore, the actuating cam 50 can be rotated in the CW direction relative to the date indicator driving wheel. 43 at a predetermined angle (approximately 90 ° according to the present embodiment) corresponding to the formation range of the groove 43a.

[0055] Dans son ensemble, le levier de came d’actionnement 52 est formé dans une configuration en forme de L. Le levier de came d’actionnement 52 peut être entraîné en rotation lorsqu’il est pivoté par la platine 5. Le levier de came d’actionnement 52 est compressé par un ressort de levier de came d’actionnement 54 de telle sorte que l’extrémité distale 53 se déplace en direction de la came d’actionnement 50. L’extrémité distale 53 du levier de came d’actionnement 52 entre en contact glissant avec la surface de came d’actionnement 50a et la surface de pression 50b de la came d’actionnement 50; au même moment, avec la rotation du levier de came d’actionnement 52, il se déplace vers et depuis le premier axe C1, qui est le centre de rotation de la came d’actionnement 50.As a whole, the actuating cam lever 52 is formed in an L-shaped configuration. The actuating cam lever 52 can be rotated when pivoted by the platen 5. The lever actuating cam 52 is compressed by an actuating cam lever spring 54 so that the distal end 53 moves toward the actuating cam 50. The distal end 53 of the cam lever actuation 52 slidably engages the actuating cam surface 50a and the pressing surface 50b of the actuating cam 50; at the same time, with the rotation of the actuating cam lever 52, it moves towards and from the first axis C1, which is the center of rotation of the actuating cam 50.

[0056] Au niveau de l’extrémité distale 53 du levier de came d’actionnement 52, sont formées une première saillie 53a faisant saillie en direction de la came d’actionnement 50, et une deuxième saillie 53b agencée au niveau de l’extrémité proximale du levier de came d’actionnement 52 par rapport à la première saillie 53a. Lorsque la came d’actionnement 50 tourne dans le sens CW, la deuxième saillie 53b de l’extrémité distale 53 du levier de came d’actionnement 52 entre en contact glissant avec la surface de came d’actionnement 50a. A instant prédéterminé autour de 0 heure a.m., lorsque la date est changée, la deuxième saillie 53b de l’extrémité distale 53 du levier de came d’actionnement 52 atteint la surface de compression 50b de la came d’actionnement 50, et vient compresser la surface de compression 55b par la force de compression du ressort de levier de came d’actionnement 54. Il en résulte que la came d’actionnement 50 peut tourner instantanément dans le sens CW par rapport à la roue menante d’indicateur de quantième 43 selon un angle prédéterminé (qui est approximativement de 90° selon le présent mode de réalisation) correspondant à la plage de formation de la rainure 43a de la roue menante d’indicateur de quantième 43. En outre, la came d’actionnement 50 tourne selon un angle prédéterminé, et ensuite la partie renflée 50c vient pénétrer entre la première saillie 53a et la deuxième saillie 53b du levier de came d’actionnement 52, et y est retenue temporairement.At the distal end 53 of the actuating cam lever 52 are formed a first projection 53a projecting towards the actuating cam 50, and a second projection 53b arranged at the end. proximal of the actuating cam lever 52 relative to the first projection 53a. When the actuating cam 50 rotates in the CW direction, the second projection 53b of the distal end 53 of the actuating cam lever 52 slidably contacts the actuating cam surface 50a. At a predetermined time around 0 am, when the date is changed, the second projection 53b of the distal end 53 of the actuating cam lever 52 reaches the compression surface 50b of the actuating cam 50, and compresses the compression surface 55b by the compression force of the actuating cam lever spring 54. As a result, the actuating cam 50 can instantaneously rotate in the CW direction relative to the date indicator driving wheel 43 according to a predetermined angle (which is approximately 90 ° according to the present embodiment) corresponding to the formation range of the groove 43a of the calendar indicator driving wheel 43. In addition, the actuating cam 50 rotates according to the present invention. a predetermined angle, and then the bulge portion 50c penetrates between the first projection 53a and the second projection 53b of the actuating cam lever 52, and is temporarily retained there.

[0057] Le röchet d’avancement de jour 47 est composé d’une roue dentée de röchet d’avancement de jour 47a en forme de disque et un doigt d’avancement de jour 47b. Le röchet d’avancement de jour 47 est inséré et fixé sur l’extrémité du côté arrière de la goupille de date 41, et tourne de manière synchronisée avec la came d’actionnement 50.[0057] The day advance pin 47 is composed of a disc-shaped day-ahead gear wheel 47a and a day-ahead pin 47b. The forward advancement pin 47 is inserted and fixed on the end of the rear side of the date pin 41, and rotates synchronously with the actuating cam 50.

[0058] La roue dentée de röchet d’avancement de jour 47a est insérée et fixée dans la goupille de date 41. Des dents sont formées sur la surface périphérique externe de la roue dentée de röchet d’avancement de jour 47a. La roue dentée de röchet d’avancement de jour 47a peut être amenée en prise d’engrenage avec une roue intermédiaire de date 85 du mécanisme de commande d’indicateur de quantième de mois court 70 décrit ci-dessous.[0058] The day advance gear wheel 47a is inserted and fixed in the date pin 41. Teeth are formed on the outer peripheral surface of the day advance gear wheel 47a. The forward feed gear 47a can be brought into gear engagement with a date intermediate wheel 85 of the short month calendar indicator control mechanism 70 described below.

[0059] Du côté arrière de la roue dentée de röchet d’avancement de jour 47a, le doigt d’avancement de jour 47b est inséré et fixé dans la goupille de date 41. Sur la surface périphérique externe du doigt d’avancement de jour 47b, un doigt 47c est formé faisant saillie vers l’extérieur dans la direction radiale pour être capable d’être engagée avec les dents 22 de l’indicateur de quantième 20. A un instant prédéterminé d’autour de 0 heure a.m., lorsque la date change, le röchet d’avancement de jour 47 tourne de manière synchronisée avec la rotation instantanée de la came d’actionnement 50. Par conséquent, le doigt d’avancement de jour 47b vient agir contre la dent 22 de l’indicateur de quantième 20 pour le faire tourner d’un cran dans le sens CW.On the rear side of the daylight forward gear 47a, the daylighting finger 47b is inserted and fixed in the date pin 41. On the outer peripheral surface of the day advance finger 47b, a finger 47c is formed protruding outward in the radial direction to be able to be engaged with the teeth 22 of the date indicator 20. At a predetermined time of around 0 hours am, when the As the date changes, the forward feed pin 47 rotates synchronously with the instantaneous rotation of the actuating cam 50. Therefore, the forward advancing finger 47b acts against the tooth 22 of the date indicator. 20 to make it turn a notch in the CW direction.

[0060] La came de contrôle 45 est superposé mobile en rotation sur la roue menante d’indicateur de quantième 43, et est agencée entre la roue menante d’indicateur de quantième 43 et le röchet d’avancement de jour 47. La came de contrôle 45 est insérée et fixée dans la goupille de date 41, et tourne de manière synchronisée avec la came d’actionnement 50 et le röchet d’avancement de jour 47. Une extrémité distale 73a d’un levier de détermination d’avancement de jour 73 fourni sur le mécanisme de commande d’indicateur de quantième de mois court 70 décrit ci-dessous entre en contact glissant avec la surface périphérique externe de la came de contrôle 45.The control cam 45 is superimposed rotating in rotation on the date indicator driving wheel 43, and is arranged between the date indicator driving wheel 43 and the daylight locating pin 47. control 45 is inserted and fixed in the date pin 41, and rotates synchronously with the actuating cam 50 and the day advance pin 47. A distal end 73a of a day advance lever 73 provided on the short month date indicator control mechanism 70 described below comes into sliding contact with the outer peripheral surface of the control cam 45.

[0061] Une partie de détermination d’avancement de jour 46 est formée sur la surface périphérique externe de la came de contrôle 45. La partie de détermination d’avancement de jour 46 est formée pour être enfoncée dans le côté interne dans la direction radiale. Une surface latérale 46a dans le sens CW de la partie de détermination d’avancement de jour 46 est formée pour s’étendre le long de la direction radiale. Une surface latérale 46b dans le sens CCW de la partie de détermination d’avancement de jour 46 est inclinée dans le sens CCW depuis l’intérieur vers l’extérieur dans la direction radiale, de sorte que l’ouverture de la partie de détermination d’avancement de jour 46 est élargie. Lorsque le passage de changement de mois est effectué lors du trentième quantième, qui est le dernier jour d’un mois court, au premier jour du mois suivant, l’extrémité distale 73a du levier de détermination d’avancement de jour 73 entre dans la partie de détermination d’avancement de jour 46 en vient en contact glissant avec elle. (Mécanisme de commande d’indicateur de quantième de mois court) [0062] Dans une position située entre l’axe de centre O et la surface périphérique interne 20a de l’indicateur de quantième 20, correspondant à la direction de 7 heures, un arbre 7 fait saillie verticalement depuis la platine 5 le long d’un deuxième axe C2 (qui correspond à l’axe prédéterminé» dans les revendications).A day advance determination portion 46 is formed on the outer peripheral surface of the control cam 45. The day advance determining portion 46 is formed to be driven into the inner side in the radial direction. . A side surface 46a in the CW direction of the day advance determination portion 46 is formed to extend along the radial direction. A side surface 46b in the CCW direction of the day advance determination portion 46 is inclined in the CCW direction from the inside to the outside in the radial direction, so that the opening of the determining portion of 'day progress 46 is enlarged. When the change of month pass is made on the thirtieth day, which is the last day of a short month, on the first day of the following month, the distal end 73a of the day advance lever 73 enters the day 46 progress determination section comes into sliding contact with it. (Short month calendar indicator control mechanism) In a position located between the center axis O and the inner peripheral surface 20a of the date indicator 20, corresponding to the direction of 7 hours, a shaft 7 protrudes vertically from plate 5 along a second axis C2 (which corresponds to the predetermined axis "in the claims).

[0063] Le mécanisme de commande d’indicateur de quantième de mois court 70 comporte un levier d’actionnement 71, un röchet d’avancement de jour du mois court 76, et la roue de date intermédiaire 85.The short month calendar indicator control mechanism 70 includes an actuation lever 71, a day advance signal of the short month 76, and the intermediate date wheel 85.

[0064] Le levier d’actionnement 71 est un élément plat similaire à une plaque formé, par exemple, d’un matériau en métal. Le levier d’actionnement 71 est simplement inséré dans une partie tubulaire 77 du röchet d’avancement de jour de mois court 76 décrit ci-dessous qui est inséré sans serrage dans l’arbre 7, et est supporté par l’arbre 7 pour être mobile en rotation autour du deuxième axe C2. Le levier d’actionnement 71 est compressé dans le sens CCW autour du deuxième axe C2 par un ressort de levier d’actionnement 72 agencé vers l’extérieur dans le sens radial du levier d’actionnement 71.The actuating lever 71 is a flat element similar to a plate formed, for example, of a metal material. The actuating lever 71 is simply inserted into a tubular portion 77 of the short month advancement head 76 described below which is inserted without interference into the shaft 7, and is supported by the shaft 7 to be mobile in rotation about the second axis C2. The actuating lever 71 is compressed in the CCW direction about the second axis C2 by an actuating lever spring 72 arranged radially outwardly of the actuating lever 71.

[0065] Le levier d’actionnement 71 est équipé d’une goupille de régulation 71a, d’un levier de détermination d’avancement de jour 73, d’un levier de détermination de trentième quantième 74, et d’un levier de détermination de mois court 75. Le levier de détermination d’avancement de jour 73, le levier de détermination de trentième quantième 74, et le levier de détermination de mois court 75 sont formés de façon monobloc.The actuating lever 71 is equipped with a regulation pin 71a, a day advance determination lever 73, a thirtieth calendar determination lever 74, and a determination lever. The day progress determination lever 73, the thirtieth calendar determination lever 74, and the short month determination lever 75 are integrally formed.

[0066] La goupille de régulation 71a est agencée de telle sorte qu’elle se dresse vers l’arrière dans le voisinage du deuxième axe C2. La goupille de régulation 71 est insérée dans une rainure 78a d’une roue dentée de doigt 78 d’un röchet d’avancement de jour de mois court 76 décrit ci-dessous, et y est agencé pour indexer la rotation du röchet d’avancement de jour de mois court 76.The regulating pin 71a is arranged such that it stands rearward in the vicinity of the second axis C2. The control pin 71 is inserted into a groove 78a of a finger gear 78 of a short month advancement pin 76 described below, and is arranged therein to index the rotation of the feed pin. short month day 76.

[0067] L’extrémité distale 73a du levier de détermination d’avancement de jour 73 est formée pour être courbée vers la came de contrôle 45. L’extrémité distale 73a du levier de détermination d’avancement de jour 73 est maintenue en contact avec la surface périphérique externe de la came de contrôle 45 par la force de compression du ressort du levier d’actionnement 72, et, par la rotation de la came de contrôle 45, entre en contact glissant avec la surface périphérique externe de la came de contrôle 45. Lorsque le trentième quantième, qui est le dernier jour d’un mois court, est changé pour passer au premier jour du mois suivant (par exemple, entre 23 heures 55 et 24 heures du dernier jour d’un mois court), l’extrémité distale 73a du levier de détermination d’avancement de jour 73 tend à entrer dans la partie de détermination d’avancement de jour 46 de la came de contrôle 45, et est mis en contact glissant avec celle-ci par la force de compression du ressort du levier d’actionnement 72.The distal end 73a of the day advance determining lever 73 is formed to be curved toward the control cam 45. The distal end 73a of the day advance determining lever 73 is kept in contact with the outer peripheral surface of the control cam 45 by the compression force of the spring of the operating lever 72, and, by the rotation of the control cam 45, slidingly engages the outer peripheral surface of the control cam 45. When the thirtieth day, which is the last day of a month runs, is changed to the first day of the following month (for example, between 23.55 and 24.00 on the last day of a short month), the The distal end 73a of the day advance determining lever 73 tends to enter the day advance determination portion 46 of the control cam 45, and is brought into sliding contact therewith by the compressive force. spring release of the operating lever 72.

[0068] La fig. 6 est une vue en plan élargie du levier de détermination de trentième quantième et du röchet d’avancement de jour de mois court.FIG. 6 is an enlarged plan view of the thirtieth day determination lever and the short month day advance ticket.

