CA2992607A1 - Gas turbine facility - Google Patents
Gas turbine facility Download PDFInfo
- Publication number
- CA2992607A1 CA2992607A1 CA2992607A CA2992607A CA2992607A1 CA 2992607 A1 CA2992607 A1 CA 2992607A1 CA 2992607 A CA2992607 A CA 2992607A CA 2992607 A CA2992607 A CA 2992607A CA 2992607 A1 CA2992607 A1 CA 2992607A1
- Authority
- CA
- Canada
- Prior art keywords
- flow rate
- oxidant
- supply pipe
- detecting unit
- combustion gas
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F02—COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
- F02C—GAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
- F02C7/00—Features, components parts, details or accessories, not provided for in, or of interest apart form groups F02C1/00 - F02C6/00; Air intakes for jet-propulsion plants
- F02C7/04—Air intakes for gas-turbine plants or jet-propulsion plants
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F02—COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
- F02C—GAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
- F02C3/00—Gas-turbine plants characterised by the use of combustion products as the working fluid
- F02C3/34—Gas-turbine plants characterised by the use of combustion products as the working fluid with recycling of part of the working fluid, i.e. semi-closed cycles with combustion products in the closed part of the cycle
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F02—COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
- F02C—GAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
- F02C6/00—Plural gas-turbine plants; Combinations of gas-turbine plants with other apparatus; Adaptations of gas-turbine plants for special use
- F02C6/04—Gas-turbine plants providing heated or pressurised working fluid for other apparatus, e.g. without mechanical power output
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F02—COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
- F02C—GAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
- F02C7/00—Features, components parts, details or accessories, not provided for in, or of interest apart form groups F02C1/00 - F02C6/00; Air intakes for jet-propulsion plants
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F02—COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
- F02C—GAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
- F02C7/00—Features, components parts, details or accessories, not provided for in, or of interest apart form groups F02C1/00 - F02C6/00; Air intakes for jet-propulsion plants
- F02C7/04—Air intakes for gas-turbine plants or jet-propulsion plants
- F02C7/057—Control or regulation
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F02—COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
- F02C—GAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
- F02C7/00—Features, components parts, details or accessories, not provided for in, or of interest apart form groups F02C1/00 - F02C6/00; Air intakes for jet-propulsion plants
- F02C7/08—Heating air supply before combustion, e.g. by exhaust gases
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E20/00—Combustion technologies with mitigation potential
- Y02E20/16—Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Fuel Cell (AREA)
- Engine Equipment That Uses Special Cycles (AREA)
