CH649720A5 - Overload protection of a jaw crusher, in particular a continuous crusher - Google Patents
Overload protection of a jaw crusher, in particular a continuous crusher Download PDFInfo
- Publication number
- CH649720A5 CH649720A5 CH5516/80A CH551680A CH649720A5 CH 649720 A5 CH649720 A5 CH 649720A5 CH 5516/80 A CH5516/80 A CH 5516/80A CH 551680 A CH551680 A CH 551680A CH 649720 A5 CH649720 A5 CH 649720A5
- Authority
- CH
- Switzerland
- Prior art keywords
- overload protection
- shear
- protection according
- rod
- bearing openings
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C1/00—Crushing or disintegrating by reciprocating members
- B02C1/02—Jaw crushers or pulverisers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C4/00—Crushing or disintegrating by roller mills
- B02C4/10—Crushing or disintegrating by roller mills with a roller co-operating with a stationary member
Landscapes
- Engineering & Computer Science (AREA)
- Food Science & Technology (AREA)
- Mechanical Engineering (AREA)
- Crushing And Grinding (AREA)
Description
Die Erfindung betrifft eine Überlastsicherung eines Bak-kenbrechers, mit oberhalb eines Förderers angeordneten Brechbacken, wobei die schwingende Brechbacke über eine Schubstange angetrieben ist. The invention relates to an overload protection of a bak crusher, with crushing jaws arranged above a conveyor, the vibrating crushing jaw being driven via a push rod.
Ein Backenbrecher z.B. ein Durchlauf-Backenbrecher, bei dem die beiden Brechbacken in liegender Position oberhalb eines als Kettenkratzförderer ausgebildeten Förderers gelagert sind, ist z.B. aus DE-OS 2 621 785 bekannt. Der Antrieb des Brechers erfolgt über eine Schubstange, die zwischen einem angetriebenen Exzenter und der beweglichen Brechbacke eingeschaltet ist. Gelangen nicht brechbare Teile in den Brechraum oder wird durch den Förderer eine Übermenge an Brechgut in den Brechraum mit hoher Pressung eingeführt, so kommt es zu Überbeanspruchungen und als Folge davon zu Beschädigungen des Backenbrechers. A jaw crusher e.g. a continuous jaw crusher, in which the two crushing jaws are stored in a lying position above a conveyor designed as a chain scraper conveyor, is e.g. known from DE-OS 2 621 785. The crusher is driven by a push rod that is switched on between a driven eccentric and the movable crushing jaw. If non-breakable parts get into the crushing chamber or if the conveyor introduces an excessive amount of crushed material into the crushing chamber with high pressure, this leads to overstressing and, as a result, damage to the jaw crusher.
Aufgabe der Erfindung ist es daher, zur Vermeidung der Überbeanspruchungen eine wenig raumaufwendige und einfache sowie zuverlässige Überlastsicherung für Backenbrecher zu schaffen. The object of the invention is therefore to provide a space-saving and simple and reliable overload protection for jaw crusher to avoid the overstressing.
Diese Aufgabe wird erfindungsgemäss dadurch gelöst, dass die Schubstange aus über eine Schersicherung verbundenen Stangenteilen besteht. Vorzugsweise ist die Anordnung so getroffen, dass die Stangenteile teleskopartig verschiebbar ineinandergreifen, wobei sie an ihren ineinandergreifenden Teilen durch die Schersicherung gegeneinander festgelegt sind. According to the invention, this object is achieved in that the push rod consists of rod parts connected via a shear protection. The arrangement is preferably such that the rod parts engage in a telescopically displaceable manner, wherein they are fixed against one another on their interlocking parts by the shear protection.
