CH105426A - Process for the production of concrete piles sunk in the ground. - Google Patents

Process for the production of concrete piles sunk in the ground.

Info

Publication number
CH105426A
CH105426A CH105426DA CH105426A CH 105426 A CH105426 A CH 105426A CH 105426D A CH105426D A CH 105426DA CH 105426 A CH105426 A CH 105426A
Authority
CH
Switzerland
Prior art keywords
sep
base plate
concrete
pipe
production
Prior art date
Application number
Other languages
German (de)
Inventor
Tiefbau-Actiengesell Beton-Und
Original Assignee
Beton Und Tiefbau Actiengesell
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beton Und Tiefbau Actiengesell filed Critical Beton Und Tiefbau Actiengesell
Publication of CH105426A publication Critical patent/CH105426A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/70Mould-pipes or other moulds for making sheet piles not used
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/60Piles with protecting cases
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/72Pile shoes

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

  

  Verfuhren zur Herstellung von Betonpfählen mit im Erdreich versenktem     Vortreibrohr.       Das den Gegenstand der Erfindung bil  dende Verfahren gestattet die Herstellung  von Betonpfählen mit im Boden versenktem       Vortreibrohr,    die gegen die Einwirkung der       Säuren    des Erdbodens geschützt sind: Nach  diesem Verfahren können auch Eisenbeton  pfähle mit einer die     Säureeinwirkung    aus  schliessenden     Schutzschicht        versehen    werden.  



  Gemäss der Erfindung geschieht die Her  stellung von Betonpfählen derart. dass eine  Senkhülle, ein sogenanntes     Vörtreibrohr,    in  das Erdreich versenkt wird. Dann erfolgt  das Aufbringen der Schutzschicht auf die  Innenseite des     Vortreibrohres,    indem zum  Beispiel ein Anstrich aufgetragen oder ein  Einsatzrohr aus Asphaltpappe als Ausklei  dung     verwendet    wird. Hierdurch erhält der  nunmehr     ini    Rohr herzustellende Beton  pfahl eine Umkleidung, die allen Angriffen  der     Bodensäuren    widersteht. Alsdann wird  auf einer Langsam in der Senkhülle abwärts       h-wegten    Bodenplatte Beton eingefüllt.  



  Bei der     IIerstellung    von Eisenbeton  pfählen in der im     Erdreich.    befindlichen  Senkhülle kann ein Eisengerippe verwendet  werden,     das    in geeigneter Weise mit einer    Bodenplatte verbunden ist, deren Querschnitt  dem     innern        Hülleziquerschnitt        entsprich.     Von dieser mit entsprechender Öffnung     ver-          selienen    Platte kann ein Steigrohr ausgehen,  das zum Abführen von in der Senkhülle be  findlichem Boden- oder Regenwasser dient.  



  Dieses Eisengerippe kann zum Beispiel  an einem Seil oder dergleichen aufgehängt  werden und entsprechend der     I3erstellung     des Betonkörpers des Pfahls kann das Ge  rippe langsam unter Nachlassen des Winden  seils in das     Vortreibrohr    versenkt werden.  Hierbei verdrängt die Bodenplatte das im       Vortreibrohr    befindliche Grundwasser     bezw.     das von oben eingetretene Regenwasser, wel  ches das     Vortreibrohr    selbsttätig durch das  Steigrohr verlässt.  



  In der Zeichnung ist eine Ausführungs  form der Erfindung veranschaulicht.  



       Fig.    1 ist ein senkrechter Schnitt durch  eine im Erdreich befindliche Senkhülle, in  die der Betonpfahl zum Teil eingesenkt ist;       Fig.    2 zeigt einen senkrechten     Schnitt     durch den fertigen Betonpfahl und das     Vor-          treibrohr.         Gemäss der     Ausführungsforrri    nach     Fig.    1  und ? ist. mit 1 die mit Spitze versehene  Senkhülle bezeichnet, die     nach    ihrer     Ent-          l,@e@u@g    des     etwa        eingedrungenen    Wassers  mit.

       einerchtit.zsf@hicht    2     verseli@n    wird.       Die    Bodenplatte 3 ist an     einem        Eisengerippe     4     befestigt,    das unter     Vermittlung    eines Ha  kens 5 an einer     Kette        G        aufgehängt    wird,  die über eine am Gerüst     i        befestigte    Rolle     S          g,