- Control Of Turbines (AREA)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CA3097547A CA3097547C (en) | 2013-07-26 | 2014-07-16 | Gas turbine facility |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2013-155406 | 2013-07-26 | ||
| JP2013155406A JP6220589B2 (ja) | 2013-07-26 | 2013-07-26 | ガスタービン設備 |
| CA2856995A CA2856995C (en) | 2013-07-26 | 2014-07-16 | Gas turbine facility |
Related Parent Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CA2856995A Division CA2856995C (en) | 2013-07-26 | 2014-07-16 | Gas turbine facility |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CA3097547A Division CA3097547C (en) | 2013-07-26 | 2014-07-16 | Gas turbine facility |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CA2992607A1 true CA2992607A1 (en) | 2015-01-26 |
Family
ID=52389286
Family Applications (3)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CA2992607A Abandoned CA2992607A1 (en) | 2013-07-26 | 2014-07-16 | Gas turbine facility |
| CA2856995A Active CA2856995C (en) | 2013-07-26 | 2014-07-16 | Gas turbine facility |
| CA3097547A Active CA3097547C (en) | 2013-07-26 | 2014-07-16 | Gas turbine facility |
Family Applications After (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CA2856995A Active CA2856995C (en) | 2013-07-26 | 2014-07-16 | Gas turbine facility |
| CA3097547A Active CA3097547C (en) | 2013-07-26 | 2014-07-16 | Gas turbine facility |
Country Status (4)
| Country | Link |
|---|---|
| US (2) | US20150027099A1 (enExample) |
| JP (1) | JP6220589B2 (enExample) |
| CN (2) | CN104343537B (enExample) |
| CA (3) | CA2992607A1 (enExample) |
Families Citing this family (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6250332B2 (ja) | 2013-08-27 | 2017-12-20 | 8 リバーズ キャピタル,エルエルシー | ガスタービン設備 |
| JP6384916B2 (ja) | 2014-09-30 | 2018-09-05 | 東芝エネルギーシステムズ株式会社 | ガスタービン設備 |
| US10961920B2 (en) | 2018-10-02 | 2021-03-30 | 8 Rivers Capital, Llc | Control systems and methods suitable for use with power production systems and methods |
| MA40950A (fr) | 2014-11-12 | 2017-09-19 | 8 Rivers Capital Llc | Systèmes et procédés de commande appropriés pour une utilisation avec des systèmes et des procédés de production d'énergie |
| US11686258B2 (en) | 2014-11-12 | 2023-06-27 | 8 Rivers Capital, Llc | Control systems and methods suitable for use with power production systems and methods |
| MY188544A (en) * | 2015-06-15 | 2021-12-21 | 8 Rivers Capital Llc | System and method for startup of a power production plant |
| GB2545464B (en) * | 2015-12-17 | 2019-10-02 | Toshiba Energy Systems & Solutions Corp | Gas turbine facility with multiple combustion gas streams |
| AU2015275260B2 (en) * | 2015-12-22 | 2017-08-31 | Toshiba Energy Systems & Solutions Corporation | Gas turbine facility |
| US10526968B2 (en) | 2015-12-22 | 2020-01-07 | Toshiba Energy Systems & Solutions Corporation | Gas turbine facility |
| CN106917680B (zh) * | 2015-12-24 | 2018-12-18 | 东芝能源系统株式会社 | 燃气轮机设备 |
| CA3015321A1 (en) * | 2016-02-26 | 2017-08-31 | 8 Rivers Capital, Llc | Systems and methods for controlling a power plant |
| CN110573799A (zh) | 2017-03-07 | 2019-12-13 | 八河流资产有限责任公司 | 用于操作燃气涡轮机的灵活燃料燃烧室的系统和方法 |
| JP7458370B2 (ja) * | 2018-07-23 | 2024-03-29 | 8 リバーズ キャピタル,エルエルシー | 無炎燃焼による発電のためのシステムおよび方法 |
| KR20220088460A (ko) | 2019-10-22 | 2022-06-27 | 8 리버스 캐피탈, 엘엘씨 | 동력 생산 시스템들 및 방법들의 열 관리를 위한 제어 계획들 |
| JP2021191951A (ja) | 2020-06-05 | 2021-12-16 | 東芝エネルギーシステムズ株式会社 | Co2タービン発電システム |