Dadurch, dass eine Schersicherung verwendet wird, die der in diesem Fall teleskopartig ausgebildeten Schubstange zugeordnet wird, ergibt sich eine besonders einfache, wenig bau- und raumaufwendige Überlastsicherung, bei der einfache Scherbolzen als Sollbruchelemente verwendet werden können, die sich bei einem Bruch auch leicht entfernen und durch neue Scherbolzen ersetzen lassen. Die Anordnung lässt sich in einfacher Weise so treffen, dass die Stangenteile quer verlaufende Lageröffnungen od.dgl. für die Aufnahme mindestens eines Scherbolzens erhalten. Vorzugsweise werden aber zwei Scherbolzen verwendet, die von den beiden gegenüberliegenden Seiten her in die Lageröffnungen einführbar sind und zwischen deren einander zugewandten Enden zweckmässig ein hinreichend grosser Freiraum verbleibt, so dass bei einem Bruch der Scherbolzen die innenliegenden Bolzenteile sich beim unvermeidbaren Nachlauf des Backenbrechers in den genannten Freiraum hineinbewegen und daher mit ihren an der Scherstelle liegenden Bruchflächen keine Fräs- und Schabwirkung an den Stossstellen der Lageröffnungen bzw. der die Lageröffnung bildenden Buchsen od.dgl. ausüben können. Aus dem gleichen Grunde empfiehlt es sich, die Lageröffnungen bzw. die Buchsen an den Sollbruchstellen der Scherbolzen mit einer Ausfräsung bzw. einer Nut zu versehen, um bei dem Nachlauf des Backenbrechers eine Fräswirkung durch die Bolzenbruchstücke zu verhindern, die zu einer Gratbildung an den Enden der gehärteten Lagerbuchsen führen würde. The fact that a shear protection is used, which is assigned to the telescopic push rod in this case, results in a particularly simple, little construction and space-consuming overload protection, in which simple shear bolts can be used as predetermined breaking elements, which are easily removed in the event of a break and have it replaced by new shear bolts. The arrangement can be made in a simple manner so that the rod parts or the like transverse bearing openings. received for receiving at least one shear pin. Preferably, however, two shear bolts are used which can be inserted into the bearing openings from the two opposite sides and which expediently leave a sufficiently large free space between their mutually facing ends, so that if the shear bolts break, the inner bolt parts become inevitable when the jaw crusher runs afterwards move the free space mentioned and therefore, with their fracture surfaces lying at the shear point, no milling and scraping effect at the abutment points of the bearing openings or the bushings forming the bearing opening or the like. can exercise. For the same reason, it is advisable to provide the bearing openings or the bushes at the predetermined breaking points of the shear bolts with a cutout or a groove in order to prevent a milling effect due to the bolt fragments when the jaw crusher runs on, which leads to burr formation at the ends the hardened bushings would lead.
Bei einem Scherbolzenbruch wird der Backenbrecher abgeschaltet, wobei, wie erwähnt, jedoch noch ein gewisser Nachlauf eintritt. Durch entsprechende Materialpaarungen und durch Verwendung eines Schmiermittels lässt sich eine angemessene Notlaufeigenschaft der teleskopartig ineinan-dergleitenden Teile der Schubstange erreichen. Um die Nachlaufphase des Brechers abzukürzen, empfiehlt es sich, den Zylinderraum desjenigen Stangenteils, welcher den kolbenartigen Stangenteil aufnimmt, über mindestens einen Drosselkanal od. dgl. mit der Aussenluft zu verbinden, so dass bei Scherbolzenbruch durch den Drosselkanal in der einen Bewegungsrichtung Luft angesaugt und in der gegenläufigen Bewegungsrichtung Luft herausgepresst wird, was zur Dämpfung der Schwingbewegung der Brechbacke führt. In the event of a shear pin break, the jaw crusher is switched off, but, as mentioned, a certain overrun still occurs. Adequate emergency running properties of the telescoping parts of the push rod can be achieved by appropriate material combinations and by using a lubricant. In order to shorten the after-running phase of the crusher, it is advisable to connect the cylinder chamber of the rod part which receives the piston-like rod part to the outside air via at least one throttle duct or the like, so that air is sucked in through the throttle duct in one direction of movement when the shear pin breaks air is pressed out in the opposite direction of movement, which leads to damping of the oscillating movement of the crushing jaw.
Die beiden ineinandergreifenden Schubstangenteile erhalten zweckmässig eine ihre gegenseitige Verdrehung verhindernde Profilierung, was durch eine Abflachung der im übrigen zylindrischen Schubstangenteile erreicht werden kann. The two intermeshing connecting rod parts are appropriately given a profile preventing their mutual rotation, which can be achieved by flattening the otherwise cylindrical connecting rod parts.
