BRPI1100836B8 - processo de gestão da circulação de veículos sobre uma rede ferroviária, controlador embarcado, controlador no solo, e, sistema de gestão da circulação de veículos sobre uma rede ferroviária - Google Patents
processo de gestão da circulação de veículos sobre uma rede ferroviária, controlador embarcado, controlador no solo, e, sistema de gestão da circulação de veículos sobre uma rede ferroviáriaInfo
- Publication number
- BRPI1100836B8 BRPI1100836B8 BRPI1100836A BRPI1100836A BRPI1100836B8 BR PI1100836 B8 BRPI1100836 B8 BR PI1100836B8 BR PI1100836 A BRPI1100836 A BR PI1100836A BR PI1100836 A BRPI1100836 A BR PI1100836A BR PI1100836 B8 BRPI1100836 B8 BR PI1100836B8
- Authority
- BR
- Brazil
- Prior art keywords
- controller
- vehicle
- railway network
- ground
- circulation management
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 238000013475 authorization Methods 0.000 abstract 1
- 238000012795 verification Methods 0.000 abstract 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L23/00—Control, warning or like safety means along the route or between vehicles or trains
- B61L23/22—Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in two directions over the same pair of rails
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L11/00—Operation of points from the vehicle or by the passage of the vehicle
- B61L11/08—Operation of points from the vehicle or by the passage of the vehicle using electrical or magnetic interaction between vehicle and track
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/12—Preparing schedules
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L11/00—Operation of points from the vehicle or by the passage of the vehicle
- B61L11/08—Operation of points from the vehicle or by the passage of the vehicle using electrical or magnetic interaction between vehicle and track
- B61L2011/086—German radio based operations, called "Funkfahrbetrieb" [FFB]
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
- Mobile Radio Communication Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
processo de gestão da circulação de veículos sobre uma rede ferroviária, controlador embarcado, controlador no solo, e, sistema de gestão da circulação de veículos sobre uma rede ferroviária. este processo consiste, a rede ferroviária sendo subdividida em recursos (1 a 5) cujo estado é pilotado por um controlador no solo (11), e cada veículo comportando um controlador embarcado (21) apto a se comunicar com os controladores no solo (11): - na planificação, por uma central de regulação (31), da missão de um veículo; - na transmissão da sua missão ao veículo (20) cujo controlador embarcado: - identifica um grupo de recursos permitindo ao veículo prosseguir a sua missão; - reserva os recursos identificados junto aos controladores no solo;- uma vez todos os recursos alocados, solidariza cada recurso em um estado requerido;- verifica que cada recurso é reservado e se encontra no estado requerido; e, quando esta verificação é positiva, - estende a autorização do movimento do veículo sobre o caminho correspondendo a este grupo de recursos.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1052472A FR2958248B1 (fr) | 2010-04-01 | 2010-04-01 | Procede de gestion de la circulation de vehicules sur un reseau ferroviaire et systeme associe |
FR1052472 | 2010-04-01 |
Publications (4)
Publication Number | Publication Date |
---|---|
BRPI1100836A2 BRPI1100836A2 (pt) | 2012-08-14 |
BRPI1100836A8 BRPI1100836A8 (pt) | 2016-06-21 |
BRPI1100836B1 BRPI1100836B1 (pt) | 2020-10-27 |
BRPI1100836B8 true BRPI1100836B8 (pt) | 2021-03-02 |
Family
ID=43303892
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BRPI1100836A BRPI1100836B8 (pt) | 2010-04-01 | 2011-03-31 | processo de gestão da circulação de veículos sobre uma rede ferroviária, controlador embarcado, controlador no solo, e, sistema de gestão da circulação de veículos sobre uma rede ferroviária |