| JP7725252B2 (ja) * | 2021-06-21 | 2025-08-19 | 東芝エネルギーシステムズ株式会社 | ガスタービン燃焼器の運転方法 |
| AU2023224893B2 (en) * | 2022-02-23 | 2024-10-10 | Nuovo Pignone Tecnologie - S.R.L. | Oxyfuel turbine system and method for oxidant control |
| EP4649228A1 (en) | 2023-01-13 | 2025-11-19 | Arbor Energy And Resources Corporation | Integrated carbon sequestration and power generation system and methods of use |
| KR20250133966A (ko) * | 2023-01-25 | 2025-09-09 | 누보 피그노네 테크놀로지 에스알엘 | 복수의 열 교환기를 포함하는 산소-연료 팽창기 시스템 및 방법 |
Family Cites Families (33)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4164124A (en) * | 1975-06-11 | 1979-08-14 | Combustion Turbine Power, Inc. | Turbine system using unclean fuel |
| US4147024A (en) * | 1977-09-15 | 1979-04-03 | Avco Corporation | Dual cycle gas turbine engine system |
| JPS57146028A (en) * | 1981-03-04 | 1982-09-09 | Hitachi Ltd | Regenerative cycle type gas turbine |
| US5175995A (en) * | 1989-10-25 | 1993-01-05 | Pyong-Sik Pak | Power generation plant and power generation method without emission of carbon dioxide |
| US5724805A (en) * | 1995-08-21 | 1998-03-10 | University Of Massachusetts-Lowell | Power plant with carbon dioxide capture and zero pollutant emissions |
| US5724806A (en) * | 1995-09-11 | 1998-03-10 | General Electric Company | Extracted, cooled, compressed/intercooled, cooling/combustion air for a gas turbine engine |
| EP0859135A1 (en) * | 1997-02-17 | 1998-08-19 | N.V. Kema | Gas turbine with energy recovering |
| NL1017029C2 (nl) * | 2001-01-04 | 2002-07-05 | Turboconsult Bv | Energieopwekkinginstallatie. |
| CN1231660C (zh) * | 2002-03-22 | 2005-12-14 | 中国科学院工程热物理研究所 | 利用液化天然气冷分离二氧化碳的燃气轮机发电系统及流程 |
| JP3684208B2 (ja) * | 2002-05-20 | 2005-08-17 | 株式会社東芝 | ガスタービン制御装置 |
| JP4241239B2 (ja) * | 2003-07-07 | 2009-03-18 | 株式会社Ihi | ガスタービン |
| ATE496206T1 (de) * | 2005-10-12 | 2011-02-15 | Alstom Technology Ltd | Gasturbine mit geregelter luftkühlung |
| JP2008082247A (ja) * | 2006-09-27 | 2008-04-10 | Mitsubishi Heavy Ind Ltd | ガスタービン |
| US7966829B2 (en) * | 2006-12-11 | 2011-06-28 | General Electric Company | Method and system for reducing CO2 emissions in a combustion stream |
| US8051654B2 (en) * | 2008-01-31 | 2011-11-08 | General Electric Company | Reheat gas and exhaust gas regenerator system for a combined cycle power plant |
| WO2009117442A2 (en) * | 2008-03-17 | 2009-09-24 | Watson John D | Regenerative braking for gas turbine systems |
| US9222671B2 (en) * | 2008-10-14 | 2015-12-29 | Exxonmobil Upstream Research Company | Methods and systems for controlling the products of combustion |
| CH699804A1 (de) * | 2008-10-29 | 2010-04-30 | Alstom Technology Ltd | Gasturbinenanlage mit Abgasrückführung sowie Verfahren zum Betrieb einer solchen Anlage. |
| US20100229525A1 (en) * | 2009-03-14 | 2010-09-16 | Robin Mackay | Turbine combustion air system |
| BRPI1007723A2 (pt) * | 2009-05-12 | 2018-03-06 | Icr Turbine Engine Corp | sistema de armazenamento e conversão de turbina a gás |
| JP2011007111A (ja) * | 2009-06-26 | 2011-01-13 | Hitachi Ltd | 再生サイクルガスタービンシステム、およびその運転方法 |
| JP5075900B2 (ja) * | 2009-09-30 | 2012-11-21 | 株式会社日立製作所 | 水素含有燃料対応燃焼器および、その低NOx運転方法 |
| JP5906555B2 (ja) * | 2010-07-02 | 2016-04-20 | エクソンモービル アップストリーム リサーチ カンパニー | 排ガス再循環方式によるリッチエアの化学量論的燃焼 |
| US20120000204A1 (en) * | 2010-07-02 | 2012-01-05 | Icr Turbine Engine Corporation | Multi-spool intercooled recuperated gas turbine |
