CH644926A5 - Mortar can - Google Patents

Mortar can Download PDF

Info

Publication number
CH644926A5
CH644926A5 CH102683A CH102683A CH644926A5 CH 644926 A5 CH644926 A5 CH 644926A5 CH 102683 A CH102683 A CH 102683A CH 102683 A CH102683 A CH 102683A CH 644926 A5 CH644926 A5 CH 644926A5
Authority
CH
Switzerland
Prior art keywords
mortar
jug
rollers
drainage
container
Prior art date
Application number
CH102683A
Other languages
German (de)
Inventor
Emil Ott
Original Assignee
Emil Ott
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Emil Ott filed Critical Emil Ott
Priority to CH102683A priority Critical patent/CH644926A5/en
Publication of CH644926A5 publication Critical patent/CH644926A5/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/20Tools or apparatus for applying mortar
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/20Tools or apparatus for applying mortar
    • E04G21/204Mortar sledges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

In the case of a brick wall which is to be erected, the mortar can applies mortar on the upper bed surface of the row of bricks last laid. The mortar can has a container (A) into which the mortar is filled. The container is provided on one side with a handle for the manual advancement of the can, and on the other side it has a discharge channel, at the end of which there is fitted a rolling shoe (B) for the uniform distribution of the mortar when moving the can onwards over a row of bricks. <IMAGE>

Description

       

  
 

**WARNUNG** Anfang DESC Feld konnte Ende CLMS uberlappen **.

 



  PATENTANSPRÜCHE
1. Mörtelkanne, dadurch gekennzeichnet, dass diese einen Mörtelbehälter (A) aufweist und zum Anheben und gleichzeitigen Vorwärtsbewegen einen Griff besitzt und auf der Gegenseite sich der Behälter zu einem Ablaufkännelverengt, wobei der Ablaufkännel am Oberteil des Behälters beginnt und am freien Ende in einen Rollschuh (B) mündet, und zwar so, dass bei Gebrauch der Mörtelkanne das Ende des   Kännels    in jeder Kipplage unten ist, damit der Mörtel aus dem Rollschuh fliessen kann, dessen Oberteil so ausgebildet ist, dass er den Mörtel wie ein Gefäss umschliesst, so dass sich dieser aufstauen kann, um nach hinten   auszufliessen    unter der Rückwand des Rollschuhs hindurch und um von einem Abstreifer auf die gewünschte Dicke abgestreift zu werden, dass der Rollschuh beweglich an den Ablaufkännel durch zwei Schrauben fixiert ist,

   dass erste Rollen (C) als Stützrollen und zweite Rollen (D) als Begleitrollen vorgesehen sind und der Abstreifer mit zwei Führungsschlitzen versehen ist, welche in zwei Schraubenbolzen gelagert sind und mit zwei Drehknöpfen (F) arretiert werden können.



   2. Verwendung der Mörtelkanne nach Patentanspruch 1 zum Erstellen von Backsteinmauern, dadurch gekennzeichnet, dass mittels der gefüllten Kanne der Mörtel auf der ganzen Länge der oberen Lagerfläche einer zu erstellenden   B acksteinmauer    in zwei Lagen aufgetragen wird, wobei die darauf aufzulegende Seinlage vor dem Auflegen so bereit gestellt wird, dass ein Backstein hinter dem andern so anliegt, dass die Stirnseite, welche nachher die vertikale Fuge bildet, oben ist und horizontal verläuft, und die so gebildete horizontale Fläche mit zwei Lagen Mörtel belegt wird, dann ein Stein nach dem andern abgehoben wird und als neue Steinlage auf den bereits bestehenden Teil der zu erstellenden Mauer aufgelegt wird.



   Gegenstand der vorliegenden Erfindung ist eine Mörtelkanne und ihre Verwendung zum Erstellen von Backsteinmauern.



