BR112013028588A2 - método baseado em computador para o cálculo de modelo geológico tridimensional em tempo real e navegação de reservatório - Google Patents
método baseado em computador para o cálculo de modelo geológico tridimensional em tempo real e navegação de reservatórioInfo
- Publication number
- BR112013028588A2 BR112013028588A2 BR112013028588A BR112013028588A BR112013028588A2 BR 112013028588 A2 BR112013028588 A2 BR 112013028588A2 BR 112013028588 A BR112013028588 A BR 112013028588A BR 112013028588 A BR112013028588 A BR 112013028588A BR 112013028588 A2 BR112013028588 A2 BR 112013028588A2
- Authority
- BR
- Brazil
- Prior art keywords
- based method
- real
- computer
- geological model
- time
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 238000012821 model calculation Methods 0.000 title abstract 2
- 238000005553 drilling Methods 0.000 abstract 2
- 238000005259 measurement Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V20/00—Geomodelling in general
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V99/00—Subject matter not provided for in other groups of this subclass
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Geochemistry & Mineralogy (AREA)
- General Physics & Mathematics (AREA)
- Geophysics (AREA)
- Geophysics And Detection Of Objects (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Position Fixing By Use Of Radio Waves (AREA)
Abstract
resumo patente de invenção: "método baseado em computador para o cálculo de modelo geológico tridimensional em tempo real e navegação de reservatório". a presente invenção refere-se a um método de cálculo de um modelo geológico 3-d em tempo real usando, como entrada, dados geológicos 2-d. o modelo 3-d é usado para a realização de outras operações de perfuração. o modelo pode ser atualizado em tempo real usando outras medições obtidas durante as operações de perfuração.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/EP2011/060357 WO2012175115A1 (en) | 2011-06-21 | 2011-06-21 | Computer-based method for real-time three-dimensional geological model calculation and reservoir navigation |
Publications (2)
Publication Number | Publication Date |
---|---|
BR112013028588A2 true BR112013028588A2 (pt) | 2017-01-17 |
BR112013028588B1 BR112013028588B1 (pt) | 2020-06-30 |
Family
ID=47360776
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR112013028588-5A BR112013028588B1 (pt) | 2011-06-21 | 2011-06-21 | método baseado em computador para o cálculo de modelo geológico tridimensional em tempo real e navegação de reservatório |
Country Status (5)
Country | Link |
---|---|
US (1) | US9043154B2 (pt) |
BR (1) | BR112013028588B1 (pt) |
GB (1) | GB2505095B (pt) |
NO (1) | NO345271B1 (pt) |
WO (1) | WO2012175115A1 (pt) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140214476A1 (en) * | 2013-01-31 | 2014-07-31 | Halliburton Energy Services, Inc. | Data initialization for a subterranean operation |
GB2528191B (en) * | 2013-03-27 | 2019-12-04 | Logined Bv | Automatic geosteering and evolutionary algorithm for use with same |
RU2016108496A (ru) * | 2013-10-04 | 2017-11-13 | Лэндмарк Графикс Корпорейшн | Динамический способ и мониторинг в реальном времени туннельного рабочего диапазона бурения на депрессии с помощью гидравлического забойного двигателя |
MX2016004353A (es) * | 2013-10-25 | 2016-11-14 | Landmark Graphics Corp | Constructor de itinerarios para el analisis de la ingenieria de perforacion. |
CN104481522B (zh) * | 2014-11-05 | 2017-01-18 | 西南石油大学 | 一种在一维空间实现岩石地层数字描述的方法 |
US10451769B2 (en) | 2015-01-26 | 2019-10-22 | Schlumberger Technology Corporation | Method for determining petrophysical properties from logging measurements |
US10961837B2 (en) * | 2017-03-20 | 2021-03-30 | Nabors Drilling Technologies Usa, Inc. | Downhole 3D geo steering viewer for a drilling apparatus |
US10954772B2 (en) | 2017-09-14 | 2021-03-23 | Baker Hughes, A Ge Company, Llc | Automated optimization of downhole tools during underreaming while drilling operations |
US10584536B2 (en) | 2017-10-30 | 2020-03-10 | Nabors Drilling Technologies Usa, Inc. | Apparatus, systems, and methods for efficiently communicating a geosteering trajectory adjustment |