  #fülirt    ist und mit einer     Windevorrichtung          beliebiger    Art in     Verbindung    steht. In der  Bodenplatte 5     endigt    ein in der Zeichnung       gebrochen        gezeichnet:

  cs    Rohr 9, das als     A.b-          zrib    für das in der Senkhülle befindliche       Wasser    dient und zu     dem    Zweck     gegebenen-          falls    mit einer     Saugvorrichtung    in     Verbin-          dung    gesetzt     wird.     



  Der     lrbc-itsvorganb    zur Herstellung des       Betonpfahls    ist ohne     weiteres-    ersichtlich.  Wird die Haltekette     G    durch die     ZVindevor-          richtunb        nachbelassen,    senkt sieh selbsttätig  der in der Herstellung befindliche Beton  pfahl 10, und das obere freiwerdende Stück       des        Vortreibrohres    wird nunmehr mit flüs  sigem Beton ausgefüllt.

   Dieser     Vorgang          rles    absatzweisen     IIerstellens    des Beton  körpers des Pfahls wird so lange wiederholt,       bis    der Pfahl in seiner Länge ausgefüllt ist.       Dureh    das langsame     Versenken    des den teil  -weise hergestellten Betonpfahl tragenden       Clerüstes    kann ein Beschädigen der     Isolier-          selriclit    der     Senkhülle    vollkommen vermieden       werden.     



  Das     Vortreibrohr    ist am     untern    Ende  mit. einer Spitze versehen; diese könnte auch  in Fortfall kommen, was an dem     Herstel-          lungSverfahren    nur insofern etwas ändert,  als in diesem Falle vor dem     Einsenken    des       Eisengerippes    4 in die Senkhülle aus dieser  das     darin    befindliche Erdreich entfernt wer  den muss.  



       BF-i    mit Spitzen     versehenen        Vortreib-          rohren    ist dem Grundwasser der Eintritt  in dieselben sehr erschwert; es ist     je.doi-li     trotzdem bisweilen     möglich,    und ferner kann  Regenwasser ungehindert im Rohr sieh     sa.in-          rneln.    In besonderen Fällen, in denen weder  mit     Gitindwasser,    noch mit Regenwasser    zu rechnen     isl,        kann    -las     Stei-rohr        fort-          fallen.  



  Process for the production of concrete piles with a driving pipe sunk into the ground. The method forming the subject of the invention allows the production of concrete piles with a driving pipe sunk into the ground, which are protected against the effects of the acids in the ground: according to this method, reinforced concrete piles can also be provided with a protective layer that eliminates the effects of acids.



  According to the invention, the manufacture of concrete piles happens in this way. that a sinking shell, a so-called pre-driving pipe, is sunk into the ground. Then the protective layer is applied to the inside of the jacking pipe, for example by applying a paint or using an insert pipe made of asphalt cardboard as a lining. As a result, the concrete pile, which is now to be produced in a pipe, is given a casing that resists all attacks by soil acids. Then concrete is poured in on a floor slab slowly moving downwards in the plunging envelope.



  When creating reinforced concrete piles in the ground. An iron framework can be used which is connected in a suitable manner to a base plate, the cross section of which corresponds to the inner shell cross section. From this plate, which is provided with a corresponding opening, a riser pipe can extend, which serves to drain off soil or rainwater that is in the sinker.



  This iron framework can be suspended from a rope or the like, for example, and according to the creation of the concrete body of the pile, the rib can be slowly sunk into the propulsion pipe, releasing the winch rope. Here, the base plate displaces the groundwater located in the jacking pipe or. the rainwater that has entered from above and leaves the propulsion pipe automatically through the riser pipe.



  In the drawing, an embodiment of the invention is illustrated.



