|
US8688487B2
(en)
*
|
2007-04-18 |
2014-04-01 |
Schlumberger Technology Corporation |
Method and system for measuring technology maturity
|
|
US8462012B2
(en)
*
|
2007-07-20 |
2013-06-11 |
Schlumberger Technology Corporation |
Anti-collision method for drilling wells
|
|
US8061444B2
(en)
*
|
2008-05-22 |
2011-11-22 |
Schlumberger Technology Corporation |
Methods and apparatus to form a well
|
|
US8499829B2
(en)
*
|
2008-08-22 |
2013-08-06 |
Schlumberger Technology Corporation |
Oilfield application framework
|
|
US8510081B2
(en)
*
|
2009-02-20 |
2013-08-13 |
Canrig Drilling Technology Ltd. |
Drilling scorecard
|
|
CA2754152A1
(en)
*
|
2009-03-17 |
2010-09-23 |
Smith International, Inc. |
Relative and absolute error models for subterranean wells
|
|
WO2011017626A1
(en)
*
|
2009-08-07 |
2011-02-10 |
Exxonmobil Upstream Research Company |
Methods to estimate downhole drilling vibration amplitude from surface measurement
|
|
CA2767689C
(en)
|
2009-08-07 |
2018-01-02 |
Exxonmobil Upstream Research Company |
Drilling advisory systems and methods based on at least two controllable drilling parameters
|
|
MY158575A
(en)
|
2009-08-07 |
2016-10-14 |
Exxonmobil Upstream Res Co |
Methods to estimate downhole drilling vibration indices from surface measurement
|
|
EP2450527A1
(en)
*
|
2009-08-14 |
2012-05-09 |
Services Pétroliers Schlumberger |
Method of displaying well drilling operations
|
|
AU2010345083B2
(en)
|
2010-02-03 |
2016-03-10 |
Exxonmobil Upstream Research Company |
Method for using dynamic target region for well path/drill center optimization
|
|
EP2534605B1
(en)
|
2010-02-12 |
2020-06-17 |
Exxonmobil Upstream Research Company |
Method and system for partitioning parallel simulation models
|
|
WO2011112221A1
(en)
|
2010-03-12 |
2011-09-15 |
Exxonmobil Upstream Research Company |
Dynamic grouping of domain objects via smart groups
|
|
US8800880B2
(en)
*
|
2010-04-27 |
2014-08-12 |
National Oilwell Varco, L.P. |
Downhole tag assembly
|
|
BR112012025995A2
(pt)
|
2010-04-30 |
2016-06-28 |
Exxonmobil Upstream Res Co |
método e sistema para simulação de fluxo de volume finito
|
|
US10087721B2
(en)
|
2010-07-29 |
2018-10-02 |
Exxonmobil Upstream Research Company |
Methods and systems for machine—learning based simulation of flow
|
|
US20120024606A1
(en)
*
|
2010-07-29 |
2012-02-02 |
Dimitrios Pirovolou |
System and method for direction drilling
|
|
CA2803068C
(en)
|
2010-07-29 |
2016-10-11 |
Exxonmobil Upstream Research Company |
Method and system for reservoir modeling
|
|
AU2011283193B2
(en)
|
2010-07-29 |
2014-07-17 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
|
CA2807300C
(en)
|
2010-09-20 |
2017-01-03 |
Exxonmobil Upstream Research Company |
Flexible and adaptive formulations for complex reservoir simulations
|
|
US8781879B2
(en)
*
|
2010-11-04 |
2014-07-15 |
Schlumberger Technology Corporation |
System and method of facilitating petroleum engineering analysis
|
|
AU2011356658B2
(en)
|
2011-01-26 |
2017-04-06 |
Exxonmobil Upstream Research Company |
Method of reservoir compartment analysis using topological structure in 3D earth model
|
|
US11496760B2
(en)
|
2011-07-22 |
2022-11-08 |
Qualcomm Incorporated |
Slice header prediction for depth maps in three-dimensional video codecs
|
|
US9521418B2
(en)
|
2011-07-22 |
2016-12-13 |
Qualcomm Incorporated |
Slice header three-dimensional video extension for slice header prediction
|
|
US9288505B2
(en)
*
|