[0069] L’extrémité distale 74a du levier de détermination de trentième quantième 74 est formée de telle sorte qu’elle est courbée vers la surface périphérique interne 20a de l’indicateur de quantième 20. L’extrémité distale 74a du levier de détermination de trentième quantième 74 est espacée de la surface périphérique interne 20a de l’indicateur de quantième 20 par une distance prédéterminée. Lorsque l’indicateur de quantième 20 affiche le trentième quantième, l’extrémité distale 74a du levier de détermination de trentième quantième 74 est agencée pour se trouver dans une position correspondant à la partie de détermination de trentième quantième 29 de l’indicateur de quantième 20 (voir la fig. 6).The distal end 74a of the thirtieth calendar determination lever 74 is formed such that it is curved towards the inner peripheral surface 20a of the date indicator 20. The distal end 74a of the determination lever Thirtieth date 74 is spaced from the inner peripheral surface 20a of the date indicator 20 by a predetermined distance. When the date indicator 20 displays the thirtieth day, the distal end 74a of the thirtieth calendar determination lever 74 is arranged to be in a position corresponding to the thirtieth date determination portion 29 of the date indicator 20. (see Fig. 6).

[0070] Le levier de détermination de mois court 75 s’étend entre l’axe de centre O et le premier axe C1 selon une vue en plan, et son extrémité distale 75a est formée de telle sorte qu’elle est recourbée vers la came de mois 33. L’extrémité distale 75a du levier de détermination de mois court 75 est espacée de la surface périphérique externe de la came de mois 33 d’une distance prédéterminée. Dans un mois long, l’extrémité distale 75a du levier de détermination de mois court 75 se trouve dans une position correspondant à la saillie 34a de chaque mois; dans un mois court, il se trouve dans une position correspondant à l’entaille 34b de chaque mois.The short month determination lever 75 extends between the center axis O and the first axis C1 according to a plan view, and its distal end 75a is formed such that it is bent towards the cam The distal end 75a of the short month determining lever 75 is spaced from the outer peripheral surface of the month cam 33 by a predetermined distance. In a long month, the distal end 75a of the short month determining lever 75 is in a position corresponding to the protrusion 34a of each month; in a short month, it is in a position corresponding to the notch 34b of each month.

[0071] La fig. 7 est une vue en plan illustrant l’état vers 23 heures 55 minutes lors du dernier jour pour les changements de jour lors d’un mois court, et la fig. 8 est une vue en plan illustrant l’état vers 23 heures 55 minutes lors du dernier jour pour les changements de jour d’un mois court.FIG. 7 is a plan view illustrating the state around 23 hours 55 minutes on the last day for day changes in a short month, and FIG. 8 is a plan view illustrating the state around 23 hours 55 minutes on the last day for the day changes of a short month.

[0072] Comme représenté sur la fig. 2, lorsque l’extrémité distale 73a du levier de détermination d’avancement de jour 73 est en contact glissant avec la région de la came de contrôle 45 autre que la partie de détermination d’avancement de jour 46, le levier d’actionnement 71 est agencé pour se trouver dans une position (à laquelle on se réfère ci-après comme étant la «première position») inclinée dans le sens CW autour du deuxième axe C2 contre la force de compression du ressort du levier d’actionnement 72.As shown in FIG. 2, when the distal end 73a of the day advance determining lever 73 is in sliding contact with the region of the control cam 45 other than the day advance determining portion 46, the operating lever 71 is arranged to be in a position (hereinafter referred to as the "first position") inclined in the CW direction about the second axis C2 against the spring compression force of the operating lever 72.

[0073] En outre, comme représenté sur la fig. 7, comme pour le levier d’actionnement 71, lors du trentième quantième, qui est le dernier jour d’un mois court, l’extrémité distale 75a du levier de détermination de mois court 75 est agencée dans une position correspondant à l’entaille 34b, et l’extrémité distale 74a du levier de détermination de trentième quantième 74 est agencée pour se trouver dans une position correspondant à la partie de détermination de trentième quantième 29.In addition, as shown in FIG. 7, as for the actuating lever 71, on the thirtieth day, which is the last day of a short month, the distal end 75a of the short month determination lever 75 is arranged in a position corresponding to the notch 34b, and the distal end 74a of the thirtieth-day determination lever 74 is arranged to be in a position corresponding to the thirtieth-day determination portion 29.

[0074] Et, comme représenté à la fig. 8, lorsque le trentième quantième, qui est le dernier jour d’un mois court, est changé pour passer au premier jour du mois suivant (par exemple, entre 23 heures 55 minutes et 24 heures du dernier jour d’un mois court), l’extrémité distale 73a du levier de détermination d’avancement de jour 73 vient pénétrer dans la partie de détermination d’avancement de jour 46, et entre en contact glissant avec cette dernière, et l’extrémité distale 74a du levier de détermination de trentième quantième 74 entre dans la partie de détermination de trentième quantième 29 pour le suivre, et l’extrémité distale 75a du levier de détermination de mois court 75 pénètre dans l’entaille 34b de la came de mois 33 pour la suivre. Lorsque l’extrémité distale 73a du levier de détermination d’avancement de jour 73 pénètre dans la partie de détermination d’avancement de jour 46 pour entrer en contact glissant avec elle, le levier d’actionnement 71 est agencé pour se trouver dans une position (à laquelle l’on se réfère ci-après comme étant la «deuxième position») plus inclinée en outre dans le sens CCW que la première position autour du deuxième axe C2 par la force de compression du ressort du levier d’actionnement 72.And, as shown in FIG. 8, when the thirtieth day, which is the last day of a short month, is changed to the first day of the following month (for example, between 23 hours 55 minutes and 24 hours of the last day of a short month), the distal end 73a of the day advance determining lever 73 comes into and makes sliding contact with the day advance determining portion 46, and the distal end 74a of the thirtieth determination lever. Date 74 enters the thirtieth-day determination portion 29 to follow it, and the distal end 75a of the short month determination lever 75 enters the notch 34b of the month cam 33 to follow it. When the distal end 73a of the day advance determining lever 73 enters the day advance determination portion 46 to make sliding contact with it, the operating lever 71 is arranged to be in a position (which is referred to hereinafter as the "second position") more inclined in the CCW direction than the first position about the second axis C2 by the compression force of the actuating lever spring 72.

[0075] Comme représenté sur la fig. 6, le röchet d’avancement de jour de mois court 76 a une partie tubulaire 77, une roue dentée de doigt 78, une plaque de doigt 79, et une partie de liaison de ressort de rappel 80. La partie tubulaire 77, la roue dentée de doigt 78, la plaque de doigt 79, et la partie de liaison de ressort de rappel 80 sont fixées l’une à l’autre de façon monobloc, et tournent autour du deuxième axe C2 de manière synchronisée l’un avec l’autre.As shown in FIG. 6, the short month day advancement pin 76 has a tubular portion 77, a finger gear 78, a finger plate 79, and a return spring connecting portion 80. The tubular portion 77, the wheel toothed finger 78, the finger plate 79, and the return spring connection portion 80 are integrally attached to one another, and rotate about the second axis C2 synchronously with each other. other.

[0076] La partie tubulaire 77 est insérée de manière rotative sur l’arbre 7.The tubular portion 77 is rotatably inserted on the shaft 7.

[0077] Du côté arrière du levier d’actionnement 71 est simplement insérée sans serrage la roue dentée de doigt 78 dans la partie tubulaire 77, ainsi fixée sur la partie tubulaire 77. Sur la surface périphérique externe de la roue dentée de doigt 78, une pluralité de dents est formée dans la direction périphérique. La roue dentée de doigt 78 est munie d’une rainure arquée 78a, le centre de laquelle est formé par le deuxième axe C2 selon une vue en plan, et dont la largeur s’étend dans la direction radiale de la roue dentée de doigt 78. L’angle de centre de la rainure 78a formée selon une configuration arquée est, par exemple, d’approximativement 90°. Une goupille de régulation 71a faisant saillie verticalement depuis le levier d’actionnement 71 est insérée dans la rainure 78a et agencée pour être déplaçable.The rear side of the actuating lever 71 is simply inserted without tightening the toothed wheel 78 in the tubular portion 77, thus fixed on the tubular portion 77. On the outer peripheral surface of the finger gear 78, a plurality of teeth is formed in the peripheral direction. The finger gear 78 is provided with an arcuate groove 78a, the center of which is formed by the second axis C2 in a plan view, and whose width extends in the radial direction of the finger gear 78 The center angle of the groove 78a formed in an arcuate configuration is, for example, approximately 90 °. A control pin 71a protruding vertically from the actuating lever 71 is inserted into the groove 78a and arranged to be movable.

[0078] Une plaque de doigt 79 est fixée à la roue dentée de doigt 78 du côté arrière de la roue dentée de doigt 78. La plaque de doigt 79 comprend principalement une base 79a, un doigt d’avancement de jour de mois court 79b, et un support élastique 79c.A finger plate 79 is attached to the finger gear 78 on the rear side of the finger gear 78. The finger plate 79 mainly comprises a base 79a, a short month day advance finger 79b , and an elastic support 79c.

[0079] La base 79a est prévue pour couvrir la majorité de la roue dentée de doigt 78, et possède une rainure de doigt 79d s’étendant le long de la direction radiale.The base 79a is provided to cover the majority of the finger gear 78, and has a finger groove 79d extending along the radial direction.

[0080] Le doigt d’avancement de jour de mois court 79b possède une forme allongée selon la direction radiale, et fait saillie vers l’extérieur de la roue dentée de doigt 78 dans le sens radial. Dans une position précédant le changement de date (à laquelle on se réfère ci-après simplement comme la «position de pré-avancement»), avant qu’il ne vienne agir sur les dents 22 de l’indicateur de quantième 20 pour le faire tourner, le doigt d’avancement de jour de mois court 79b est dirigé approximativement dans la direction de 6 heures. Le doigt d’avancement de jour de mois court 79b se trouve dans la rainure de doigt 79d, et est déplaçable le long de la direction radiale. La surface latérale dans le sens CW du doigt d’avancement de jour de mois court 79b est formée comme une surface plate, et peut être engagée avec les dents 22 de l’indicateur de quantième 20. La surface latérale dans le sens CCW du doigt d’avancement de jour de mois court 79b est une surface recourbée, qui peut être séparée des dents 22 de l’indicateur de quantième 20.The short month advancement finger 79b has an elongated shape in the radial direction, and protrudes outwardly from the finger gear 78 in the radial direction. In a position preceding the change of date (which is referred to hereinafter simply as the "pre-advancement position"), before it comes to act on the teeth 22 of the date indicator 20 to do so. turn, the short month day advance finger 79b is steered approximately in the 6 o'clock direction. The short month advancement finger 79b is in the finger groove 79d, and is movable along the radial direction. The CW side surface of the short month advancement finger 79b is formed as a flat surface, and can be engaged with the teeth 22 of the date indicator 20. The lateral surface in the CCW direction of the finger The short month day advance 79b is a curved surface, which can be separated from the teeth 22 of the date indicator 20.

[0081] Dans son ensemble, le support élastique 79c est formé selon une configuration en forme de C capable de déformation élastique, et relie la base 79a au doigt d’avancement de jour de mois court 79b. Le support élastique 79c soutient de manière élastique le doigt d’avancement de jour de mois court 79b de sorte qu’il peut se déplacer dans la rainure de doigt 79d vers l’intérieur dans le sens radial.As a whole, the elastic support 79c is formed in a C-shaped configuration capable of elastic deformation, and connects the base 79a to the short month day advance finger 79b. The elastic support 79c resiliently supports the short month advancement finger 79b so that it can move in the finger groove 79d radially inwardly.

[0082] La partie de liaison de ressort de rappel 80 est un élément formé selon une configuration tubulaire, et est insérée et fixée sur la partie tubulaire 77 du côté avant du levier d’actionnement 71.The return spring connecting portion 80 is a member formed in a tubular configuration, and is inserted and fixed on the tubular portion 77 on the front side of the actuating lever 71.

[0083] Un ressort de rappel 82 (qui correspond au «moyen décompression» dans les revendications) est relié à la partie de liaison de ressort de rappel 80. Le ressort de rappel 82 est un spiral formé pour s’étendre le long d’une spirale d’Archimède dont le centre est, par exemple, le deuxième axe C2. L’extrémité interne du spiral de rappel 82 est fixée à la partie de liaison de ressort de rappel 80, et son extrémité externe est fixée à une goupille stationnaire 84 faisant saillie verticalement depuis la platine 5.A return spring 82 (which corresponds to the "means of decompression" in the claims) is connected to the return spring connection portion 80. The return spring 82 is a spiral formed to extend along an Archimedean spiral whose center is, for example, the second axis C2. The inner end of the balance spring 82 is fixed to the return spring connection portion 80, and its outer end is fixed to a stationary pin 84 projecting vertically from the plate 5.

[0084] Le ressort de rappel 82 agit sur la roue dentée de doigt 78 du röchet d’avancement de jour de mois court 76 dans le sens CCW vers la position de pré-changement de date depuis la position suivant le changement de date (à laquelle on se réfère ci-après simplement comme étant la «position postchangement») après que le doigt d’avancement de jour de mois court 79b a agi sur les dents 22 de l’indicateur de quantième 20 pour le faire tourner.The return spring 82 acts on the finger gear 78 of the short month day forward gear 76 in the CCW direction to the pre-change date position from the position following the change of date (to which is hereinafter simply referred to as the "post-change position") after the short month advancement finger 79b has acted on the teeth 22 of the date indicator 20 to rotate it.

[0085] Le ressort de rappel 82 est fixé à la partie de liaison de ressort de rappel 80 et à la goupille stationnaire 84 tout en compressant le röchet d’avancement de jour de mois court 76 dans le sens CCW. Le röchet d’avancement de jour de mois court 76 est indexé en rotation dans le sens CCW et est maintenu en position lorsque la goupille de régulation 71a du levier d’actionnement 71 jouxte l’extrémité dans le sens CCW de la rainure 78a de la roue dentée de doigt 78.The return spring 82 is attached to the return spring connecting portion 80 and the stationary pin 84 while compressing the short month forward advancement mark 76 in the CCW direction. The short month day advance mark 76 is rotatably indexed in the CCW direction and is held in position when the control pin 71a of the operating lever 71 adjoins the CCW end of the groove 78a of the gear wheel 78.

[0086] Comme représenté sur les fig. 2 et 4, la roue intermédiaire de date 85 est agencée mobile en rotation par rapport au levier d’actionnement 71 autour d’un troisième axe C3 entre le premier axe C1 et le deuxième axe C2. La roue intermédiaire de date 85 engrène avec la roue dentée de doigt 78 du röchet d’avancement de jour de mois court 76.As shown in FIGS. 2 and 4, the intermediate date wheel 85 is arranged mobile in rotation with respect to the actuating lever 71 about a third axis C3 between the first axis C1 and the second axis C2. Intermediate date wheel 85 meshes with the 78 month short month advancement gear wheel 76.

