CH134474A - Method for distributing the total load to be handled by a power plant or group of plants. - Google Patents

Method for distributing the total load to be handled by a power plant or group of plants.

Info

Publication number
CH134474A
CH134474A CH134474DA CH134474A CH 134474 A CH134474 A CH 134474A CH 134474D A CH134474D A CH 134474DA CH 134474 A CH134474 A CH 134474A
Authority
CH
Switzerland
Prior art keywords
plants
power plant
total load
power
group
Prior art date
Application number
Other languages
German (de)
Inventor
Cie Aktiengesellschaft Boveri
Original Assignee
Bbc Brown Boveri & Cie
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bbc Brown Boveri & Cie filed Critical Bbc Brown Boveri & Cie
Publication of CH134474A publication Critical patent/CH134474A/en

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/06Programme control other than numerical control, i.e. in sequence controllers or logic controllers using cams, discs, rods, drums or the like
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01HELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
    • H01H43/00Time or time-programme switches providing a choice of time-intervals for executing one or more switching actions and automatically terminating their operations after the programme is completed
    • H01H43/10Time or time-programme switches providing a choice of time-intervals for executing one or more switching actions and automatically terminating their operations after the programme is completed with timing of actuation of contacts due to a part rotating at substantially constant speed
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/48Controlling the sharing of the in-phase component

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)
  • Control Of Electric Motors In General (AREA)

Description

  

  Verfahren zur Verteilung der von einem Kraftwerk oder von einer Kraftwerksgruppe  zu bewältigenden Gesamtlast.    Wenn mehrere Kraftmaschinen eines  einzigen oder mehrerer Kraftwerke auf ein  gemeinsames Netz arbeiten, so werden in  der Regel für die die Grundlast deckenden  Maschinen von der Betriebsleitung     soge,-          nannte        "Leistungsfahrpläne"    vorgezeichnet,  die . für jede Maschine oder für jedes Kraft  werk genau bestimmen, welche     Leistung    sie  in jedem Zeitpunkt zu erzeugen haben,  während die restlichen Maschinen die Perio  denzahl zu halten, das heisst jeweils so viel  Leistung zu erzeugen haben,     da.ss    die Perio  denzahl weder steigt noch sinkt.

   Die Schalt  tafelwärter haben durch entsprechende Be  dienung der Servomotoren für die genaueste  Einhaltung der für die einzelnen Maschinen  vorgezeichneten "Fahrpläne" und für die       Konstanthaltung    der     Periodenzahl        zu    sor  gen.

   Die Fahrpläne sind meist unabhängig  von der Gesamtleistung, die die zusammen  geschalteten Werke zu erzeugen haben; sie  richten sich nach der Art der einzelnen Ma-         schinen    (ältere odermoderne Dampfmaschi  nen, Dieselmotoren), nach ihrem Brennstoff  verbrauch, nach dem     von.    den einzelnen  Werken aufgestellten Tarifen und     _derglei-          ehen.    Im folgenden ist zunächst ein Aus       führungsbeispiel    für eine     Einrichtung    be  schrieben, die -die Einhaltung der "Fahr  pläne" selbsttätig besorgt.  



  Die Einrichtung besteht im wesentli  chen aus einer Uhr und einem Leistungszei  ger. Durch die Uhr wird eine, mit Stunden  einteilung versehene Trommel angetrieben,  die innerhalb 24 Stunden eine Umdrehung  macht. Auf der Zylinderfläche dieser Trom  mel wird der etwa in Karton, Blech oder  dergleichen ausgeschnittene "Leistungsfahr  plan" so befestigt, dass über jedem Stunden  teilstrich die für diesen Zeitpunkt vorge  schriebene Leistungsabgabe der zu steuern  den Maschine erscheint. Die Grundlinie des       "Fahrplanes",    auf der die Zeiten von 0 bis  24 Uhr aufgetragen sind, muss also gerade      so lang sein, wie der Umfang der Trommel.

