CH360196A - Climbing formwork for concreting work - Google Patents

Climbing formwork for concreting work

Info

Publication number
CH360196A
CH360196A CH360196DA CH360196A CH 360196 A CH360196 A CH 360196A CH 360196D A CH360196D A CH 360196DA CH 360196 A CH360196 A CH 360196A
Authority
CH
Switzerland
Prior art keywords
planks
formwork
panel
rails
attached
Prior art date
Application number
Other languages
German (de)
Original Assignee
Aluminium Ind Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aluminium Ind Ag filed Critical Aluminium Ind Ag
Publication of CH360196A publication Critical patent/CH360196A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/28Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

  

      Kletterschalung        für        Betonierungsarbeiten       Es sind Kletterschalungen für     Betonierungsarbei-          ten    bekannt, die aus einer an einem Traggerüst be  festigtem Schaltafel bestehen. Die Schaltafel ist aus  horizontalen oder vertikalen, durch Halteschienen  miteinander verbundenen Planken     zusammengesetzt.     Das Traggerüst, an dessen oberer Hälfte die Schal  tafel befestigt ist, und das im unteren Teil mit Hilfe  von einbetonierten     Bolzen    oder Ankern im bereits  betonierten Teil des Bauwerkes befestigt ist, besteht  im wesentlichen aus     vertikalen    und     horizontalen     Trägern.

   Es tritt nun häufig der Fall ein, insbeson  dere bei Staumauern, dass die zu betonierenden  Mauern in vertikaler und/oder in horizontaler Rich  tung gekrümmt sein sollen. Da die bekannten Klet  terschalungen starr sind, können sie einer Krümmung  nicht angepasst werden.  



  Die vorliegende Erfindung bezieht sich auf eine  Kletterschalung für     Betonierungsarbeiten    mit einer  an einem Traggerüst befestigten Schaltafel aus durch  Halteschienen miteinander verbundenen Planken,  der auf einfache Weise die gewünschte Krümmung  erteilt werden kann. Erfindungsgemäss ist die Schal  tafel mit Hilfe von in ihrer Länge verstellbaren  Spannelementen am Gerüst befestigt, so dass sie  durch verschiedene Einstellung der in Reihen. par  allel zu den Planken angeordneten Verbindungsele  mente und Einfügen von Distanzstücken in Längs  richtung der Planken quer zur     Plankenebene    gebogen  werden kann, um sie der Krümmung des zu beto  nierenden Objektes anpassen zu können.  



  In der     Zeichnung    ist ein Ausführungsbeispiel  der erfindungsgemässen Kletterschalung dargestellt.       Fig.    1 ist eine Ansicht der     Kletterschalung    von der  der Mauer abgekehrten Seite;     Fig.    2 stellt eine  Draufsicht und     Fig.    3 eine Seitenansicht dar.  



  Die Kletterschalung besteht aus der Schaltafel,  die aus den     horizontalen    Planken 1 und den verti-         kalen    Halteschienen 2 zusammengesetzt ist, und dem  Traggerüst aus den     Vertikalträgern    3 und den Quer  schienen 4. Als Konstruktionswerkstoffe kommen  vor allem Leichtmetall, Stahl oder Holz in Frage.  Aluminiumwerkstoffe weisen den Vorteil auf, dass  sie leicht im Gewicht sind und sich bei der Anpas  sung der     Schalung    an die     Mauerkrümmung    leicht  biegen lassen; sie kommen vor allem für die Plan  ken in Frage.  



  Die Planken 1 der     Schaltafel    weisem vorzugs  weise auf einer Seite Längsrippen. auf, mit denen  sie auf irgendeine Weise an den Halteschienen 2       befestigt    sind. Die Halteschienen können im Quer  schnitt irgendein Profil aufweisen.  



  Die Planken sind lösbar an den Halteschienen  befestigt, so dass sie bei Beschädigung leicht aus  gewechselt werden     können.    Sie können dann auch  nach Belieben gegeneinander versetzt angeordnet  werden und z. B. eine rhombische Schalfläche bil  den. In einer der oberen Planken sind in bekannter  Weise Löcher oder     Schlitze    angeordnet zum Durch  stecken und Befestigen der einzubetonierenden An  ker 7.  



  Die Vertikalträger 3 sind     I-Balken,    deren Stege  Ausschnitte zur Durchführung der sie verbinden  den Querschienen 4 aufweisen. Sie können auch  einen anderen Querschnitt aufweisen, und die  Querschienen 4, von     ebenfalls    beliebiger Form, kön  nen auch ausserhalb der Vertikalträger 3 auf den       Flanschen    derselben aufliegen, wie z. B. die Ver  bindungsschiene 12, welche die unteren Enden der       Vertikalträger    3 miteinander verbindet. Das Trag  gerüst ist auf die im bereits     erhärteten    Mauerstück  5 einbetonierten Anker 6 mittels Konsolen 11 auf  gesetzt und befestigt.