  Zweck der Erfindung ist das Auftragen des Mörtels und das Ausfüllen der Fugen nicht von Hand mit einer Kelle, sondern, unter Zuhilfenahme dieser Erfindung, schneller und ohne grosse Mühe zu bewältigen. Dies wird erreicht durch eine Mörtelkanne gemäss dem kennzeichnenden Teil des Patentanspruches 1 und ihre Verwendung gemäss dem Patentanspruch 2.



   Dank der Erfindung kann mittels der gefüllten Kanne der Mörtel auf der ganzen Länge der oberen Lagerfläche einer zu erstellenden Backsteinmauer in zwei Lagen aufgetragen werden.



  Für die vertikalen Fugen kann der Mörtel zuvor auf die Steine aufgetragen werden gemäss Kennzeichnung des Patentanspruches 2. Zweckmässigerweise sind die Bausteine zwischen 10 und 15 cm breit und weisen nicht zu grosse Löcher auf, es sei denn, dass diese Löcher nicht ganz durchgehend verlaufen, wie bei den Fabrikaten der Firma Steinfabrik Pfäffikon und Firma   HunzikerAG,    Zürich. Was   andereFabrikatebetrifft,    sei erwähnt, dass auch diese so ausgeführt werden könnten, dass die grossen Löcher nicht ganz durchgehend verlaufen.



   Eine erfindungsgemässe Mörtelkanne ist in der beiliegenden Zeichnung in einem Ausführungsbeispiel veranschaulicht und zwar für eine Verwendung zum Erstellen von Backsteinmauern mit Bausteinen von 15 cm Breite. Es zeigen:
Fig. 1 eine perspektivische Ansicht einer erfindungsgemässen Mörtelkanne;
Fig. 2 eine Ansicht von hinten.



   Die gezeichnete Mörtelkanne besteht aus dem eigentlichen   Mörtelb eh älter A,    der nach hinten sich zum Ablaufkännel verengt, welcher zuerst ganz leicht nach oben und dann nach unten verläuft.   Dieser Ablaufkännel ist so    konstruiert, dass das Ende immer auf den Bausteinen läuft, indem er mit einem Rollschuh B beweglich verschraubt ist und zwar so, dass der Behälter in jede Schräglage gebracht werden kann.



   Die Rollen C dienen als Stützrollen, während die hinteren Rollen D die gleiche Funktion nur begrenzt ausüben, indem sie beim Fortbewegen der Mörtelkanne oft nur begrenzt auf dem Stein aufliegen. In diesem Moment sorgen die Stützrollen C dafür, dass beim Abrollen die Distanz vom Stein zum Abstreifer E gleich bleibt. Der Abstreifer E besteht aus einer Platte mit zwei Führungsschlitzen und kann beliebig verstellt werden, je nach der gewünschten Dicke   der Mörtellage.    Er wird mit den beiden Drehknöpfen F arretiert; normalerweise wird der Mörtel ungefähr der Fugendicke entsprechend abgestreift.



   Die Mörtelkanne wird auf die Steinlage aufgesetzt und mit Mörtel aufgefüllt (Mischung 1:4), also   1 TeilWasserund 4Teile    Mischung (Sand und Zement). Dann wird die Mörtelkanne am   Griffgefasstundleicht    angehohen, bei gleichzeitigem Nachziehen der Kanne. Der Mörtel ergiesst sich vom Behälter in den Ablaufkännel, rutscht nach unten in den Rollschuh, dessen Oberteil den Mörtel wie ein Gefäss umschliesst, aus welchem der Mörtel nach hinten und untendurch   ausfliessen    kann, wo er vom Abstreifer auf die gewünschte Dicke abgestreift wird. Durch eine entsprechende Unterteilung wird erreicht, dass zwei Mörtelschichten wie zwei Riemen aufgetragen werden können. Das Auflegen einer neuen Steinlage kann während diesem Vorgang oder kurz danach von einem Maurer erfolgen. 