Country Status (8)
Country | Link |
---|---|
US (1) | US8820685B2 (pt) |
EP (1) | EP2371662B1 (pt) |
AU (1) | AU2011201482B2 (pt) |
BR (1) | BRPI1100836B8 (pt) |
CA (1) | CA2736080C (pt) |
ES (1) | ES2402820T3 (pt) |
FR (1) | FR2958248B1 (pt) |
RU (1) | RU2559674C2 (pt) |
Families Citing this family (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102011075652A1 (de) * | 2011-05-11 | 2012-11-15 | Siemens Aktiengesellschaft | Verfahren zum Betreiben einer Eisenbahnstrecke sowie diesbezügliche Eisenbahnstrecke |
EP2572955A1 (en) * | 2011-09-23 | 2013-03-27 | Siemens SAS | Method and system for managing an interlocking |
FR2982230B1 (fr) * | 2011-11-07 | 2015-09-04 | Alstom Transport Sa | Installation et procede de gestion de la circulation de vehicules sur un reseau ferroviaire |
EP2607199B1 (en) * | 2011-12-23 | 2018-07-25 | Siemens S.A.S. | Decentralized interlocking |
US20130339098A1 (en) * | 2012-06-15 | 2013-12-19 | Telogis, Inc. | Vehicle fleet routing system |
DE102012216744A1 (de) * | 2012-09-19 | 2014-04-03 | Siemens Aktiengesellschaft | Steuerung von Schienenfahrzeugen |
US20140142868A1 (en) * | 2012-11-18 | 2014-05-22 | Andian Technologies Ltd. | Apparatus and method for inspecting track in railroad |
US9003039B2 (en) * | 2012-11-29 | 2015-04-07 | Thales Canada Inc. | Method and apparatus of resource allocation or resource release |
FR3009533B1 (fr) | 2013-08-09 | 2015-09-04 | Alstom Transport Sa | Procede de gestion de la circulation de vehicules sur un reseau ferroviaire ; controleur central et systeme associes. |
JP6151148B2 (ja) * | 2013-10-01 | 2017-06-21 | 株式会社日立製作所 | 信号保安システム |
CA2972298C (fr) * | 2013-12-30 | 2022-08-30 | Ineo Urban Transportation Solutions | Procede et dispositif informatise pour l'enclenchement d'un itineraire ferroviaire |
CN104134378A (zh) * | 2014-06-23 | 2014-11-05 | 北京交通大学 | 一种基于驾驶经验和在线学习的城轨列车智能控制方法 |
US9327740B2 (en) * | 2014-07-31 | 2016-05-03 | General Electric Company | Method and system for communicating data with vehicles |
JP6239469B2 (ja) * | 2014-09-01 | 2017-11-29 | 株式会社日立製作所 | 車上装置、列車、及び信号保安システム |
JP6258167B2 (ja) * | 2014-09-12 | 2018-01-10 | 株式会社日立製作所 | 車上装置、列車、及び信号保安システム |
US10850755B2 (en) | 2015-05-27 | 2020-12-01 | Amsted Rail Company, Inc. | System and method for building and managing a train consist |
DE102015218987A1 (de) | 2015-09-30 | 2017-03-30 | Siemens Aktiengesellschaft | Sicherungsverfahren für ein Gleisstreckennetz |
DE102016203695A1 (de) * | 2016-03-07 | 2017-09-07 | Siemens Aktiengesellschaft | Bahntechnische Anlage und Verfahren zum Betreiben einer bahntechnischen Anlage |
BR112020015049A2 (pt) | 2018-01-24 | 2020-12-08 | Amsted Rail Company, Inc. | Sistema para detectar o estado operacional de um ou mais portões de descarga, método para detectar o estado operacional de um portão de descarga, e, conjunto para uso com um vagão ferroviário. |
EP4048573A4 (en) | 2018-04-17 | 2024-03-20 | Amsted Rail Co Inc | AUTONOMOUS OPTIMIZATION OF AN INTERNAL TRAIN COMMUNICATION NETWORK |
CN108622119A (zh) * | 2018-05-11 | 2018-10-09 | 中车青岛四方机车车辆股份有限公司 | 轨道列车的激活控制方法和装置 |
US11312350B2 (en) | 2018-07-12 | 2022-04-26 | Amsted Rail Company, Inc. | Brake monitoring systems for railcars |
RU2693357C1 (ru) * | 2018-07-19 | 2019-07-02 | Акционерное общество "Научно-исследовательский и проектно-конструкторский институт информатизациии, автоматизации и связи на железнодорожном транспорте" | Способ интервального регулирования движения поездов и система для его реализации |
FR3101841B1 (fr) * | 2019-10-11 | 2022-06-03 | Alstom Transp Tech | Système de gestion de la circulation de véhicules ferroviaires sur des voies de service d’un réseau ferroviaire |
CN111103887B (zh) * | 2020-01-14 | 2021-11-12 | 大连理工大学 | 一种基于多传感器的多移动机器人调度系统设计方法 |