2011-08-11 |
2016-03-15 |
Qualcomm Incorporated |
Three-dimensional video with asymmetric spatial resolution
|
|
US9285794B2
(en)
|
2011-09-07 |
2016-03-15 |
Exxonmobil Upstream Research Company |
Drilling advisory systems and methods with decision trees for learning and application modes
|
|
CN103959233B
(zh)
|
2011-09-15 |
2017-05-17 |
埃克森美孚上游研究公司 |
在执行eos计算的指令受限算法中最优化矩阵和向量运算
|
|
US9485503B2
(en)
|
2011-11-18 |
2016-11-01 |
Qualcomm Incorporated |
Inside view motion prediction among texture and depth view components
|
|
EP2802737B1
(en)
|
2012-01-13 |
2016-06-22 |
Landmark Graphics Corporation |
Method and system of planning and/or drilling wellbores
|
|
US9191266B2
(en)
|
2012-03-23 |
2015-11-17 |
Petrolink International |
System and method for storing and retrieving channel data
|
|
US9706185B2
(en)
|
2012-04-16 |
2017-07-11 |
Canrig Drilling Technology Ltd. |
Device control employing three-dimensional imaging
|
|
WO2013184280A1
(en)
*
|
2012-06-08 |
2013-12-12 |
Exxonmobil Upstream Research Company |
Systems and methods for vertical depth control during extended-reach drilling operations
|
|
US9518459B1
(en)
|
2012-06-15 |
2016-12-13 |
Petrolink International |
Logging and correlation prediction plot in real-time
|
|
US9512707B1
(en)
|
2012-06-15 |
2016-12-06 |
Petrolink International |
Cross-plot engineering system and method
|
|
EP2880260A4
(en)
*
|
2012-08-01 |
2015-08-12 |
Services Petroliers Schlumberger |
ASSESSMENT, MONITORING AND MANAGEMENT OF BOHAKES AND / OR EVALUATION OF GEOLOGICAL PROPERTIES
|
|
US9482084B2
(en)
|
2012-09-06 |
2016-11-01 |
Exxonmobil Upstream Research Company |
Drilling advisory systems and methods to filter data
|
|
AU2013324162B2
(en)
|
2012-09-28 |
2018-08-09 |
Exxonmobil Upstream Research Company |
Fault removal in geological models
|
|
US20150330209A1
(en)
*
|
2012-12-13 |
2015-11-19 |
Schlumberger Technology Corporation |
Optimal trajectory control for directional drilling
|
|
US20140172303A1
(en)
*
|
2012-12-18 |
2014-06-19 |
Smith International, Inc. |
Methods and systems for analyzing the quality of a wellbore
|
|
CA2891581C
(en)
|
2013-01-03 |
2019-11-26 |
Landmark Graphics Corporation |
System and method for predicting and visualizing drilling events
|
|
US9388682B2
(en)
*
|
2013-01-25 |
2016-07-12 |
Schlumberger Technology Corporation |
Hazard avoidance analysis
|
|
US10430897B2
(en)
*
|
2013-03-28 |
2019-10-01 |
Schlumberger Technology Corporation |
Automated rig activity report generation
|
|
US9399900B2
(en)
|
2013-05-23 |
2016-07-26 |
Baker Hughes Incorporated |
Estimation of optimum tripping schedules
|
|
CA2910640A1
(en)
*
|
2013-05-29 |
2014-12-04 |
Landmark Graphics Corporation |
Compiling drilling scenario data from disparate data sources
|
|
WO2014200685A2
(en)
|
2013-06-10 |
2014-12-18 |
Exxonmobil Upstream Research Company |
Interactively planning a well site
|
|
EP3008285A4
(en)
|
2013-06-12 |
2017-04-05 |
Services Pétroliers Schlumberger |
Well trajectory planning using bounding box scan for anti-collision analysis
|
|
US10590761B1
(en)
|
2013-09-04 |
2020-03-17 |
Petrolink International Ltd. |
Systems and methods for real-time well surveillance
|
|
US10428647B1
(en)
|
2013-09-04 |
2019-10-01 |
Petrolink International Ltd. |
Systems and methods for real-time well surveillance
|
|
US9864098B2
(en)
|
2013-09-30 |
2018-01-09 |
Exxonmobil Upstream Research Company |