[0087] La roue intermédiaire de date 85 est séparée du röchet d’avancement de jour 47 dans la première position où le levier d’actionnement 71 est incliné dans le sens CW autour du deuxième axe C2. En outre, la roue intermédiaire de date 85 est mise en prise avec le röchet d’avancement de jour 47 dans la deuxième position où le levier d’actionnement 71 est incliné dans le sens CCW autour du deuxième axe C2. (Fonctionnement) [0088] Dans ce qui suit, on décrira le fonctionnement du mécanisme de calendrier 100 décrit, et en particulier comment le mécanisme de calendrier 100 passe du dernier jour d’un mois au premier jour du mois suivant.The intermediate date wheel 85 is separated from the day forward gear 47 in the first position where the actuating lever 71 is inclined in the CW direction about the second axis C2. In addition, the date intermediate wheel 85 is engaged with the forward gear 47 in the second position where the actuating lever 71 is inclined in the CCW direction about the second axis C2. (Operation) [0088] In what follows, the operation of the calendar mechanism 100 described will be described, and in particular how the calendar mechanism 100 changes from the last day of a month to the first day of the following month.

[0089] La fig. 9 est un schéma illustrant le parcours de transmission d’énergie dans le mécanisme de calendrier. Sur la fig. 9, la flèche en trait plein indique la direction de transmission de l’énergie.FIG. 9 is a diagram illustrating the energy transmission path in the calendar mechanism. In fig. 9, the arrow in solid line indicates the direction of transmission of the energy.

[0090] Les fig. 10 à 15 sont des vues en plan illustrant l’état vers 24 heures pour un changement de date lors du dernier jour d’un mois court; les schémas sont donnés séquentiellement selon l’ordre des fig. 10 à 15. En ce qui concerne les numéros de référence des composants du mécanisme de calendrier 100 décrit ci-dessous, les dessins s’y réfèrent le cas échéant.Figs. 10 to 15 are plan views illustrating the state around 24 hours for a date change on the last day of a short month; the diagrams are given sequentially in the order of fig. 10-15. As regards the reference numbers of the components of the calendar mechanism 100 described below, the drawings refer to them as appropriate.

[0091] Premièrement, on décrira le fonctionnement du mécanisme de calendrier 100 jusqu’au premier jour du mois suivant qui est atteint à partir du dernier jour d’un mois court. Dans ce qui suit, on décrit, à titre d’exemple, le fonctionnement du mécanisme de calendrier 100 lorsqu’une transition est effectuée du dernier jour d’avril (30 avril), qui est un mois court, au premier jour de mai (1er mai), qui est un mois long. Dans la description qui suit, l’opération du mécanisme de calendrier 100 lors du dernier jour d’un mois court correspond à l’opération du mécanisme de calendrier 100 lors du dernier jour d’avril, juin, septembre, et novembre, avec février constituant une exception.First, the operation of the calendar mechanism 100 will be described until the first day of the next month which is reached from the last day of a short month. In the following, by way of example, the operation of calendar mechanism 100 is described when a transition is made from the last day of April (April 30), which is a short month, to the first day of May ( May 1), which is a long month. In the following description, the operation of the calendar mechanism 100 on the last day of a short month corresponds to the operation of the calendar mechanism 100 on the last day of April, June, September, and November, with February an exception.

[0092] Comme illustré sur la fig. 7, l’inscription des jours 21 de «30» indiquant le trentième quantième est affichée à travers la fenêtre de quantième 11a. En outre, les lettres des mois 15a «APR» indiquant ici le mois d’avril, qui est un mois court, sont affichées à travers la fenêtre des mois 11b. L’extrémité distale 75a du levier de détermination de mois court 75 est agencée pour se trouver dans une position correspondant à l’entaille 34b d’avril, qui est un mois court.As illustrated in FIG. 7, the inscription of days 21 of "30" indicating the thirtieth day is displayed through the date window 11a. In addition, the letters of the month 15a "APR" indicating here the month of April, which is a short month, are displayed through the month window 11b. The distal end 75a of the short month determining lever 75 is arranged to be in a position corresponding to the April notch 34b, which is a short month.

[0093] L’énergie de la source d’énergie (non représentée) telle qu’un moteur et un barillet de mouvement est transmise à la roue menante d’indicateur de quantième 43 du mécanisme principal de commande d’indicateur de quantième 40 via le rouage consistant en la roue des heures 16, la roue intermédiaire 17, etc. (voir la fig. 9). Par conséquent, la roue menante d’indicateur de quantième 43 du mécanisme principal de commande d’indicateur de quantième 40 tourne dans le sens CW autour du premier axe C1 à une vitesse d’une rotation complète par jour.The energy of the energy source (not shown) such as a motor and a movement barrel is transmitted to the date indicator driving wheel 43 of the date indicator main control mechanism 40 via the wheel consisting of the hour wheel 16, the intermediate wheel 17, etc. (see Fig. 9). Therefore, the date indicator driving wheel 43 of the date indicator main control mechanism 40 rotates in the CW direction about the first axis C1 at a speed of a full rotation per day.

[0094] Dans l’état dans lequel la goupille de régulation 51 jouxte l’extrémité de la rainure 43a, la came d’actionnement 50 tourne dans le sens CW avec la roue menante d’indicateur de quantième 43. Par conséquent, le röchet d’avancement de jour 47 et la came de contrôle 45 du mécanisme principal de commande d’indicateur de quantième 40 tournent dans le sens CW autour du premier axe C1 à une vitesse d’une rotation par jour de manière synchronisée avec la roue menante d’indicateur de quantième 43 et la came d’actionnement 50.In the state in which the regulation pin 51 adjoins the end of the groove 43a, the actuating cam 50 rotates in the CW direction with the date indicator driving wheel 43. Therefore, the röchet 47 and the control cam 45 of the date indicator main control mechanism 40 turn in the CW direction about the first axis C1 at a speed of one rotation per day synchronously with the driving wheel of date indicator 43 and the actuating cam 50.

[0095] En outre, la deuxième saillie 53b du levier de came d’actionnement 52 entre en contact glissant avec la surface de came d’actionnement 50a par l’intermédiaire de la rotation de la came d’actionnement 50.In addition, the second projection 53b of the actuating cam lever 52 comes into sliding contact with the actuating cam surface 50a through the rotation of the actuating cam 50.

[0096] Ace moment-là, l’extrémité distale 73a du levier de détermination d’avancement de jour 73 du levier d’actionnement 71 est amenée en contact glissant avec la zone de la came de contrôle 45 autre que la partie de détermination d’avancement de jour 46. Le levier d’actionnement 71 est agencé dans la première position où il est incliné dans le sens CW autour du deuxième axe C2. La roue intermédiaire de date 85 est espacée du röchet d’avancement de jour 47.At this time, the distal end 73a of the day advance determining lever 73 of the operating lever 71 is brought into sliding contact with the zone of the control cam 45 other than the determining portion of the control lever. 46. The actuating lever 71 is arranged in the first position where it is inclined in the CW direction about the second axis C2. The intermediate date wheel 85 is spaced from the day forward gear 47.

[0097] Ensuite, lorsque le röchet d’avancement de jour 47, la came de contrôle 45, la roue menante d’indicateur de quantième 43, et la came d’actionnement 50 tournent encore dans le sens CW avec le temps qui passe, l’extrémité distale 73a du levier de détermination d’avancement de jour 73 atteint la partie de détermination d’avancement de jour 46 de la came de contrôle 45.Then, when the forward gear 47, the control cam 45, the date indicator driving wheel 43, and the actuating cam 50 still rotate in the CW direction with the passing time, the distal end 73a of the day advance determining lever 73 reaches the day advance determination portion 46 of the control cam 45.

[0098] Ensuite, comme représenté sur la fig. 8, lorsqu’on atteint 23 heures 55 minutes, l’extrémité distale 73a du levier de détermination d’avancement de jour 73 pénètre dans la partie de détermination d’avancement de jour 46 de la came de contrôle 45 en raison de la force de compression du ressort d’élément de levier d’opération 72. En outre, l’extrémité distale 74a du levier de détermination de trentième quantième 74 pénètre à l’intérieur de la partie de détermination de trentième quantième 29 et suit ce dernier. En outre, l’extrémité distale 75a du levier de détermination de mois court 75 pénètre dans l’entaille 34b de la came de mois 33 et suit cette dernière. Par conséquent, le levier d’actionnement 71 tourne dans le sens CCW autour du deuxième axe C2, et se déplace depuis la première position, où il est incliné dans le sens CW autour du deuxième axe C2, vers la deuxième position où il est incliné dans le sens CCW autour du deuxième axe C2. La roue intermédiaire de date 85 se déplace avec la rotation de le levier d’actionnement 71, et vient en prise avec le röchet d’avancement de jour 47.Then, as shown in FIG. 8, when 23 hours 55 minutes are reached, the distal end 73a of the day advance determination lever 73 enters the day advance determination portion 46 of the control cam 45 due to the force of compression of the operating lever member spring 72. In addition, the distal end 74a of the thirtieth-day determination lever 74 penetrates inside the thirtieth-day determination portion 29 and follows it. In addition, the distal end 75a of the short month determination lever 75 enters the notch 34b of the month cam 33 and follows it. Therefore, the operating lever 71 rotates in the CCW direction about the second axis C2, and moves from the first position, where it is inclined in the CW direction about the second axis C2, to the second position where it is inclined in the CCW direction around the second axis C2. The date intermediate wheel 85 moves with the rotation of the operating lever 71, and engages with the forward gear 47.

[0099] Par ailleurs, la deuxième saillie 53b du levier de came d’actionnement 52 atteint la surface de compression 50b par l’intermédiaire de la rotation de la came d’actionnement 50.Furthermore, the second projection 53b of the actuating cam lever 52 reaches the compression surface 50b via the rotation of the actuating cam 50.

[0100] Ensuite, comme représenté sur la fig. 10, lorsque 24 heures est atteint, la deuxième saillie 53b du levier de came d’actionnement 52 agit sur la surface de pression 50b de la came d’actionnement 50 en raison de la force de compression du ressort de levier de came d’actionnement 54. Par conséquent, le röchet d’avancement de jour 47, la came de contrôle 45, et la came d’actionnement 50 du mécanisme principal de commande d’indicateur de quantième 40 tournent dans le sens CW à une vitesse plus grande que celle de la roue menante d’indicateur de quantième 43.[0100] Then, as shown in FIG. 10, when 24 hours is reached, the second projection 53b of the actuating cam lever 52 acts on the pressing surface 50b of the actuating cam 50 due to the compressive force of the actuating cam lever spring. 54. As a result, the forward feed nose 47, the control cam 45, and the actuating cam 50 of the date indicator main control mechanism 40 rotate in the CW direction at a greater speed than the of the indicator wheel of date indicator 43.

[0101] En outre, avec l’énergie transmise par le röchet d’avancement de jour 47, la roue intermédiaire de date 85 tourne à grande vitesse dans le sens CCW autour du troisième axe C3, et la roue dentée de doigt 78 du röchet d’avancement de jour de mois court 76, en prise avec la roue de date intermédiaire 85, tourne à grande vitesse dans le sens CW contre la force de compression du ressort de rappel 82.In addition, with the energy transmitted by the forward gear 47, the intermediate date wheel 85 rotates at a high speed in the CCW direction about the third axis C3, and the gear wheel 78 of the röchet a short month day advancement 76, engaged with the intermediate date wheel 85, rotates at a high speed in the CW direction against the compression force of the return spring 82.

[0102] Ensuite, comme représenté sur la fig. 11, le doigt d’avancement de jour de mois court 79b du röchet d’avancement de jour de mois court 76 tourne à grande vitesse dans le sens CW autour du deuxième axe C2, et vient en appui contre les dents 22 de l’indicateur de quantième 20. Le doigt d’avancement de jour de mois court 79b du röchet d’avancement de jour de mois court 76 agit en compression sur les dents 22 de l’indicateur de quantième 20. L’indicateur de quantième 20 est dégagé du sautoir de date 25, et amené à tourner dans le sens CW autour de l’axe de centre O.[0102] Then, as shown in FIG. 11, the short month day forward advancement pin 79b of the short month advancement pin 76 rotates at high speed in the CW direction about the second axis C2, and bears against the teeth 22 of the indicator 20. The short month day advance finger 79b of the short month advancement mark 76 acts in compression on the teeth 22 of the date indicator 20. The date indicator 20 is disengaged from the date jumper 25, and rotated in the CW direction around the center axis O.

[0103] En outre, avec la rotation de l’indicateur de quantième 20, la partie de détermination de trentième quantième 29 se déplace dans le sens CW. A ce moment-là, l’extrémité distale 74a du levier de détermination de trentième quantième 74, qui a été positionné à l’intérieur de la partie de détermination de trentième quantième 29, se déplace le long de la partie de détermination de trentième quantième 29, et tend à sortir de la partie de détermination de trentième quantième 29. En outre, le levier d’opération 71 tourne dans le sens CW autour du deuxième axe C2.In addition, with the rotation of the date indicator 20, the thirtieth calendar determination portion 29 moves in the CW direction. At this time, the distal end 74a of the thirtieth-day determination lever 74, which has been positioned inside the thirtieth-day determination part 29, moves along the thirtieth-day determination part. 29, and tends to exit the determination portion of thirtieth day 29. In addition, the operating lever 71 rotates in the CW direction about the second axis C2.

[0104] Ensuite, comme représenté à la fig. 12, l’indicateur de quantième 20 vient s’engager à nouveau avec le sautoir de date 25, et tourne d’un cran dans le sens CW autour de l’axe de centre O. L’inscription de quantième 21 affichée dans la fenêtre de quantième 11 a est changée de «30» à «31.» [0105] En outre, l’extrémité distale 74a du levier de détermination de trentième quantième 74 sort de la partie de détermination de trentième quantième 29 tout en étant en contact glissant avec celui-ci. Par conséquent, le levier d’actionnement 71 tourne dans le sens CW autour du deuxième axe C2 depuis la deuxième position où il est incliné dans le sens CCW autour du deuxième axe C2 vers la première position où il est incliné dans le sens CW autour du deuxième axe C2. Par conséquent, la roue intermédiaire de date 85 est séparée du röchet d’avancement de jour 47. En outre, en ce qui concerne le röchet d’avancement de jour de mois court 76, la transmission d’énergie à ce dernier depuis le röchet d’avancement de jour 47 via la roue intermédiaire de date 85 est désormais libérée.[0104] Then, as shown in FIG. 12, the date indicator 20 is again engaged with the date jumper 25, and rotates a notch in the CW direction about the center axis O. The date marking 21 displayed in the window date of date 11 a is changed from "30" to "31." [0105] In addition, the distal end 74a of the thirtieth calendar determination lever 74 leaves the thirtieth day determination portion 29 while being in sliding contact. with this one. Consequently, the operating lever 71 rotates in the CW direction about the second axis C2 from the second position where it is inclined in the CCW direction about the second axis C2 to the first position where it is inclined in the CW direction around the second axis C2. second axis C2. Therefore, the date intermediate wheel 85 is separated from the daylight forward gear 47. In addition, with respect to the short month day forward gear 76, the transmission of energy to the latter from the gear day progress 47 via the intermediate date wheel 85 is now released.