US11200093B2 (en) * | 2019-07-15 | 2021-12-14 | Baker Hughes Oilfield Operations Llc | Management of a geomechanical workflow of a geomechanics application in a computer system |
US11815650B2 (en) | 2020-04-09 | 2023-11-14 | Saudi Arabian Oil Company | Optimization of well-planning process for identifying hydrocarbon reserves using an integrated multi-dimensional geological model |
US11693140B2 (en) | 2020-04-09 | 2023-07-04 | Saudi Arabian Oil Company | Identifying hydrocarbon reserves of a subterranean region using a reservoir earth model that models characteristics of the region |
US11486230B2 (en) * | 2020-04-09 | 2022-11-01 | Saudi Arabian Oil Company | Allocating resources for implementing a well-planning process |
Family Cites Families (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2364382A (en) * | 1997-05-02 | 2002-01-23 | Baker Hughes Inc | Optimising hydrocarbon production by controlling injection according to an injection parameter sensed downhole |
GB2354852B (en) | 1999-10-01 | 2001-11-28 | Schlumberger Holdings | Method for updating an earth model using measurements gathered during borehole construction |
US7295005B2 (en) * | 2001-05-30 | 2007-11-13 | Baker Hughes Incorporated | Azimuthal NMR imaging while drilling |
US7463035B2 (en) | 2002-03-04 | 2008-12-09 | Baker Hughes Incorporated | Method and apparatus for the use of multicomponent induction tool for geosteering and formation resistivity data interpretation in horizontal wells |
US7035165B2 (en) | 2003-01-29 | 2006-04-25 | Baker Hughes Incorporated | Imaging near-borehole structure using directional acoustic-wave measurement |
WO2005071222A1 (en) | 2004-01-20 | 2005-08-04 | Saudi Arabian Oil Company | Real time earth model for collaborative geosteering |
RU2321064C2 (ru) | 2004-06-03 | 2008-03-27 | Мурманский государственный технический университет | Способ построения обратимой трехмерной гидродинамической модели земли, калибруемой в реальном времени в процессе бурения |
US7630872B2 (en) | 2004-09-16 | 2009-12-08 | Schlumberger Technology Corporation | Methods for visualizing distances between wellbore and formation boundaries |
US7359845B2 (en) * | 2004-11-12 | 2008-04-15 | Baker Hughes Incorporated | Method and system for predictive stratigraphy images |
US7317991B2 (en) * | 2005-01-18 | 2008-01-08 | Baker Hughes Incorporated | Multicomponent induction measurements in cross-bedded and weak anisotropy approximation |
US7313479B2 (en) | 2005-01-31 | 2007-12-25 | Baker Hughes Incorporated | Method for real-time well-site interpretation of array resistivity log data in vertical and deviated wells |
US8812334B2 (en) * | 2006-02-27 | 2014-08-19 | Schlumberger Technology Corporation | Well planning system and method |
US7657375B2 (en) | 2006-04-26 | 2010-02-02 | Baker Hughes Incorporated | Method and apparatus for correcting underestimation of formation anisotropy ratio |
US7751280B2 (en) | 2007-03-27 | 2010-07-06 | Schlumberger Technology Corporation | Determining wellbore position within subsurface earth structures and updating models of such structures using azimuthal formation measurements |
US7924652B2 (en) | 2007-06-01 | 2011-04-12 | Baker Hughes Incorporated | Method for determining seismic anisotropy |
WO2009055152A1 (en) | 2007-10-22 | 2009-04-30 | Schlumberger Canada Limited | Formation modeling while drilling for enhanced high angle or horizontal well placement |
WO2009079355A1 (en) * | 2007-12-18 | 2009-06-25 | Schlumberger Canada Limited | System and method for improving surface electromagnetic surveys |
US8286729B2 (en) | 2008-02-15 | 2012-10-16 | Baker Hughes Incorporated | Real time misalignment correction of inclination and azimuth measurements |
US8199166B2 (en) * | 2008-03-14 | 2012-06-12 | Schlumberger Technology Corporation | Visualization techniques for oilfield operations |
US8427162B2 (en) | 2008-08-25 | 2013-04-23 | Baker Hughes Incorporated | Apparatus and method for detection of position of a component in an earth formation |
CA2744419C (en) * | 2008-11-21 | 2013-08-13 | Exxonmobil Upstream Research Company | Methods and systems for modeling, designing, and conducting drilling operations that consider vibrations |
