BRPI1014754A2 - estimativa de estados iniciais de um modelo de sistema para controlar um processo industrial - Google Patents

estimativa de estados iniciais de um modelo de sistema para controlar um processo industrial

Info

Publication number
BRPI1014754A2
BRPI1014754A2 BRPI1014754A BRPI1014754A BRPI1014754A2 BR PI1014754 A2 BRPI1014754 A2 BR PI1014754A2 BR PI1014754 A BRPI1014754 A BR PI1014754A BR PI1014754 A BRPI1014754 A BR PI1014754A BR PI1014754 A2 BRPI1014754 A2 BR PI1014754A2
Authority
BR
Brazil
Prior art keywords
estimation
control
system model
industrial process
initial states
Prior art date
Application number
BRPI1014754A
Other languages
English (en)
Inventor
Eduardo Gallestey Alvarez
Hamed Shisheh Foroush
Konrad Stadler
Poland Jan
Sebastian Gaulocher
Original Assignee
Abb Research Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Abb Research Ltd filed Critical Abb Research Ltd
Publication of BRPI1014754A2 publication Critical patent/BRPI1014754A2/pt
Publication of BRPI1014754B1 publication Critical patent/BRPI1014754B1/pt

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/04Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
    • G05B13/042Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators in which a parameter or coefficient is automatically adjusted to optimise the performance
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B03SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03DFLOTATION; DIFFERENTIAL SEDIMENTATION
    • B03D1/00Flotation
    • B03D1/02Froth-flotation processes
    • B03D1/028Control and monitoring of flotation processes; computer models therefor
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B17/00Systems involving the use of models or simulators of said systems
    • G05B17/02Systems involving the use of models or simulators of said systems electric
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/04Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
    • G05B13/041Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators in which a variable is automatically adjusted to optimise the performance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
BRPI1014754-3A 2009-06-24 2010-05-25 método de estimativa de estados iniciais de um modelo de sistema para um processo industrial e dispositivo para controlar um processo industrial BRPI1014754B1 (pt)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP09163541.7 2009-06-24
EP09163541A EP2273327A1 (en) 2009-06-24 2009-06-24 Estimating initial states of a system model for controlling an industrial process
PCT/EP2010/057148 WO2010149444A1 (en) 2009-06-24 2010-05-25 Estimating initial states of a system model for controlling an industrial process

Publications (2)

Publication Number Publication Date
BRPI1014754A2 true BRPI1014754A2 (pt) 2016-04-19
BRPI1014754B1 BRPI1014754B1 (pt) 2020-08-25

Family

ID=41510627

Family Applications (1)

Application Number Title Priority Date Filing Date
BRPI1014754-3A BRPI1014754B1 (pt) 2009-06-24 2010-05-25 método de estimativa de estados iniciais de um modelo de sistema para um processo industrial e dispositivo para controlar um processo industrial

Country Status (7)

Country Link
US (1) US9285787B2 (pt)
EP (2) EP2273327A1 (pt)
CN (1) CN102483613B (pt)
BR (1) BRPI1014754B1 (pt)
CA (1) CA2765793C (pt)
PL (1) PL2446329T3 (pt)
WO (1) WO2010149444A1 (pt)

Families Citing this family (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8805910B2 (en) * 2011-03-04 2014-08-12 Kylowave Inc. System and method for generating discrete-time model (DTM) of continuous-time model (CTM) for a dynamical system
US8645883B2 (en) * 2012-05-08 2014-02-04 Oracle International Corporation Integrated circuit simulation using fundamental and derivative circuit runs
CN104871097B (zh) * 2012-12-13 2018-05-18 Abb 技术有限公司 用于监测和/或诊断工业工厂生产线操作的系统和方法
EP3101500B1 (de) * 2015-06-02 2024-02-14 Siemens Aktiengesellschaft Steuersystem für eine verteilte prozesssteuerung einer technischen anlage und ein verfahren zur steuerung einer technischen anlage
JP6522445B2 (ja) * 2015-06-30 2019-05-29 三菱日立パワーシステムズ株式会社 制御パラメータ最適化システム及びそれを備えた運転制御最適化装置
CN105093928B (zh) * 2015-08-25 2018-02-16 中南大学 一种基于主抽风机变频调控的烧结过程状态智能控制方法
US10224579B2 (en) 2015-12-31 2019-03-05 Robert Bosch Gmbh Evaluating capacity fade in dual insertion batteries using potential and temperature measurements
US10243385B2 (en) 2016-01-29 2019-03-26 Robert Bosch Gmbh Secondary battery management system
US10686321B2 (en) 2016-01-29 2020-06-16 Robert Bosch Gmbh Secondary battery management
US10263447B2 (en) 2016-01-29 2019-04-16 Robert Bosch Gmbh Secondary battery management system
US9960625B2 (en) 2016-03-31 2018-05-01 Robert Bosch Gmbh Battery management system with multiple observers
US10447046B2 (en) 2016-09-22 2019-10-15 Robert Bosch Gmbh Secondary battery management system with remote parameter estimation
EP3474091B1 (de) * 2017-10-20 2023-07-05 aixprocess GmbH Verfahren und vorrichtung zur regelung eines prozesses innerhalb eines systems, nämlich eines mahlprozesses in einer mahlvorrichtung
US11501193B2 (en) 2017-12-18 2022-11-15 Mitsubishi Electric Research Laboratories, Inc. Model-based control under uncertainty
US11693989B2 (en) * 2017-12-21 2023-07-04 Koninklijke Philips N.V. Computer-implemented methods and nodes implementing performance estimation of algorithms during evaluation of data sets using multiparty computation based random forest
CN108519770B (zh) * 2018-04-27 2020-10-27 东北大学 一种浮选过程运行控制的实验平台
JP7197789B2 (ja) * 2019-03-01 2022-12-28 富士通株式会社 最適化装置及び最適化装置の制御方法
US11944984B2 (en) * 2019-09-23 2024-04-02 Rockwell Automation Technologies, Inc. Adaptive control of industrial automation for mining flotation cells
CN110687790B (zh) * 2019-10-30 2022-03-18 杭州电子科技大学 一种城市排水系统防止污水溢出的优化控制方法
US11644814B2 (en) * 2019-11-20 2023-05-09 Abb Schweiz Ag Method and apparatus for coordinating the utilization of operational zones to achieve production goals
CN112163376B (zh) * 2020-10-09 2024-03-12 江南大学 一种基于天牛须搜索的极端随机树炉温预测控制方法
CN112361348B (zh) * 2020-11-19 2022-10-21 上海电气集团股份有限公司 危险废物水泥窑焚烧处置的排产方法、系统、设备及介质
CN113539383B (zh) * 2021-06-02 2022-10-04 中南大学 基于动态多目标优化和模糊多属性决策的除铜过程控制方法
CN116878693B (zh) * 2023-09-05 2023-11-21 济宁市金桥煤矿 一种矿用机电设备监测管理方法及系统