Damit bei Scherbolzenbruch die beiden Schubstangenteile nicht gegeneinander schlagen, ist in weiterer Ausgestaltung der Erfindung zweckmässig ein die Brechbackenbewe2 So that the two push rod parts do not hit against each other in the event of a shear pin fracture, the crushing jaw movement is expedient in a further embodiment of the invention
5 5
10 10th
15 15
20 20th
25 25th
30 30th
35 35
40 40
45 45
50 50
55 55
60 60
65 65
3 3rd
649720 649720
gung begrenzender Anschlagbock od.dgl. vorgesehen, der am Rahmen des Brechers angeordnet werden kann. Vorzugsweise ist der Anschlagbock bzw. das Anschlagteil desselben z. B. mittels Stellschrauben verstellbar, wodurch das Einsetzen neuer Scherbolzen erleichtert wird. limit stop or the like. provided that can be arranged on the frame of the crusher. Preferably, the stop block or the stop part of the same z. B. adjustable by means of set screws, which facilitates the insertion of new shear bolts.
Die Scherbolzen weisen zweckmässig an ihren aussenlie-genden Enden einen Kragen oder Flansch od.dgl. auf, mit dem sie sich aussenseitig gegen die Lagerbuchse abstützen. Zwischen den Bolzenenden wird zweckmässig eine Ringnut als Sollbruchstelle vorgesehen. The shear bolts expediently have a collar or flange or the like at their outer ends. with which they are supported on the outside against the bearing bush. An annular groove is expediently provided as a predetermined breaking point between the bolt ends.
In der Zeichnung ist ein bevorzugtes Ausführungsbeispiel der Erfindung dargestellt. Es zeigt: In the drawing, a preferred embodiment of the invention is shown. It shows:
Fig. 1 eine Teil-Draufsicht auf einen als Durchlaufbrecher ausgebildeten Backenbrecher mit einer erfindungsge-mässen Uberlastsicherung; 1 shows a partial top view of a jaw crusher designed as a continuous crusher with an overload protection device according to the invention;
Fig. 2 in grösserem Massstab die Schubstange des Bak-kenbrechers gemäss Fig. 1 mit der Überlastsicherung; FIG. 2 on a larger scale the push rod of the jaw crusher according to FIG. 1 with the overload protection;
Fig. 3 einen Querschnitt nach Linie III-III der Fig. 2; Fig. 3 shows a cross section along line III-III of Fig. 2;
Fig. 4 eine Teil-Ansicht des Backenbrechers mit an dessen Rahmen angeordnetem Anschlagbock. Fig. 4 is a partial view of the jaw crusher with the stop block arranged on its frame.
Der dargestellte Backenbrecher entspricht in seinem Grundaufbau demjenigen nach DE-OS 2 621 785. Er weist oberhalb eines als Kettenkratzförderer ausgebildeten (nicht dargestellten) Förderers in liegender Anordnung zwei zusammenwirkende Brechbacken auf, von denen nur die angetriebene, um eine Vertikalachse schwingende Brechbacke 10 in Fig. 1 dargestellt ist. Der Antrieb dieser Brechbacke 10 erfolgt über einen angetriebenen Exzenter 11 und eine Schubstange 12, die über ein Gelenk 13 mit dem in Nähe des Brecheraustrages liegenden Ende der Brechbacke 10 gekoppelt isj. Die Schubstange 12 besteht aus zwei Stangenteilen 14 und 15, von denen der Stangenteil 14 mit dem angetriebenen Exzenter 11 und der Stangenteil 15 über das Gelenk 13 mit der Brechbacke 10 gekoppelt ist. Der Stangenteil 15 fasst nach Art eines Kolbens in die Innenbohrung 16 des Stangenteils 14. Der kolbenartige Stangenteil 15 ist etwa zylindrisch ausgebildet, wobei er auf diametral gegenüberliegenden Seiten jeweils eine Abflachung 17 aufweist. Die Innenbohrung 16 des anderen Stangenteils 14 ist entsprechend profiliert, so dass beide Stangenteile 14 und 15 drehschlüssig, jedoch axial verschieblich miteinander verbunden sind. The basic construction of the jaw crusher shown corresponds to that according to DE-OS 2 621 785. It has two interacting crushing jaws above a conveyor (not shown) designed as a chain scraper conveyor, of which only the driven crushing jaw 10, which swings about a vertical axis, in FIG 1 is shown. This crushing jaw 10 is driven via a driven eccentric 11 and a push rod 12, which is coupled via a joint 13 to the end of the crushing jaw 10 which is close to the crusher discharge. The push rod 12 consists of two rod parts 14 and 15, of which the rod part 14 is coupled to the driven eccentric 11 and the rod part 15 via the joint 13 to the crushing jaw 10. The rod part 15 fits into the inner bore 16 of the rod part 14 in the manner of a piston. The piston-like rod part 15 is approximately cylindrical, it each having a flat 17 on diametrically opposite sides. The inner bore 16 of the other rod part 14 is profiled accordingly, so that both rod parts 14 and 15 are connected to one another in a rotationally locking but axially displaceable manner.
