BR112013014093A2 - sistemas e métodos para simulação de reservatório de subsuperfície - Google Patents
sistemas e métodos para simulação de reservatório de subsuperfícieInfo
- Publication number
- BR112013014093A2 BR112013014093A2 BR112013014093A BR112013014093A BR112013014093A2 BR 112013014093 A2 BR112013014093 A2 BR 112013014093A2 BR 112013014093 A BR112013014093 A BR 112013014093A BR 112013014093 A BR112013014093 A BR 112013014093A BR 112013014093 A2 BR112013014093 A2 BR 112013014093A2
- Authority
- BR
- Brazil
- Prior art keywords
- systems
- methods
- reservoir simulation
- subsurface reservoir
- subsurface
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
- G06F30/28—Design optimisation, verification or simulation using fluid dynamics, e.g. using Navier-Stokes equations or computational fluid dynamics [CFD]
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V11/00—Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
- G06F30/23—Design optimisation, verification or simulation using finite element methods [FEM] or finite difference methods [FDM]
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201061428436P | 2010-12-30 | 2010-12-30 | |
PCT/US2011/053977 WO2012091775A1 (en) | 2010-12-30 | 2011-09-29 | Systems and methods for subsurface reservoir simulation |
Publications (1)
Publication Number | Publication Date |
---|---|
BR112013014093A2 true BR112013014093A2 (pt) | 2016-09-20 |
Family
ID=46383461
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR112013014093A BR112013014093A2 (pt) | 2010-12-30 | 2011-09-29 | sistemas e métodos para simulação de reservatório de subsuperfície |
Country Status (6)
Country | Link |
---|---|
US (1) | US9922142B2 (pt) |
EP (1) | EP2659424A4 (pt) |
CN (1) | CN103282915A (pt) |
BR (1) | BR112013014093A2 (pt) |
CA (1) | CA2820999A1 (pt) |
WO (1) | WO2012091775A1 (pt) |
Families Citing this family (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012015517A1 (en) | 2010-07-29 | 2012-02-02 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
AU2011283190A1 (en) | 2010-07-29 | 2013-02-07 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
WO2012071090A1 (en) | 2010-11-23 | 2012-05-31 | Exxonmobil Upstream Research Company | Variable discretization method for flow simulation on complex geological models |
CA2860860A1 (en) * | 2012-01-18 | 2013-07-25 | Schlumberger Canada Limited | Method for characterization of hydrocarbon reservoirs |
US9753180B2 (en) | 2012-03-28 | 2017-09-05 | Exxonmobil Upstream Research Company | Method for multiphase flow upscaling |
US9256681B2 (en) * | 2012-11-28 | 2016-02-09 | Raytheon Company | Method and system for identifying clusters within a collection of data entities |
US9322263B2 (en) | 2013-01-29 | 2016-04-26 | Landmark Graphics Corporation | Systems and methods for dynamic visualization of fluid velocity in subsurface reservoirs |
GB2512372B (en) * | 2013-03-28 | 2020-07-29 | Total Sa | Method of modelling a subsurface volume |
DE112014003764T5 (de) * | 2013-08-16 | 2016-05-25 | Landmark Graphics Corporation | Umwandlung von Reserveschätzungen in einem Reservoirmodell in ein Standardformat zum dynamischenVergleich |
US9797225B2 (en) * | 2013-11-27 | 2017-10-24 | Saudi Arabian Oil Company | Data compression of hydrocarbon reservoir simulation grids |
AU2015229274B2 (en) * | 2014-03-12 | 2018-01-04 | Landmark Graphics Corporation | Efficient and robust compositional reservoir simulation using a fast phase envelope |
US10808501B2 (en) * | 2014-03-17 | 2020-10-20 | Saudi Arabian Oil Company | Modeling intersecting faults and complex wellbores in reservoir simulation |
CN104029280B (zh) * | 2014-03-27 | 2016-03-16 | 南京倍立达新材料系统工程股份有限公司 | 一种三维数字化地面模具生产方法 |
US10108762B2 (en) * | 2014-10-03 | 2018-10-23 | International Business Machines Corporation | Tunable miniaturized physical subsurface model for simulation and inversion |
US10288766B2 (en) * | 2014-10-09 | 2019-05-14 | Chevron U.S.A. Inc. | Conditioning of object or event based reservior models using local multiple-point statistics simulations |
WO2016153482A1 (en) * | 2015-03-24 | 2016-09-29 | Landmark Graphics Corporation | Cluster analysis for selecting reservoir models from multiple geological realizations |