    Die aufgeschnittene und in eine Ebene ab  gerollte     Zylinderfläche    der Trommel ist in  der beiliegenden     Abb.    1 mit T, der auf ihr  angebrachte     "Leistungsfahrplan"    mit P be  zeichnet.  



  Durch die Feder     I'    wird ein in einem  Längsschlitz oder     mittelst        Lenker    geführter  Stift     .S'    gegen die von der Trommel etwas  abstehende Kontur -des Fahrplanes gedrückt,  so dass er beim Ablaufen der Trommel im  mer an dieser Kontur anliegt.  



  Die Bewegung des Stiftes     S\    wird auf  einen Hebel H, der um die Drehachse des  Zeigers Z des Wattmeters der zu steuernden  Maschine drehbar ist, so übertragen, dass  sich die Mittellinie     b-b'    des Drehhebels     TI     auf die Leistungsanzeige der Wattmeter  skala einstellt, die der     Fahrplanleistung    ent  spricht, auf der gerade der Stift S steht.  



  Befindet sich der     Wattmeterzeiger    Z in  der gleichen Stellung, wie die Mittellinie       b-b'    des Hebels H, also in der Lage, wie  in der Abbildung gezeichnet, so bedeutet das,  dass die Leistung, die die zu steuernde Ma  schine abgibt, in diesem Augenblick gerade  mit -der Leistung übereinstimmt, die sie nach  dem vorgezeichneten Fahrplan P abgeben  soll. Steht der     Wattmeterzeiger    weiter links,  <I>so</I> ist die Leistung der Maschine kleiner als  die fahrplanmässige von ihr abzugebende.

   In  diesem Falle schliesst der Zeiger nach Über  windung eines kleinen freigegebenen Spiel  raumes über den Kontakt a den Ankerstrom  kreis des Servomotors M in dem Sinn, dass  der Servomotor eine höhere Leistungsabgabe  der Maschine bewirkt. 'Steht der Wattmeter  zeiger Z zu weit rechts, ist also die Lei  stungsabgabe der Maschine grösser als die  fahrplanmässig von ihr     a.bzizaebende,    so  schliesst der Zeiger über den Kontakt ä den  Ankerstromkreis des Servomotors im umge  kehrten Sinn und bewirkt dadurch eine ge  ringere     Leistungsabgabe    der Maschine.  



  Dieser selbsttätige Reguliervorgang wird  sich jeweils solange fortsetzen, bis der Watt  meterzeiger Z frei zwischen den Anschlägen  <I>a</I> und<I>a'</I> schwingt, bis also die Leistungs-         abgabe    der Maschine der fahrplanmässig von  ihr abzugebenden entspricht.  



  Durch Ausrüstung jeder Maschine eines  Kraftwerkes oder einer Kraftwerksgruppe  mit der     vorbeschriebenen        Steuereinrichtum,     kann die Gesamtlast eines jeden Kraftwer  kes oder einer jeden Kraftwerksgruppe in  zeitlich und quantitativ voraus bestimmter  Weise und unabhängig von der Gesamtlast.  auf die einzelnen Maschinensätze eines jeden  Kraftwerkes oder auf die Kraftwerke einer  Kraftwerksgruppe verteilt werden.  



  Kuppelt man die Drehhebel     11l,        H2,   <I>113</I>  der Messgeräte, beispielsweise Wattmeter,  .der einzelnen Maschinensätze     tY1l,        M2,        M3.     wie in     Abb.    2 dargestellt, so kann man da  durch bei entsprechender Skalenteilung der  Messgeräte erreichen, dass die Lastanteile,  die jede Maschine übernimmt, stets im glei  chen Verhältnis zueinander stehen. In     Abb.     2 verhalten sich zum Beispiel die Lastan  teile der Maschinen I,     1I,        III        zueinander    wie  4 zu 2 zu 2.