Der teleskopartig ausgebildeten Schubstange 12 ist die Überlastsicherung in Gestalt einer Schersicherung zugeordnet. Diese weist zwei gleich ausgebildete Scherbolzen 18 auf, die in die Innenbohrungen 19,20 von Lagerbuchsen 21,22 eingeführt sind, welche in Aufnahmebohrungen 23,24 der beiden Stangenteile 14,15 sitzen. Die Innenbohrungen 19,20 der drei Buchsen 21,22 fluchten miteinander und verlaufen senkrecht zur Schubstangenachse; sie bilden die Lageröffnungen für die Aufnahme der beiden Scherbolzen 18. Die beiden Stirnflächen der mittleren Buchse 22 enden in den Abflachungen 17 des Stangenteils 15. Die aussenliegenden Buchsen 21 schliessen sich unmittelbar an die innenliegende Buchse 22 an. The telescopic push rod 12 is assigned the overload protection in the form of a shear protection. This has two identical shear bolts 18 which are inserted into the inner bores 19, 20 of bearing bushes 21, 22, which are seated in receiving bores 23, 24 of the two rod parts 14, 15. The inner bores 19, 20 of the three bushings 21, 22 are aligned with one another and run perpendicular to the push rod axis; they form the bearing openings for receiving the two shear bolts 18. The two end faces of the middle bushing 22 end in the flattened areas 17 of the rod part 15. The outer bushings 21 adjoin the inner bushing 22 directly.
Die beiden Scherbolzen 18 weisen an ihren aussenliegenden Enden jeweils einen Kragen oder Flansch 25 auf, mit denen sie sich gegen eine Schulterfläche 26 der zugehörigen Lagerbuchse 21 legen. Die Anordnung ist so getroffen, dass zwischen den in die Lageröffnungen der Buchsen 21,22 eingesetzten Scherbolzen 18 ein axiales Spiel X verbleibt. Im mittleren Bereich weist jeder Scherbolzen 18 eine umlaufende Ringnut 27 als Sollbruchstelle auf, die in der Montagestellung der Scherbolzen an dem innenliegenden Ende der betreffenden Buchse 21 liegt. Die Buchsen 21 weisen an dieser Stelle jeweils eine nut- oder ringförmige Einfräsung 28 auf. The two shear bolts 18 each have a collar or flange 25 at their outer ends, with which they lie against a shoulder surface 26 of the associated bearing bush 21. The arrangement is such that an axial play X remains between the shear bolts 18 inserted into the bearing openings of the bushings 21, 22. In the central area, each shear pin 18 has a circumferential annular groove 27 as a predetermined breaking point, which lies in the assembly position of the shear pin at the inner end of the bushing 21 in question. At this point, the bushings 21 each have a groove-shaped or ring-shaped recess 28.
Die Sicherung der beiden Scherbolzen 18 erfolgt mittels Verschlussplatten 29, welche die äusseren Enden der Buchsen 21 überbrückend aussenseitig mittels Schrauben 30 an den Stangenteilen 14,15 lösbar befestigt sind. Die Verschlussplatten 29 dienen zugleich zur Sicherung der Buchsen 21. The two shear bolts 18 are secured by means of locking plates 29, which are detachably fastened on the outside by bridging the outer ends of the bushings 21 by means of screws 30 to the rod parts 14, 15. The closure plates 29 also serve to secure the bushings 21.