EP4234361A1 (en) * | 2022-02-25 | 2023-08-30 | ALSTOM Holdings | Method for controlling a plurality of track devices and railway control system |
CN114670903B (zh) * | 2022-03-02 | 2023-05-09 | 合肥工业大学 | 以资源为导向的列车运行调整模型的跨层资源分解方法 |
US20240062123A1 (en) * | 2022-08-18 | 2024-02-22 | Progress Rail Services Corporation | Train departure strategy in automatic driving system |
Family Cites Families (42)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3819932A (en) * | 1972-03-22 | 1974-06-25 | Gen Signal Corp | Multi-computer automatic vehicle control system |
US4122523A (en) * | 1976-12-17 | 1978-10-24 | General Signal Corporation | Route conflict analysis system for control of railroads |
GB9202830D0 (en) * | 1992-02-11 | 1992-03-25 | Westinghouse Brake & Signal | A railway signalling system |
US5463552A (en) * | 1992-07-30 | 1995-10-31 | Aeg Transportation Systems, Inc. | Rules-based interlocking engine using virtual gates |
US5420883A (en) * | 1993-05-17 | 1995-05-30 | Hughes Aircraft Company | Train location and control using spread spectrum radio communications |
US5398894B1 (en) * | 1993-08-10 | 1998-09-29 | Union Switch & Signal Inc | Virtual block control system for railway vehicle |
US6459964B1 (en) * | 1994-09-01 | 2002-10-01 | G.E. Harris Railway Electronics, L.L.C. | Train schedule repairer |
US20040172175A1 (en) * | 2003-02-27 | 2004-09-02 | Julich Paul M. | System and method for dispatching by exception |
US7092894B1 (en) * | 1994-09-01 | 2006-08-15 | Harris Corporation | Cost reactive scheduler and method |
US5623413A (en) * | 1994-09-01 | 1997-04-22 | Harris Corporation | Scheduling system and method |
WO1998034825A1 (en) * | 1997-02-07 | 1998-08-13 | Ge-Harris Railway Electronics, L.L.C. | A system and method for automatic train operation |
US6680694B1 (en) * | 1997-08-19 | 2004-01-20 | Siemens Vdo Automotive Corporation | Vehicle information system |
US20030183697A1 (en) * | 2000-05-11 | 2003-10-02 | Porter Jeffrey Wayne | System and method for automated, wireless short range reading and writing of data for interconnected mobile systems, such as reading/writing radio frequency identification (RFID) tags on trains |
JP3553466B2 (ja) * | 2000-06-21 | 2004-08-11 | 三菱電機株式会社 | 列車運行管理システム |
AUPR221900A0 (en) * | 2000-12-20 | 2001-01-25 | Central Queensland University | Vehicle dynamics prediction system and method |
US6799097B2 (en) * | 2002-06-24 | 2004-09-28 | Modular Mining Systems, Inc. | Integrated railroad system |
US6865454B2 (en) * | 2002-07-02 | 2005-03-08 | Quantum Engineering Inc. | Train control system and method of controlling a train or trains |
US6694231B1 (en) * | 2002-08-08 | 2004-02-17 | Bombardier Transportation Gmbh | Train registry overlay system |
EP1573578B1 (en) * | 2002-12-20 | 2010-03-17 | Ansaldo STS USA, Inc. | Dynamic optimizing traffic planning method and system |
JP2004203258A (ja) * | 2002-12-26 | 2004-07-22 | Hitachi Ltd | 信号保安方法,信号保安装置及びそれを用いた信号保安システム |
US7076343B2 (en) * | 2003-02-20 | 2006-07-11 | General Electric Company | Portable communications device integrating remote control of rail track switches and movement of a locomotive in a train yard |
US7725249B2 (en) * | 2003-02-27 | 2010-05-25 | General Electric Company | Method and apparatus for congestion management |
US7937193B2 (en) * | 2003-02-27 | 2011-05-03 | General Electric Company | Method and apparatus for coordinating railway line of road and yard planners |
US6915191B2 (en) * | 2003-05-19 | 2005-07-05 | Quantum Engineering, Inc. | Method and system for detecting when an end of train has passed a point |
FR2856645B1 (fr) * | 2003-06-27 | 2005-08-26 | Alstom | Dispositif et procede de commande de trains, notamment du type ertms |
FR2861680B1 (fr) * | 2003-10-29 | 2006-01-27 | Sncf | Procede et systeme d'aide a la circulation des trains-travaux |