   Wird der Drehhebel     Hl    des  Wattmeters der Maschine I noch nach dem  in     Abb.    1 vorgezeichneten Fahrplan  gesteuert, so wird durch in     Abb.    2 darge  stellte Kupplung der Drehhebel der Watt  meter erreicht, dass von der fahrplanmässig       vorgezeichneten    Leistung die Maschine I je  weils die Hälfte, die Maschinen     II    und     III     ,jeweils ein Viertel übernehmen.  



  Kuppelt man die Drehhebel der Watt  meter     W1,        W2,        W3    der Maschinen I,     II    und       III,    wie-in     Abb.    .3 dargestellt, sowohl unter  sich als auch mit dem Zeiger des     Wattma-          ters    Wo, das die Gesamtbelastung des gan  zen Kraftwerkes oder einer Gruppe von  Kraftwerken anzeigt, steuert aber keines  der Wattmeter nach einem     vorgezeieh@neten     Fahrplan, so kann man dadurch erreichen,       da.ss    jede Maschine einen     gewissen,    voraus  bestimmten Teil der jeweiligen Gesamtlast  übernimmt.

   In -dem in     Abb.    3 dargestellten  Zeitpunkt beträgt zum Beispiel die Gesamt  last     ss   <I>MW</I> und diese wird auf die Maschi  nen I,     1I    und     III    in :der Weise verteilt, dass  Maschine I die 'Hälfte (4-     MTV),    die Maschi  nen     II    und HI je     1/   <I>(2</I>     MW)    der Gesamt-      last. übernehmen. Die Kupplung der Dreh  hebel unter sich und mit dem Wattmeter  zeiger kann dabei auf mechanische oder  auch auf elektrische Weise vorgenommen  werden. Diese Einrichtung kann insbeson  dere auch dazu verwendet werden, dass man  die Spitzenleistung, die die Periodenzahl  haltenden Maschinen (s.

   Absatz 1 der vor  liegenden Beschreibung) zu übernehmen ha  ben, nach einem gewissen Aufteilungs  schlüssel auf diese Maschinen verteilt. Sind  zum Beispiel 2 gleich grosse Maschinen zur  Spitzendeckung vorhanden, so kann man le  diglich durch die Kupplung der Drehhebel  der Wattmeter dieser Maschinen erreichen,  dass jede Maschine stets -die     HäIfte    -der zu  deckenden     Gesamtleistungsspitze    übernimmt.  



  Die vorstehende Beschreibung ist auf die  Steuerung von "Leistungsfahrplänen" und  von Leistungsverteilungsschlüsseln abge  stellt. In gleicher Weise sind die beschrie  benen Einrichtungen auch zur :Steuerung  anderer, zum Beispiel von Drehzahl-, Perio  den-, Blindstrom-, Dampfdruck-,     Wasserzu-          führungs-Fahrplänen    und dergleichen oder  zur Steuerung derartiger Verteilungsschlüs  sel zu gebrauchen. Es kann beispielsweise  auch die Feuerung eines Kessels durch Ver  stärkung des Zuges und Beschleunigung der  Brennstoffzufuhr oder die Wasserzufuhr in  einem Kanal durch     Offnen    und Schliessen  der     Schützen    und dergleichen gesteuert wer  den.

   Zweckmässig werden dabei die     Steuer-          -)r"ane    zur Regelung der verschiedenen     Be-          t: iz#hsgrössen    durch     Messgerä,te    ausgelöst.  



  Die Steuerung beispielsweise eines  Dampfkessels oder der Wasserzuleitung in       einem        Kanal        kann        auch        mit        derartiger     gegenüber dem Leistungsfahrplan er  folgen, dass die für die fahrplanmässige vor  gezeichnete Leistung erforderliche     Dampf-          oder    Wassermenge in dem Zeitpunkt des Be  darfes schon bereit steht, so dass bei steigen  der Last kein Rückgang und bei sinkender  Last kein Anstieg des Dampfdruckes,     bezie-          l:

  ungsweise    ein Sinken und Steigen     desWas-          serspiegels    erfolgt.