[0106] Dans cette position, le röchet d’avancement de jour de mois court 76 est compressé depuis la position de postchangement de date vers la position de pré-changement par le ressort de rappel 82. Donc, lorsque la transmission de l’énergie depuis le röchet d’avancement de jour 47 est libérée, le röchet d’avancement de jour de mois court 76 est entraîné en rotation à grande vitesse dans le sens CCW autour du deuxième axe par la force de compression du ressort de rappel 82. Par conséquent, le doigt d’avancement de jour de mois court 79b revient instantanément dans la position de pré-changement depuis la position de post-changement. Le röchet d’avancement de jour de mois court 76 est maintenu élastiquement par le support élastique 79c de telle sorte qu’il puisse être déplacé vers l’intérieur dans le sens radial. Donc, lorsqu’il revient dans la position de pré-changement depuis la position de post-changement, le doigt d’avancement de jour de mois court 79b se déplace vers l’intérieur dans le sens radial même quand il vient en appui contre les dents 22 de l’indicateur de quantième 20. Par conséquent, un engagement entre le doigt d’avancement de jour de mois court 79b et les dents 22 est évité, de sorte que l’indicateur de quantième 20 n’effectue pas de rotation inverse dans le sens CCW.In this position, the short month day advance signal 76 is compressed from the postchanging position to the pre-change position by the return spring 82. Thus, when the transmission of energy since the day forward gear 47 is released, the short month day forward gear 76 is rotated at a high speed in the CCW direction about the second axis by the compression force of the return spring 82. therefore, the short month day advance finger 79b instantly returns to the pre-change position from the post-change position. The short month day advancement mark 76 is resiliently held by the elastic support 79c so that it can be moved inward radially. Therefore, when it returns to the pre-change position from the post-change position, the short month advancement finger 79b moves inward radially even when it bears against teeth 22 of the date indicator 20. Therefore, a commitment between the short month advancement finger 79b and the teeth 22 is avoided, so that the date indicator 20 does not rotate in reverse in the CCW sense.

[0107] Ensuite, comme représenté sur la fig. 13, le röchet d’avancement de jour 47, la came de contrôle 45, et la came d’actionnement 50 du mécanisme principal de commande d’indicateur de quantième 40 tournent à grande vitesse dans le sens CW autour du premier axe C1. La partie de doigt 47c du röchet d’avancement de jour 47 vient en appui contre les dents 22 de l’indicateur de quantième 20 et agit en compression sur celles-ci.[0107] Then, as shown in FIG. 13, the forward feed nose 47, the control cam 45, and the actuating cam 50 of the date indicator main control mechanism 40 rotate at a high speed in the CW direction about the first axis C1. The finger portion 47c of the forward gear 47 bears against the teeth 22 of the date indicator 20 and acts in compression thereon.

[0108] Ensuite, comme représenté sur la fig. 14, l’indicateur de quantième 20 est dégagé du sautoir de date 25, et tourne dans le sens CW autour de l’axe de centre O. En outre, avec la rotation de l’indicateur de quantième 20, la partie d’avancement de mois 26 agit sur la dent 28a d’une roue intermédiaire des mois 28 prévue à l’intérieur de l’indicateur de quantième 20. Par conséquent, la roue intermédiaire des mois 28 tourne dans le sens CW. En outre, la roue de mois 30 en prise avec la roue intermédiaire des mois 28 est dégagée du sautoir de mois 35, et tourne dans le sens CCW. Par conséquent, une plaque d’affichage des mois 15 affichant des lettres de mois 15a tourne de manière synchronisée avec la roue de mois 30.[0108] Then, as shown in FIG. 14, the date indicator 20 is disengaged from the date jumper 25, and rotates in the CW direction about the center axis O. In addition, with the rotation of the date indicator 20, the advancing part of month 26 acts on the tooth 28a of an intermediate wheel months 28 provided inside the date indicator 20. Therefore, the intermediate wheel months 28 rotates in the CW direction. In addition, the month wheel 30 in engagement with the intermediate wheel 28 is disengaged from the month jumper 35, and rotates in the CCW direction. As a result, a month display plate 15 displaying month letters 15a rotates synchronously with the month wheel 30.

[0109] Ensuite, comme représenté sur la fig. 15, l’indicateur de quantième 20 est amené à s’engager à nouveau avec le sautoir de date 25, et tourne encore d’un cran dans le sens CW autour de l’axe de centre O. Par conséquent, l’inscription de quantième 21 affichée à travers la fenêtre de quantième 11a est changée de «31 » à «1.» [0110] En outre, la roue des mois 30 est amenée à s’engager à nouveau avec le sautoir de mois 35, et tourne d’un cran dans le sens CCW autour de l’axe de centre O. La plaque d’affichage des mois 15 affichant les lettres de mois 15a tourne d’un cran dans le sens CCW autour de l’axe de centre O de manière synchronisée avec la roue de mois 30. Les lettres de mois 15a affichées dans la fenêtre des mois 11b sont changées de «APR» représentant le mois d’avril à «MAY» représentant le mois de mai.[0109] Then, as shown in FIG. 15, the date indicator 20 is made to engage again with the date jumper 25, and still turns a notch in the CW direction about the center axis O. Therefore, the inscription of date 21 displayed through the date window 11a is changed from "31" to "1." [0110] In addition, the wheel of the month 30 is made to engage again with the jumper of month 35, and turns of a CCW-directional notch about the center axis O. The month display plate 15 displaying the month letters 15a rotates one notch in the CCW direction about the center axis O synchronously with the month wheel 30. The month letters 15a displayed in the month window 11b are changed from "APR" representing the month of April to "MAY" representing the month of May.

[0111] Ainsi, la transition du dernier jour d’avril, qui est un mois court, au premier jour de mai, qui est un mois long, effectuée par le mécanisme de calendrier 100, est terminée.Thus, the transition from the last day of April, which is a short month, to the first day of May, which is a long month, carried out by the calendar mechanism 100, is over.

[0112] La fig. 16 est une vue en plan illustrant l’état vers 23 heures et 55 minutes lors du trentième quantième pour le changement de jour lors d’un mois long.[0112] FIG. 16 is a plan view illustrating the state around 23 hours and 55 minutes on the thirtieth day for the change of day in a long month.

[0113] La fig. 17 est une vue en plan illustrant l’état vers 24 heures lors du trentième quantième pour le changement de jour lors d’un mois long, avec le changement de date effectué à moitié.[0113] FIG. 17 is a plan view illustrating the state around 24 o'clock on the thirtieth day for the change of day in a long month, with the change of date done halfway.

[0114] La fig. 18 est une vue en plan illustrant l’état vers 24 heures lors du trentième quantième pour le changement de jour lors d’un mois long, avec le changement de date effectué dans son intégralité.[0114] FIG. 18 is a plan view illustrating the state around 24 hours on the thirtieth day for the change of day in a long month, with the change of date done in its entirety.

[0115] Dans ce qui suit on donnera, à titre d’exemple, le mode de fonctionnement du mécanisme de calendrier 100 lorsqu’une transition est effectuée depuis le trentième quantième du mois de mai, qui est un mois long, au premier jour de juin (1 er juin), qui est un mois court, lors du trente-et-unième jour de mai. Pour tout ce qui concerne n’importe quelle opération qui est la même que celle qui est décrite ci-dessus du mécanisme de calendrier 100 pour une transition depuis le dernier jour d’avril, qui est un mois court, au premier jour de mai, qui est un mois long, on se référera à ce qui précède sans fournir une nouvelle fois de description détaillée.In what follows we will give, as an example, the operating mode of the calendar mechanism 100 when a transition is made since the thirtieth day of May, which is a long month, the first day of June (1 June), which is a short month, on the thirty-first day of May. For all that concerns any operation that is the same as that described above of the 100 calendar mechanism for a transition since the last day of April, which is a short month, the first day of May, which is a long month, we will refer to the above without providing a further detailed description.

[0116] Comme représenté sur la fig. 16, l’inscription de quantième 21 de «30», indiquant le trentième quantième, est affichée dans la fenêtre de quantième 11a. Dans la fenêtre des mois 11b, les lettres de mois 15a de «MAY» indiquant mai, qui est un mois long, sont affichées.As shown in FIG. 16, the date marking 21 of "30", indicating the thirtieth day, is displayed in the date window 11a. In the month window 11b, the month letters 15a of "MAY" indicating May, which is a long month, are displayed.

[0117] Par ailleurs, puisque l’indicateur de quantième 20 affiche le trentième quantième, l’extrémité distale 74a du levier de détermination de trentième quantième 74 est agencée pour se trouver dans une position correspondant à la partie de détermination de trentième quantième 29 de l’indicateur de quantième 20.Moreover, since the date indicator 20 displays the thirtieth day, the distal end 74a of the thirtieth calendar determination lever 74 is arranged to be in a position corresponding to the thirtieth day determination portion 29 of the date indicator 20.

[0118] En outre, l’extrémité distale 75a du levier de détermination de mois court 75 est agencée pour se trouver dans une position correspondant à la saillie 34a de mai, qui est un mois long.In addition, the distal end 75a of the short month determination lever 75 is arranged to be in a position corresponding to the protrusion 34a of May, which is a long month.

[0119] Lorsque le temps s’écoule, le röchet d’avancement de jour 47, la came de contrôle 45, la roue menante d’indicateur de quantième 43, et la came d’actionnement 50 tournent dans le sens CW. L’extrémité distale 73a du levier de détermination d’avancement de jour 73 atteint la partie de détermination d’avancement de jour 46 de la came de contrôle 45.When the time elapses, the forward gear 47, the control cam 45, the date indicator gear wheel 43, and the actuating cam 50 rotate in the CW direction. The distal end 73a of the day advance determination lever 73 reaches the day advance determining portion 46 of the control cam 45.

[0120] Ensuite, comme représenté sur la fig. 16, lorsqu’on atteint 23 heures 55 minutes lors du trentième quantième, l’extrémité distale 73a du levier de détermination d’avancement de jour 73 tend à pénétrer dans la partie de détermination d’avancement de jour 46 de la came de contrôle 45 en raison de la force de compression exercée par le ressort d’élément de levier d’opération 72.Then, as shown in FIG. 16, when reaching 23 hours 55 minutes on the thirtieth day, the distal end 73a of the day advance determination lever 73 tends to enter the day advance determining portion 46 of the control cam 45 due to the compressive force exerted by the operating lever element spring 72.

[0121] Dans cette position, l’extrémité distale 75a du levier de détermination de mois court 75 est agencée dans une position correspondant à la saillie 34a. Donc, en ce qui concerne le levier d’actionnement 71, l’extrémité distale 75a du levier de détermination de mois court 75 vient en appui contre la saillie 34a, et sa rotation dans le sens CCW (c’est-à-dire, son mouvement de la première position à la deuxième position) est indexée. La roue intermédiaire de date 85 est maintenue dans un état dans lequel elle demeure espacée du röchet d’avancement de jour 47. Donc, la transmission d’énergie du röchet d’avancement de jour 47 à la roue intermédiaire de date 85 et à la roue dentée de doigt 78 du röchet d’avancement de jour de mois court 76 est coupée, et elles sont maintenues en position sans tourner.In this position, the distal end 75a of the short month determination lever 75 is arranged in a position corresponding to the projection 34a. Therefore, with respect to the actuating lever 71, the distal end 75a of the short month determining lever 75 bears against the projection 34a, and its rotation in the CCW direction (i.e., its movement from the first position to the second position) is indexed. The intermediate date wheel 85 is maintained in a state in which it remains spaced from the day forward gear 47. Thus, the energy transmission of the forward gear 47 to the intermediate date wheel 85 and the 78 month short day forward gear pin 78 is cut, and they are held in position without turning.

[0122] Ensuite, lorsqu’on atteint 24 heures (minuit) lors du trentième quantième, la deuxième saillie 53b du levier de came d’actionnement 52 agit contre la surface de compression 50b de la came d’actionnement 50 en raison de la force de compression exercée par le ressort de levier de came d’actionnement 54. Par conséquent, le röchet d’avancement de jour 47, la came de contrôle 45, et la came d’actionnement 50 du mécanisme principal de commande d’indicateur de quantième 40 tournent dans le sens CW à une vitesse plus grande que la roue menante d’indicateur de quantième 43.Then, when reached 24 hours (midnight) on the thirtieth day, the second projection 53b of the actuating cam lever 52 acts against the compression surface 50b of the actuating cam 50 due to the force in this way, the forward feed beam 47, the control cam 45, and the actuating cam 50 of the date indicator main control mechanism. 40 rotate in the CW direction at a speed greater than the date indicator driving wheel 43.

[0123] Ensuite, comme représenté sur la fig. 17, le röchet d’avancement de jour 47, la came de contrôle 45, et la came d’actionnement 50 du mécanisme principal de commande d’indicateur de quantième 40 tournent dans le sens CW à grande vitesse autour du premier axe C1. La partie de doigt 47c du röchet d’avancement de jour 47 vient en appui sur les dents 22 de l’indicateur de quantième 20 et exerce une compression sur ces dernières. L’indicateur de quantième 20 est dégagé du sautoir de date 25, et tourne dans le sens CW autour de l’axe de centre O. A ce moment-là, l’extrémité distale 73a du levier de détermination d’avancement de jour 73 est amenée en contact glissant avec la zone de la came de contrôle 45 autre que la partie de détermination d’avancement de jour 46.[0123] Then, as shown in FIG. 17, the forward feed nose 47, the control cam 45, and the actuating cam 50 of the date indicator main control mechanism 40 rotate in CW direction at high speed about the first axis C1. The finger portion 47c of the forward gear 47 bears on the teeth 22 of the date indicator 20 and exerts a compression on the latter. The date indicator 20 is disengaged from the date jumper 25, and rotates in the CW direction about the center axis O. At this time, the distal end 73a of the day advance determination lever 73 is brought into sliding contact with the area of the control cam 45 other than the day advance determining portion 46.