  Vor dem Auflegen wird die   Stimseite,    d. h. die Seite die nachher die vertikale Fuge bildet, mit Hilfe der Mörtelkanne mit Mörtel belegt. 



  
 

** WARNING ** beginning of DESC field could overlap end of CLMS **.

 



  PATENT CLAIMS
1. Mortar jug, characterized in that it has a mortar container (A) and has a handle for lifting and simultaneously moving forward and on the opposite side the container narrows to a drainage can, the drainage can starting at the upper part of the container and at the free end in a roller skate (B) opens out in such a way that when the mortar jug is used, the end of the jug is at the bottom in every tilt position so that the mortar can flow out of the roller skate, the upper part of which is designed so that it encloses the mortar like a vessel so that it can build up in order to flow backwards under the rear wall of the roller skate and to be wiped to the desired thickness by a scraper, so that the roller skate is movably fixed to the drainage canister by two screws,

   that first rollers (C) are provided as support rollers and second rollers (D) as accompanying rollers and the scraper is provided with two guide slots which are mounted in two screw bolts and can be locked with two rotary knobs (F).



   2. Use of the mortar can according to claim 1 for creating brick walls, characterized in that by means of the filled can the mortar is applied over the entire length of the upper bearing surface of a brick wall to be created in two layers, the layer of being to be placed thereon before laying on It is provided that one brick lies behind the other in such a way that the end face, which subsequently forms the vertical joint, is above and runs horizontally, and the horizontal surface thus formed is covered with two layers of mortar, then one stone after the other is lifted off and is placed as a new stone layer on the already existing part of the wall to be created.



   The present invention relates to a mortar jug and its use for building brick walls.



  The purpose of the invention is the application of the mortar and the filling of the joints not by hand with a trowel, but, with the aid of this invention, to be accomplished more quickly and with little effort. This is achieved by a mortar can according to the characterizing part of patent claim 1 and its use according to patent claim 2.



   Thanks to the invention, the mortar can be applied in two layers over the entire length of the upper bearing surface of a brick wall to be created by means of the filled pot.



  For the vertical joints, the mortar can be applied to the stones beforehand in accordance with the characterization of claim 2. The blocks are expediently between 10 and 15 cm wide and do not have holes that are too large, unless these holes do not run completely through, such as for the brands of Steinfabrik Pfäffikon and Hunziker AG, Zurich. As far as other brands are concerned, it should be mentioned that these could also be designed so that the large holes do not run completely through.



   A mortar can according to the invention is illustrated in the exemplary embodiment in the accompanying drawing, specifically for use in the construction of brick walls with building blocks of 15 cm in width. Show it:
1 is a perspective view of a mortar can according to the invention;
Fig. 2 is a rear view.



   The drawn mortar jug consists of the actual mortar before A, which narrows towards the back to the drainage can, which first runs slightly upwards and then downwards. This drainage can is constructed in such a way that the end always runs on the building blocks by being screwed together with a roller skate B in such a way that the container can be brought into any inclined position.



   The rollers C serve as support rollers, while the rear rollers D perform the same function only to a limited extent, since they often only lie on the stone to a limited extent when the mortar jug is moving. At this moment, the support rollers C ensure that the distance from the stone to the scraper E remains the same when rolling. The scraper E consists of a plate with two guide slots and can be adjusted as required, depending on the desired thickness of the mortar layer. It is locked with the two knobs F; normally the mortar is stripped off according to the joint thickness.



   The mortar jug is placed on the stone layer and filled with mortar (mixture 1: 4), i.e. 1 part water and 4 parts mixture (sand and cement). Then the mortar jug is gripped by the handle and slightly raised, while the jug is being pulled. The mortar pours out of the container into the drainage can, slides down into the roller skate, the upper part of which surrounds the mortar like a vessel from which the mortar can flow back and underneath, where it is stripped to the desired thickness by the scraper. Appropriate subdivision ensures that two layers of mortar can be applied like two belts. A bricklayer can lay a new stone layer during this process or shortly thereafter.