       1 is a vertical section through a submerged casing in which the concrete pile is partially sunk; 2 shows a vertical section through the finished concrete pile and the driving pipe. According to the embodiment according to FIG. 1 and? is. 1 denotes the tipped sinker, which after its ent- l, @ e @ u @ g of any water that has penetrated with.

       einechtit.zsf@hicht 2 verseli @ n. The base plate 3 is attached to an iron framework 4, which is suspended from a chain G under the mediation of a Ha kens 5, which via a roller S g attached to the frame i,

  # is filled and is connected to any type of winding device. A broken line in the drawing ends in the base plate 5:

  cs tube 9, which serves as an a-zrib for the water in the sinker and, for this purpose, is connected to a suction device if necessary.



  The lrbc-itsvorganb for producing the concrete pile is readily apparent. If the retaining chain G is left behind by the ZVindevor- richtunb, the concrete pile 10 which is in the process of being produced automatically lowers, and the upper part of the driving pipe that is freed up is now filled with liquid concrete.

   This process of intermittent creation of the concrete body of the pile is repeated until the pile is filled in its length. By slowly sinking the cler structure supporting the partially produced concrete pile, damage to the insulating element of the sinking envelope can be completely avoided.



  The jacking pipe is at the lower end with. provided with a tip; this could also be omitted, which only changes something in the manufacturing process insofar as in this case the earth located therein has to be removed from the sinking casing before the iron framework 4 is lowered into it.



       BF-i jacking pipes provided with tips are very difficult for the groundwater to enter; it is nevertheless possible from time to time, and rainwater can also trickle unhindered in the pipe. In special cases in which neither Gitindwasser nor rainwater is to be expected, -las Stei-Rohr- can be omitted.

 

Claims (1)