Bei einer vorgegebenen Überlast, die z.B. bei 130 bis 1501 liegt, brechen die Scherbolzen 18 an den Sollbruchstellen 27, wodurch die antriebsmässige Kopplung der beweglichen Brechbacke 10 mit dem angetriebenen Exzenter 11 aufgehoben und der Brecher stillgesetzt wird. Bei dem unvermeidbaren Nachlauf bewegen sich die Stangenteile 14,15 der Schubstange 12 relativ zueinander. Damit die beiden Stangenteile 14, 15 hierbei nicht gegeneinander schlagen, ist ein die Brechbackenbewegung begrenzender Anschlagbock 31 (Fig. 1 und 4) am Rahmen des Backenbrechers angeordnet, gegen welchen die Brechbacke 10 in ihrer grössten Ausschwenkposition zum Anschlag kommt. Die Innenbohrung 16 des Stangenteils 14, welche einen den kolbenartigen Stangenteil 15 aufnehmenden Zylinderraum bildet, ist über mindestens eine Bohrung 32 (Fig. 2) mit der Aussenseite verbunden. Diese Bohrung 32 bildet einen Drosselkanal, über den bei der Ausschubbewegung des kolbenartigen Stangenteils 15 Luft in die Innenbohrung 16 angesaugt und bei der Einschubbewegung des Stangenteils 15 die Luft herausgedrückt wird, was zu einer Dämpfung der Bewegung während der Nachlaufphase des Brechers führt. With a given overload, e.g. is 130 to 1501, the shear pins 18 break at the predetermined breaking points 27, whereby the drive coupling of the movable jaw 10 to the driven eccentric 11 is canceled and the crusher is stopped. In the unavoidable caster, the rod parts 14, 15 of the push rod 12 move relative to one another. So that the two rod parts 14, 15 do not strike against each other here, a stop block 31 (FIGS. 1 and 4) limiting the jaw movement is arranged on the frame of the jaw crusher, against which the jaw 10 comes to a stop in its largest pivoting position. The inner bore 16 of the rod part 14, which forms a cylinder space which receives the piston-like rod part 15, is connected to the outside via at least one bore 32 (FIG. 2). This bore 32 forms a throttle channel, via which air is sucked into the inner bore 16 when the piston-like rod part 15 is pushed out and the air is pressed out when the rod part 15 is pushed in, which leads to a damping of the movement during the after-running phase of the crusher.
Da zwischen den beiden Scherbolzen 18 der Freiraum bzw. das Axialspiel X vorhanden ist, können bei einem Bruch der Scherbolzen die inneren Bolzenbruchstücke nach innen ausweichen, so dass deren ggfls. scharfkantigen Bruchflächen an der Sollbruchstelle 27 während der Nachlaufphase keine Schab- und Fräswirkung an den inneren Stirnflächen der Lagerbuchsen 21 bewirken können. In gleicher Weise verhindern die Eindrehungen 28 eine unerwünschte Ausfräsung und Gratbildung an diesen Stellen der Buchsen 21 während der Nachlaufphase. Since there is free space or axial play X between the two shear bolts 18, if the shear bolts break, the inner bolt fragments can deflect inwards, so that if necessary. sharp-edged fracture surfaces at the predetermined breaking point 27 during the follow-up phase cannot produce a scraping and milling effect on the inner end faces of the bearing bushes 21. In the same way, the indentations 28 prevent undesired milling and burr formation at these points of the bushings 21 during the follow-up phase.
Durch Lösen der Verschlussplatten oder Riegel 29 lassen sich die gebrochenen Scherbolzen aus den Lageröffnungen der Buchsen 21,22 entfernen. Anschliessend können neue Scherbolzen von den entgegengesetzten Seiten her in die Lageröffnungen eingeführt und mittels der Riegel 29 gesichert werden. The broken shear bolts can be removed from the bearing openings of the bushings 21, 22 by loosening the locking plates or bolts 29. Subsequently, new shear bolts can be inserted into the bearing openings from the opposite sides and secured by means of the bolts 29.
Um die Scherbolzen 18 einsetzen zu können, ist es erforderlich, dass die Lageröffnungen 19, 20 der Buchsen 21, 22 miteinander fluchten. Um die Montage zu erleichtern, ist an dem Anschlagbock 31 ein Verstellorgan 32 in Gestalt einer Stellschraube angeordnet, mit welchem sich über die Brechbacke 10 der Stangenteil 15 von Hand oder mittels eines kleinen Stellantriebs verstellen lässt, um die Lageröffnungen gegeneinander auszufluchten. Das Verstellorgan 32 kann, wie dargestellt, an dem Anschlagbock 31 angeordnet werden, so dass es gegenüber dem feststehenden Lagerbock verstellbar ist. Andererseits kann die Anordnung aber auch so getroffen werden, dass mit Hilfe des Verstellorgans der gesamte Lagerbock gegenüber dem Brecherrahmen verstellbar ist. In order to be able to use the shear bolts 18, it is necessary that the bearing openings 19, 20 of the bushings 21, 22 are aligned with one another. In order to facilitate assembly, an adjusting member 32 in the form of an adjusting screw is arranged on the stop block 31, with which the rod part 15 can be adjusted by hand or by means of a small actuator via the crushing jaw 10 in order to align the bearing openings with one another. The adjusting member 32 can, as shown, be arranged on the stop block 31 so that it can be adjusted relative to the fixed bearing block. On the other hand, the arrangement can also be made such that the entire bearing block can be adjusted with respect to the crusher frame with the aid of the adjusting element.