US8783382B2 (en) * | 2009-01-15 | 2014-07-22 | Schlumberger Technology Corporation | Directional drilling control devices and methods |
-
2011
- 2011-06-21 US US13/509,765 patent/US9043154B2/en active Active
- 2011-06-21 BR BR112013028588-5A patent/BR112013028588B1/pt active IP Right Grant
- 2011-06-21 WO PCT/EP2011/060357 patent/WO2012175115A1/en active Application Filing
- 2011-06-21 GB GB1317827.2A patent/GB2505095B/en active Active
-
2013
- 2013-09-23 NO NO20131275A patent/NO345271B1/no unknown
Also Published As
Publication number | Publication date |
---|---|
WO2012175115A1 (en) | 2012-12-27 |
US20120325556A1 (en) | 2012-12-27 |
US9043154B2 (en) | 2015-05-26 |
GB201317827D0 (en) | 2013-11-20 |
GB2505095B (en) | 2018-07-04 |
GB2505095A (en) | 2014-02-19 |
NO20131275A1 (no) | 2013-10-02 |
NO345271B1 (no) | 2020-11-23 |
BR112013028588B1 (pt) | 2020-06-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR112013028588A2 (pt) | método baseado em computador para o cálculo de modelo geológico tridimensional em tempo real e navegação de reservatório | |
BR112015009680A2 (pt) | método e sistema para geo-orientar um conjunto de fundo de poço, e, produto de programa de computador | |
WO2012109063A3 (en) | Seismic-scale reservoir simulation of giant subsurface reservoirs using gpu-accelerated linear equation systems | |
Hughes et al. | A functional approach to the study of implicit cognition: The Implicit Relational Assessment Procedure (IRAP) and the Relational Elaboration and Coherence (REC) model. | |
WO2012170201A3 (en) | System and method for seismic data inversion by non-linear model update | |
WO2012122503A3 (en) | Method for 3-d gravity forward modeling and inversion in the wavenumber domain | |
FI20125644L (fi) | Tietokoneavusteinen mallintaminen | |
EA201270424A1 (ru) | Способ построения трехмерного представления горных пород с использованием петрофизических данных | |
GB2550820A (en) | Enhanced oil recovery(EOR)chemical coreflood simulation study workflow | |
BR112014009813A2 (pt) | processo em tempo real para determinação de porosidade e saturação com água de uma formação subterrânea usando dados de transporte de lama e gás | |
GB2497055A (en) | Earth model estimation through an acoustic full waveform inversion of seismic data | |
EA201291123A1 (ru) | Система и способ осуществления комплексного моделирования медицинской процедуры | |
EA201300683A1 (ru) | Способ усовершенствования модели коллектора и повышения отдачи трещиноватых пластов | |
WO2011097055A3 (en) | Multilevel percolation aggregation solver for petroleum reservoir simulations | |
IN2014DE01235A (pt) | ||
BR112013010536A2 (pt) | sistema e método para inversão de dados sísmicos | |
BR112016006470A2 (pt) | método para predizer um risco durante operações de perfuração de um poço, e, dispositivo portador de programa não transitório | |
BR112016006621A2 (pt) | método para gerenciar um risco predeterminado durante as operações de perfuração de um poço e dispositivo transportador de programa não transitório tangível | |
MX2015012585A (es) | Dilatación regulada por flujo para determinar la edad vascular. | |
EA201491485A1 (ru) | Моделирование и анализ распространения трещины гидравлического разрыва к поверхности от башмака обсадной колонны | |
GB2569900A (en) | Geostatistical analysis of microseismic data in fracture modelling | |
GB2536123A (en) | Integrated oilfield asset modeling using multiple resolutions of reservoir detail | |
EA201170658A1 (ru) | Системы и способы вычисления и проверки достоверности модели вариограммы | |
IN2014DN09872A (pt) | ||
GB201207722D0 (en) | Method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B06F | Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette] | ||
B06U | Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette] | ||
B09A | Decision: intention to grant [chapter 9.1 patent gazette] | ||
B16A | Patent or certificate of addition of invention granted [chapter 16.1 patent gazette] |
Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 21/06/2011, OBSERVADAS AS CONDICOES LEGAIS. |