EMI0002.0079 PATE\ <SEP> TA <SEP> N <SEP> SPR<B>M</B>HE <tb> I. <SEP> \-uialiren <SEP> zur <SEP> Herstellung <SEP> von <SEP> Belon pfühl.cii <SEP> mit <SEP> ini <SEP> Erdreich <SEP> versenklini <tb> @"ortreibrohr, <SEP> dadurch <SEP> gehennzeichn@t, <tb> dass <SEP> nian <SEP> eine <SEP> im <SEP> Erdreii-li <SEP> verseiditu <tb> J.cere <SEP> S(@rildiiille, <SEP> das <SEP> heisst <SEP> das <SEP> Vortreib rohr, <SEP> auf <SEP> vier <SEP> 111111-riwand <SEP> mit <SEP> einer <SEP> die <tb> Säureivirhung <SEP> auss,-hliessenden <SEP> Schutz schieht <SEP> versiebt <SEP> und <SEP> dassdarauf <SEP> in <SEP> die <tb> Senkhülle <SEP> auf <SEP> einer <SEP> langsam <SEP> in <SEP> der <tb> Senkhülli# <SEP> abiv < iris <SEP> bewegten <SEP> Boderiplattu <tb> Beton <SEP> i-in,,Yel.'ülirt <SEP> wird. <tb> 1I. EMI0002.0079 PATE \ <SEP> TA <SEP> N <SEP> SPR <B> M </B> HE <tb> I. <SEP> \ -uialiren <SEP> for <SEP> production <SEP> of <SEP> Belon pfühl.cii <SEP> with <SEP> ini <SEP> Erdreich <SEP> sunklini <tb> @ "driving pipe, <SEP> thereby <SEP> gonzeichn @ t, <tb> that <SEP> nian <SEP> verseiditu a <SEP> in <SEP> Erdreii-li <SEP> <tb> J.cere <SEP> S (@rildiiille, <SEP> the <SEP> means <SEP> the <SEP> jacking pipe, <SEP> on <SEP> four <SEP> 111111-riwand <SEP> with <SEP> a <SEP> die <tb> Acidic protection <SEP>, - closing <SEP> protection works <SEP> shifts <SEP> and <SEP> that <SEP> in <SEP> the <tb> Sink cover <SEP> on <SEP> one <SEP> slowly <SEP> in <SEP> the <tb> Senkhülli # <SEP> abiv <iris <SEP> moving <SEP> Boderiplattu <tb> Concrete <SEP> i-in ,, Yel.'ülirt <SEP> is. <tb> 1I. <SEP> Vorrii#hlun- <SEP> zur <SEP> Ausführun- <SEP> des <SEP> Ver fahrens <SEP> 11a(11 <SEP> Patentanspruch <SEP> I, <SEP> gekenn zeichnet <SEP> durch <SEP> eine <SEP> Windevorrichtuiig, <tb> die <SEP> mittelst <SEP> eines <SEP> Zugmittels <SEP> eine <SEP> mit <tb> Steigrohr <SEP> versehene <SEP> Bodenplatte <SEP> hält. <tb> <B>UN</B>TERAN <SEP> SPRü <SEP> CHE <tb> l <SEP> . <SEP> Vorrii # hlun- <SEP> for <SEP> execution- <SEP> of the <SEP> procedure <SEP> 11a (11 <SEP> patent claim <SEP> I, <SEP> marked <SEP> by < SEP> a <SEP> winch device, <tb> the <SEP> using <SEP> a <SEP> traction device <SEP> a <SEP> with <tb> Riser pipe <SEP> provided <SEP> base plate <SEP> holds. <tb> <B> UN </B> TERAN <SEP> SPRü <SEP> CHE <tb> l <SEP>. <SEP> Verfahren <SEP> nach <SEP> Patentanspruch <SEP> I, <SEP> cla dureli <SEP> gekennzeichnet, <SEP> dass <SEP> in <SEP> einer <SEP> senk liülle <SEP> eine <SEP> Bodenplatte <SEP> abwärts <SEP> bewegt <tb> wird, <SEP> auf <SEP> der <SEP> ein <SEP> den <SEP> herzustellenden <tb> Betonpfahl <SEP> versteifendes <SEP> Eisengerippe <tb> <B>#</B> <SEP> am, <SEP> -eordnet <SEP> ist <SEP> und <SEP> wobei <SEP> die <SEP> Herstellung <tb> des <SEP> Betonkörpers <SEP> des <SEP> Pfahls <SEP> auf <SEP> dieser <tb> Bodenplatte <SEP> absatzweise <SEP> derart <SEP> geschieht, <tb> dass <SEP> zunächst <SEP> ein <SEP> \feil <SEP> dieses <SEP> Körpers <SEP> ge formt. <SEP> dann <SEP> dis <SEP> Bodenplatte <SEP> etwas <SEP> ge senkt: <SEP> method <SEP> according to <SEP> patent claim <SEP> I, <SEP> cla dureli <SEP> marked, <SEP> that <SEP> in <SEP> a <SEP> vertical <SEP> a <SEP > Base plate <SEP> moved downwards <SEP> <tb> becomes, <SEP> on <SEP> the <SEP> a <SEP> the <SEP> to be produced <tb> concrete pile <SEP> reinforcing <SEP> iron frame <tb> <B> # </B> <SEP> am, <SEP> -ordered <SEP> is <SEP> and <SEP> where <SEP> is the <SEP> production <tb> of the <SEP> concrete body <SEP> of the <SEP> pile <SEP> on <SEP> this <tb> Base plate <SEP> intermittently <SEP> happens like <SEP>, <tb> that <SEP> first <SEP> a <SEP> \ feil <SEP> this <SEP> body <SEP> is formed. <SEP> then <SEP> dis <SEP> base plate <SEP> slightly <SEP> lowered: <SEP> und <SEP> darauf <SEP> i11 <SEP> der <SEP> Formgebung <tb> des <SEP> Betonkörpens <SEP> fortgefahren <SEP> wird. <tb> ?. <SEP> Verfahren <SEP> nach <SEP> Patentanspruch <SEP> I, <SEP> da durch <SEP> gf.kenüzeicAinet, <SEP> dass <SEP> in <SEP> der <SEP> Senk büll:c <SEP> anbF#sammeltes <SEP> Wasser <SEP> dureh <tb> Hohlräume <SEP> hindurch <SEP> entleert <SEP> -wird. <SEP> die <tb> den <SEP> Beloirl@örpcr <SEP> des <SEP> Pfahls <SEP> durch setzen. <tb> . <SEP> Verfahren <SEP> nach <SEP> Patentaüspi,uch <SEP> 1 <SEP> und <tb> LTiric@ransprüclic#n <SEP> 1 <SEP> lind <SEP> ?, <SEP> dadurch <SEP> ge kennzeichnet, <SEP> dass <SEP> das <SEP> in <SEP> der <SEP> Senkhülle <tb> angesammelte <SEP> Wasser <SEP> durch <SEP> ein <SEP> Steig rohr <SEP> entfernt <SEP> -wird. <SEP> das <SEP> dur(-li <SEP> die <SEP> Boden platte <SEP> geführt <SEP> ist. <SEP> and <SEP> on it <SEP> i11 <SEP> of the <SEP> design <tb> of the <SEP> concrete body <SEP> is continued <SEP>. <tb>?. <SEP> method <SEP> according to <SEP> patent claim <SEP> I, <SEP> because through <SEP> if necessary küzeicAinet, <SEP> that <SEP> in <SEP> the <SEP> sink büll: c <SEP > AnbF # collected <SEP> water <SEP> dureh <tb> Cavities <SEP> through <SEP> emptied <SEP> - is. <SEP> the <tb> put the <SEP> Beloirl @ Körpercr <SEP> of the <SEP> post <SEP> through. <tb>. <SEP> method <SEP> according to <SEP> Patentaüspi, also <SEP> 1 <SEP> and <tb> LTiric @ rverbindclic # n <SEP> 1 <SEP> lind <SEP>?, <SEP> denoted by <SEP>, <SEP> that <SEP> the <SEP> in <SEP> the <SEP> Sink cover <tb> accumulated <SEP> water <SEP> through <SEP> a <SEP> riser <SEP> <SEP> is removed. <SEP> the <SEP> dur (-li <SEP> the <SEP> base plate <SEP> is guided <SEP>.
CH105426D 1923-08-23 1923-08-23 Process for the production of concrete piles sunk in the ground. CH105426A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH105426T 1923-08-23