   Im neu zu betonierenden       Mauerstück    werden im richtigen Abstand neue An  ker 7     einbetoniert,    so dass nach Erhärtung des Betons      die     Kletterschalung    um die Höhe einer     Betonierungs-          schicht    gehoben werden kann.

   Am unteren Ende  der Vertikalträger 3 ist je eine     Verstellvorrichtung     8 angebracht, mit deren Hilfe der Abstand des un  teren Endes der Vertikalträger von der Mauer ver  schieden eingestellt werden     kann,    um der Schaltafel       eventuell    eine von der     Vertikalen    abweichende Nei  gung zu geben bzw. eine in ihrer Höhe polygonal  gekrümmte Mauer zu schalen, wobei die obere  Ankerreihe als Drehachse wirkt.  



  Die     Schaltafel,    ist mit     Hilfe    von in ihrer Länge  verstellbaren Spannelementen 9 am Traggerüst be  festigt. Diese Spannelemente sind     in    mehreren Rei  hen     parallel    zu den Planken an den vertikalen Halte  schienen 2 der Schaltafel befestigt. Sie greifen an  derseits an den horizontalen Querschienen 4 des  Traggerüstes an und ziehen die Schaltafel an das  Traggerüst. Die Spannelemente sind z. B.

   Spindeln,  die in Bügeln an den Halteschienen 2 beweglich       eingehängt    sind und mit ihrem Gewindeteil die  Querschienen 4 des Traggerüstes     durchstossen.     Durch Drehen von an den Querschienen anliegenden  Schraubenmuttern werden die Halteschienen an die  Querschienen herangezogen oder von diesen weg  gestossen. Durch Anziehen des mittleren Spannele  mentes 9 in jeder Reihe und Einfügen von Distanz  stücken zwischen Schaltafel und den äusseren Ver  tikalträgern 3 kann der Schaltafel eine konvexe  Krümmung aufgezwungen werden. Dabei wird, wie       Fig.    3 zeigt, die Schaltafel in Längsrichtung der Plan  ken und quer zu der Ebene gebogen, in welcher die  Planken bei nicht gekrümmter Schaltafel liegen.

    Umgekehrt kann durch Anziehen der äusseren Ver  bindungselemente und Einfügen der Distanzstücke  zwischen Schaltafel und inneren Vertikalträgern die  Schalung auch zum Betonieren konkav gekrümm  ter Wände verwendet werden. Soll eine in vertikaler  Richtung gekrümmte Wand betoniert werden, so  wird die Schaltafel so gestellt,     d'ass    die Planken ver  tikal stehen. Die Schaltafel kann dann auf gleiche  Weise mit Hilfe der Spannelemente gebogen werden.



      Climbing formwork for concreting work Climbing formwork for concreting work is known which consists of a formwork panel fastened to a supporting structure. The panel is made up of horizontal or vertical planks connected to one another by holding rails. The shoring, on the upper half of which the scarf panel is attached, and which is attached in the lower part with the help of concreted bolts or anchors in the already concreted part of the structure, consists essentially of vertical and horizontal beams.

   The case now often occurs, especially in the case of dams, that the walls to be concreted should be curved in the vertical and / or in the horizontal direction. Since the known climbing formworks are rigid, they cannot be adapted to a curvature.



  The present invention relates to a climbing formwork for concreting work with a formwork panel which is fastened to a supporting frame and made of planks connected to one another by holding rails and which can be given the desired curvature in a simple manner. According to the invention, the scarf panel is attached to the frame with the help of adjustable length tensioning elements, so that they can be set in rows by different settings. In parallel to the planks arranged connecting elements and inserting spacers in the longitudinal direction of the planks can be bent transversely to the plank plane in order to be able to adapt them to the curvature of the object to be concreted.



  An exemplary embodiment of the climbing formwork according to the invention is shown in the drawing. Fig. 1 is a view of the climbing formwork from the side facing away from the wall; Fig. 2 shows a plan view and Fig. 3 shows a side view.



  The climbing formwork consists of the formwork panel, which is composed of the horizontal planks 1 and the vertical support rails 2, and the supporting frame made of the vertical beams 3 and the cross rails 4. The construction materials mainly light metal, steel or wood come into question. Aluminum materials have the advantage that they are light in weight and can be easily bent when adapting the formwork to the curvature of the wall; they are particularly suitable for the plans.