  Before hanging up, the front side, i.e. H. the side that subsequently forms the vertical joint is covered with mortar using the mortar can.


    

Claims (2)

PATENTANSPRÜCHE 1. Mörtelkanne, dadurch gekennzeichnet, dass diese einen Mörtelbehälter (A) aufweist und zum Anheben und gleichzeitigen Vorwärtsbewegen einen Griff besitzt und auf der Gegenseite sich der Behälter zu einem Ablaufkännelverengt, wobei der Ablaufkännel am Oberteil des Behälters beginnt und am freien Ende in einen Rollschuh (B) mündet, und zwar so, dass bei Gebrauch der Mörtelkanne das Ende des Kännels in jeder Kipplage unten ist, damit der Mörtel aus dem Rollschuh fliessen kann, dessen Oberteil so ausgebildet ist, dass er den Mörtel wie ein Gefäss umschliesst, so dass sich dieser aufstauen kann, um nach hinten auszufliessen unter der Rückwand des Rollschuhs hindurch und um von einem Abstreifer auf die gewünschte Dicke abgestreift zu werden, dass der Rollschuh beweglich an den Ablaufkännel durch zwei Schrauben fixiert ist, PATENT CLAIMS 1. Mortar jug, characterized in that it has a mortar container (A) and has a handle for lifting and simultaneously moving forward and on the opposite side the container narrows to a drainage can, the drainage can starting at the upper part of the container and at the free end in a roller skate (B) opens out in such a way that when the mortar jug is used, the end of the jug is at the bottom in every tilt position so that the mortar can flow out of the roller skate, the upper part of which is designed so that it encloses the mortar like a vessel so that it can build up in order to flow backwards under the rear wall of the roller skate and to be wiped to the desired thickness by a scraper, so that the roller skate is movably fixed to the drainage canister by two screws, dass erste Rollen (C) als Stützrollen und zweite Rollen (D) als Begleitrollen vorgesehen sind und der Abstreifer mit zwei Führungsschlitzen versehen ist, welche in zwei Schraubenbolzen gelagert sind und mit zwei Drehknöpfen (F) arretiert werden können.  that first rollers (C) are provided as support rollers and second rollers (D) as accompanying rollers and the scraper is provided with two guide slots which are mounted in two screw bolts and can be locked with two rotary knobs (F). 2. Verwendung der Mörtelkanne nach Patentanspruch 1 zum Erstellen von Backsteinmauern, dadurch gekennzeichnet, dass mittels der gefüllten Kanne der Mörtel auf der ganzen Länge der oberen Lagerfläche einer zu erstellenden B acksteinmauer in zwei Lagen aufgetragen wird, wobei die darauf aufzulegende Seinlage vor dem Auflegen so bereit gestellt wird, dass ein Backstein hinter dem andern so anliegt, dass die Stirnseite, welche nachher die vertikale Fuge bildet, oben ist und horizontal verläuft, und die so gebildete horizontale Fläche mit zwei Lagen Mörtel belegt wird, dann ein Stein nach dem andern abgehoben wird und als neue Steinlage auf den bereits bestehenden Teil der zu erstellenden Mauer aufgelegt wird.  2. Use of the mortar can according to claim 1 for creating brick walls, characterized in that by means of the filled can the mortar is applied over the entire length of the upper bearing surface of a brick wall to be created in two layers, the layer of being to be placed thereon before laying on It is provided that one brick lies behind the other in such a way that the end face, which subsequently forms the vertical joint, is above and runs horizontally, and the horizontal surface thus formed is covered with two layers of mortar, then one stone after the other is lifted off and is placed as a new stone layer on the already existing part of the wall to be created. Gegenstand der vorliegenden Erfindung ist eine Mörtelkanne und ihre Verwendung zum Erstellen von Backsteinmauern.  