BRPI0906446A2 - Processo otimizado em termos de produção para fabricação de um tubo multicamada - Google Patents

Processo otimizado em termos de produção para fabricação de um tubo multicamada

Info

Publication number
BRPI0906446A2
BRPI0906446A2 BRPI0906446-0A BRPI0906446A BRPI0906446A2 BR PI0906446 A2 BRPI0906446 A2 BR PI0906446A2 BR PI0906446 A BRPI0906446 A BR PI0906446A BR PI0906446 A2 BRPI0906446 A2 BR PI0906446A2
Authority
BR
Brazil
Prior art keywords
pipe
another
layer
elements
multilayer
Prior art date
Application number
BRPI0906446-0A
Other languages
English (en)
Portuguese (pt)
Inventor
Bernd Berg
Original Assignee
Bergrohr Gmbh Siegen
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bergrohr Gmbh Siegen filed Critical Bergrohr Gmbh Siegen
Publication of BRPI0906446A2 publication Critical patent/BRPI0906446A2/pt

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/15Making tubes of special shape; Making tube fittings
    • B21C37/154Making multi-wall tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/08Making tubes with welded or soldered seams
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/08Making tubes with welded or soldered seams
    • B21C37/09Making tubes with welded or soldered seams of coated strip material ; Making multi-wall tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D5/00Bending sheet metal along straight lines, e.g. to form simple curves
    • B21D5/01Bending sheet metal along straight lines, e.g. to form simple curves between rams and anvils or abutments
    • B21D5/015Bending sheet metal along straight lines, e.g. to form simple curves between rams and anvils or abutments for making tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D5/00Bending sheet metal along straight lines, e.g. to form simple curves
    • B21D5/06Bending sheet metal along straight lines, e.g. to form simple curves by drawing procedure making use of dies or forming-rollers, e.g. making profiles
    • B21D5/10Bending sheet metal along straight lines, e.g. to form simple curves by drawing procedure making use of dies or forming-rollers, e.g. making profiles for making tubes
    • B21D5/12Bending sheet metal along straight lines, e.g. to form simple curves by drawing procedure making use of dies or forming-rollers, e.g. making profiles for making tubes making use of forming-rollers

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Bending Of Plates, Rods, And Pipes (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)
  • Blow-Moulding Or Thermoforming Of Plastics Or The Like (AREA)
  • Metal Extraction Processes (AREA)
BRPI0906446-0A 2009-06-19 2009-06-19 Processo otimizado em termos de produção para fabricação de um tubo multicamada BRPI0906446A2 (pt)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/EP2009/004467 WO2010145680A1 (de) 2009-06-19 2009-06-19 Produktionsoptimiertes verfahren zur herstellung eines mehrlagenrohres

Publications (1)

Publication Number Publication Date
BRPI0906446A2 true BRPI0906446A2 (pt) 2015-07-14

Family

ID=41528987

Family Applications (1)

Application Number Title Priority Date Filing Date
BRPI0906446-0A BRPI0906446A2 (pt) 2009-06-19 2009-06-19 Processo otimizado em termos de produção para fabricação de um tubo multicamada

Country Status (10)

Country Link
US (1) US20110146366A1 (ko)
EP (1) EP2285508B1 (ko)
JP (1) JP2012529993A (ko)
KR (1) KR101205676B1 (ko)
CN (1) CN101983109A (ko)
AT (1) ATE520479T1 (ko)
AU (1) AU2009318922B2 (ko)
BR (1) BRPI0906446A2 (ko)
CA (1) CA2706347C (ko)
WO (1) WO2010145680A1 (ko)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102012019315A1 (de) 2012-10-02 2014-04-03 Bergrohr Gmbh Siegen Verfahren zur schnellen Herstellung eines Mehrlagenrohres
DE102013103811B3 (de) * 2013-04-16 2014-03-20 EISENBAU KRäMER GMBH Verfahren zum Herstellen eines mehrlagigen Großrohres
BR102013021664B1 (pt) * 2013-08-23 2020-11-10 Vallourec Soluções Tubulares Do Brasil S.A processo para produção de tubo cladeado por trefilação e tubo cladeado
KR101657817B1 (ko) * 2014-12-23 2016-09-20 주식회사 포스코 클래드 강관용 판재 제조방법과 그 제조장치 및 클래드 강관
CN106140922A (zh) * 2015-04-10 2016-11-23 上海丁柯机械有限公司 一种多层叠放工件的拉伸方法
CN115846791A (zh) * 2023-03-03 2023-03-28 无锡市源隆金属制品有限公司 一种用于汽车直缝焊管焊接装置