Method and system of interactive drill center and well planning evaluation and optimization
|
|
AU2013402485B2
(en)
*
|
2013-10-08 |
2017-05-18 |
Halliburton Energy Services, Inc. |
Integrated well survey management and planning tool
|
|
WO2015053747A1
(en)
*
|
2013-10-08 |
2015-04-16 |
Halliburton Energy Services, Inc. |
Integrated well survey management and planning tool
|
|
RU2657277C2
(ru)
*
|
2013-10-18 |
2018-06-09 |
Бейкер Хьюз Инкорпорейтед |
Прогнозирование буримости исходя из электромагнитного излучения, испускаемого в ходе буровых работ
|
|
US10248920B2
(en)
*
|
2013-11-13 |
2019-04-02 |
Schlumberger Technology Corporation |
Automatic wellbore activity schedule adjustment method and system
|
|
CN105899757A
(zh)
*
|
2013-12-17 |
2016-08-24 |
哈利伯顿能源服务公司 |
包括钻柱伸长和扭转的估计的钻井模型校准
|
|
US9745842B2
(en)
*
|
2013-12-18 |
2017-08-29 |
Schlumberger Technology Corporation |
Proximity calculation in a geoscience domain
|
|
US10062044B2
(en)
*
|
2014-04-12 |
2018-08-28 |
Schlumberger Technology Corporation |
Method and system for prioritizing and allocating well operating tasks
|
|
US9939802B2
(en)
*
|
2014-05-16 |
2018-04-10 |
Baker Hughes, A Ge Company, Llc |
Automated conflict resolution management
|
|
GB2542037B
(en)
*
|
2014-05-20 |
2020-12-16 |
Halliburton Energy Services Inc |
Improving well survey performance
|
|
US10319143B2
(en)
|
2014-07-30 |
2019-06-11 |
Exxonmobil Upstream Research Company |
Volumetric grid generation in a domain with heterogeneous material properties
|
|
US10612307B2
(en)
*
|
2014-08-28 |
2020-04-07 |
Schlumberger Technology Corporation |
Method and system for directional drilling
|
|
US20160090822A1
(en)
*
|
2014-09-25 |
2016-03-31 |
Schlumberger Technology Corporation |
Collision detection method
|
|
AU2015339883B2
(en)
|
2014-10-31 |
2018-03-29 |
Exxonmobil Upstream Research Company |
Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
|
|
WO2016069171A1
(en)
|
2014-10-31 |
2016-05-06 |
Exxonmobil Upstream Research Company |
Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
|
|
US10094209B2
(en)
|
2014-11-26 |
2018-10-09 |
Nabors Drilling Technologies Usa, Inc. |
Drill pipe oscillation regime for slide drilling
|
|
US10280731B2
(en)
*
|
2014-12-03 |
2019-05-07 |
Baker Hughes, A Ge Company, Llc |
Energy industry operation characterization and/or optimization
|
|
US10626716B2
(en)
|
2014-12-10 |
2020-04-21 |
Halliburton Energy Services, Inc. |
Wellbore trajectory visualization and ranging measurement location determination
|
|
US9784035B2
(en)
|
2015-02-17 |
2017-10-10 |
Nabors Drilling Technologies Usa, Inc. |
Drill pipe oscillation regime and torque controller for slide drilling
|
|
US20180045031A1
(en)
*
|
2015-02-18 |
2018-02-15 |
Schlumberger Technology Corporation |
Integrated well completions
|
|
CA2966043C
(en)
|
2015-03-27 |
2020-02-18 |
Pason Systems Corp. |
Method and apparatus for drilling a new well using historic drilling data
|
|
WO2016161295A1
(en)
*
|
2015-04-03 |
2016-10-06 |
Schlumberger Technology Corporation |
Wellsite system services
|
|
CN106156933B
(zh)
*
|
2015-04-17 |
2022-01-28 |
普拉德研究及开发股份有限公司 |
设计井规划及预测钻井性能
|
|
CN106156934B
(zh)
*
|
2015-04-17 |
2022-06-28 |
普拉德研究及开发股份有限公司 |
分布式井工程和规划
|
|
US10280729B2
(en)
|
2015-04-24 |
2019-05-07 |
Baker Hughes, A Ge Company, Llc |
Energy industry operation prediction and analysis based on downhole conditions
|
|
US11125070B2
(en)
*
|
2015-05-08 |
2021-09-21 |
Schlumberger Technology Corporation |