  Method for distributing the total load to be handled by a power plant or group of plants. If several power machines of a single power plant or several power plants work on a common network, so-called "performance timetables" are usually drawn up by the management for the machines covering the base load. For each machine or for each power plant, determine exactly what power they have to generate at any point in time, while the remaining machines have to maintain the number of periods, i.e. each have to generate so much power that the number of periods neither increases nor increases sinks.

   The control panel attendants must operate the servomotors accordingly to ensure that the "schedules" drawn up for the individual machines are adhered to and that the number of periods is kept constant.

   The timetables are mostly independent of the total output that the interconnected plants have to generate; they depend on the type of individual machines (older or modern steam engines, diesel engines), their fuel consumption, and that of. the tariffs and the rates set up for the individual plants. In the following, an exemplary embodiment for a device is first described, which -the compliance with the "timetables" automatically concerned.



  The device consists essentially of a clock and a power pointer. A drum with hour markings is driven by the clock, which makes one rotation within 24 hours. On the cylinder surface of this drum, the "performance schedule" cut out in cardboard, sheet metal or the like is attached so that the power output of the machine to be controlled appears over every hour tick mark for this point in time. The baseline of the "timetable", on which the times from midnight to midnight are plotted, must therefore be just as long as the circumference of the drum.

    The cylinder surface of the drum, which has been cut open and rolled into a plane, is shown in the accompanying Fig. 1 with T, the "performance schedule" attached to it with P be.



  A pin .S 'guided in a longitudinal slot or by means of a link is pressed by the spring I' against the contour of the timetable, which protrudes slightly from the drum, so that it always rests against this contour when the drum rolls off.



  The movement of the pin S \ is transmitted to a lever H, which can be rotated around the axis of rotation of the pointer Z of the wattmeter of the machine to be controlled, so that the center line bb 'of the rotary lever TI is set on the power display of the wattmeter scale, which the Timetable performance corresponds to which the pin S is currently on.



  If the wattmeter pointer Z is in the same position as the center line bb 'of the lever H, i.e. in the position as shown in the illustration, this means that the power that the machine to be controlled is delivering is at that moment with the service that it should deliver according to the pre-drawn schedule P. If the wattmeter pointer is further to the left, <I> so </I> the power of the machine is less than the scheduled output of the machine.

   In this case, the pointer closes the armature circuit of the servomotor M after overcoming a small clearance space via the contact a in the sense that the servomotor causes a higher power output from the machine. '' If the wattmeter pointer Z is too far to the right, i.e. the power output of the machine is greater than that indicated by it according to the schedule, the pointer closes the armature circuit of the servo motor in the opposite direction via the contact dadurch and thus causes a lower power output the machine.



  This automatic regulating process will continue until the watt meter pointer Z swings freely between the stops <I> a </I> and <I> a '</I>, ie until the machine's power output according to the schedule to be submitted.



  By equipping each machine of a power plant or a power plant group with the above-described control device, the total load of each power plant or each power plant group can be determined in advance in terms of time and quantity and independently of the total load. be distributed to the individual machine sets of each power plant or to the power plants of a power plant group.



  If the rotary levers 11l, H2, <I> 113 </I> of the measuring devices, for example wattmeters, of the individual machine sets tY1l, M2, M3 are coupled. As shown in Fig. 2, with the appropriate scale division of the measuring devices, you can achieve that the load shares that each machine takes on are always in the same ratio to one another. In Fig. 2, for example, the load components of machines I, 1I, III are related to each other like 4 to 2 to 2.

   If the rotary lever Hl of the watt meter of the machine I is still controlled according to the schedule drawn in Fig. 1, the rotary lever of the watt meter is achieved by means of the clutch shown in Fig. 2 that the machine I each half of the scheduled power , machines II and III, each take over a quarter.