The present invention relates to a mortar jug and its use for building brick walls. Zweck der Erfindung ist das Auftragen des Mörtels und das Ausfüllen der Fugen nicht von Hand mit einer Kelle, sondern, unter Zuhilfenahme dieser Erfindung, schneller und ohne grosse Mühe zu bewältigen. Dies wird erreicht durch eine Mörtelkanne gemäss dem kennzeichnenden Teil des Patentanspruches 1 und ihre Verwendung gemäss dem Patentanspruch 2. The purpose of the invention is the application of the mortar and the filling of the joints not by hand with a trowel, but, with the aid of this invention, to be accomplished more quickly and with little effort. This is achieved by a mortar can according to the characterizing part of patent claim 1 and its use according to patent claim 2. Dank der Erfindung kann mittels der gefüllten Kanne der Mörtel auf der ganzen Länge der oberen Lagerfläche einer zu erstellenden Backsteinmauer in zwei Lagen aufgetragen werden.  Thanks to the invention, the mortar can be applied in two layers over the entire length of the upper bearing surface of a brick wall to be created by means of the filled pot. Für die vertikalen Fugen kann der Mörtel zuvor auf die Steine aufgetragen werden gemäss Kennzeichnung des Patentanspruches 2. Zweckmässigerweise sind die Bausteine zwischen 10 und 15 cm breit und weisen nicht zu grosse Löcher auf, es sei denn, dass diese Löcher nicht ganz durchgehend verlaufen, wie bei den Fabrikaten der Firma Steinfabrik Pfäffikon und Firma HunzikerAG, Zürich. Was andereFabrikatebetrifft, sei erwähnt, dass auch diese so ausgeführt werden könnten, dass die grossen Löcher nicht ganz durchgehend verlaufen. For the vertical joints, the mortar can be applied to the stones beforehand in accordance with the characterization of claim 2. The blocks are expediently between 10 and 15 cm wide and do not have holes that are too large, unless these holes do not run completely through, such as for the brands of Steinfabrik Pfäffikon and Hunziker AG, Zurich. As far as other brands are concerned, it should be mentioned that these could also be designed so that the large holes do not run completely through. Eine erfindungsgemässe Mörtelkanne ist in der beiliegenden Zeichnung in einem Ausführungsbeispiel veranschaulicht und zwar für eine Verwendung zum Erstellen von Backsteinmauern mit Bausteinen von 15 cm Breite. Es zeigen: Fig. 1 eine perspektivische Ansicht einer erfindungsgemässen Mörtelkanne; Fig. 2 eine Ansicht von hinten.  A mortar can according to the invention is illustrated in the exemplary embodiment in the accompanying drawing, specifically for use in the construction of brick walls with building blocks of 15 cm in width. Show it: 1 is a perspective view of a mortar can according to the invention; Fig. 2 is a rear view. Die gezeichnete Mörtelkanne besteht aus dem eigentlichen Mörtelb eh älter A, der nach hinten sich zum Ablaufkännel verengt, welcher zuerst ganz leicht nach oben und dann nach unten verläuft. Dieser Ablaufkännel ist so konstruiert, dass das Ende immer auf den Bausteinen läuft, indem er mit einem Rollschuh B beweglich verschraubt ist und zwar so, dass der Behälter in jede Schräglage gebracht werden kann.  