Real time drilling monitoring
|
|
WO2017070025A1
(en)
*
|
2015-10-18 |
2017-04-27 |
Schlumberger Technology Corporation |
Rig operations information system
|
|
US11151762B2
(en)
*
|
2015-11-03 |
2021-10-19 |
Ubiterra Corporation |
Systems and methods for shared visualization and display of drilling information
|
|
US20170122095A1
(en)
*
|
2015-11-03 |
2017-05-04 |
Ubiterra Corporation |
Automated geo-target and geo-hazard notifications for drilling systems
|
|
US10267132B2
(en)
*
|
2015-12-21 |
2019-04-23 |
Baker Hughes, A Ge Company, Llc |
Eliminating discrete fracture network calculations by rigorous mathematics
|
|
EP3443198A4
(en)
*
|
2016-04-15 |
2020-02-19 |
Landmark Graphics Corporation |
OPTIMIZATION AND REAL-TIME VISUALIZATION OF PARAMETERS FOR DRILLING OPERATIONS
|
|
US10423915B2
(en)
*
|
2016-06-02 |
2019-09-24 |
Ge Oil & Gas Esp, Inc. |
System and method for well lifecycle planning visualization
|
|
US10794134B2
(en)
*
|
2016-08-04 |
2020-10-06 |
Baker Hughes, A Ge Company, Llc |
Estimation of optimum tripping schedules
|
|
WO2018035661A1
(en)
*
|
2016-08-22 |
2018-03-01 |
Schlumberger Technology Corporation |
Bore trajectory system
|
|
WO2018067131A1
(en)
*
|
2016-10-05 |
2018-04-12 |
Schlumberger Technology Corporation |
Machine-learning based drilling models for a new well
|
|
US10546355B2
(en)
|
2016-10-20 |
2020-01-28 |
International Business Machines Corporation |
System and tool to configure well settings for hydrocarbon production in mature oil fields
|
|
WO2018102264A1
(en)
*
|
2016-11-29 |
2018-06-07 |
Hrl Laboratories, Llc |
Opportunistic sensor fusion algorithm for autonomous guidance while drilling
|
|
DE102016014685A1
(de)
*
|
2016-12-12 |
2018-06-14 |
Tracto-Technik Gmbh & Co. Kg |
Verfahren und System zum Ermitteln einer Bodenklasse sowie Verwendung beim Ermitteln einer Bodenklasse
|
|
HUE064459T2
(hu)
|
2016-12-23 |
2024-03-28 |
Exxonmobil Technology & Engineering Company |
Eljárás és rendszer stabil és hatékony tározó szimulációhoz stabilitási proxyk alkalmazásával
|
|
CN106996282B
(zh)
*
|
2017-06-08 |
2019-06-18 |
成都北方石油勘探开发技术有限公司 |
气顶圈闭的复合型完井方法
|
|
CN107083940B
(zh)
*
|
2017-06-08 |
2019-06-18 |
成都北方石油勘探开发技术有限公司 |
气顶圈闭的复合型完井结构
|
|
US10968730B2
(en)
|
2017-07-25 |
2021-04-06 |
Exxonmobil Upstream Research Company |
Method of optimizing drilling ramp-up
|
|
CA3069128C
(en)
|
2017-08-14 |
2022-01-25 |
Exxonmobil Upstream Research Company |
Methods of drilling a wellbore within a subsurface region and drilling control systems that perform the methods
|
|
US11131181B2
(en)
|
2017-10-09 |
2021-09-28 |
Exxonmobil Upstream Research Company |
Controller with automatic tuning and method
|
|
FR3078739B1
(fr)
*
|
2018-03-09 |
2020-03-27 |
Soletanche Freyssinet |
Machine de forage comportant un dispositif de connexion pour un dispositif de mesure de verticalite
|
|
US11494887B2
(en)
*
|
2018-03-09 |
2022-11-08 |
Schlumberger Technology Corporation |
System for characterizing oilfield tools
|
|
US11288609B2
(en)
|
2018-12-04 |
2022-03-29 |
Schlumberger Technology Corporation |
Systems and methods for executing a plan associated with multiple equipment by using rule-based inference
|
|
EP3794528A4
(en)
|
2018-05-12 |
2022-01-26 |
Services Pétroliers Schlumberger |
SYSTEM FOR INTERPRETATION OF SEISMIC DATA
|
|
US12147920B2
(en)
|
2018-12-04 |
2024-11-19 |
Schlumberger Technology Corporation |
Multi-domain planning and execution
|
|
CA3100068A1
