AT126422B - Device for the automatic management of a power plant or a power plant group. - Google Patents

Device for the automatic management of a power plant or a power plant group.

Info

Publication number
AT126422B
AT126422B AT126422DA AT126422B AT 126422 B AT126422 B AT 126422B AT 126422D A AT126422D A AT 126422DA AT 126422 B AT126422 B AT 126422B
Authority
AT
Austria
Prior art keywords
power plant
power
machine
load
automatic management
Prior art date
Application number
Other languages
German (de)
Original Assignee
Bbc Brown Boveri & Cie
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bbc Brown Boveri & Cie filed Critical Bbc Brown Boveri & Cie
Application granted granted Critical
Publication of AT126422B publication Critical patent/AT126422B/en

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/06Programme control other than numerical control, i.e. in sequence controllers or logic controllers using cams, discs, rods, drums or the like
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01HELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
    • H01H43/00Time or time-programme switches providing a choice of time-intervals for executing one or more switching actions and automatically terminating their operations after the programme is completed
    • H01H43/10Time or time-programme switches providing a choice of time-intervals for executing one or more switching actions and automatically terminating their operations after the programme is completed with timing of actuation of contacts due to a part rotating at substantially constant speed
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/48Controlling the sharing of the in-phase component

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Control Of Electric Motors In General (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Description

  

   <Desc/Clms Page number 1> 
 



  Einrichtung zur selbsttätigen Betriebsführung eines Kraftwerkes oder einer Kraft- werksgruppe. 



   Wenn mehrere Kraftmaschinen eines einzigen oder mehrerer Kraftwerke auf ein gemeinsames Netz arbeiten, so werden in der Regel für die die Grundlast deckenden Maschinen von der Betriebsleitung   sogenannte, Leistungsfahrpläne"vorgezeichnet, die   für jede Maschine oder für jedes Kraftwerk genau bestimmen, welche Leistung sie in jedem Zeitpunkt zu erzeugen haben, während die restlichen Maschinen die Periodenzahl zu halten, d. h. jeweils soviel Leistung zu erzeugen haben, dass die Periodenzahl weder steigt noch sinkt. Die Schalttafelwärter haben durch entsprechende Bedienung der Servomotoren für die genaueste Einhaltung der für die einzelnen Maschinen vorgezeichneten ,,Fahrpläne" und für die Konstanthaltung der Periodenzahl zu sorgen.

   Die Fahrpläne sind meist unabhängig von der Gesamtleistung, die die zusammengeschalteten Werke zu erzeugen haben ; sie richten sich nach der Art der einzelnen Maschinen (ältere oder moderne Dampfmaschinen, Dieselmotoren), nach ihrem   Brermstoffverbrauch,   nach den von den einzelnen Werken aufgestellten Tarifen u. dgl. Die Erfindung besteht   !) U) i   
 EMI1.1 
 Steuerorgane zur Regelung der Erzeugung, Aufnahme und Verteilung der Last oder zur Blindlastverschiebung durch Messgeräte ausgelöst werden. 



   Die Einrichtung besteht im wesentlichen aus einer Uhr und einem Leistungszeig. er. Durch die Uhr wird in an sich bekannter Weise eine mit Stundeneinteilung versehene Trommel angetrieben, die innerhalb 24 Stunden eine Umdrehung macht und auf deren Zylinderfläche der etwa in Karton, Blech od. dgl.   ausgeschnittene Leish.lmgsfahrpla. n''   so befestigt ist, dass über jedem Stundenteilstrich die für diesen Zeitpunkt vorgeschriebene Leistungsabgabe der zu steuernden Maschine erscheint. Die Grundlinie   des, Fahrplanes", auf   der die Zeiten von 0 bis 24 Uhr aufgetragen sind, muss also gerade so lang sein, wie der Umfang der Trommel. Die auf- 
 EMI1.2 
 auf ihr angebrachte Leistungsfahrplan" mit P bezeichnet. 