  If you couple the rotary levers of watt meters W1, W2, W3 of machines I, II and III, as shown in Fig. 3, both under you and with the pointer of the wattmeter Wo, which shows the total load on the entire power plant or a group of power stations, but does not control any of the wattmeters according to a pre-drawn schedule, this means that each machine takes on a certain, predetermined part of the respective total load.

   At the time shown in Fig. 3, for example, the total load is ss <I> MW </I> and this is distributed to machines I, 1I and III in such a way that machine I half (4 - MTV), machines II and HI each 1 / <I> (2 </I> MW) of the total load. take. The coupling of the rotary lever under itself and with the wattmeter pointer can be done mechanically or electrically. In particular, this device can also be used to monitor the peak performance of the machines that maintain the number of periods (s.

   Paragraph 1 of the present description), distributed to these machines according to a certain allocation key. If, for example, there are 2 machines of the same size to cover peaks, you can only achieve by coupling the rotary levers of the wattmeter of these machines that each machine always takes over half of the total power peak to be covered.



  The above description is based on the control of "performance timetables" and performance distribution keys. In the same way, the described devices can also be used to: control others, for example speed, period, idle current, steam pressure, water supply schedules and the like or to control such distribution keys. For example, the firing of a boiler can be controlled by increasing the draft and accelerating the fuel supply or the water supply in a channel by opening and closing the gates and the like.

   The control units for regulating the various parameters are expediently triggered by measuring devices.



  The control of, for example, a steam boiler or the water supply line in a sewer can also be carried out with such a system compared to the performance schedule that the steam or water quantity required for the scheduled, pre-signed performance is already available at the time it is needed, so that when the load increases no decrease and with decreasing load no increase in vapor pressure, referring to:

  The water level rises and falls.

 

Claims (1)

PATENTANSPRUCH: Verfahren zur Verteilung der von einem Kraftwerke oder einer Kraftwerksgruppe zu bewältigenden Gesamtlast, dadurch gekenn zeichnet, dass wenigstens ein Teil der Ge samtlast auf mehrere Bestandteile eines Werkes oder auf mehrere Werke nach einem festgesetzten Verteilungsschlüssel oder Fahr plan selbsttätig verteilt wird. PATENT CLAIM: A method for distributing the total load to be handled by a power plant or a group of power plants, characterized in that at least part of the total load is automatically distributed to several components of a plant or to several plants according to a fixed distribution key or schedule. UN TERANSPRüCHE 1.. Verfahren nach Patentanspruch, dadurch gekennzeichnet, 'dass ein oder mehrere Werke einer Gruppe von Kraftwerken oder ein oder mehrere Bestandteile eines solchen Werkes unabhängig von den Än derungen der Gesamtbelastung, lediglich nach einem zeitlich vorgezeichneten Fahr plan selbsttätig gesteuert werden. 2. Verfahren nach Unteranspruch 1, da durch gekennzeichnet, dass -die durch den Fahrplan zeitlich vorgezeichneten Än derungen des Betriebszustandes durch Steuerorgane herbeigeführt werden, deren Einstellung den Linienzügen dieser Fahr pläne mechanisch folgt. 3. UN TERRECLÜCHE 1 .. Method according to patent claim, characterized in that 'that one or more plants of a group of power plants or one or more components of such a plant independently of the changes in the total load, are only controlled automatically according to a predetermined timetable. 2. The method according to dependent claim 1, characterized in that the changes in the operating state timed by the timetable are brought about by control organs, the setting of which follows the lines of these timetables mechanically. 3. Verfahren nach Patentanspruch, dadurch gekennzeichnet, dass die Steuerorgane zur Regelung der verschiedenen Betriebs grössen durch Messgeräte ausgelöst wer den. 4. Verfahren nach Patentanspruch, dadurch gekennzeichnet, dass ein von wenigstens einem Teil -der Gesamtleistung abhängi ges Kontrollorgan mit mehreren, die Ver teilung der Leistung besorgenden Steuer organen gekuppelt ist. 5. Method according to claim, characterized in that the control elements for regulating the various operating parameters are triggered by measuring devices. 4. The method according to claim, characterized in that a control body dependent on at least a part of the overall performance is coupled to several control bodies responsible for distributing the performance. 5. Verfahren nach Patentanspruch, dadurch gekennzeichnet, dass die Beeinflussung der einzelnen Bestandteile der Kraftan lage dem gewünschten Betriebszustand derart voreilt, dass die Kraftanlage in ihrer Gesamtheit zu dem Zeitpunkt, in dem eine Änderung ihres Betriebszustan- des zu beginnen hat, in der beabsichtigten Weise arbeitsbereit ist. A method according to claim, characterized in that the influencing of the individual components of the power plant leads the desired operating state in such a way that the power plant in its entirety is ready to work in the intended way at the point in time at which a change in its operating state has to begin .
CH134474D 1927-06-11 1928-06-05 Method for distributing the total load to be handled by a power plant or group of plants. CH134474A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEL68896D DE610405C (en) 1927-06-11 1927-06-11 Device for the automatic control of the energy generation of a power plant according to a mechanical schedule driven by an independent timer