(en)
*
|
2018-05-12 |
2019-11-21 |
Schlumberger Canada Limited |
Multi-domain planning and execution
|
|
US12524716B2
(en)
|
2018-05-15 |
2026-01-13 |
Schlumberger Technology Corporation |
Operations management network system and method
|
|
US11156526B1
(en)
|
2018-05-15 |
2021-10-26 |
eWellbore, LLC |
Triaxial leak criterion for optimizing threaded connections in well tubulars
|
|
US11513027B1
(en)
|
2018-05-15 |
2022-11-29 |
eWellbore, LLC |
Triaxial leak criterion with thread shear for optimizing threaded connections in well tubulars
|
|
WO2019241243A1
(en)
*
|
2018-06-11 |
2019-12-19 |
Conocophillips Company |
System and method to detect and avoid wellbore collision
|
|
CN109441422B
(zh)
|
2018-12-03 |
2020-06-26 |
北京科技大学 |
一种页岩气井间距优化开采方法
|
|
US11905821B2
(en)
*
|
2019-08-15 |
2024-02-20 |
Schlumberger Technology Corporation |
Offset well analysis using well trajectory similarity
|
|
US20220307366A1
(en)
*
|
2019-08-23 |
2022-09-29 |
Landmark Graphics Corporation |
Automated offset well analysis
|
|
CN110500081B
(zh)
*
|
2019-08-31 |
2022-09-16 |
中国石油集团川庆钻探工程有限公司 |
一种基于深度学习的自动钻井方法
|
|
US11396801B2
(en)
|
2019-09-12 |
2022-07-26 |
Schlumberger Technology Corporation |
Displaying steering response with uncertainty in a heat map ellipse
|
|
US12590509B2
(en)
*
|
2019-09-13 |
2026-03-31 |
Schlumberger Technology Corporation |
Automated identification of well targets in reservoir simulation models
|
|
CA3159346A1
(en)
*
|
2019-10-28 |
2021-05-06 |
Schlumberger Canada Limited |
Drilling activity recommendation system and method
|
|
US20220268139A1
(en)
*
|
2019-10-29 |
2022-08-25 |
Landmark Graphics Corporation |
Auto-Detection And Classification Of Rig Activities From Trend Analysis Of Sensor Data
|
|
CA3172374A1
(en)
|
2020-02-24 |
2021-09-02 |
Schlumberger Canada Limited |
Multi-domain controller
|
|
CN111444612B
(zh)
*
|
2020-03-26 |
2021-04-16 |
北京科技大学 |
一种致密油藏水平井多级压裂流场形态模拟方法
|
|
US11585202B2
(en)
*
|
2020-05-29 |
2023-02-21 |
Saudi Arabian Oil Company |
Method and system for optimizing field development
|
|
CA3121351A1
(en)
*
|
2020-06-15 |
2021-12-15 |
Nabors Drilling Technologies Usa, Inc. |
Automated display of wellbore information
|
|
CN112084553B
(zh)
*
|
2020-08-06 |
2024-06-04 |
重庆设计集团有限公司 |
一种用于隧道规划的勘测方法
|
|
CN111794742B
(zh)
*
|
2020-08-28 |
2022-10-04 |
四川长宁天然气开发有限责任公司 |
一种页岩气钻井工程跟踪推演方法
|
|
CN112883473B
(zh)
*
|
2021-02-25 |
2024-04-12 |
中国石油天然气集团有限公司 |
一种钻井工程设计生成装置及方法
|
|
US20220333479A1
(en)
*
|
2021-04-14 |
2022-10-20 |
Halliburton Energy Services, Inc. |
Well placement systems and methods to determine well placement
|
|
CA3240526A1
(en)
*
|
2021-11-30 |
2023-06-08 |
Schlumberger Canada Limited |
Automated tools recommender system for well completion
|
|
CN114528650A
(zh)
*
|
2021-12-31 |
2022-05-24 |
中国石油天然气集团有限公司 |
一种钻井工程设计方法、装置和相关设备
|
|
US12291955B2
(en)
|
2022-03-18 |
2025-05-06 |
Saudi Arabian Oil Company |
Real-time model of rig and bit hydraulics efficiency
|
|
US20240418889A1
(en)
*
|
2022-05-24 |
2024-12-19 |
Schlumberger Technology Corporation |
Processing geophysics data in the image domain in real-time
|
|
US20240026773A1
(en)
*
|
2022-07-20 |
2024-01-25 |
Halliburton Energy Services, Inc. |
Three-dimensional drilling collision avoidance display
|
|
CN115949387B
(zh)
*
|
2022-12-13 |
2025-03-18 |
上海中联重科桩工机械有限公司 |
软土层钻进效率的控制方法、电子设备及计算机存储介质
|
|
CN118309368B
(zh)
*
|
2024-06-07 |
2024-10-18 |
陕西延长石油矿业有限责任公司 |
一种煤矿厚基岩地层一钻完井智能建井方法
|