   Durch die Feder F wird ein in einem   Längsschlitz   oder mittels Lenker geführter Still S gegen die von der Trommel etwas abstehende Kontur des Fahrplanes gedrückt. so dass er beim Ablaufen der Trommel immer an dieser Kontur anliegt. 



   Die Bewegung des Stiftes   8 wird auf einell   Hebel H. der um die Drehachse des Zeigers   Z   des Wattmeters der zu steuernden Maschine drehbar ist, so   übertragen,   dass sich die Mittellinie b-b'des Drehhebels II auf die Leistungsanzeige der Wattmeterskala einstellt, die der Fahrplanleistung entspricht. auf der gerade der Stift S steht. 



   Befindet sich der Wattmeterzeiger Z in der gleichen Stellung, wie die Mittellinie   b-b'   des   Hebels R,   also in der Lage, wie in Fig. 1 gezeichnet, so bedeutet das, dass die Leistung. die die zu steuernde Maschine abgibt, in diesem Augenblick gerade mit der Leistung übereinstimmt. die sie nach dem vorgezeichneten Fahrplan P abgeben soll. Steht der Wattmeterzeiger weiter links, so ist die Leistung der Maschine kleiner als die   fahrplanmässig   von ihr abzugebende. 



  In diesem Falle schliesst der Zeiger nach Überwindung eines kleinen freigegebenen Spielraumes 
 EMI1.3 
 

 <Desc/Clms Page number 2> 

 eine höhere Leistuiigsabgabe der Maschine bewirkt. Steht der   Wattmeterzeiger Z zu   weit rechts. ist also die Leistungsabgabe der Maschine   grösser   als die fahrplanmässig von ihr abzugebende, so schliesst der Zeiger über den Kontakt al den Ankerstromkreis des Servomotors im umgekehrten Sinn und bewirkt dadurch eine geringere Leistungsabgabe der Maschine. 



   Dieser selbsttätige Reguliervorgang wird sich jeweils so lange fortsetzen, bis der Wattmeterzeiger Z frei zwischen den   Anschlägen a und a'schwingt,   bis also die Leistungsabgabe der Maschine der fahrplanmässig von ihr abzugebenden entspricht. 



   Bringt man den Leistungszeiger an der Zusammenschlussstelle zwischen zwei Leistungsnetzen an und überträgt man die Angaben dieses Leistungszeigers auf einen im Spitzenkraftwerk   befindlichen'Leistungszeiger (Fernleistungszeiger),   so kann man die Leistungserzeugung der zur Frequenzhaltung bestimmten Maschinen mit den beschriebenen Vorrichtungen derart steuern, dass zwischen den beiden Netzen die nach dem Fahrplan vorgeschriebene Leistung verschoben wird. Die Last, die die so gesteuerten Maschinen selbst erzeugen, wird in diesem Falle nicht der Last entsprechen, die der Fahrplan für die Verschiebung zwischen den beiden Netzen vorschreibt.

   Die Maschinen werden vielmehr einen Teil der Belastung des primären Netzes decken und dazu noch soviel Last erzeugen, dass von dem einen in das andere Netz die im gegebenen Zeitpunkt vorgeschriebene Leistung gedrückt wird. 



   Durch Ausrüstung jeder Maschine eines Kraftwerkes oder einer Kraftwerksgruppe mit der vorgeschriebenen Steuereinrichtung kann die Gesamtlast eines jeden Kraftwerkes oder einer jeden Kraftwerksgruppe in zeitlich und quantitativ voraus bestimmter Weise und unabhängig von der Gesamtlast auf die einzelnen Maschinensätze eines jeden Kraftwerkes oder auf die Kraftwerke einer Kraftwerksgruppe verteilt werden. 



   Kuppelt man die Drehhebel H1, H2, H3 der Messgeräte, beispielsweise Wattmeter, der einzelnen Maschinensätze L   II,   III, wie in Fig. 2 dargestellt, so kann man dadurch bei entsprechender Skalenteilung der Messgeräte erreichen, dass die Lastanteile, die jede Maschine übernimmt, stets im gleichen Verhältnis zueinander stehen. In Fig. 2 verhalten sich z. B. die. 