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5081591A (en) * 1990-02-28 1992-01-14 Westinghouse Electric Corp. Optimizing reactive power distribution in an industrial power network
EP1418477A1 (en) * 2002-11-06 2004-05-12 Abb Research Ltd. Method for controlling an electric power transmission network
ATE419567T1 (de) * 2004-01-09 2009-01-15 Abb Research Ltd Vorrichtung zur prozesssteuerung
DE602004012399T2 (de) 2004-06-07 2008-11-27 Abb Research Ltd. Vefahren zur Generierung von optimalen Steuerungsproblemen für industrielle Prozesse

Also Published As

Publication number Publication date
US20120150507A1 (en) 2012-06-14
CN102483613A (zh) 2012-05-30
CA2765793A1 (en) 2010-12-23
BRPI1014754B1 (pt) 2020-08-25
CN102483613B (zh) 2015-03-25
EP2446329B1 (en) 2015-02-25
WO2010149444A1 (en) 2010-12-29
US9285787B2 (en) 2016-03-15
PL2446329T3 (pl) 2015-07-31
CA2765793C (en) 2018-02-27
EP2273327A1 (en) 2011-01-12
EP2446329A1 (en) 2012-05-02

Similar Documents

Publication Publication Date Title
BRPI1014754A2 (pt) estimativa de estados iniciais de um modelo de sistema para controlar um processo industrial
BRPI1010056A2 (pt) processo para produção de bioproduto e sistema para a produção de bioproduto
CO6930353A2 (es) Método para utilizar trazadores de liberación controlada
BR112012030949A2 (pt) processo de recuperação de álcool usando menbranas
BR112012000659A2 (pt) recuperação de álcoois superiores de soluções aquosas diluídas
BRPI1010860A2 (pt) tecidos industriais elásticos compreenssíveis
BR112014010293A2 (pt) processo de conversão termoquímica
BR112012019008B8 (pt) processo para esterelizar uma solução
BRPI1010093A2 (pt) processo de polimerização em solução
BRDI7103784S (pt) Configuração aplicada em conjunto de catéter
BRPI0910730A2 (pt) processo para a produção e purificação de fases aquosas
BRPI1014812A2 (pt) Processo para a produção de alacoóis
BR112012005418A2 (pt) processo para a produção de grânulos
BRDI7105200S (pt) Configuração aplicada em vaporizador sublingual de produtos fluidos
BR112014017308A2 (pt) processo para a digestão anaeróbica de uma solução substancialmente aquosa
BR112013022734A2 (pt) processo de preparação d euma n-fenil-hidroxilamina
BRPI0911629A2 (pt) Método de reduzir a fitotoxicidade
BR112014008355A2 (pt) feruloil-coa;monolignol transferase de hibiscus cannabinnus
BR112014002719A8 (pt) sistema de comando de equipamentos domésticos e processo de realização de um sistema de comando de equipamentos domésticos
BR112014009104A2 (pt) ácidos nucleicos que se ligam ao glucagon
BR112013016201A2 (pt) processo para a produção de enzimas
BR112013010695A2 (pt) processo para operação de um elemento de ligação magnético
EP2678429A4 (en) PROCESS FOR PURIFYING NUCLEIC ACIDS BASED ON MICROFLUIDIC DEVICE
BR112013012606A2 (pt) processo de produção de acetato de vinila
FR2978156B1 (fr) Procede flexible de transformation de biomasse lignocellulosique avec etape de purification

Legal Events

Date Code Title Description
B06F Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette]
B06U Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette]
B09A Decision: intention to grant [chapter 9.1 patent gazette]
B25A Requested transfer of rights approved

Owner name: ABB SCHWEIZ AG (CH)

B25G Requested change of headquarter approved

Owner name: ABB SCHWEIZ AG (CH)

B16A Patent or certificate of addition of invention granted [chapter 16.1 patent gazette]

Free format text: PRAZO DE VALIDADE: 10 (DEZ) ANOS CONTADOS A PARTIR DE 25/08/2020, OBSERVADAS AS CONDICOES LEGAIS.

B21F Lapse acc. art. 78, item iv - on non-payment of the annual fees in time

Free format text: REFERENTE A 14A ANUIDADE.