WO2016187238A1 (en) * | 2015-05-20 | 2016-11-24 | Schlumberger Technology Corporation | Auto-validating earth interpretation and modeling system |
US10191182B2 (en) * | 2015-12-01 | 2019-01-29 | Saudi Arabian Oil Company | Accuracy of water break-through time prediction |
EP3452698B1 (en) * | 2016-05-04 | 2023-06-28 | Saudi Arabian Oil Company | Two dimensional reservoir pressure estimation with integrated static bottom hole pressure survey data and simulation modeling |
US10303711B2 (en) | 2016-09-30 | 2019-05-28 | Schlumberger Technology Corporation | Unstructured volumetric grid simplification using sub-volume clustering |
WO2018166594A1 (en) * | 2017-03-15 | 2018-09-20 | Telefonaktiebolaget Lm Ericsson (Publ) | Combined layer 3 and downlink control information (dci) signaling of virtual cell id |
CN109741429B (zh) * | 2018-12-21 | 2020-06-19 | 浙江远算云计算有限公司 | 一种用于非结构化流体仿真模型的vr动画可视化方法 |
US11454105B2 (en) * | 2019-04-25 | 2022-09-27 | Saudi Arabian Oil Company | Reservoir simulation modeling with well trajectory at true positions in grid simulation models |
US11501038B2 (en) | 2019-10-31 | 2022-11-15 | Saudi Arabian Oil Company | Dynamic calibration of reservoir simulation models using pattern recognition |
US11499397B2 (en) | 2019-10-31 | 2022-11-15 | Saudi Arabian Oil Company | Dynamic calibration of reservoir simulation models using flux conditioning |
CN110988999A (zh) * | 2019-12-02 | 2020-04-10 | 山东大学 | 基于跨孔电阻率法ct反演成像分析桩基的探测方法及系统 |
CN112507581B (zh) * | 2020-11-18 | 2023-04-07 | 华能澜沧江水电股份有限公司 | 可避免畸形计算单元的岩石细观数值模型生成方法及系统 |
CN112784338A (zh) * | 2021-01-19 | 2021-05-11 | 上海跃影科技有限公司 | 一种模型尺寸构建方法及系统 |
US20220308261A1 (en) * | 2021-03-26 | 2022-09-29 | Halliburton Energy Services, Inc. | Visualizing fluid flow through porous media in virtual reality |
Family Cites Families (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5740342A (en) | 1995-04-05 | 1998-04-14 | Western Atlas International, Inc. | Method for generating a three-dimensional, locally-unstructured hybrid grid for sloping faults |
US6018497A (en) | 1997-02-27 | 2000-01-25 | Geoquest | Method and apparatus for generating more accurate earth formation grid cell property information for use by a simulator to display more accurate simulation results of the formation near a wellbore |
US6106561A (en) | 1997-06-23 | 2000-08-22 | Schlumberger Technology Corporation | Simulation gridding method and apparatus including a structured areal gridder adapted for use by a reservoir simulator |
GB2352036B (en) | 1998-05-04 | 2002-11-27 | Schlumberger Evaluation & Prod | Near wellbore modelling method and apparatus |
US6662146B1 (en) | 1998-11-25 | 2003-12-09 | Landmark Graphics Corporation | Methods for performing reservoir simulation |
US6928399B1 (en) | 1999-12-03 | 2005-08-09 | Exxonmobil Upstream Research Company | Method and program for simulating a physical system using object-oriented programming |
FR2802324B1 (fr) | 1999-12-10 | 2004-07-23 | Inst Francais Du Petrole | Methode pour generer un maillage sur une formation heterogene traversee par une ou plusieurs discontinuites geometriques dans le but de realiser des simulations |
MXPA02002150A (es) | 2000-06-29 | 2005-06-13 | Object Reservoir Inc | Metodo y sistema para solucionar modelos de elementos finitos utilizando fisica de fase multiple. |
US20040230404A1 (en) * | 2002-08-19 | 2004-11-18 | Messmer Richard Paul | System and method for optimizing simulation of a discrete event process using business system data |
US7096122B2 (en) | 2003-07-22 | 2006-08-22 | Dianli Han | Method for producing full field radial grid for hydrocarbon reservoir simulation |
CA2543801C (en) * | 2004-01-30 | 2014-03-04 | Exxonmobil Upstream Research Company | Reservoir model building methods |
FR2870621B1 (fr) | 2004-05-21 | 2006-10-27 | Inst Francais Du Petrole | Methode pour generer un maillage hybride conforme en trois dimensions d'une formation heterogene traversee par une ou plusieurs discontinuites geometriques dans le but de realiser des simulations |