The drawn mortar jug consists of the actual mortar before A, which narrows towards the back to the drainage can, which first runs slightly upwards and then downwards. This drainage can is constructed in such a way that the end always runs on the building blocks by being screwed together with a roller skate B in such a way that the container can be brought into any inclined position. Die Rollen C dienen als Stützrollen, während die hinteren Rollen D die gleiche Funktion nur begrenzt ausüben, indem sie beim Fortbewegen der Mörtelkanne oft nur begrenzt auf dem Stein aufliegen. In diesem Moment sorgen die Stützrollen C dafür, dass beim Abrollen die Distanz vom Stein zum Abstreifer E gleich bleibt. Der Abstreifer E besteht aus einer Platte mit zwei Führungsschlitzen und kann beliebig verstellt werden, je nach der gewünschten Dicke der Mörtellage. Er wird mit den beiden Drehknöpfen F arretiert; normalerweise wird der Mörtel ungefähr der Fugendicke entsprechend abgestreift.  The rollers C serve as support rollers, while the rear rollers D perform the same function only to a limited extent, since they often only lie on the stone to a limited extent when the mortar jug is moving. At this moment, the support rollers C ensure that the distance from the stone to the scraper E remains the same when rolling. The scraper E consists of a plate with two guide slots and can be adjusted as required, depending on the desired thickness of the mortar layer. It is locked with the two knobs F; normally the mortar is stripped off according to the joint thickness. Die Mörtelkanne wird auf die Steinlage aufgesetzt und mit Mörtel aufgefüllt (Mischung 1:4), also 1 TeilWasserund 4Teile Mischung (Sand und Zement). Dann wird die Mörtelkanne am Griffgefasstundleicht angehohen, bei gleichzeitigem Nachziehen der Kanne. Der Mörtel ergiesst sich vom Behälter in den Ablaufkännel, rutscht nach unten in den Rollschuh, dessen Oberteil den Mörtel wie ein Gefäss umschliesst, aus welchem der Mörtel nach hinten und untendurch ausfliessen kann, wo er vom Abstreifer auf die gewünschte Dicke abgestreift wird. Durch eine entsprechende Unterteilung wird erreicht, dass zwei Mörtelschichten wie zwei Riemen aufgetragen werden können. Das Auflegen einer neuen Steinlage kann während diesem Vorgang oder kurz danach von einem Maurer erfolgen.  The mortar jug is placed on the stone layer and filled with mortar (mixture 1: 4), i.e. 1 part water and 4 parts mixture (sand and cement). Then the mortar jug is gripped by the handle and slightly raised, while the jug is being pulled. The mortar pours out of the container into the drainage can, slides down into the roller skate, the upper part of which surrounds the mortar like a vessel from which the mortar can flow back and underneath, where it is stripped to the desired thickness by the scraper. A corresponding subdivision ensures that two layers of mortar can be applied like two belts. A bricklayer can lay a new stone layer during this process or shortly thereafter. Vor dem Auflegen wird die Stimseite, d. h. die Seite die nachher die vertikale Fuge bildet, mit Hilfe der Mörtelkanne mit Mörtel belegt. **WARNUNG** Ende CLMS Feld konnte Anfang DESC uberlappen**. Before hanging up, the front side, i.e. H. the side that subsequently forms the vertical joint is covered with mortar using the mortar can. ** WARNING ** End of CLMS field could overlap beginning of DESC **.
CH102683A 1983-02-11 1983-02-11 Mortar can CH644926A5 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CH102683A CH644926A5 (en) 1983-02-11 1983-02-11 Mortar can