Publications (1)

Publication Number Publication Date
CH134474A true CH134474A (en) 1929-07-31

Family

ID=7282180

Family Applications (1)

Application Number Title Priority Date Filing Date
CH134474D CH134474A (en) 1927-06-11 1928-06-05 Method for distributing the total load to be handled by a power plant or group of plants.

Country Status (4)

Country Link
US (1) US1903055A (en)
AT (1) AT126422B (en)
CH (1) CH134474A (en)
DE (1) DE610405C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE760191C (en) * 1935-12-21 1953-12-21 Siemens Schuckertwerke A G Control arrangement for the automatic distribution of the load

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE760191C (en) * 1935-12-21 1953-12-21 Siemens Schuckertwerke A G Control arrangement for the automatic distribution of the load

Also Published As

Publication number Publication date
DE610405C (en) 1935-03-09
AT126422B (en) 1932-01-25
US1903055A (en) 1933-03-28

Similar Documents

Publication Publication Date Title
EP2202470B1 (en) Method and system for use of renewable energy sources
DE102008057563A1 (en) Method and device for network-compliant operation of a plurality of decentralized with consumers / generators of electrical energy and connected to a low-voltage electrical network unit
EP3867990A1 (en) Method and wind park for feeding electric power into an electric supply network
CH134474A (en) Method for distributing the total load to be handled by a power plant or group of plants.
DE102016202808A1 (en) Method for controlling the electrical charging of a group of vehicles
DE631990C (en) Process for the automatic distribution of the total energy generated by several machines in a power plant or by several power plants in a power plant group
CH128068A (en) Control device to achieve a planned load distribution for cooperating power generators.
DE498040C (en) Steam power plant with load distribution on several preheating machines, especially preheating turbines
DE574073C (en) Device for driving electrical clocks by means of alternating current distribution networks
DE712444C (en) Device for regulating operating parameters of electrical machines
AT130111B (en) Method for regulating AC power plants working in parallel.
DE102020104390A1 (en) Supplying an industrial plant with electrical energy
DE962080C (en) Steam boiler system with several waste heat boilers
AT130012B (en) Method for regulating the frequency of alternating current generators.
DE712731C (en) Arrangement for controlling synchronous generators working in parallel
DE569743C (en) Process for regulating the load distribution between several power generators
DE679981C (en) Device for regulating co-operating engines with different efficiency characteristics
DE655621C (en) Control device for the planned change or keeping constant the output of power generators
DE376181C (en) Steam power plant with waste steam recovery and steam storage
AT126474B (en) Device for regulating operating parameters.
DE728677C (en) Method for regulating the frequency in AC power distribution networks that are fed by two or more spatially separated power plants
DE611961C (en) Device for carrying out the tariff change
AT136921B (en) Device for power and frequency control.
DE578122C (en) Device for reducing frequency fluctuations in the event of impacts
DE611546C (en) Control device for power generators working in parallel