| US9410481B2 (en) * | 2010-09-21 | 2016-08-09 | 8 Rivers Capital, Llc | System and method for high efficiency power generation using a nitrogen gas working fluid |
| DE102011115364A1 (de) * | 2010-10-19 | 2012-04-19 | Alstom Technology Ltd. | Kraftwerk |
| JP5599743B2 (ja) * | 2011-02-28 | 2014-10-01 | 一般財団法人電力中央研究所 | Co2回収型ガス化ガス発電用閉サイクルガスタービン発電プラント |
| TWI564474B (zh) * | 2011-03-22 | 2017-01-01 | 艾克頌美孚上游研究公司 | 於渦輪系統中控制化學計量燃燒的整合系統和使用彼之產生動力的方法 |
| EP2530278A1 (en) * | 2011-06-01 | 2012-12-05 | Alstom Technology Ltd | Flue gas recirculation system and method |
| US8347600B2 (en) * | 2011-08-25 | 2013-01-08 | General Electric Company | Power plant and method of operation |
| JP5183795B1 (ja) * | 2011-12-05 | 2013-04-17 | 川崎重工業株式会社 | 希薄燃料吸入ガスタービン |
| JP6220586B2 (ja) * | 2013-07-22 | 2017-10-25 | 8 リバーズ キャピタル,エルエルシー | ガスタービン設備 |
| US9856793B2 (en) * | 2015-02-12 | 2018-01-02 | United Technologies Corporation | Intercooled cooling air with improved air flow |
-
2013
- 2013-07-26 JP JP2013155406A patent/JP6220589B2/ja active Active
-
2014
- 2014-07-15 US US14/331,599 patent/US20150027099A1/en not_active Abandoned
- 2014-07-16 CA CA2992607A patent/CA2992607A1/en not_active Abandoned
- 2014-07-16 CA CA2856995A patent/CA2856995C/en active Active
- 2014-07-16 CA CA3097547A patent/CA3097547C/en active Active
- 2014-07-25 CN CN201410456454.XA patent/CN104343537B/zh not_active Expired - Fee Related
- 2014-07-25 CN CN201710791320.7A patent/CN107448295A/zh active Pending
-
2020
- 2020-03-20 US US16/825,892 patent/US20200284194A1/en not_active Abandoned
Also Published As
| Publication number | Publication date |
|---|---|
| JP2015025418A (ja) | 2015-02-05 |
| US20200284194A1 (en) | 2020-09-10 |
| CN107448295A (zh) | 2017-12-08 |
| CA3097547A1 (en) | 2015-01-26 |
| CA3097547C (en) | 2022-06-21 |
| CN104343537B (zh) | 2017-09-29 |
| CA2856995C (en) | 2018-06-05 |
| CN104343537A (zh) | 2015-02-11 |
| JP6220589B2 (ja) | 2017-10-25 |
| US20150027099A1 (en) | 2015-01-29 |
| CA2856995A1 (en) | 2015-01-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA2856995C (en) | Gas turbine facility | |
| US20200284189A1 (en) | Process for regulating flows in operation of a power generation plant | |
| CA2859883C (en) | Gas turbine facility | |
| Promes et al. | Thermodynamic evaluation and experimental validation of 253 MW Integrated Coal Gasification Combined Cycle power plant in Buggenum, Netherlands | |
| CA2906503C (en) | Gas turbine facility | |
| Luo et al. | Dynamic simulation and transient analysis of a 3 MWth oxy-fuel combustion system | |
| Moon et al. | Simulation of optimizing the partial load performance of a gas turbine combined cycle using exhaust heat recuperation and inlet bleed heating | |
| Romano et al. | Thermodynamic analysis and optimization of IT-SOFC-based integrated coal gasification fuel cell power plants | |
| Livshits et al. | Performance and water consumption of the solar steam-injection gas turbine cycle | |
| JP6636002B2 (ja) | ガスタービン設備 | |
| Pribaturin et al. | Combustion of Methane-Oxygen Mixture in Steam Atmosphere |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| EEER | Examination request |
Effective date: 20180123 |
|
| FZDE | Discontinued |
Effective date: 20220323 |
|
| FZDE | Discontinued |
Effective date: 20220323 |