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE582387C (de) * 1933-08-14 Kurt Ruppin Verfahren zur Herstellung von doppelwandigen Rohren oder aehnlichen Hohlkoerpern
US2489802A (en) * 1945-04-02 1949-11-29 Smith Corp A O Method of constructing multilayer cylinders
US2585237A (en) * 1946-04-03 1952-02-12 Babcock & Wilcox Co Method of making banded pressure vessels
US3327383A (en) 1963-01-03 1967-06-27 Walter C Reed Method of making clad pipe
US3400449A (en) * 1966-06-06 1968-09-10 Continental Can Co Method of preparing a surface for welding
US3857159A (en) * 1973-09-27 1974-12-31 Pacific Roller Die Co Inc Pipe forming method
FR2477962A1 (fr) * 1980-03-11 1981-09-18 Sireix Georges Procede de formage de profiles notamment de profiles tubulaires
JPH0790270B2 (ja) * 1987-11-20 1995-10-04 日立電線株式会社 金属パイプ成形方法
DE4333036A1 (de) * 1993-09-30 1995-04-06 Froh Roehren Vorrichtung zum Herstellen gelöteter mehrlagiger Metallrohre
WO2001033129A1 (en) * 1999-11-05 2001-05-10 Wellstream, Inc. Flexible pipe and method of manufacturing same
DE10022823A1 (de) * 2000-05-10 2001-11-22 Unicor Extrusionstechnik Gmbh Verfahren zur Herstellung von Mehrschicht-Metall-Verbundrohren
JP2006126787A (ja) 2004-09-30 2006-05-18 Victor Co Of Japan Ltd 画像表示装置
AU2005318485B2 (en) 2004-12-21 2011-07-28 First Tube Intellectual Property Management Company Of Luxembourg S.A.R.L. Multi-layer pipe and method for its production
WO2009023973A1 (de) * 2007-08-21 2009-02-26 Soutec Soudronic Ag Vorrichtung und verfahren zum formen eines rohres aus einem blech

Also Published As

Publication number Publication date
AU2009318922A1 (en) 2011-01-13
EP2285508B1 (de) 2011-08-17
JP2012529993A (ja) 2012-11-29
KR101205676B1 (ko) 2012-11-27
CN101983109A (zh) 2011-03-02
CA2706347A1 (en) 2010-09-08
KR20110033977A (ko) 2011-04-04
CA2706347C (en) 2012-01-24
AU2009318922B2 (en) 2011-12-08
ATE520479T1 (de) 2011-09-15
US20110146366A1 (en) 2011-06-23
EP2285508A1 (de) 2011-02-23
WO2010145680A1 (de) 2010-12-23

Similar Documents

Publication Publication Date Title
BRPI0906446A2 (pt) Processo otimizado em termos de produção para fabricação de um tubo multicamada
BRPI0519169A2 (pt) tubo de camadas méltiplas e processo para a sua fabricaÇço
WO2013016482A3 (en) Methods and systems for forming reinforced composite articles having variable thickness corners
GB201013227D0 (en) A composite material and method
WO2011028400A3 (en) Internally reinforced structural composites and associated methods of manufacturing
MX337675B (es) Metodo para deformar una trama.
BR112013024416A2 (pt) chapa de aço laminada a quente e processo de fabricação associado
CL2013001934A1 (es) Metodo para hacer un elemento de trituracion para un dispositivo de trituracion comprende, formar un elemento de desgaste que tiene una superficie de trituracion exterior, formar una insercion que tiene un primer extremo adyacente a una porcion de base, formar un canal en el elemento de desgaste; dispositivo de trituracion.
BRPI0923329A2 (pt) núcleo para um artigo laminado compósito, conjunto para produzir um artigo laminado compósito, e, método para fabricar um núcleo para um artigo laminado compósito
BR112012002408A2 (pt) método e ferramenta para a fabricação de engrenagens de face.
BR112014025125A2 (pt) método para fabricar um painel sanduíche composto com um núcleo alveolar, molde para a realização do mesmo e painel sanduíche.
WO2014182825A3 (en) Method of manufacturing a composite material
BR112014029717A2 (pt) material lignocelulósico, tendo um núcleo e duas camadas exteriores, método para produzir o mesmo e uso do material lignocelulósico.
MX2016014816A (es) Metodos para fabricar una estructura fibrosa con diseños elemental y visualmente equilibrados.
BRPI0909928A2 (pt) material compósito em multicamadas, método para produzir um material, compósito em multimarcas e material compósito
JP2015074229A5 (ko)
MX366386B (es) Metodo de produccion para lamina de acero que cambia la configuracion en seccion transversal en la direccion longitudinal, y dispositivo de moldeo por rodillo.
EP3456505A4 (en) METHOD FOR PRODUCING A METHOD OF DEPTHED PATTERN AND METHOD FOR PRODUCING A PATTERNED FOIL
EP3059073A3 (en) Manufacture of thermoplastic core
JP2012135659A5 (ko)
EA201591134A1 (ru) Вытяжной формовочный инструмент и способ изготовления формованного материала
MX2015010860A (es) Metodo para fabricar centros fibrosos.
FR2970266B1 (fr) Procede de fabrication d'une piece metallique annulaire monobloc a insert de renfort en materiau composite, et piece obtenue
JP2013527816A5 (ko)
WO2011015345A3 (de) Verfahren zur und vorrichtungen mit verbindung zweier materiallagen

Legal Events

Date Code Title Description
B08F Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette]

Free format text: REFERENTE A 6A ANUIDADE.

B08K Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette]

Free format text: EM VIRTUDE DO ARQUIVAMENTO PUBLICADO NA RPI 2344 DE 08-12-2015 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDO O ARQUIVAMENTO DO PEDIDO DE PATENTE, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013.