[0124] Ensuite, comme représenté sur la fig. 18, l’indicateur de quantième 20 vient s’engager à nouveau avec le sautoir de date 25, et tourne d’un cran dans le sens CW autour de l’axe de centre O. L’inscription de quantième 21 affichée dans la fenêtre de quantième 11a est changée de «30» à «31.» [0125] Une opération similaire est également effectuée lors du passage du 31 mai, qui est le dernier jour d’un mois long, au 1 er juin, qui est le premier jour d’un mois court. Autrement dit, lorsqu’on atteint 24 heures le 31 mai, la deuxième saillie 53b du levier de came d’actionnement 52 vient agir sur la surface de compression 50b de la came d’actionnement 50 en raison de la force de compression du ressort de levier de came d’actionnement 54. Le röchet d’avancement de jour 47, la came de contrôle 45, et la came d’actionnement 50 du mécanisme principal de commande d’indicateur de quantième 40 tournent à grande vitesse dans le sens CW autour du premier axe C1. Le doigt 47c du röchet d’avancement de jour 47 vient en appui contre les dents 22 de l’indicateur de quantième 20 et exerce une force de compression sur ces dernières. Par conséquent, l’indicateur de quantième 20 est dégagé du sautoir de date 25, et tourne dans le sens CW autour de l’axe de centre O.[0124] Then, as shown in FIG. 18, the date indicator 20 is again engaged with the date jumper 25, and turns a notch in the CW direction about the axis of center O. The date of inscription 21 displayed in the window of date 11a is changed from "30" to "31." [0125] A similar operation is also performed during the passage of May 31, which is the last day of a long month, June 1, which is the first day of a short month. In other words, when it reaches 24 hours on May 31, the second projection 53b of the actuating cam lever 52 acts on the compression surface 50b of the actuating cam 50 due to the compressive force of the spring. actuating cam lever 54. The forward feed nose 47, the control cam 45, and the actuating cam 50 of the date indicator main control mechanism 40 rotate at high speed in the CW direction around of the first axis C1. The finger 47c of the forward gear 47 bears against the teeth 22 of the date indicator 20 and exerts a compressive force on the latter. As a result, the date indicator 20 is disengaged from the date jumper 25, and rotates in CW direction about the center axis O.

[0126] En outre, avec la rotation de l’indicateur de quantième 20, la partie d’avancement de mois 26 vient agir sur la dent 28a de la roue intermédiaire des mois 28 agencée vers l’intérieur de l’indicateur de quantième 20. Par conséquent, la roue intermédiaire des mois 28 tourne dans le sens CW. En outre, la roue des mois 30 en prise avec la roue intermédiaire des mois 28 est dégagée du sautoir de mois 35 et tourne dans le sens CCW. Par conséquent, la plaque d’affichage des mois 15 affichant les lettres des mois 15a tourne dans le sens CCW de manière synchronisée avec la roue des mois 30.In addition, with the rotation of the date indicator 20, the month advancement portion 26 acts on the tooth 28a of the intermediate wheel 28 months arranged inward of the date indicator 20 As a result, the intermediate wheel of the months 28 rotates in the CW direction. In addition, the 30-month wheel engaged with the intermediate wheel 28 is released from the month jumper 35 and rotates in the CCW direction. As a result, the month display plate 15 displaying the month 15a letters rotates in the CCW direction synchronously with the 30 month wheel.

[0127] Ensuite, l’indicateur de quantième 20 est vient s’engager à nouveau avec le sautoir de date 25, et tourne encore d’un cran dans le sens CW autour de l’axe de centre O. Par conséquent, l’inscription de quantième 21 affichée dans la fenêtre de quantième 11 a passe de «31» à «1.» [0128] En outre, la roue des mois 30 vient à nouveau s’engager avec le sautoir des mois, et tourne d’un cran dans le sens CCW autour de l’axe de centre O. Par conséquent, les lettres de mois 15a affichées dans la fenêtre de mois 11b sont changées de «MAY», indiquant le mois de mai, à «JUN» indiquant le mois de juin.Then, the date indicator 20 is engaged again with the date jumper 25, and turns a notch in the CW direction about the center axis O. Therefore, the date inscription 21 displayed in the date window 11 a passes from "31" to "1." [0128] In addition, the wheel of the month 30 comes again to engage with the saltire of the months, and turns of a in the CCW direction around the center axis O. Therefore, the month letters 15a displayed in the month window 11b are changed from "MAY", indicating the month of May, to "JUN" indicating the month of June.

[0129] Ainsi, la transition du trentième quantième du mois de mai, qui est un mois long, au 1er juin, qui est le premier jour d’un mois court, est complètement effectuée grâce au mécanisme de calendrier 100 via le trente-et-unième jour de mai.Thus, the transition from the thirtieth day of May, which is a long month, to June 1st, which is the first day of a short month, is completely carried out thanks to the calendar mechanism 100 via the thirty-one - the first day of May.

[0130] Selon le présent mode de réalisation, il est possible de faire fonctionner le mécanisme de calendrier 100 par le biais du levier d’actionnement 71, de telle sorte que, comparé à la technique de l’art antérieur dans lequel quatre leviers sont prévus, on réalise une réduction du nombre de composants et une simplification structurelle.According to the present embodiment, it is possible to operate the calendar mechanism 100 by means of the operating lever 71, so that, compared with the prior art technique in which four levers are provided, a reduction in the number of components and a structural simplification is achieved.

[0131] Par ailleurs, le levier d’actionnement 71 est muni du levier de détermination de trentième quantième 74 et du levier de détermination de mois court 75, de telle sorte que, seulement en montant le levier d’actionnement 71, il est possible d’agencer le levier de détermination de trentième quantième 74 et le levier de détermination de mois court 75 dans des positions prédéterminées. Autrement dit, il n’y a pas besoin d’effectuer de positionnement individuel du levier de détermination de trentième quantième 74 et du levier de détermination de mois court 75, de telle sorte que la production d’un tel mécanisme en est facilitée.Furthermore, the actuating lever 71 is provided with the thirty-day determination lever 74 and the short month determination lever 75, so that, only by raising the actuating lever 71, it is possible arranging the thirtieth day determination lever 74 and the short month determining lever 75 into predetermined positions. In other words, there is no need to perform individual positioning of the thirtieth calendar determination lever 74 and the short month determination lever 75, so that the production of such a mechanism is facilitated.

[0132] En outre, le levier d’actionnement 71 tourne depuis la première position vers la deuxième position lorsque le levier de détermination de trentième quantième 74 suit la partie de détermination de trentième quantième 29, et le levier de détermination de mois court 75 suit l’entaille 34b de la came de mois 33; et la roue intermédiaire de date 85 vient en prise avec le röchet d’avancement de jour 47 lorsqu’il se trouve dans la deuxième position, de sorte qu’il est possible de transmettre l’énergie du röchet d’avancement de jour 47 au röchet d’avancement de jour de mois court 76 par la roue de date intermédiaire 85. Donc, il est possible de faire tourner l’indicateur de quantième 20 lors du dernier jour d’un mois court par le biais du röchet d’avancement de jour 47 et du röchet d’avancement de jour de mois court 76 pour effectuer avec précision le changement de date.In addition, the actuating lever 71 rotates from the first position to the second position when the thirtieth day determination lever 74 follows the thirtieth day determination portion 29, and the short month determination lever 75 follows. the notch 34b of the month cam 33; and the intermediate date wheel 85 engages with the day advance pin 47 when in the second position, so that the energy of the daylight forward gear 47 can be transmitted to the Short month day advance signal 76 by the intermediate date wheel 85. Thus, it is possible to rotate the date indicator 20 on the last day of a short month by means of the forward speed signal. 47 day and 76 month short day progress log to accurately perform the date change.

[0133] En outre, le levier d’actionnement 71 est agencé de telle sorte que le levier de détermination d’avancement de jour 73 est en contact glissant avec la surface périphérique externe de la came de contrôle 45, de telle sorte qu’il est possible d’engendrer le suivi de la partie de détermination de trentième quantième 29 par levier de détermination de trentième quantième 74 sans pour autant le mettre en contact avec l’indicateur de quantième 20. Par conséquent, il est possible de supprimer la génération d’une charge sur l’indicateur de quantième 20 provenant du levier d’actionnement 71, de telle sorte qu’il est possible d’empêcher une déviation de l’indicateur de quantième 20 et d’afficher un jour dans une position prédéterminée.In addition, the actuating lever 71 is arranged such that the day advance determining lever 73 is in sliding contact with the outer peripheral surface of the control cam 45, so that It is possible to generate the tracking of the thirtieth day determination part 29 by thirtieth calendar determination lever 74 without putting it in contact with the date indicator 20. Therefore, it is possible to suppress the generation of a load on the date indicator 20 from the operating lever 71, so that it is possible to prevent a deflection of the date indicator 20 and display a day in a predetermined position.

[0134] En outre, le mécanisme de commande d’indicateur de quantième de mois court 70 est équipé du ressort de rappel 82 venant agir en compression sur le röchet d’avancement de jour de mois court 76 depuis la position de postchangement de date vers la position de pré-changement de date, de sorte que le röchet d’avancement de jour de mois court 76 peut être ramené en position de pré-avancement après la rotation de l’indicateur de quantième 20 lors d’un mois court. Donc, il est possible d’effectuer avec précision un changement de date par avancement d’un jour également durant le mois court suivant.In addition, the short month calendar indicator control mechanism 70 is equipped with the return spring 82 acting in compression on the short month day advance signal 76 from the date postchange position to the pre-change date position, so that the short month forward advancement mark 76 can be returned to the pre-forward position after the date indicator 20 is rotated within a short month. Therefore, it is possible to accurately perform a date change by advancing one day also during the next short month.

[0135] En outre, le support élastique 79c soutenant de manière élastique le doigt d’avancement de jour de mois court 79 est prévu pour permettre un mouvement vers l’intérieur dans le sens radial du röchet d’avancement de jour de mois court 76, de telle sorte que, lorsque le doigt d’avancement de jour de mois court 79b est ramené en position de pré-changement de date vers la position de post-changement de date, il est possible d’empêcher l’indicateur de quantième 20 de tourner. Donc, il est possible de faire tourner l’indicateur de quantième par le biais du röchet d’avancement de jour 47 et du röchet d’avancement de jour de mois court 76 à la fin d’un mois court pour effectuer un changement de date avec précision.In addition, the resilient support 79c resiliently supporting the short month advancement finger 79 is provided to allow radially inward movement of the short month advancement mark 76 , so that when the short month advancement finger 79b is returned to the pre-change date position to the post-change date position, it is possible to prevent the date indicator 20 to turn. Thus, it is possible to rotate the date indicator through the day advance mark 47 and the short month day advance mark 76 at the end of a short month to make a date change. precisely.

[0136] Ainsi, on fournit un mécanisme de calendrier 100 comme décrit ci-dessus qui est d’une structure simple et qui peut être produit facilement, de telle sorte qu’il est possible d’avoir un mouvement 10 et une pièce d’horlogerie 1 qui sont de meilleure fiabilité et de faible coût de revient. (Variantes du mode de réalisation précédent) [0137] La fig. 19 est une vue en plan d’un mouvement équipé d’un mécanisme de calendrier selon une variante, et la fig. 20 est une vue en coupe prise le long de la ligne C-C de la fig. 19.Thus, there is provided a calendar mechanism 100 as described above which is of a simple structure and which can be produced easily, so that it is possible to have a movement 10 and a piece of furniture. watches 1 which are better reliability and low cost. (Variants of the previous embodiment) FIG. 19 is a plan view of a movement equipped with a calendar mechanism according to a variant, and FIG. 20 is a sectional view taken along line C-C of FIG. 19.

[0138] Dans ce qui suit, on décrit une variante du mode de réalisation précédent.In what follows, a variant of the previous embodiment is described.

[0139] Le mécanisme de calendrier 100 du mode de réalisation décrit ci-dessus est équipé de la came de contrôle 45 superposée de manière rotative à la roue menante d’indicateur de quantième 43, et le levier de détermination d’avancement de jour 73 est en contact glissant avec la came de contrôle 45 (voir les fig. 2 et 4).The calendar mechanism 100 of the embodiment described above is equipped with the control cam 45 rotatably superimposed on the date indicator driving wheel 43, and the day progress determination lever 73. is in sliding contact with the control cam 45 (see Figs 2 and 4).

[0140] De cette manière, comme représenté sur les fig. 19 et 20, le mécanisme de calendrier 100 selon la variante du mode de réalisation diffère du mode de réalisation ci-dessus en ce qu’il n’est pas équipé de la came de contrôle et du levier de détermination d’avancement de jour. Dans ce qui suit, une description détaillée des composants qui sont les mêmes que ceux du mode de réalisation décrit ci-dessus ne sera par conséquent pas réitérée. (Mécanisme principal de commande d’indicateur de quantième) [0141] Comme représenté sur les fig. 19 et 20, le mécanisme principal de commande d’indicateur de quantième 40 est équipé de la goupille de date 41, de la roue menante d’indicateur de quantième 43, de la came d’actionnement 50, du levier de came d’actionnement 52, et du röchet d’avancement de jour 47.In this way, as shown in FIGS. 19 and 20, the calendar mechanism 100 according to the variant of the embodiment differs from the above embodiment in that it is not equipped with the control cam and the day progress determination lever. In the following, a detailed description of the components which are the same as those of the embodiment described above will therefore not be repeated. (Main date indicator control mechanism) [0141] As shown in FIGS. 19 and 20, the main date indicator control mechanism 40 is equipped with the date pin 41, the date indicator driving wheel 43, the actuating cam 50, the actuating cam lever. 52, and day advance mark 47.

[0142] La goupille de date 41 est d’une configuration tubulaire, et est insérée sans serrage sur l’arbre 6 pour être mobile en rotation autour du premier axe C1. Au niveau de la partie intermédiaire dans la direction axiale de la goupille de date 41 se trouve une plaque de soutien 41a. La plaque de soutien 41a est agencée à l’arrière du mouvement 10 par rapport à la roue menante d’indicateur de quantième 43. La plaque de soutien 41a est configurée en forme de cercle selon la direction axiale, et est d’un diamètre plus petit que la roue menante d’indicateur de quantième 43.The date pin 41 is of a tubular configuration, and is inserted without clamping on the shaft 6 to be movable in rotation about the first axis C1. At the intermediate portion in the axial direction of the date pin 41 is a support plate 41a. The support plate 41a is arranged at the rear of the movement 10 with respect to the date indicator driving wheel 43. The support plate 41a is configured in the form of a circle in the axial direction, and is of a larger diameter. small as the date indicator driving wheel 43.