  The planks 1 of the panel show preference as longitudinal ribs on one side. with which they are attached to the support rails 2 in some way. The support rails can have any profile in cross-section.



  The planks are detachably attached to the support rails so that they can be easily replaced if damaged. You can then also be arranged offset from one another at will and z. B. a rhombic scarf bil the. In one of the upper planks, holes or slots are arranged in a known manner for inserting and securing the anchor 7 to be set in concrete.



  The vertical beams 3 are I-beams, the webs of which have cutouts for the implementation of the cross rails 4 that they connect. They can also have a different cross section, and the cross rails 4, also of any shape, can also rest outside the vertical beam 3 on the flanges of the same, such as. B. the connection rail 12, which connects the lower ends of the vertical support 3 together. The support frame is set on the already hardened wall section 5 anchors 6 by means of brackets 11 and attached.

   In the new section of wall to be concreted, new anchors 7 are concreted in at the correct spacing, so that after the concrete has hardened, the climbing formwork can be raised by the height of a concreting layer.

   At the lower end of the vertical support 3 an adjusting device 8 is attached, with the help of which the distance between the un lower end of the vertical support from the wall can be set differently to give the panel possibly a different inclination from the vertical or an in to form a wall with a polygonal curve at its height, with the upper row of anchors acting as an axis of rotation.



  The formwork panel is fastened with the help of adjustable clamping elements 9 on the supporting structure be. These clamping elements are parallel to the planks on the vertical holding rails 2 of the formwork panel in several rows. On the other hand, they attack the horizontal cross rails 4 of the supporting structure and pull the panel onto the supporting structure. The clamping elements are z. B.

   Spindles that are movably suspended in brackets on the support rails 2 and with their threaded part pierce the cross rails 4 of the supporting frame. By turning the screw nuts resting on the cross rails, the holding rails are pulled towards the cross rails or pushed away from them. By tightening the middle Spannele Mentes 9 in each row and inserting distance pieces between the panel and the outer Ver tikalträgern 3, the panel can be forced to a convex curvature. Here, as shown in FIG. 3, the panel is bent in the longitudinal direction of the plan ken and transversely to the plane in which the planks are not curved panel.

    Conversely, by tightening the outer connecting elements and inserting the spacers between the panel and the inner vertical beams, the formwork can also be used for concreting concave walls ter. If a wall that is curved in the vertical direction is to be concreted, the panel is placed so that the planks are vertical. The panel can then be bent in the same way with the help of the clamping elements.

 

Claims (1)

PATENTANSPRUCH 1 Kletterschalung für Betonierungsarbeiten mit einer an einem Traggerüst befestigten Schaltafel, die aus durch Halteschienen miteinander verbundenen Plan ken besteht, dadurch gekennzeichnet, dass die Schal tafel mit Hilfe von in ihrer Länge verstellbaren Spannelementen (9) am Traggerüst befestigt ist, so dass sie durch verschiedene Einstellung der in Rei hen parallel zu den Planken angeordneten Spannele mente und Einfügen von Distanzstücken in Längs richtung der Planken quer zur Plankenebene gebo gen werden kann, um sie der Krümmung des zu betonierenden Objektes anpassen zu können. UNTERANSPRÜCHE 1. PATENT CLAIM 1 Climbing formwork for concreting work with a formwork panel attached to a supporting frame, which consists of plan ken connected to one another by holding rails, characterized in that the formwork panel is attached to the supporting frame with the help of adjustable clamping elements (9) so that it can be through various settings of the tension elements arranged in parallel to the planks and insertion of spacers in the longitudinal direction of the planks transversely to the plank plane can be bent in order to adapt them to the curvature of the object to be concreted. SUBCLAIMS 1. Kletterschalung nach Patentanspruch 1, da durch gekennzeichnet, dass horizontale Planken durch mehrere vertikale Halteschienen (2) zusammenge fasst sind, an denen verstellbare Spannelemente (9) befestigt sind, die anderseits an horizontalen Quer schienen (4) des Traggerüstes angreifen. 2. Kletterschalung nach Patentanspruch 1, da durch gekennzeichnet, dass die Planken der Schal tafel vertikal stehen. 3. Kletterschalung nach Patentanspruch 1, da durch gekennzeichnet, dass die Planken lösbar an den Halteschienen befestigt sind.. Climbing formwork according to claim 1, characterized in that horizontal planks are summarized by several vertical retaining rails (2) on which adjustable clamping elements (9) are attached, which on the other hand attack the horizontal transverse rails (4) of the supporting frame. 2. climbing formwork according to claim 1, characterized in that the planks of the scarf panel are vertical. 3. Climbing formwork according to claim 1, characterized in that the planks are releasably attached to the support rails. PATENTANSPRUCH II Verwendung der Kletterschalung gemäss Patent anspruch I für die Herstellung von eine gekrümmte Fläche aufweisende Mauern, dadurch gekennzeich net, dass durch Anziehen der einen der in Reihen parallel zu den Planken liegenden Spannelemente und Lockern der anderen und Einfügen von Di stanzstecken zwischen Schaltafel und Traggerüst die Schaltafel der Krümmung der herzustellenden Mauer angepasst wird, wobei die Schaltafel so ge stellt wird, dass die Planken in Richtung der Mauer krümmung verlaufen. PATENT CLAIM II Use of the climbing formwork according to patent claim I for the production of walls having a curved surface, characterized in that by tightening one of the tensioning elements lying in rows parallel to the planks and loosening the other and inserting distance between the formwork and supporting structure the formwork panel is adapted to the curvature of the wall to be produced, the formwork panel being provided so that the planks extend in the direction of the curvature of the wall.
CH360196D 1957-10-09 1957-10-09 Climbing formwork for concreting work CH360196A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH360196T 1957-10-09