  Lastanteile der Maschinen   I, Ir, III zueinander wie 4   : 2 : 2. Wird der Drehhebel   II1   des Wattmeters der Maschine   I   noch nach dem   in Fig. 1   vorgezeichneten Fahrplan gesteuert, so wird durch die in Fig. 2 dargestellte Kupplung der Drehhebel der Wattmeter erreicht, dass von 
 EMI2.1 
 in Fig. 3 dargestellt, sowohl unter sich als auch mit dem Zeiger   J ?   des Wattmeters, das die Gesamtbelastung des ganzen Kraftwerkes oder einer Gruppe von Kraftwerken anzeigt, steuert aber keines der Wattmeter nach einem vorgezeichneten Fahrplan, so kann man dadurch erreichen, dass jede Maschine einen gewissen, voraus bestimmten Teil der jeweiligen Gesamtlast übernimmt. In den in Fig. 3 dargestellten Zeitpunkt beträgt z.

   B. die Gesamtlast 8 MW und 
 EMI2.2 
 auf elektrische Weise vorgenommen werden. Diese Einrichtung kann insbesondere auch dazu verwendet werden, dass man die Spitzenleistung, die die Periodenzahl haltenden Maschinen (s. Absatz 1 der Beschreibung) zu übernehmen haben, nach einem gewissen Aufteilungsschlüssel auf diese Maschinen verteilt. Sind z. B. zwei gleich grosse Maschinen zur Spitzendeckung vorhanden, so kann man lediglich durch die Kupplung der Drehhebel der Wattmeter dieser Maschinen erreichen, dass jede Maschine stets die Hälfte der zu deckenden Gesamtleistungsspitze übernimmt. 



   Die vorstehende Beschreibung ist auf die Steuerung   von, Leistungsfahrplänen"und von     Leistungsverteilungsschlüsseln   abgestellt. In gleicher Weise sind die beschriebenen   Einrichtungen   
 EMI2.3 
 zuführungsfahrplänen u. dgl. oder zur Steuerung derartiger Verteilungsschlüssel zu gebrauchen. 



    PATENTANSPRÜCHE :   
 EMI2.4 
 Mitwirkung von Organen herbeigeführt werden, deren Einstellung den Linienzügen dieser Fahrpläne mechanisch folgt, dadurch gekennzeichnet, dass die Steuerorgane   (ill)   zur Regelung der Erzeugung, Aufnahme und Verteilung der Last oder zur Blindlastverschiebung durch Messgeräte (MW) ausgelöst werden (Fig. 1). 
 EMI2.5 




   <Desc / Clms Page number 1>
 



  Device for the automatic operational management of a power plant or a power plant group.



   If several power machines of a single power plant or several power plants work on a common network, so-called "performance schedules" are usually drawn up by the management for the machines covering the base load, which precisely determine for each machine or power plant what power it has in each Time to generate, while the remaining machines have to maintain the number of periods, ie each have to generate enough power that the number of periods neither increases nor decreases. The control panel attendants have to operate the servomotors for the most exact adherence to the prescribed for the individual machines, Timetables "and to keep the number of periods constant.

   The schedules are mostly independent of the total output that the interconnected plants have to generate; they are based on the type of individual machines (older or modern steam engines, diesel engines), their fuel consumption, the tariffs set up by the individual plants, etc. Like. The invention exists!) U) i
 EMI1.1
 Control organs for regulating the generation, absorption and distribution of the load or for shifting the reactive load are triggered by measuring devices.



   The device essentially consists of a clock and a power indicator. he. The clock drives in a manner known per se a drum provided with hour division, which makes one revolution within 24 hours and on the cylinder surface of which the Leish.lmgsfahrpla cut out in cardboard, sheet metal or the like. n '' is attached in such a way that the power output of the machine to be controlled appears above every hour division. The base line of the "timetable" on which the times from midnight to midnight are plotted must therefore be just as long as the circumference of the drum.
 EMI1.2
 marked "P" on the performance schedule.