[0143] Le röchet d’avancement de jour 47 est inséré et fixé sur l’extrémité arrière de la goupille de date 41. La roue dentée de röchet d’avancement de jour 47a du röchet d’avancement de jour 47 est agencée dans un état dans lequel il est en contact avec la plaque de soutien 41a.The forward feed pin 47 is inserted and fixed on the rear end of the date pin 41. The forward feed pin 47a of the forward feed nose 47 is arranged in a state in which it is in contact with the support plate 41a.

[0144] Le mécanisme de commande d’indicateur de quantième de mois court 70 est équipé du levier d’actionnement 71.The short month calendar indicator control mechanism 70 is equipped with the operating lever 71.

[0145] Le levier d’actionnement 71 est équipé de la goupille de régulation 71a, du levier de détermination de trentième quantième 74, et du levier de détermination de mois court 75. Le levier de détermination de trentième quantième 74 et le levier de détermination de mois court 75 sont agencés de façon monobloc les uns par rapport aux autres.The actuating lever 71 is equipped with the regulating pin 71a, the thirtieth calendar determination lever 74, and the short month determination lever 75. The thirtieth-day determination lever 74 and the determination lever Short months 75 are arranged integrally with one another.

[0146] L’extrémité 74a du levier de détermination de trentième quantième 74 possède une forme recourbée vers la surface périphérique interne 20a de l’indicateur de quantième 20. L’extrémité 74a du levier de détermination de trentième quantième 74 est maintenu en contact avec la surface périphérique interne 20a de l’indicateur de quantième 20 par la force de compression du ressort du levier d’actionnement 72.The end 74a of the thirtieth calendar determination lever 74 has a shape curved towards the inner peripheral surface 20a of the date indicator 20. The end 74a of the thirtieth calendar determination lever 74 is kept in contact with the inner peripheral surface 20a of the date indicator 20 by the compressive force of the spring of the actuating lever 72.

[0147] Lorsque le passage de changement de mois est effectué lors du trentième quantième, qui est le dernier jour d’un mois court, l’extrémité distale 74a du levier de détermination de trentième quantième 74 vient pénétrer dans la partie de détermination de trentième quantième 29 et vient en contact glissant avec celle-ci pour lui permettre ainsi de la suivre.When the month change passage is made on the thirtieth day, which is the last day of a short month, the distal end 74a of the thirtieth calendar determination lever 74 enters the thirtieth determination part. date 29 and comes into sliding contact with it so that it can follow it.

[0148] Le doigt d’avancement de jour de mois court 79b s’étend le long de la direction radiale. Le doigt d’avancement de jour de mois court 79b fait saillie vers l’extérieur dans le sens de direction radiale au-delà de la roue dentée de doigt 78, et est aligné approximativement dans la direction de 9 heures.[0148] The short month day advance finger 79b extends along the radial direction. The short month advancement finger 79b protrudes outwardly in the radial direction beyond the finger gear 78, and is aligned approximately in the 9 o'clock direction.

[0149] Lorsque l’extrémité distale 74a du levier de détermination de trentième quantième 74 est en contact glissant avec la zone de la surface périphérique interne 20a de l’indicateur de quantième 20 autre que la partie de détermination de trentième quantième 29, le levier d’actionnement 71 est agencé pour se trouver dans la première position où il est incliné dans le sens CW autour du deuxième axe C2. Lorsque l’extrémité distale 74a du levier de détermination de trentième quantième 74 a pénétré à l’intérieur de la partie de détermination de trentième quantième 29 de l’indicateur de quantième 20, et se trouve en contact glissant avec celle-ci, le levier d’actionnement 71 est agencé pour se trouver dans la deuxième position où il est encore plus incliné dans le sens CCW autour du deuxième axe C2 que lorsqu’il se trouve dans la première position. (Fonctionnement) [0150] Dans ce qui suit, on décrira le fonctionnement du mécanisme de calendrier 100 selon la variante du mode de réalisation décrit ci-dessus, et en particulier lors d’un changement de mois, c’est-à-dire lors du basculement du dernier jour d’un mois au premier jour du mois suivant.When the distal end 74a of the thirtieth calendar determination lever 74 is in sliding contact with the zone of the inner peripheral surface 20a of the date indicator 20 other than the thirtieth calendar determination portion 29, the lever actuator 71 is arranged to be in the first position where it is inclined in the CW direction about the second axis C2. When the distal end 74a of the thirtieth-day determination lever 74 has penetrated inside the thirtieth-day determination part 29 of the date indicator 20, and is in sliding contact with it, the lever actuator 71 is arranged to be in the second position where it is even more inclined in the CCW direction about the second axis C2 than when it is in the first position. (Operation) [0150] In the following, we will describe the operation of the calendar mechanism 100 according to the variant of the embodiment described above, and in particular during a change of month, that is to say when switching from the last day of a month to the first day of the following month.

[0151] La fig. 21 est une vue en plan illustrant l’état vers minuit lors du dernier jour du mois pour un changement de date lors d’un mois court.[0151] FIG. 21 is a plan view illustrating the state around midnight on the last day of the month for a date change in a short month.

[0152] La fig. 22 est une vue en plan illustrant l’état vers 5 heures 55 minutes lors du dernier jour d’un mois court pour un changement de date.[0152] FIG. 22 is a plan view illustrating the state around 5 hours 55 minutes on the last day of a short month for a date change.

[0153] Les fig. 23 à 27 sont des vues en plan illustrant l’état vers minuit lors du dernier jour d’un mois court pour un changement de date, les dessins étant ordonnés selon une séquence suivant l’écoulement du temps.Figs. 23 to 27 are plan views illustrating the state around midnight on the last day of a short month for a date change, the patterns being ordered in a sequence following the passage of time.

[0154] Tout d’abord, on décrira le fonctionnement du mécanisme de calendrier 100 lors du passage du dernier jour d’un mois court vers le premier jour du mois suivant; à titre d’exemple, on décrira comment le mécanisme de calendrier 100 opère lorsqu’une transition est effectuée du dernier jour d’avril, qui est un mois court (30 avril), au premier jour de mai, qui est un mois long (1er mai).First of all, the operation of the calendar mechanism 100 will be described during the transition from the last day of a short month to the first day of the following month; for example, we will describe how the calendar mechanism 100 operates when a transition is made from the last day of April, which is a short month (April 30), to the first day of May, which is a long month ( May 1st).

[0155] Comme représenté sur la fig. 19, l’inscription de quantième 21 du «29» indiquant le 29ème jour est exposée et affichée dans la fenêtre de quantième 11a. La lettre des mois 15a de «APR» indiquant avril, qui est un mois court, est exposée et affichée dans la fenêtre des mois 11b.As shown in FIG. 19, the date marking 21 of the "29" indicating the 29th day is exposed and displayed in the date window 11a. The month 15a letter of "APR" indicating April, which is a short month, is exposed and displayed in the month window 11b.

[0156] Par ailleurs, l’extrémité distale 75a du levier de détermination de mois court 75 est agencée pour se trouver dans une position correspondant à l’entaille d’un mois court 34b.Furthermore, the distal end 75a of the short month determination lever 75 is arranged to be in a position corresponding to the notch of a short month 34b.

[0157] Immédiatement avant 24 heures du 29ème jour, qui est le jour précédant le dernier jour pour le changement de quantième d’un mois court, le röchet d’avancement de jour 47 et la came d’actionnement 50 du mécanisme principal de commande d’indicateur de quantième 40 tournent dans le sens CW à une vitesse plus grande que la roue menante d’indicateur de quantième 43. Le doigt 47c du röchet d’avancement de jour 47 vient en appui contre les dents 22 de l’indicateur de quantième 20 et agit sur ces dernières.[0157] Immediately before 24 hours of the 29th day, which is the day before the last day for the change of calendar of a short month, the daylight forwarding pin 47 and the actuating cam 50 of the main control mechanism Date indicator 40 rotates in the CW direction at a speed greater than the date indicator driving wheel 43. The finger 47c of the forward feed nose 47 bears against the teeth 22 of the indicator of date 20 and acts on them.

[0158] Ensuite, comme représenté sur la fig. 21, à 0 heure lors du trentième quantième, qui est le dernier jour pour le changement de quantième lors d’un mois court, l’indicateur de quantième 20 tourne d’un cran, et l’inscription de quantième 21 exposée à travers la fenêtre de quantième 11 a est changée de «29» à «30.» [0159] Ensuite, l’extrémité distale 74a du levier de détermination de trentième quantième 74 atteint la partie de détermination de trentième quantième 29 de l’indicateur de quantième 20 et, en même temps, pénètre à l’intérieur de la partie de détermination de trentième quantième 29 de l’indicateur de quantième 20 en raison de la force de compression exercée par le ressort du levier d’actionnement 72. En outre, l’extrémité distale 75a du levier de détermination de mois court 75 pénètre dans l’entaille 34b de la came de mois 33 et suit cette dernière. Par conséquent, le levier d’actionnement 71 tourne dans le sens CCW autour du deuxième axe C2, et se déplace depuis la première position, où il est incliné dans le sens CW par rapport au deuxième axe C2, vers la deuxième position où il est encore plus incliné dans le sens CCW par rapport au deuxième axe C2 que quand il se trouve dans la première position. Et, la roue intermédiaire de date 85 se déplace conjointement à la rotation de le levier d’actionnement 71, et vient en prise avec le röchet d’avancement de jour 47.[0158] Then, as shown in FIG. 21, at 0 o'clock on the thirtieth day, which is the last day for the change of date during a short month, the date indicator 20 rotates a notch, and the date marking 21 exposed through the date window 11a is changed from "29" to "30." [0159] Then, the distal end 74a of the thirtieth calendar determination lever 74 reaches the determination portion of thirtieth day 29 of the date indicator 20 and, at the same time, penetrates inside the thirtieth day determination portion 29 of the date indicator 20 due to the compressive force exerted by the spring of the actuating lever 72. In addition, the The distal end 75a of the short month determination lever 75 enters the notch 34b of the month cam 33 and follows it. Therefore, the operating lever 71 rotates in the CCW direction about the second axis C2, and moves from the first position, where it is inclined in the CW direction relative to the second axis C2, to the second position where it is even more inclined in the CCW direction with respect to the second axis C2 than when it is in the first position. And, the date intermediate wheel 85 moves together with the rotation of the actuating lever 71, and engages with the forward gear 47.

[0160] La goupille de régulation 51 de la came d’actionnement 50 se déplace dans la rainure 43a par le biais du mouvement à grande vitesse du röchet d’avancement de jour 47 et la came d’actionnement 50, et lorsque, après l’écoulement d’une période de temps prédéterminée (qui, dans le présent mode de réalisation, est d’approximativement 5 heures et 55 minutes), vient en appui contre l’extrémité dans le sens CCW de la rainure 43a de la roue menante d’indicateur de quantième 43 tournant à une vitesse fixe. Donc, la came d’actionnement 50 et le röchet d’avancement de jour 47 sont au repos sans tourner jusqu’à 5 heures 55 minutes lors du trentième quantième.The control pin 51 of the actuating cam 50 moves in the groove 43a by means of the high speed movement of the forward gear 47 and the actuating cam 50, and when, after flow of a predetermined period of time (which in the present embodiment is approximately 5 hours and 55 minutes) abuts against the CCW end of the groove 43a of the drive wheel. date indicator 43 rotating at a fixed speed. Thus, the actuating cam 50 and the day feed nose 47 are idle without turning until 5 hours 55 minutes on the thirtieth day.

[0161] Ensuite, comme représenté sur la fig. 22, lorsque, par exemple, l’heure de 5 heures 55 minutes est atteinte lors du trentième quantième, la goupille de régulation 51 de la came d’actionnement 50 vient en appui contre l’extrémité de la rainure 43a de la roue menante d’indicateur de quantième 43 dans le sens CCW. Par conséquent, l’énergie de la roue menante d’indicateur de quantième 43, tournant dans le sens CW à une vitesse fixe, est transmise à la came d’actionnement 50 et le röchet d’avancement de jour 47 via la goupille de régulation 51. La came d’actionnement 50 et le röchet d’avancement de jour 47 tournent de manière synchronisée avec la roue menante d’indicateur de quantième 43. En outre, l’énergie est transmise du röchet d’avancement de jour 47 à la roue intermédiaire de date 85 en prise avec le röchet d’avancement de jour 47, et la roue intermédiaire de date 85 tourne dans le sens CCW à une vitesse prédéterminée autour d’un troisième axe C3.[0161] Next, as shown in FIG. 22, when, for example, the hour of 5 hours 55 minutes is reached on the thirtieth day, the regulation pin 51 of the actuating cam 50 abuts against the end of the groove 43a of the driving wheel date indicator 43 in the CCW direction. As a result, the energy of the date indicator driving wheel 43, rotating in the CW direction at a fixed speed, is transmitted to the actuating cam 50 and the forward advancement pin 47 via the regulating pin 51. The actuating cam 50 and the forward gear 47 rotate synchronously with the date indicator driving wheel 43. In addition, the energy is transmitted from the forward gear 47 to the intermediate date wheel 85 engaged with the day forward gear 47, and the date intermediate wheel 85 rotates in the CCW direction at a predetermined speed about a third axis C3.

[0162] Comme représenté sur la fig. 23, au fur et à mesure que le temps s’écoule, la roue dentée de doigt 78 du röchet d’avancement de jour de mois court 76, en prise avec la roue intermédiaire de date 85 tourne dans le sens CW à une vitesse prédéterminée contre la force de compression du ressort de rappel 82.As shown in FIG. 23, as time elapses, the finger wheel gear 78 of the short month advancement pin 76, engaged with the date intermediate wheel 85 rotates in the CW direction at a predetermined speed against the compression force of the return spring 82.

[0163] Ensuite, comme représenté sur la fig. 24, lorsqu’on atteint 24 heures lors du trentième quantième, le doigt d’avancement de jour de mois court 79b du röchet d’avancement de jour de mois court 76 vient en appui contre les dents 22 de l’indicateur de quantième 20. Et, le doigt d’avancement de jour de mois court 79b du röchet d’avancement de jour de mois court 76 vient agir sur les dents 22 de l’indicateur de quantième 20.[0163] Then, as shown in FIG. 24, when it reaches 24 hours on the thirtieth day, the short month advancement finger 79b of the short month advancement mark 76 bears against the teeth 22 of the date indicator 20. And, the short month day advancement finger 79b of the short month advancement marker 76 comes to act on the teeth 22 of the date indicator 20.