Publications (1)

Publication Number Publication Date
CH105426A true CH105426A (en) 1924-06-16

Family

ID=4364303

Family Applications (1)

Application Number Title Priority Date Filing Date
CH105426D CH105426A (en) 1923-08-23 1923-08-23 Process for the production of concrete piles sunk in the ground.

Country Status (1)

Country Link
CH (1) CH105426A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3707847A (en) * 1968-02-06 1973-01-02 Raymond Int Inc Installation of sand drains

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3707847A (en) * 1968-02-06 1973-01-02 Raymond Int Inc Installation of sand drains

Similar Documents

Publication Publication Date Title
DE2751972A1 (en) METHOD OF MANUFACTURING REINFORCED UNDERGROUND BUILDING PANEL
CH105426A (en) Process for the production of concrete piles sunk in the ground.
DE69201409T2 (en) Method of making a foundation pile.
DE541673C (en) Process for the production of place posts with club feet
DE767144C (en) Manufacture of foundation bodies in the underwater concreting process
DE69316908T2 (en) POLDER PRINCIPLE AND PROCEDURE USING PROTECTIVE WALLS
DE764099C (en) Process and device for the production of reinforced concrete piles
DE417326C (en) Device for the production of concrete stakes in a driving pipe
DE2130115A1 (en) Concrete piles prodn - in situ, using polyethylene sheath tube
DE2626762C2 (en) Method of making pile foundations using precast concrete piles
DE1928471A1 (en) Process and device for compacting and draining soil
DE609976C (en) Process for the production of a watertight construction pit enclosure
DE262879C (en)
DE605359C (en) Method and device for the production of foundation bodies from concrete, in particular piles, in aggressive waters
DE609238C (en) Method for producing a sufficiently watertight construction pit enclosure within the soil surrounding the pit
DE617556C (en) Process and facilities for the installation of a new passage pipe in a damaged old one for underpasses of watercourses in high traffic routes
DE505312C (en) Closure body with sealing ring for the lower end of a casing pipe that has been sunk into the ground for the production of site posts made of concrete
DE599787C (en) Process for the production of bored piles with a widened pile base
AT263845B (en) Method of excavating an underground cavity, e.g. to accommodate a traffic structure to be built later
DE646628C (en) Process for the production of place posts and concrete pillars in the water
DE599931C (en) Method and device for the production of place posts with bulges or thickened shafts
DE534528C (en) Anchoring of sheet pile walls using round iron bars
DE511365C (en) Process for lining concrete masonry with acid-resistant panels
DE231033C (en)
DE222633C (en)