   By means of the spring F, a still S guided in a longitudinal slot or by means of a handlebar is pressed against the contour of the timetable that protrudes slightly from the drum. so that it always lies against this contour when the drum rolls off.



   The movement of the pin 8 is transmitted to a lever H, which can be rotated around the axis of rotation of the pointer Z of the wattmeter of the machine to be controlled, so that the center line b-b'of the rotary lever II is set on the power display of the wattmeter scale, which the Schedule performance. on which the pin S is currently standing.



   If the wattmeter pointer Z is in the same position as the center line b-b 'of the lever R, i.e. in the position as shown in FIG. 1, this means that the power. which the machine to be controlled delivers, at that moment just matches the performance. which they should deliver according to the drawn up timetable P. If the wattmeter pointer is further to the left, the machine's performance is less than that which it can deliver according to the schedule.



  In this case, the pointer closes after overcoming a small released clearance
 EMI1.3
 

 <Desc / Clms Page number 2>

 causes a higher output of the machine. If the wattmeter pointer Z is too far to the right. So if the power output of the machine is greater than that to be output according to the schedule, the pointer closes the armature circuit of the servomotor via the contact al in the opposite direction and thus causes a lower power output of the machine.



   This automatic regulating process will continue until the wattmeter pointer Z swings freely between the stops a and a ', until the power output of the machine corresponds to that to be output according to the schedule.



   If the power indicator is attached to the junction between two power networks and the information from this power indicator is transferred to a power indicator located in the peak power plant (remote power indicator), the power generation of the machines intended for frequency maintenance can be controlled with the devices described in such a way that between the two Networks the performance prescribed in the timetable is postponed. The load that the machines controlled in this way generate themselves will in this case not correspond to the load that the schedule prescribes for the shift between the two networks.

   Rather, the machines will cover part of the load on the primary network and generate so much load that the power required at the given point in time is pushed from one network to the other.



   By equipping each machine of a power plant or a power plant group with the prescribed control device, the total load of each power plant or each power plant group can be distributed to the individual machine sets of each power plant or to the power plants of a power plant group in a temporally and quantitatively predetermined manner and independently of the total load .



   If the rotary levers H1, H2, H3 of the measuring devices, for example wattmeters, of the individual machine sets L II, III are coupled, as shown in Fig. 2, then, with the appropriate scale division of the measuring devices, one can achieve that the load shares that each machine takes on, are always in the same relationship to each other. In Fig. 2 behave, for. B. the.



  Load proportions of the machines I, Ir, III to one another as 4: 2: 2. If the rotary lever II1 of the wattmeter of the machine I is still controlled according to the schedule shown in FIG. 1, the rotary lever of the wattmeter becomes through the coupling shown in FIG achieved that by
 EMI2.1
 shown in Fig. 3, both below and with the pointer J? The wattmeter, which shows the total load of the entire power plant or a group of power plants, does not control any of the watt meters according to a pre-drawn schedule, so you can achieve that each machine takes over a certain, predetermined part of the respective total load. In the time shown in Fig. 3 z.

   B. the total load 8 MW and
 EMI2.2
 be done in an electrical manner. This device can in particular also be used to distribute the peak power that the machines holding the number of periods (see paragraph 1 of the description) have to take over according to a certain distribution key. Are z. If, for example, there are two machines of the same size to cover peaks, you can only achieve by coupling the rotary levers of the wattmeter of these machines that each machine always takes over half of the total power peak to be covered.



   The above description is based on the control of "performance schedules" and performance distribution keys. The devices described are the same
 EMI2.3
 feed schedules u. Like. Or to control such distribution keys.