[0164] Ensuite, comme représenté sur la fig. 25, l’indicateur de quantième 20 est dégagé du sautoir de date 25, et tourne dans le sens CW autour de l’axe de centre O. En outre, avec la rotation de l’indicateur de quantième 20, la partie de détermination de trentième quantième 29 se déplace dans le sens CW. A ce moment-là, l’extrémité distale 74a du levier de détermination de trentième quantième 74, qui a été positionné à l’intérieur de la partie de détermination de trentième quantième 29, tend à sortir de la partie de détermination de trentième quantième 29. En outre, le levier d’actionnement 71 tourne dans le sens CW autour du deuxième axe C2.[0164] Then, as shown in FIG. 25, the date indicator 20 is disengaged from the date jumper 25, and rotates in the CW direction about the center axis O. In addition, with the rotation of the date indicator 20, the determination portion of thirtieth day 29 moves in the CW direction. At this time, the distal end 74a of the thirtieth-day determination lever 74, which has been positioned inside the thirtieth-day determination part 29, tends to leave the thirtieth-day determination part 29. In addition, the operating lever 71 rotates in the CW direction about the second axis C2.

[0165] Ensuite, comme représenté sur la fig. 26, l’indicateur de quantième 20 vient s’engager à nouveau avec le sautoir de date 25, et tourne d’un cran dans le sens CW autour de l’axe de centre O. L’inscription de quantième 21 affichée dans la fenêtre de quantième 11a est changée de «30» à «31.» [0166] Le levier d’actionnement 71 tourne dans le sens CW autour du deuxième axe C2 depuis la deuxième position où il est incliné dans le sens CCW autour du deuxième axe C2 en direction de la première position où il est incliné dans le sens CW autour du deuxième axe C2. Par conséquent, la roue intermédiaire de date 85 est espacée du röchet d’avancement de jour 47.[0165] Then, as shown in FIG. 26, the date indicator 20 is again engaged with the date jumper 25, and rotates one notch in the CW direction about the center axis O. The date marking 21 displayed in the window date of date 11a is changed from "30" to "31." [0166] The operating lever 71 rotates in the CW direction around the second axis C2 from the second position where it is inclined in the CCW direction around the second axis C2 towards the first position where it is inclined in the CW direction about the second axis C2. Therefore, the date intermediate wheel 85 is spaced from the day advance pin 47.

[0167] En outre, la transmission d’énergie au röchet d’avancement de jour de mois court 76 depuis le röchet d’avancement de jour 47 via la roue intermédiaire de date 85 est libérée. Le röchet d’avancement de jour de mois court 76 tourne à grande vitesse dans le sens CCW autour du deuxième axe en raison de la force de compression exercée par le ressort de rappel 82, et est instantanément ramené dans la position de pré-changement de date depuis la position de post-changement de date.[0167] In addition, the transmission of power to the short month forward gear 76 from the forward gear 47 via the intermediate date wheel 85 is released. The short month day forwarding pin 76 rotates at a high speed in the CCW direction about the second axis due to the compression force exerted by the return spring 82, and is instantly returned to the pre-change position of date from the post-change date position.

[0168] La deuxième saillie 53b du levier de came d’actionnement 52 atteint la surface de compression 50b et vient agir sur cette dernière en raison de la rotation de la came d’actionnement 50. Par conséquent, le röchet d’avancement de jour 47 et la came d’actionnement 50 du mécanisme principal de commande d’indicateur de quantième 40 tournent dans le sens CW à une vitesse plus grande que la roue menante d’indicateur de quantième 43. Le doigt d’avancement de jour de mois court 79b du röchet d’avancement de jour de mois court 79b vient agir sur les dents 22 de l’indicateur de quantième 20. L’indicateur de quantième 20 est dégagé du sautoir de date 25, et tourne dans le sens CW autour de l’axe de centre O.The second protrusion 53b of the actuating cam lever 52 reaches the compression surface 50b and acts on it because of the rotation of the actuating cam 50. Therefore, the advancement mark of day 47 and the actuating cam 50 of the date indicator main control mechanism 40 rotate in the CW direction at a speed greater than the date indicator driving wheel 43. The short month advancement finger 79b of the short month day advance signal 79b acts on the teeth 22 of the date indicator 20. The date indicator 20 is disengaged from the date jumper 25, and rotates in the CW direction around the center axis O.

[0169] Et, comme représenté sur la fig. 27, l’indicateur de quantième 20 est à nouveau en prise avec le sautoir de date 25, et tourne d’un cran dans le sens CW autour l’axe de centre O. L’inscription de quantième 21 affichée dans la fenêtre de quantième 11 a est changée de «31 «à «1.» [0170] En outre, en raison de la rotation de l’indicateur de quantième 20, la partie d’avancement de mois 26 vient agir sur la dent 28a de la roue intermédiaire des mois 28 agencée à l’intérieur de l’indicateur de quantième 20. Par conséquent, les lettres des mois 15a affichées dans la fenêtre de mois 11b sont changées de «APR» représentant le mois d’avril à «MAY» représentant le mois de mai.And, as shown in FIG. 27, the date indicator 20 is again engaged with the date jumper 25, and turns a notch in the CW direction about the center axis O. The date marking 21 displayed in the date window 11 a is changed from "31" to "1." [0170] In addition, due to the rotation of the date indicator 20, the advancing part of month 26 acts on the tooth 28a of the intermediate wheel months months 28 arranged inside the date indicator 20. Consequently, the letters of the months 15a displayed in the month window 11b are changed from "APR" representing the month of April to "MAY" representing the month from May.

[0171] De cette manière, le mécanisme de calendrier 100 a complètement effectué la transition du dernier jour d’avril, qui est un mois court, au premier jour de mai, qui est un mois long.[0171] In this way, the calendar mechanism 100 has completely made the transition from the last day of April, which is a short month, to the first day of May, which is a long month.

[0172] La fig. 28 est une vue explicative illustrant le changement de quantième lors d’un mois long.[0172] FIG. 28 is an explanatory view illustrating the change of date during a long month.

[0173] Dans ce qui suit on donnera, à titre d’exemple, le mode de fonctionnement du mécanisme de calendrier 100 pour une transition du trentième quantième du mois de mai, qui est un mois long, au premier quantième de juin, qui est le premier jour d’un mois long, via le trente-et-unième jour, qui est le dernier jour de mai. En ce qui concerne les opérations similaires à celles du changement de date relatives à celles décrites dans le cadre du mécanisme de calendrier 100 du mode de réalisation décrit ci-dessus, et celle de changement de date en fin de mois court du mécanisme de calendrier 100 selon la variante décrite ci-dessus, une description détaillée ne sera pas réitérée.In what follows we will give, as an example, the operating mode of the calendar mechanism 100 for a transition of the thirtieth day of May, which is a long month, the first day of June, which is the first day of a long month, via the thirty-first day, which is the last day of May. For similar date-change operations to those described in the calendar mechanism 100 of the embodiment described above, and that of a change in date at the end of the short month of the calendar mechanism 100 according to the variant described above, a detailed description will not be repeated.

[0174] Comme représenté sur la fig. 28, l’extrémité distale 75a du levier de détermination de mois court 75 est agencée dans une position correspondant à la saillie 34a du mois long (qui, sur la fig. 28, correspond au mois de mai). L’extrémité distale 75a du levier de détermination de mois court 75 est en appui la saillie 34a, et le levier d’actionnement 71 est ajusté dans sa rotation dans le sens CCW (c’est-à-dire, le mouvement de la première position vers la deuxième position). La roue intermédiaire de date 85 est maintenue dans un état dans lequel il est espacé du röchet d’avancement de jour 47. Donc, la transmission d’énergie du röchet d’avancement de jour 47 à la roue intermédiaire de date 85 et la roue dentée de doigt 78 du röchet d’avancement de jour de mois court 76 est interrompue, et ces derniers sont maintenus en position sans être entraînés en rotation.As shown in FIG. 28, the distal end 75a of the short month determining lever 75 is arranged in a position corresponding to the protrusion 34a of the long month (which in Fig. 28 corresponds to the month of May). The distal end 75a of the short month determining lever 75 abuts the projection 34a, and the actuating lever 71 is adjusted in its CCW rotation (i.e., the movement of the first position to the second position). The intermediate date wheel 85 is maintained in a state in which it is spaced from the day advance gear 47. Thus, the energy transmission of the daylight forward gear 47 to the date intermediate wheel 85 and the wheel Finger tooth 78 of the short month day advance connector 76 is interrupted, and these are held in position without being rotated.

[0175] Ensuite, lorsque l’horaire prédéterminé du trentième quantième (par exemple, 24 heures) est atteint, la deuxième saillie 53b du levier de came d’actionnement 52 vient agir sur la surface de compression 50b de la came d’actionnement 50 en raison de la force de compression exercée par le ressort de levier de came d’actionnement 54. Par conséquent, le röchet d’avancement de jour 47 et la came d’actionnement 50 du mécanisme principal de commande d’indicateur de quantième 40 tournent dans le sens CW à une vitesse plus grande que la roue menante d’indicateur de quantième 43. Il en résulte que l’indicateur de quantième 20 tourne d’un cran dans le sens CW autour de l’axe de centre O, et l’inscription de quantième 21 affichée dans la fenêtre de quantième 11a est changée de «30» à «31.» [0176] Lorsqu’un changement de date est effectué lors du 31 mai, qui est le dernier jour d’un mois long, pour passer au 1er juin, qui est le premier jour d’un mois court, une opération similaire est effectuée. En d’autres termes, lorsqu’on atteint 24 heures lors du 31 mai, la deuxième saillie 53b du levier de came d’actionnement 52 vient agir sur la surface de pression 50b de la came d’actionnement 50 en raison de la force de compression exercée par le ressort de levier de came d’actionnement 54. Par conséquent, l’indicateur de quantième 20 tourne dans le sens CW autour de l’axe de centre O d’un cran, et l’inscription de quantième 21 affichée dans la fenêtre de quantième 11a passe du «31 » au «1 ».Then, when the predetermined time of the thirtieth day (for example, 24 hours) is reached, the second projection 53b of the actuating cam lever 52 acts on the compression surface 50b of the actuating cam 50. due to the compressive force exerted by the actuating cam lever spring 54. Therefore, the forward feed pin 47 and the actuating cam 50 of the date indicator main control mechanism 40 rotate. in the CW direction at a speed greater than the date indicator driving wheel 43. As a result, the date indicator 20 rotates a notch in the CW direction about the center axis O, and the date registration 21 displayed in the date window 11a is changed from "30" to "31." [0176] When a date change is made on May 31st, which is the last day of a long month, to move to June 1st, which is the first jo For a short month, a similar operation is performed. In other words, when reaching 24 hours on May 31, the second projection 53b of the actuating cam lever 52 acts on the pressing surface 50b of the actuating cam 50 due to the force of compression exerted by the actuating cam lever spring 54. Accordingly, the date indicator 20 rotates in the CW direction about the center axis O of a notch, and the date marking 21 displayed in the date window 11a changes from "31" to "1".

[0177] Par ailleurs, en raison de la rotation de l’indicateur de quantième 20, la partie d’avancement de mois 26 vient agir sur la dent 28a de la roue intermédiaire des mois 28 agencée à l’intérieur de l’indicateur de quantième 20. Par conséquent, les lettres des mois 15a affichées dans la fenêtre de mois 11b sont modifiées de «MAY,» qui représente le mois de mai, à «JUN,» qui représente le mois de juin.Furthermore, because of the rotation of the date indicator 20, the month advancement portion 26 acts on the tooth 28a of the intermediate wheel 28 months arranged inside the indicator of date 20. Therefore, the month 15a letters displayed in the month window 11b are modified from "MAY," which represents the month of May, to "JUN," which represents the month of June.

[0178] De cette manière, la transition est complètement effectuée par le mécanisme de calendrier 100 pour passer du trentième quantième du mois de mai, qui est un mois long, au 1er juin, qui est le premier jour d’un mois court, via le trente-et-unième jour de mai.In this way, the transition is completely performed by the calendar mechanism 100 to move from the thirtieth day of May, which is a long month, to June 1, which is the first day of a short month, via the thirty-first day of May.

[0179] Selon la variante proposée du mode de réalisation, il est possible d’obtenir les mêmes effets bénéfiques que ceux obtenus par le mode de réalisation décrit ci-dessus. En outre, il n’y a plus besoin de fournir de came de contrôle, de sorte qu’il est possible de fournir un mécanisme de calendrier 100 permettant une réduction supplémentaire en taille et en épaisseur.According to the proposed variant of the embodiment, it is possible to obtain the same beneficial effects as those obtained by the embodiment described above. In addition, there is no need to provide a control cam, so that it is possible to provide a calendar mechanism 100 for further reduction in size and thickness.

[0180] La portée technique de cette invention n’est pas restreinte à celle du mode de réalisation ci-dessus mais permet diverses autres modifications sans s’écarter du champ d’application de l’esprit de la présente invention.The technical scope of this invention is not restricted to that of the above embodiment but allows various other modifications without departing from the scope of the spirit of the present invention.

[0181] La fig. 29 est une vue explicative illustrant une came de contrôle selon un autre mode de réalisation.[0181] FIG. 29 is an explanatory view illustrating a control cam according to another embodiment.

[0182] La came de contrôle 45 selon le mode de réalisation ci-dessus est formée de sorte que la surface latérale 46a dans le sens CW de la partie de détermination d’avancement de jour 46 s’étend dans la direction radiale (voir la fig. 5).The control cam 45 according to the above embodiment is formed so that the lateral surface 46a in the CW direction of the day advance determination portion 46 extends in the radial direction (see FIG. Fig. 5).

[0183] En revanche, comme pour la came de contrôle 45 représentée à la fig. 29, la surface latérale 46a dans le sens CW de la partie de détermination d’avancement de jour 46 peut être inclinée dans le sens CW depuis l’intérieur vers l’extérieur dans la direction radiale de sorte que l’ouverture de la partie de détermination d’avancement de jour 46 peut être élargie.On the other hand, as for the control cam 45 shown in FIG. 29, the CW side surface 46a of the day advance determination portion 46 can be CW-inclined from the inside out in the radial direction so that the opening of the portion of day advance determination 46 can be expanded.

[0184] Selon cette architecture, l’extrémité distale 73a du levier de détermination d’avancement de jour 73 pénètre dans la partie de détermination d’avancement de jour 46 à une vitesse plus basse que dans le mode de réalisation ci-dessus tout en glissant sur la surface latérale inclinée 46a. A ce moment-là, le levier d’actionnement 71 tourne de la première position vers la deuxième position à une vitesse plus basse que dans le mode de réalisation ci-dessus, de telle sorte que le röchet d’avancement de jour 47 et la roue intermédiaire de date 85 viennent en prise l’un avec l’autre à une vitesse plus basse que dans le mode de réalisation ci-dessus. Par conséquent, il est possible de supprimer l’usure des dents du röchet d’avancement de jour 47 et de la roue de date intermédiaire 85, de sorte qu’on peut fournir un mécanisme de calendrier 100 de plus grande longévité.According to this architecture, the distal end 73a of the day advance determination lever 73 enters the day advance determining portion 46 at a lower speed than in the above embodiment while sliding on the inclined side surface 46a. At this time, the operating lever 71 rotates from the first position to the second position at a lower speed than in the above embodiment, so that the forward gear 47 and the intermediate date wheel 85 meshes with each other at a lower speed than in the embodiment above. Therefore, it is possible to eliminate the wear of the teeth of the forward gear 47 and the intermediate date wheel 85, so that a longer life calendar mechanism 100 can be provided.