JP3808865B2 (ja) * | 2003-12-04 | 2006-08-16 | 株式会社ナビタイムジャパン | 経路案内用データ作成装置および経路案内用データを用いた経路案内配信装置 |
JP4087786B2 (ja) * | 2003-12-19 | 2008-05-21 | 株式会社日立製作所 | 列車位置検知方法 |
JP4454303B2 (ja) * | 2003-12-22 | 2010-04-21 | 株式会社日立製作所 | 信号保安システム |
DE102004042979A1 (de) * | 2004-08-31 | 2006-03-16 | Siemens Ag | System zum sicheren Betrieb von auf Fahrstrecken verkehrenden gleisgebundenen Zügen |
RU2430845C2 (ru) * | 2005-03-14 | 2011-10-10 | Дженерал Электрик Компани | Способ планирования передвижения множества железнодорожных вагонов через железнодорожный станционный парк (варианты) |
US8126601B2 (en) * | 2006-03-20 | 2012-02-28 | General Electric Company | System and method for predicting a vehicle route using a route network database |
US8290645B2 (en) * | 2006-03-20 | 2012-10-16 | General Electric Company | Method and computer software code for determining a mission plan for a powered system when a desired mission parameter appears unobtainable |
US7734383B2 (en) * | 2006-05-02 | 2010-06-08 | General Electric Company | Method and apparatus for planning the movement of trains using dynamic analysis |
US7797088B2 (en) * | 2006-05-02 | 2010-09-14 | General Electric Company | Method and apparatus for planning linked train movements |
US8082071B2 (en) * | 2006-09-11 | 2011-12-20 | General Electric Company | System and method of multi-generation positive train control system |
DE602007007366D1 (de) * | 2007-02-07 | 2010-08-05 | Siemens Transp System S A S | Antikollisionswarnsystem für ein fahrzeug |
US8140203B2 (en) * | 2008-04-08 | 2012-03-20 | General Electric Company | Method for controlling vehicle operation incorporating quick clearing function |
US8478463B2 (en) * | 2008-09-09 | 2013-07-02 | Wabtec Holding Corp. | Train control method and system |
US8271153B2 (en) * | 2008-09-11 | 2012-09-18 | General Electric Company | System, method and computer readable memory medium for verifying track database information |
US8224510B2 (en) * | 2008-11-26 | 2012-07-17 | General Electric Company | System and method to provide communication-based train control system capabilities |
US8234023B2 (en) * | 2009-06-12 | 2012-07-31 | General Electric Company | System and method for regulating speed, power or position of a powered vehicle |
-
2010
- 2010-04-01 FR FR1052472A patent/FR2958248B1/fr not_active Expired - Fee Related
-
2011
- 2011-03-30 CA CA2736080A patent/CA2736080C/fr active Active
- 2011-03-30 US US13/065,813 patent/US8820685B2/en active Active
- 2011-03-31 RU RU2011112363/11A patent/RU2559674C2/ru active
- 2011-03-31 BR BRPI1100836A patent/BRPI1100836B8/pt active IP Right Grant
- 2011-04-01 ES ES11305382T patent/ES2402820T3/es active Active
- 2011-04-01 EP EP11305382A patent/EP2371662B1/fr active Active
- 2011-04-01 AU AU2011201482A patent/AU2011201482B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
RU2559674C2 (ru) | 2015-08-10 |
US20120004796A1 (en) | 2012-01-05 |
AU2011201482B2 (en) | 2016-09-15 |
BRPI1100836A2 (pt) | 2012-08-14 |
US8820685B2 (en) | 2014-09-02 |
CA2736080C (fr) | 2018-05-01 |
FR2958248B1 (fr) | 2012-06-15 |
CN102238233A (zh) | 2011-11-09 |
EP2371662B1 (fr) | 2013-01-16 |
BRPI1100836A8 (pt) | 2016-06-21 |
EP2371662A1 (fr) | 2011-10-05 |
AU2011201482A1 (en) | 2011-10-20 |
CA2736080A1 (fr) | 2011-10-01 |
RU2011112363A (ru) | 2012-10-10 |
ES2402820T3 (es) | 2013-05-09 |
BRPI1100836B1 (pt) | 2020-10-27 |
FR2958248A1 (fr) | 2011-10-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BRPI1100836B8 (pt) | processo de gestão da circulação de veículos sobre uma rede ferroviária, controlador embarcado, controlador no solo, e, sistema de gestão da circulação de veículos sobre uma rede ferroviária | |
BR112015020500A2 (pt) | métodos para facilitar o uso de um veículo, medidor para um veículo fora de estrada, sistema interativo para o uso em conexão com o uso de veículos de passeio, e, aplicativo incorporado em uma mídia legível por computador | |