    PATENT CLAIMS:
 EMI2.4
 Involvement of organs are brought about, the setting of which follows the lines of these timetables mechanically, characterized in that the control organs (ill) for regulating the generation, reception and distribution of the load or for shifting the reactive load are triggered by measuring devices (MW) (Fig. 1).
 EMI2.5


 

Claims (1)

<Desc/Clms Page number 3> EMI3.1 <Desc / Clms Page number 3> EMI3.1 3. Einrichtung zur selbsttätigen Betriebsfiihrung eines Kraftwerkes oder einer Kraftwerksgruppe, bei der die Gesamtbelastung nach ihrer Grösse und Art auf mehrere Bestandteile eines Werkes oder auf mehrere Werke nach einem festgesetzten Verteilungsschlüssel selbsttätig verteilt wird, dadurch gekennzeichnet, dass die Steuerhebel (H1, H2, H3), zwischen deren Grenzanschlägen die auslösenden Messgeräte (1l1W) spielen, lediglich unter sich unmittelbar mechanisch oder mit Hilfe elektrischer Übertragung gekuppelt werden. EMI3.2 3. Device for the automatic management of a power plant or a power plant group, in which the total load is automatically distributed according to its size and type to several components of a plant or to several plants according to a fixed distribution key, characterized in that the control levers (H1, H2, H3 ), between whose limit stops the triggering measuring devices (1l1W) play, are simply coupled directly to one another mechanically or with the aid of electrical transmission. EMI3.2
AT126422D 1927-06-11 1928-06-08 Device for the automatic management of a power plant or a power plant group. AT126422B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEL68896D DE610405C (en) 1927-06-11 1927-06-11 Device for the automatic control of the energy generation of a power plant according to a mechanical schedule driven by an independent timer

Publications (1)

Publication Number Publication Date
AT126422B true AT126422B (en) 1932-01-25

Family

ID=7282180

Family Applications (1)

Application Number Title Priority Date Filing Date
AT126422D AT126422B (en) 1927-06-11 1928-06-08 Device for the automatic management of a power plant or a power plant group.

Country Status (4)

Country Link
US (1) US1903055A (en)
AT (1) AT126422B (en)
CH (1) CH134474A (en)
DE (1) DE610405C (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE760191C (en) * 1935-12-21 1953-12-21 Siemens Schuckertwerke A G Control arrangement for the automatic distribution of the load

Also Published As

Publication number Publication date
US1903055A (en) 1933-03-28
DE610405C (en) 1935-03-09
CH134474A (en) 1929-07-31

Similar Documents

Publication Publication Date Title
DE1264599B (en) Device for the transmission of telecontrol signals via a supply network carrying AC voltage
AT126422B (en) Device for the automatic management of a power plant or a power plant group.
DE672620C (en) Device for regulating a variable size depending on one or more variable reference sizes
DE631990C (en) Process for the automatic distribution of the total energy generated by several machines in a power plant or by several power plants in a power plant group
DE657107C (en) Device for regulating electrical power or other operating parameters
WO2019007504A1 (en) Method for trading electrical energy between small producers and end consumers
DE1181458B (en) Storage device on booking machines
DE641132C (en) Method for the automatic distribution of the total energy generated by several machines of a power plant or by several power plants of a power plant group according to patent 631990 in application to the peak load control of line networks
AT130111B (en) Method for regulating AC power plants working in parallel.
DE738266C (en) Device for distributing the load to several power generators working in parallel, in particular to several power plants at a distance from one another
DE858314C (en) Method and device for achieving black and white marking arranged according to decimal places, in particular of counters
AT65490B (en) Bill printing device for counters of consumption meters.
DE636280C (en) Resonance spring drive for the execution of work processes
DE539349C (en) Measuring device for AC systems, in which two measuring systems, which are influenced by the voltage or the current, are provided with windings and are mutually inducing, display, record, integrate or trigger switching processes as a function of the product volt times amperes
DE655621C (en) Control device for the planned change or keeping constant the output of power generators
DE722152C (en) Device for monitoring the consumption of electrical energy or the like.
DE933300C (en) Sum card punch
DE611961C (en) Device for carrying out the tariff change
DE415277C (en) Device for moving the drum of Raschel machines
DE672052C (en) Coin counter
DE498040C (en) Steam power plant with load distribution on several preheating machines, especially preheating turbines
DE443708C (en) Apparent power meter
DE617935C (en) Device for producing the same register strips for typesetting machines
DE472973C (en) Electric power transmission system
DE628467C (en) Printing device for remote counters