[0185] La fig. 30 est une vue externe d’une pièce d’horlogerie selon un autre mode de réalisation, et la fig. 31 est une vue en coupe du mouvement de la pièce d’horlogerie de cet autre mode de réalisation représenté à la fig. 30.[0185] FIG. 30 is an external view of a timepiece according to another embodiment, and FIG. 31 is a sectional view of the movement of the timepiece of this other embodiment shown in FIG. 30.

[0186] Selon ce mode de réalisation, la plaque d’affichage des mois 15 est agencée sur la face avant du mouvement 10 par rapport au cadran 11, et un mois est affiché en exposant les lettres des mois 15a de la plaque d’affichage des mois 15 à travers la fenêtre des mois 11b (voir les fig. 1 et 3).According to this embodiment, the display plate 15 months is arranged on the front of the movement 10 relative to the dial 11, and a month is displayed by exposing the letters 15a months of the display plate months 15 through the window of months 11b (see Figures 1 and 3).

[0187] En revanche, comme représenté sur les fig. 30 et 31, une aiguille des mois 18 est agencée sur la face arrière du mouvement 10 par rapport au cadran 11, et un mois peut être affiché en indiquant les nombres 1 à 12 représentés sur le cadran 11 par l’aiguille des mois 18.[0187] On the other hand, as shown in FIGS. 30 and 31, a hand of the months 18 is arranged on the rear face of the movement 10 relative to the dial 11, and a month can be displayed by indicating the numbers 1 to 12 represented on the dial 11 by the hand of the months 18.

[0188] Tandis que dans le mode de réalisation ci-dessus un spiral est adopté en tant que ressort de rappel 82, ceci ne devrait pas être interprété de manière restrictive. Donc, un ressort hélicoïdal, par exemple, ou encore un ressort plat pourraient également être adoptés en tant que ressorts de rappel.While in the embodiment above a hairspring is adopted as a return spring 82, this should not be interpreted restrictively. Thus, a coil spring, for example, or a flat spring could also be adopted as return springs.

Claims (6)

[0189] En dehors de cela, il est possible de remplacer les composants du mode de réalisation décrit ci-dessus par des composants connus le cas échéant sans s’écarter du champ d’application de l’esprit de la présente invention. RevendicationsIn addition to this, it is possible to replace the components of the embodiment described above with known components if necessary without departing from the scope of the spirit of the present invention. claims 1. Mécanisme de calendrier comprenant: un indicateur des mois (30) effectuant une rotation par année; un indicateur de quantième (20) effectuant une rotation par mois et ayant une partie de détermination de trentième quantième (29) se trouvant une position prédéterminée au niveau de sa périphérie; un mécanisme principal de commande d’indicateur de quantième (40) effectuant une rotation par jour et entraînant en rotation l’indicateur de quantième (20); et un mécanisme de commande d’indicateur de mois court (70) faisant tourner l’indicateur de quantième (20) à la fin d’un mois court ayant 30 jours ou moins, dans lequel l’indicateur des mois (30) possède une came des mois (33) ayant, sur sa surface périphérique externe, une partie de détermination de mois court correspondant au mois court; le mécanisme principal de commande d’indicateur de quantième (40) possède une came d’actionnement (50) superposée à et agencée de manière rotative par rapport à une roue d’entraînement d’indicateur de quantième (43), effectuant une rotation par jour à une vitesse fixe, et qui est configurée pour effectuer une rotation par jour, et un röchet d’avancement de jour (47) tournant de manière synchronisée avec la came d’actionnement (50) et faisant tourner l’indicateur de quantième (20); le mécanisme de commande d’indicateur de quantième de mois court (70) est muni d’un levier de détermination du trentième quantième (74) capable de suivre la partie de détermination de trentième quantième (29), et un levier de détermination de mois court (75) capable de suivre la partie de détermination de mois court, possédant un levier d’actionnement (71 ) tournant autour d’un axe prédéterminé, un röchet d’avancement de jour de mois court (76) faisant tourner l’indicateur de quantième (20) à la fin d’un mois court, et d’une roue de date intermédiaire (85) agencée mobile en rotation par rapport au levier d’actionnement (71) lorsqu’il est en prise avec le röchet d’avancement de jour de mois court (76); le levier d’actionnement (71) se déplaçant entre une première position et une deuxième position lorsque le levier de détermination du trentième quantième (74) suit la partie de détermination de trentième quantième (29), et que le levier de détermination de mois court (74) suit la partie de détermination de mois court; et la roue de date intermédiaire (85) étant espacée du röchet d’avancement de jour (47) lorsque le levier d’actionnement (71) se trouve dans la première position, et étant en prise avec le röchet d’avancement de jour (47) lorsque le levier d’actionnement (71) se trouve dans la deuxième position.1. Calendar mechanism comprising: an indicator of the months (30) rotating per year; a calendar indicator (20) rotating one month and having a thirtieth-day determining portion (29) located at a predetermined position at its periphery; a date indicator main control mechanism (40) rotating daily and rotating the date indicator (20); and a short month indicator control mechanism (70) rotating the date indicator (20) at the end of a short month having 30 days or less, wherein the month indicator (30) has a a month cam (33) having, on its outer peripheral surface, a short month determining portion corresponding to the short month; the main date indicator control mechanism (40) has an actuating cam (50) superimposed on and rotatably arranged with respect to a date indicator drive wheel (43), rotated by at a fixed speed, and which is configured to rotate per day, and a forward feedmark (47) rotating synchronously with the actuating cam (50) and rotating the date indicator ( 20); the short month calendar indicator control mechanism (70) is provided with a thirtieth calendar determination lever (74) capable of following the thirtieth day determination portion (29), and a month determination lever (74). short (75) capable of following the short month determining portion, having an operating lever (71) rotating about a predetermined axis, a short month advancing mark (76) rotating the indicator date calendar (20) at the end of a short month, and an intermediate date wheel (85) arranged to be rotatable with respect to the actuating lever (71) when engaged with the ratchet short month day advance (76); the actuating lever (71) moving between a first position and a second position when the thirtieth calendar determination lever (74) follows the thirtieth day determination part (29), and the month determination lever short (74) follows the short month determination portion; and the intermediate date wheel (85) being spaced from the forward gear (47) when the actuating lever (71) is in the first position, and engaging with the forward gear ( 47) when the operating lever (71) is in the second position. 2. Mécanisme de calendrier selon la revendication 1, dans lequel le mécanisme principal de commande d’indicateur de quantième (40) est équipé d’une came de contrôle (45) tournant de manière synchronisée avec la came d’actionnement (50) et ayant une partie de détermination d’avancement de jour (46) sur une surface périphérique externe; et le levier d’actionnement (71) possède un levier de détermination d’avancement de jour (73) en contact glissant avec la surface périphérique externe de la came de contrôle (45), et lorsque le levier de détermination d’avancement de jour (73) entre en contact glissant avec la partie de détermination d’avancement de jour (46), le levier de détermination de trentième quantième (74) suit la partie de détermination de trentième quantième (29), et le levier de détermination de mois court (75) suit la partie de détermination de mois court.The calendar mechanism according to claim 1, wherein the main date indicator control mechanism (40) is equipped with a control cam (45) rotating synchronously with the actuating cam (50) and having a day advance determining portion (46) on an outer peripheral surface; and the operating lever (71) has a day advance determining lever (73) in sliding contact with the outer peripheral surface of the control cam (45), and when the day progress determination lever (73) comes into sliding contact with the day advance determination portion (46), the thirtieth calendar determination lever (74) follows the thirtieth day determination portion (29), and the month determination lever (74). short (75) follows the short month determination portion. 3. Mécanisme de calendrier selon la revendication 1 ou 2, dans lequel le mécanisme de commande d’indicateur de quantième de mois court (70) est équipé d’un moyen de compression pour appliquer une force de rappel sur le röchet d’avancement de jour de mois court (76) visant à l’amener depuis une position précédant le changement de date, avant de faire tourner l’indicateur de quantième (20), vers une position suivant le changement de date après avoir entraîné en rotation l’indicateur de quantième (20).The calendar mechanism according to claim 1 or 2, wherein the short month calendar indicator control mechanism (70) is equipped with a compression means for applying a restoring force to the forward gear. a short month day (76) for bringing it from a position prior to the date change, before rotating the date indicator (20) to a position following the change of date after rotating the indicator of date (20). 4. Mécanisme de calendrier selon la revendication 3, dans lequel le röchet d’avancement de jour de mois court (76) est équipé d’un doigt d’avancement de jour de mois court (79b) agissant sur une dent de l’indicateur de quantième (20) pour faire tourner l’indicateur de quantième (20); et dans lequel une partie de support élastique soutenant élastiquement le doigt d’avancement de jour de mois court (79b) est agencée pour être déplaçable vers l’intérieur dans le sens radial du röchet d’avancement de jour de mois court (76) lorsque le doigt d’avancement de jour de mois court (79b) se déplace depuis la position correspondant à celle suivant le changement de date vers la position correspondant à celle précédant le changement de date pour entrer en contact avec la dent.The calendar mechanism according to claim 3, wherein the short month day advance pin (76) is equipped with a short month day advance finger (79b) acting on a flag tooth. date calendar (20) for rotating the date indicator (20); and wherein an elastic support portion resiliently supporting the short month advancement finger (79b) is arranged to be movable radially inwardly of the short month advancement mark (76) when the short month advancement finger (79b) moves from the position corresponding to that after the date change to the position corresponding to the one preceding the date change to contact the tooth. 5. Mouvement équipé d’un mécanisme de calendrier selon la revendication 4.5. A movement equipped with a calendar mechanism according to claim 4. 6. Pièce d’horlogerie équipée d’un mouvement selon la revendication 5.6. Timepiece equipped with a movement according to claim 5.
CH00149/17A 2016-02-09 2017-02-09 Calendar mechanism, movement and timepiece. CH712123B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016023049A JP6636815B2 (en) 2016-02-09 2016-02-09 Calendar mechanism, movement and clock

Publications (2)

Publication Number Publication Date
CH712123A2 true CH712123A2 (en) 2017-08-15
CH712123B1 CH712123B1 (en) 2021-03-15

Family

ID=59544354

Family Applications (1)

Application Number Title Priority Date Filing Date
CH00149/17A CH712123B1 (en) 2016-02-09 2017-02-09 Calendar mechanism, movement and timepiece.

Country Status (3)

Country Link
JP (1) JP6636815B2 (en)
CN (1) CN107045276B (en)
CH (1) CH712123B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7260446B2 (en) * 2019-09-12 2023-04-18 セイコーウオッチ株式会社 Transmission wheel, self-winding mechanism, watch movement and watch

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1242512B (en) * 1964-08-25 1967-06-15 United States Time Corp Display device on a clock for displaying a variety of calendar information
JPS5214462Y2 (en) * 1971-07-08 1977-04-01
DE7411656U (en) * 1974-04-03 1974-07-04 Gebrueder Junghans Gmbh Date and weekday progression for a clock
CH685965B5 (en) * 1994-02-23 1996-05-31 Nardin Ulysse Sa horological piece which the hour hand can be an advance or backward by an hour steps.
US6108278A (en) * 1998-09-11 2000-08-22 Frederic Piguet S.A. Annual calendar mechanism for clockwork movement
CN2470857Y (en) * 2001-02-28 2002-01-09 杭州手表有限公司 Watch calender instantaneous-tripping mechanism
EP1536298A1 (en) * 2003-11-25 2005-06-01 Montres Breguet S.A. Calendar mechanism having entrainment and correction means for two indicators
EP1785783B1 (en) * 2005-11-11 2011-10-12 Omega SA Annual calendar mechanism for a clock movement
JP5819180B2 (en) * 2011-12-26 2015-11-18 セイコーインスツル株式会社 Calendar mechanism and watch having the same

Also Published As

Publication number Publication date
CH712123B1 (en) 2021-03-15
CN107045276A (en) 2017-08-15
JP2017142134A (en) 2017-08-17
JP6636815B2 (en) 2020-01-29
CN107045276B (en) 2020-03-27

Similar Documents

Publication Publication Date Title
EP1586962B1 (en) Ewiger Kalendermechanismus
EP3026504A1 (en) Annual or perpetual calendar mechanism and timepiece comprising the use thereof
EP1316859A1 (en) Method for forming a date mechanism operated by a clockwork
CH681761B5 (en) Part of clockwork mechanical and / or electromechanical, provided with automatic retrograde moving display means.
EP0987609B1 (en) Annual calendar mechanism for clockwork-movement
CH712222B1 (en) Date indicator drive wheel, calendar mechanism, movement and timepiece.
EP3913442B1 (en) Retrograde display mechanism for a timepiece provided with a safety device
EP3904964A1 (en) Device for displaying a time or time-derived indication and device for indexing
CH712123A2 (en) Calendar mechanism, movement and timepiece.
CH699794B1 (en) An aid in maintaining the position of a ring date indicator timepiece.
CH705086B1 (en) Calendar mechanism and timepiece including such mechanism.
EP1240559A1 (en) Annual, perpetual or centennial calendar mechanism
EP2721449B1 (en) Display mechanism
EP3026505A1 (en) Annual or perpetual calendar mechanism and timepiece comprising the use thereof
EP3857313B1 (en) Display mechanism with a single dial window
EP3460588B1 (en) Date mechanism
CH714690B1 (en) Calendar mechanism, movement and timepiece.
CH713425A2 (en) Calendar mechanism, movement and timepiece.
CH707439B1 (en) Anti-retrograde display mechanism for a timepiece.
EP3989011B1 (en) Retrograde display mechanism for a timepiece of the driving type provided with a lever for disengagement of the display
EP3667435B1 (en) System for adjusting the position of a first toothed moving part relative to a support on which the first toothed moving part is pivotably mounted, and timepiece comprising such a system
EP1353244B1 (en) Timepiece with oblong shaped case
CH718804B1 (en) Perpetual or annual calendar mechanism.
CH719977A1 (en) Watch mechanism with jumping display
CH715566B1 (en) System comprising a first toothed mobile whose angular position can be adjusted relative to a support on which the first toothed mobile is pivotally mounted, timepiece comprising such a system and large date display mechanism.