5 5
10 10th
15 15
20 20th
25 25th
30 30th
35 35
40 40
45 45
50 50
55 55
60 60
65 65
S S
2 Blatt Zeichnungen 2 sheets of drawings
Claims (12)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19792930751 DE2930751A1 (en) | 1979-07-28 | 1979-07-28 | OVERLOAD SAFETY OF A JAW CRUSHER, ESPECIALLY A BREAKBREAKER |
Publications (1)
Publication Number | Publication Date |
---|---|
CH649720A5 true CH649720A5 (en) | 1985-06-14 |
Family
ID=6077075
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CH5516/80A CH649720A5 (en) | 1979-07-28 | 1980-07-18 | Overload protection of a jaw crusher, in particular a continuous crusher |
Country Status (3)
Country | Link |
---|---|
CH (1) | CH649720A5 (en) |
DE (1) | DE2930751A1 (en) |
ZA (1) | ZA804430B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE9301460U1 (en) * | 1993-02-03 | 1993-03-25 | Westfalia Becorit Industrietechnik GmbH, 4670 Lünen | Continuous jaw crusher, especially for crushing construction rubble etc. |
CN116618156B (en) * | 2023-07-19 | 2023-09-12 | 河北富康房地产开发有限公司 | Anti-blocking stone crushing equipment for construction |
CN117583063B (en) * | 2024-01-19 | 2024-03-29 | 哈尔滨学院 | Soybean product processingequipment |
-
1979
- 1979-07-28 DE DE19792930751 patent/DE2930751A1/en not_active Withdrawn
-
1980
- 1980-07-18 CH CH5516/80A patent/CH649720A5/en not_active IP Right Cessation
- 1980-07-23 ZA ZA00804430A patent/ZA804430B/en unknown
Also Published As
Publication number | Publication date |
---|---|
DE2930751A1 (en) | 1981-02-26 |
ZA804430B (en) | 1981-08-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE202004021288U1 (en) | Height-adjustable implant for insertion between vertebral bodies and handling tool | |
EP0109693A1 (en) | Connecting device for packaging layers | |
EP0060498B1 (en) | Apparatus for connecting two abutting reinforcing bar ends by a sleeve | |
EP0684174B1 (en) | Locking device for moveable railway-switch parts | |
DE2535315A1 (en) | COMPRESSION DEVICE | |
CH644080A5 (en) | DEVICE FOR COUPLING WRAPPING RODS. | |
DE4322929C1 (en) | Roller chain | |
DE3414067A1 (en) | OVERLOAD PROTECTION | |
EP1171260B1 (en) | Device for fracture-separating a workpiece | |
EP0787528A1 (en) | Vortex mill | |
CH656574A5 (en) | MOLDING UNIT OF AN INJECTION MOLDING MACHINE. | |
EP0303755B1 (en) | Apparatus for granulating chicken excrements or similar materials | |
CH649720A5 (en) | Overload protection of a jaw crusher, in particular a continuous crusher | |
DE3300227A1 (en) | Device for the releasable connection of feed-bar parts of the feed bars in a transfer press | |
EP3412388A1 (en) | Internal clamping means with secure clamping segment ring | |
DE20316274U1 (en) | Device for mounting an oil spray nozzle | |
DE19703495C2 (en) | Trough mixer | |
DE1939952C3 (en) | Core pin in a lock cylinder | |
DE7901702U1 (en) | Screw head | |
DE2435228A1 (en) | ACTUATION ELEMENT, IN PARTICULAR FOR A WINDOW GEAR | |
WO1994026572A1 (en) | Adjustable, insulating push or track rod for railway points | |
EP0570811B1 (en) | Winding mechanism for awnings | |
DE2935540C2 (en) | ||
EP0188797A1 (en) | Device for comminuting stone articles | |
CH481301A (en) | Device for adjusting the length of a linkage, in particular for windows, doors or the like. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PL | Patent ceased |