EP1751585B1 (en) | 2004-06-02 | 2009-11-18 | Paradigm France | Method for building a three dimensional cellular partition of a geological domain |
US7596480B2 (en) | 2005-04-14 | 2009-09-29 | Saudi Arabian Oil Company | Solution method and apparatus for large-scale simulation of layered formations |
FR2886743B1 (fr) * | 2005-06-02 | 2007-07-27 | Inst Francais Du Petrole | Methode pour simuler les ecoulements de fluides au sein d'un reservoir a l'aide d'une discretisation de type chimere |
BRPI0618061A2 (pt) | 2005-11-22 | 2011-08-16 | Exxonmobil Upstream Res Co | método de simulação e sistema de modelagem de fluxo de fluido |
EP2038810A4 (en) | 2006-07-07 | 2018-05-09 | Exxonmobil Upstream Research Company | Upscaling of reservoir models by reusing flow solutions from geologic models |
WO2008150325A1 (en) | 2007-06-01 | 2008-12-11 | Exxonmobil Upstream Research Company | Generation of constrained voronoi grid in a plane |
-
2011
- 2011-09-29 EP EP11852638.3A patent/EP2659424A4/en not_active Withdrawn
- 2011-09-29 CA CA2820999A patent/CA2820999A1/en not_active Abandoned
- 2011-09-29 CN CN2011800637264A patent/CN103282915A/zh active Pending
- 2011-09-29 US US13/990,757 patent/US9922142B2/en active Active
- 2011-09-29 BR BR112013014093A patent/BR112013014093A2/pt not_active Application Discontinuation
- 2011-09-29 WO PCT/US2011/053977 patent/WO2012091775A1/en active Application Filing
Also Published As
Publication number | Publication date |
---|---|
WO2012091775A1 (en) | 2012-07-05 |
EP2659424A1 (en) | 2013-11-06 |
CN103282915A (zh) | 2013-09-04 |
EP2659424A4 (en) | 2018-05-23 |
US20130275106A1 (en) | 2013-10-17 |
CA2820999A1 (en) | 2012-07-05 |
US9922142B2 (en) | 2018-03-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR112013014093A2 (pt) | sistemas e métodos para simulação de reservatório de subsuperfície | |
BR112012020897A2 (pt) | dispositivos e métodos para modelar estruturas geológicas tridimensionais | |
BR112014007073A2 (pt) | sistemas e métodos para multi-análise | |
BR112013013888A2 (pt) | sistemas e métodos para monitoramento de poço | |
BR112013014329A2 (pt) | métodos para exploração sísmica | |
BR112014000451A2 (pt) | sistemas e métodos para determinar coberturas opcionais de seguro | |
BR112013018333A2 (pt) | sistemas e métodos de âncora ajustável | |
BR112014007789A2 (pt) | sistemas e métodos para análise biológica | |
BR112014002634A2 (pt) | sistemas e métodos de gerenciamento de manutenção | |
BR112013019637A2 (pt) | sistemas, aparelho e métodos para implantação de implantes | |
BR112012025697A2 (pt) | "dispositivo e método para conjunto estrutural" | |
BR112012033201A2 (pt) | métodos e sistemas para terminação de solicitações de comunicação | |
BR112013018656A2 (pt) | sistemas e métodos para maximização de uso de amostra | |
BR112013013920A2 (pt) | sistema e método para medição de parâmetros ambientais distribuídos | |
BR112012031446A2 (pt) | componentes e métodos para implantes | |
BR112012017441A2 (pt) | compostos e métodos | |
BR112013012055A2 (pt) | dispositivo de fenestação, sistemas e métodos | |
BR112014031384A2 (pt) | métodos e sistemas | |
BR112013010676A2 (pt) | método para atualizar modelos geológicos e dispositivo portador de programa não transitório | |
BR112013010114A2 (pt) | método para formação subterrânea | |
BR112013029813A2 (pt) | métodos e dispositivos para distribuição de conteúdo | |
CO6821883A2 (es) | Nuevos moduladores y métodos para su uso | |
CO7000752A2 (es) | Sistemas y métodos para rotores hidráulicos mejorados | |
BR112014006720A2 (pt) | método implementado por computador e sistema para simulação de reservatórios implementado por computador | |
BR112012031130A2 (pt) | métodos e dispositivos para filtração |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B06F | Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette] | ||
B06U | Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette] | ||
B06A | Patent application procedure suspended [chapter 6.1 patent gazette] | ||
B11B | Dismissal acc. art. 36, par 1 of ipl - no reply within 90 days to fullfil the necessary requirements | ||
B350 | Update of information on the portal [chapter 15.35 patent gazette] |