BR112018015285A2 (pt) | sistema de estacionamento de veículos | |
BR112017016738A2 (pt) | planejamento de viagem em transporte público e solicitado | |
BR112016011849A2 (pt) | Sistemas de gerenciamento de pátio ferroviário | |
BR112012011245A2 (pt) | sistema de criação para o processo de construção e método de criação para o processo de construção | |
BR112014031124A2 (pt) | método e dispositivo para controle da velocidade de referência de um controlador de velocidade ladeira abaixo | |
BR102012006496A8 (pt) | sistema de gerenciamento de trajetória remoto para uma ou mais aeronaves | |
BR112017025245A2 (pt) | sistema e método para gerenciar ativos em um pátio ferroviário. | |
BR112013001376A2 (pt) | dispositivo de distribuição de conteúdo, dispositivo de reprodução de um conteúdo, sistema de distribuição de conteúdo, método de controle de um dispositivo de distribuição de conteúdo, programa de controle, e meio de gravação | |
BR112016004509A2 (pt) | reatribuição de tarefas a balões em uma rede de balão com base em modos de falha esperados de balões | |
BR112013024494A2 (pt) | distribuição de informação de acesso a local | |
BR112015023042A8 (pt) | sistemas e métodos de ativação de locais de entrega/coleta com atendimentos temporários | |
BR112015004721A2 (pt) | funcionalidade de controle de aparelho de sistema de dispositivo inteligente | |
DE602009000128D1 (de) | Fahrzeugverwaltungssystem | |
BR112013002998A2 (pt) | sistema de gerenciamento e controle de ativos | |
BR112018001309A2 (pt) | sistema e método de otimização da condição de pneu para um grupo de veículos de mineração | |
BR112013006586A2 (pt) | sistema que inclui um controlador multimídia programável, método para ganhar acesso, por um usuáro, ao controle de um controlador multimídia programável, método de operação de um sistema controlador multimídia programável, e, sistema controlador multimídia programável | |
GB2474183A (en) | Security-based elevator control | |
BR102012013566A8 (pt) | sistema adesivo composto por adesivo e selante e agente adesivo | |
BR112015019943A2 (pt) | tecnologia de centro de dados distribuído | |
BR112016002518A2 (pt) | método em um sistema de comunicação sem fio, nó de rádio, e, programa de computador | |
BR102014006166B8 (pt) | Método de gestão do tráfego sobre uma linha de metrô automático, e, sistema associado | |
BR102015007364A8 (pt) | método para computar uma faixa de posições e dispositivos para computar uma faixa de posições | |
BR112014019454A8 (pt) | sistema conector de suspensão, método de utilização do sistema conector de suspensão, e sistema conector de suspensão estruturado para suportar pelo menos parcialmente pelo menos uma parte de um sistema de andaime suspenso |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B15L | Others concerning applications: renumbering |
Free format text: RENUMERADO O PEDIDO DE PI1100836-9 PARA PP1100836-9. |
|
B03A | Publication of a patent application or of a certificate of addition of invention [chapter 3.1 patent gazette] | ||
B25A | Requested transfer of rights approved |
Owner name: ALSTOM TRANSPORT TECHNOLOGIES (FR) |
|
B25G | Requested change of headquarter approved |
Owner name: ALSTOM TRANSPORT TECHNOLOGIES (FR) |
|
B06F | Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette] | ||
B06U | Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette] | ||
B09A | Decision: intention to grant [chapter 9.1 patent gazette] | ||
B16A | Patent or certificate of addition of invention granted [chapter 16.1 patent gazette] |
Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 31/03/2011, OBSERVADAS AS CONDICOES LEGAIS. |
|
B16C | Correction of notification of the grant [chapter 16.3 patent gazette] |
Free format text: REF. RPI 2599 DE 27/10/2020 QUANTO AO TITULO. |