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH102683A CH644926A5 (en) 1983-02-11 1983-02-11 Mortar can

Publications (1)

Publication Number Publication Date
CH644926A5 true CH644926A5 (en) 1984-08-31

Family

ID=4200715

Family Applications (1)

Application Number Title Priority Date Filing Date
CH102683A CH644926A5 (en) 1983-02-11 1983-02-11 Mortar can

Country Status (1)

Country Link
CH (1) CH644926A5 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2897629A1 (en) * 2006-02-22 2007-08-24 Wienerberger Soc Par Actions S Mortar joint installing device for e.g. decorative walls, has base unit forming reservoir of mortar and including plane inclined from its lower face towards upper part in opposite direction to end carrying grab bar
CZ303520B6 (en) * 2011-05-03 2012-11-07 HELUZ cihlárský prumysl v.o.s. Application method of polyurethane foam and applicator for making the same
CN114482581A (en) * 2022-01-24 2022-05-13 贵州宏安升建材有限公司 Red brick mortar paints device for building
CN114809678A (en) * 2022-06-06 2022-07-29 重庆市五环工程建设管理有限公司 Mortar quantitative conveying device for movable painting trolley
CN117027445A (en) * 2023-10-09 2023-11-10 山西一建集团有限公司 Installation auxiliary device is used in refrigeration house plate construction

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2897629A1 (en) * 2006-02-22 2007-08-24 Wienerberger Soc Par Actions S Mortar joint installing device for e.g. decorative walls, has base unit forming reservoir of mortar and including plane inclined from its lower face towards upper part in opposite direction to end carrying grab bar
CZ303520B6 (en) * 2011-05-03 2012-11-07 HELUZ cihlárský prumysl v.o.s. Application method of polyurethane foam and applicator for making the same
CN114482581A (en) * 2022-01-24 2022-05-13 贵州宏安升建材有限公司 Red brick mortar paints device for building
CN114809678A (en) * 2022-06-06 2022-07-29 重庆市五环工程建设管理有限公司 Mortar quantitative conveying device for movable painting trolley
CN117027445A (en) * 2023-10-09 2023-11-10 山西一建集团有限公司 Installation auxiliary device is used in refrigeration house plate construction
CN117027445B (en) * 2023-10-09 2023-12-08 山西一建集团有限公司 Installation auxiliary device is used in refrigeration house plate construction

Similar Documents

Publication Publication Date Title
DE1584691A1 (en) Machine and method for producing concrete structural parts
AT247768B (en) Method and device for the production of prefabricated, preferably story-high brick slabs
CH644926A5 (en) Mortar can
DE2811136A1 (en) Double floor filled hollow upright supports - have tube sections inserted in feet and aligned and levelled before feet harden
DE2135577C3 (en) Shoring basket for continuously progressing shoring of a sewer trench
EP0240801B2 (en) Screed for plaster or cement
DE2210829A1 (en) Machine for the surface treatment of concrete elements
DE3406108C2 (en)
DE2308928A1 (en) DEVICE FOR PROVIDING A FLOWABLE, POSSIBLE OR NON-HARDENABLE MASS LIKE (CONCRETE MORTAR), ASPHALT BITUMES AND THE LIKE, UNDER WATER
DE1953784A1 (en) Method and device for inserting joint boards in joints in concrete road surfaces
DE522599C (en) Method and device for the production of walls from shaped stones
DE2922154C2 (en) Slipform paver for laying a concrete layer on a substructure
EP1378618A2 (en) Apparatus for forming an accurate screeding profile
DE4032577A1 (en) Cement mortar spreading tool - has rear wall with opening controlled by adjustable blade to form even layer
DE3024762A1 (en) Auxiliary brick laying set - has rectangular, U=shaped mortar bed frame whose dimensions define mortar joint, and has rectangular mortar bed slide
DE865969C (en) Method and device for making walls
DE2658890C2 (en) Basin for settling suspended matter in water, as a filter basin, sludge basin, clarifier or the like
DE7919618U1 (en) DEVICE FOR DISTRIBUTING MOERTEL
DE29718544U1 (en) Device for applying mortar to one side of stones
DE2131501C3 (en) Procedure for the foundation of a structure under water
DE2112612C3 (en) Device for applying and distributing gravel-like masses on drainage lines laid in a pipe trench
AT109248B (en) Device for guiding walls made of shaped stones.
DE841637C (en) Traveling formwork for the production of structures with walls arranged in the direction of travel and transversely thereto
CH114869A (en) Device for building walls made of shaped stones.
DE1784587A1 (en) Finisher for the production of slab or strip-shaped concrete coverings or sheets

Legal Events

Date Code Title Description
PL Patent ceased