Publications (1)

Publication Number Publication Date
CH360196A true CH360196A (en) 1962-02-15

Family

ID=4512522

Family Applications (1)

Application Number Title Priority Date Filing Date
CH360196D CH360196A (en) 1957-10-09 1957-10-09 Climbing formwork for concreting work

Country Status (1)

Country Link
CH (1) CH360196A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2452182A1 (en) * 1974-11-02 1976-05-06 Dyckerhoff & Widmann Ag Reinforced concrete building climbing formwork system erection - using brackets on climbing frame carriage for formwork deposit during climbing
JPS539009B1 (en) * 1967-03-09 1978-04-03
EP2101015A3 (en) * 2008-03-12 2014-06-11 Rund-Stahl-Bau Gesellschaft M.B.H. Method for manufacturing a wall of a construction structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS539009B1 (en) * 1967-03-09 1978-04-03
DE2452182A1 (en) * 1974-11-02 1976-05-06 Dyckerhoff & Widmann Ag Reinforced concrete building climbing formwork system erection - using brackets on climbing frame carriage for formwork deposit during climbing
EP2101015A3 (en) * 2008-03-12 2014-06-11 Rund-Stahl-Bau Gesellschaft M.B.H. Method for manufacturing a wall of a construction structure

Similar Documents

Publication Publication Date Title
DE2142150A1 (en) Support structure for formwork and work and stabilization scaffolding for this
DE2109088B2 (en) Spatial building element for the formation of all kinds of supporting structures
DE4126132A1 (en) Pre-construction and transporting of block walling - has arrangement of load carrying bars and rails and tensioning for transporting block constructed sections
EP0350525B1 (en) Method for producing building-walls and a shuttering system
EP0138196B1 (en) Method of erection of buildings consisting of casting materials in particular of concrete and device for carrying out the method
EP1156175A2 (en) Method for erecting several similar constructions having a frustoconical shape
CH360196A (en) Climbing formwork for concreting work
DE820963C (en) Scaffolding with stands made of tubes
EP0119379B1 (en) Scaffolding
DE1584637C3 (en) Device for producing a large-format building board and use of the device
DE2153495A1 (en) PREFABRICATED CEILING PANEL FOR ASSEMBLY CONSTRUCTION
DE1659218C3 (en) Composite trusses and methods of assembling them
AT412359B (en) FORMWORK
DE19713931A1 (en) Balcony tower and process for its manufacture and process and device for its assembly
DE2128548C3 (en) Device for the point-by-point support of prefabricated prestressed concrete slabs. <
DE907922C (en) Process for the construction or repair of a self-supporting furnace vault and formwork beams to carry out the process
CH190932A (en) Scaffolding on a concrete wall and process for its manufacture.
DE571338C (en) Process for the manufacture of reinforced concrete poles
DE1459925C (en) Buildings made from prefabricated components
DE2035372A1 (en) Method and form for forming a shell of construction or structural parts made of concrete or reinforced concrete
AT208057B (en) Climbing formwork
DE1824493U (en) CLIMBING FORMWORK DEVICE FOR CONCRETE WORK.
AT218229B (en) Scaffolding for supporting formwork
DE2353932A1 (en) SUPPORT DEVICE FOR FORMING PANELS
DE1934132C3 (en) Prefabricated formwork unit for ribbed concrete ceilings or similar ceilings